M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA

Similar documents
Hind Energy & Coal Beneficiation (India) Ltd.

Hind Energy & Coal Beneficiation (India) Ltd.

EXECUTIVE SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Mars Power & Steel Ltd.

Simran Industries Pvt. Ltd.

M/s. MID India Power & Steel Pvt. Ltd. has proposed to establish Steel Plant at Dongartola

North East Roofing Pvt. Ltd. Expansion of Asbestos Cement Sheets & Accessories Manufacturing Unit (50,000 TPA to 70,000 TPA)

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Chandu Cattle Feeds

Shri Girija Alloy & Power (I) Pvt. Ltd.

Roquette Riddhi Siddhi Private Limited

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT. Village : Taraimal, Tehsil : Gharghoda District : Raigarh

EXECUTIVE SUMMARY 1.0 PROJECT DESCRIPTION 1.1 INTRODUCTION

SUMMARY. for New Standalone Cement Grinding Unit. proposed at

INSPIRE INDUSTRIES PVT. LTD.

M/s. LAKSHMANAN CEMENTS PVT LTD, Survey Number 69-3, 69-4, Pachanapalli Village, Chittoor Mandal and District, Andhra Pradesh

PART A. M/s Shree Cement Ltd, (Grinding Unit) village - Udepur, Tehsil- Suratgarh, District -Shri Ganganagar, Rajasthan

at Sarora Village, Tilda Tehsil, Raipur District, Chhattisgarh in 64 acres of land. Now

M/s. Jindal Electricity Generation (P) Limited was promoted by Sri Omprakash Agrawal & Associates having other business in the area.

J-11011/45/2009- IA II (I)

The study area covers 10 km radius around the existing coal washery premises. The environmental setting of the expansion plant site is as follows:

TIRUMALA BALAJI ALLOYS PVT. LTD.

DESCRIPTIVE REPORT ON STATUS OF COMPLIANCE TO THE CONDITIONS OF ENVIRONMENTAL CLEARANCE AND ENVIRONMENTAL MANAGEMENT

Executive Summary. Vizianagaram District, Andhra Pradesh. Season : December 2016 to February 2017 File no.: J-11011/1129/2007-IA-II(I)

F. No. J-11011/480/2007-IA II (I) Government of India Ministry of Environment and Forests (I.A Division)

Revised FORM - I & PRE-FEASIBILITY REPORT

ANDHRA PRADESH POLLUTION CONTROL BOARD, REGIONAL OFFICE, TIRUPATI

Calcom Cement India Limited

JANUARY Prepared by:

CHAPTER-10 SUMMARY AND CONCLUSION

Clearance Letter no. : MoEF Vide Letter no. J-11011/79/2003-IA-II (I) dated April 21, 2004

SUMMARY ON ENVIRONMENTAL IMPACT ASSESSMENT REPORT

PART A. 3. Production Capacity 3.6 Million TPA Cement 4. Year of Establishment th September 2015 PART B WATER AND RAW MATERIAL CONSUMPTION

HINDUSTAN ZINC LIMITED Maton Rock Phosphate Mine (Maton Mine), Tehsil: Girwa District: Udaipur (Rajasthan) PROPOSED TERMS OF REFERENCE FOR EIA STUDIES

Telefax: 011: Dated:10 th May, 2013

Environmental Clearance Compliance Half Yearly Report

EIA SUMMARY FOR PROPOSED 15 MW AND 33 MW CAPACITY CAPTIVE POWER PLANT FOR M/S AMBUJA CEMENT EASTERN LTD. RAWAN, BHATAPARA (C.G.)

Janki Corp. Ltd., Six Monthly Compliance Report

Proposed Terms of Reference for EIA studies

STATE POLLUTION CONTROL BOARD, ORISSA Paribesh Bhawan, A/118, Nilakanthanagar,Unit-VIII, Bhubaneswar , INDIA

PRE-FEASIBILITY REPORT NEW KATHARA COKING COAL WASHERY (3.0 MTY)

V: PROJECT SCOPING & METHODOLOGY

COMPLIANCE STATUS REPORT

V.S LIGNITE POWER Pvt. Ltd AT VILLAGE-GURHA, KOLAYAT, BIKANER, RAJASTHAN

- 1 S. NO. PARTICULARS DETAILS

MONITORING THE IMPLEMENTATION OF ENVIRONMENTAL SAFEGUARDS Ministry of Environment & Forests Regional Office (W), Bhopal Monitoring Report Part-I

Rajasthan State Pollution Control Board

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

EXECUTIVE SUMMARY 1. INTRODUCTION

SINGHAL ENTERPRISES PRIVATE LIMITED

Name of Project: J.K. Cement Works (Unit: J.K. Cement Ltd.), Muddapur (Karnataka)

STATE EXPERT APPRAISAL COMMITTEE GOVERNMENT OF PUNJAB (Office of the Secretary) Vatavaran Bhawan, Nabha Road, Patiala

District: Chhindwara (MP)


D:\My Documents\Legislative\Legislation BS\Consents\Six monthly compliance\cement\june 2017\COMPLIANCE STATUS.docx.docx

PRE FEASIBILITY REPORT. Company of production capacity: 14,40,000 CFT/ Year located at Khasra No near Village:

M/s Deccan Cements Limited, Bhavanipuram,Janaphad, Palakeedu, Suryapet. Telangana MoEF No: J-11011/572/2007-IA II(I) Dated

THE RAMCO CEMENTS LIMITED, KSR NAGAR COMPLIANCE REPORT - ENVIRONMENTAL CLEARANCE CEMENT PLANT 2.5 MILLION TPA CLINKER, 2

MIEL/NP/EMD/ 303/2015 Date:

Proposed Terms of Reference for EIA studies

Environment protection measures / technology

Accord Energy Corporation India Pvt. Ltd.

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: APRIL, 2013 TO SEPTEMBER, 2013.

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB MINISTRY OF ENVIRONMENT AND FORESTS, GOVERNMENT OF INDIA

Mangalam Cement Ltd. (Unit-II) Stack No.

Environmental Clearance Compliance Half Yearly Report

ENVIRONMENTAL MONITORING REPORT

Application of Low and Non Waste Technology in the production process;

Environmental Clearance Compliance Half Yearly Report

Proposed Draft Terms of Reference for Preparation of EIA & EMP for Louis Pharmaceuticals Pvt Ltd STANDARD TERMS OF REFERENCE

State Level Environment Impact Assessment Authority Madhya Pradesh Government of India Ministry of Environment & Forests

Cement Manufacturing Company Ltd. Page 1

Executive Summary for R-EIA Report for 60

Environmental Impact Assessment

CHAPTER 7 ADDITIONAL STUDIES

M/S. HETERO INFRASTRUCTURE SEZ LIMITED

N.H. 6 is 50 km away from the proposed plant boundary; in N direction;

Dheeru Powergen Private Limited.

Capacity as per EC Dt commissioned 1 Sponge Iron 2.0 MTPA 1.0 MTPA 0.4 MTPA 0.6 MTPA 2 Captive Power Plant Co-generation Power Plant (WHRB)

Environmental impact assessment of a 1600 MW thermal power plant project in Karimnagar district of Telangana

STATE EXPERT APPRAISAL COMMITTEE, PUNJAB Ministry of Environment and Forests, Government of India

A. SPECIFIC CONDITION COMPLIANCE

Dated: 22 nd June, To The Director, Mjs Vulcan Waste Management Pvt. Ltd., 1046, Sector-31, Gurgaon, Haryana

EXECUTIVE SUMMARY. Dec 2017 PREPARED BY

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

ENVIRONMENTAL MONITORING REPORT

Environmental Clearance; Letter No J / 152 / 2006-IA-II (I) Dt and corrigendum dated

PROPOSED TERMS OF REFERENCE (TOR) FOR

Environmental Clearance Compliance Half Yearly Report

PROPOSED TERMS OF REFERENCE

Environmental Clearance Compliance Half Yearly Report

Compliance of Conditions laid down by MoEF for Expansion of Cement Plant (2.0 MTPA to 2.6 MTPA Clinker) at Village Suli April 2017 to September 2017

SHREE CEMENT LTD..~..~..~ ii. Regd. Office:. 0. ~ ~. ~ BANGUR NAGAR, POS': BOX NO.33, BEAWAR , RAJASTHAN, INDIA ~ 66~~'" 'Its ~s 71 66

ENVIRONMENTAL IMPACT ASSESSMENT FOR PROPOSED CONSTRUCTION OF SEWAGE PUMPING STATION & SEWAGE TREATMENT PLANT

SUMMARY ENVIRONMENTAL IMPACT ASSESSMENT REPORT. 380 MW Gas Based Combined Cycle Power Plant at

Mangalam Cement Ltd.(Unit I)

PROJECT NAME: UTKAL ALUMINA INTERNATIONAL LTD. PERIOD OF COMPLIANCE: OCTOBER 2014 TO MARCH 2015.

Transcription:

1.0 INTRODUCTION M/s Hind Energy & Coal Beneficiation Pvt. Ltd. is presently operating a 2 x 1.2 MTPA dry type of coal washery at Village: Hindadih, Tehsil: Masturi, District: Bilaspur (C.G.) for which the Honorable Ministry of Environment and Forest, GoI, New Delhi has accorded Environment Clearance vide letter No.: J-11015/190/2007-IA. II (M) dated 24/06/2008. Now as a part of the proposed expansion it is proposed to expand the unit by installing 1 x 1.2 MTPA Wet type of coal washery within existing plant premises with a total installed capacity to 3.6 MTPA. Total land in possession of the management is 27.42 Acres. The following will plant configurations and production details. Details Washing ROM Coal of Capacity (Million Tons/ Year) Existing Proposed Total after expansion : 2.4 1.2 3.6 (Dry Process) (Wet Process) Pioneer Enviro Laboratories & Consultants Private Limited, Hyderabad, which is accreditated by NABET, Quality Council of India for conducting EIA studies for coal washery projects, have prepared Draft Environmental Impact Assessment (DEIA) report for the proposed expansion of Coal washery plant by incorporating the TOR approved by Ministry of Environment & Forests, New Delhi. The report contains detailed description of the following Characterization of status of environment with in an area of 10 km radius from the plant for major environmental components including air, water, noise, soil, flora, fauna and socio-economic environment. Assessment of air emissions, liquid waste and solid waste from the proposed project along with the noise level assessment. PIONEER ENVIRO 1

Environmental Management Plan comprising of emission control measures proposed to be adopted in the proposed project, solid waste management, Greenbelt development. Post Project Environmental Monitoring. 2.0 PROJECT LOCATION DETAILS 1. The proposed project area does not fall under the critically polluted areas, which are listed in MoEF office memorandum dated 13th January 2010. 2. Nearest village is Bhadrapara at a distance of 1.0 Km from the plant. 3. No National Parks / Wild life Sanctuaries / Bird Sanctuaries / Tiger reserve / Elephant corridors / Migratory routes for birds are situated within 10 Km. radius of the plant. 4. No Historical places and places of Tourist importance within 10 Km. radius of the plant. 5. Bitkuli Reserve Forest (2.0 Kms.) & Dalha Protected Forest (6.0 Kms.) are situated within 10 Km. radius of the plant. 6. No forest land is involved in the plant site. 7. Lilagarh river (non perennial) is flowing at distance of 3.3 Kms from the plant. 8. No River / Stream passes through the site. 9. Kurug left bank canal is at a distance of 5.0 Kms. from the plant. 10. Only one industry is present within 10 Km radius of the plant site i.e. NTPC Seepat, coal based power plant is situated at distance of 3.1 Kms. from the plant site. PIONEER ENVIRO 2

3.0 DETAILS OF PROJECT 3.1 RAW MATERIALS The following will be the raw material requirement for proposed expansion project Raw Material Quantity (MTPA) Source Raw Coal 1.2 SECL, Bilaspur (through linkage / E-auction / open market) 3.2 MANUFACTURING PROCESS - COAL WASHERY This section comprises of coal crushing and screening and washing of coal to produce clean coal with 34% ash, appropriately sized and a middling fraction by treating the raised coals from the mine. Wet type of coal washery is proposed as it will have lesser environmental problems compared to the dry type of washery and to suit to client s specific requirement of lower ash content. Closed loop water system is proposed in the process. Zero effluent discharge is being maintained in the existing plant and similar pattern will be maintained in the plant premises in the proposed expansion. The process consists of crushing of the ROM coal in a single toothed roll crusher. The crushed coal is then washed in Zig to produce clean coal and middling with the help of water stream and air pressure. 3.3 WATER REQUIREMENT The proposed expansion project requires 585 cum/day of water. The total water requirement after the proposed expansion is 625 cum/day. This includes Make-up water for Coal Washery and for domestic water. The water requirement for the proposed expansion project will be sourced from ground water source. Water drawl permission from Central Ground Water Board is under process. The following is the break-up of the water requirement for expansion project. PIONEER ENVIRO 3

WATER REQUIREMENT FOR EXPANSION S.No SOURCE QUANTITY (cum/day) 1. Make-up water for Coal washery 575 2. Domestic 10 Total 585 3.4 WASTE WATER GENERATION There will not be any process waste water from the coal washery units as closed circuit water system will be adopted. The total effluent quantity expected from the proposed expansion project will be 8 cum/day. The only waste water generation will be sanitary waste water and it will be treated in septic tank followed by soak pit. WASTE WATER GENERATION FROM EXPANSION SOURCE QUANTITY (cum/day) Sanitary waste water 8 Total 8 3.5 WASTE WATER CHARACTERISTICS The characteristics of sanitary waste water (untreated) will be as following. PARAMETER CONCENTRATION ph 7.0 8.5 BOD 200 250 mg/l COD 300 400 mg/l TDS 800 900 mg/l 4.0 DESCRIPTION OF ENVIRONMENT Base line data has been collected on ambient air quality, water quality, noise levels, flora and fauna and socio economic details of people within 10 km radius of the proposed site. PIONEER ENVIRO 4

4.1 Ambient air quality Ambient air quality was monitored for Particulate Matter (PM 2.5 ), Particulate Matter (PM 10 ), SO 2 and NOx at 8 stations including project site for one season as per MoEF guidelines. The following are the concentrations of various parameters at the monitoring stations. PARAMETER CONCENTRATION PM 2.5 : 18.4 to 28.5 µg/m 3 PM 10 : 30.8 to 47.2 µg/m 3 SO 2 : 6.9 to 13.5 µg/m 3 NO X : 7.9 to 17.2 µg/m 3 4.2 Water quality Ground water samples were collected at 8 stations and analyzed for various Physico- Chemical parameters. The water samples show that they are in accordance with BIS: 10500 specifications and are suitable for potable purpose. 4.3 Noise levels Noise levels were measured at 8 locations during day time & Night time. The noise levels at the monitoring stations are ranging 42.10 dba to 50.40 dba. 5.0 Anticipated Environmental Impacts & Mitigation Measures 5.1 Prediction of impacts on air quality The emissions from the proposed expansion project will be PM 10, SO 2, NO X. The predictions of Ground level concentrations have been carried out using ISCST3. Meteorological data such as wind direction, wind speed, max. and min. temperatures collected at the site have been used as input data to run the model. The emissions from the stacks in the proposed expansion project and the fugitive emissions have been considered in the Modeling. PIONEER ENVIRO 5

It is observed from the computation results that the maximum predicted incremental rise in 24 hourly ground level concentrations of PM 10, SO 2 and NO X during operation of project are 0.02 µg/m 3, 0.5 µg/m 3 and 0.4 µg/m 3 respectively at a distance 675 m in the down wind direction. The net resultant GLCs due to the proposed project and other industries in the area are within the National Ambient Air Quality Standards (NAAQS). Hence there will not be any adverse impact on air environment due to the proposed expansion project 5.2 Prediction of impacts on noise quality The major sources of noise generation in the proposed project will be DG set & Crusher. The ambient noise levels will be with in the standards prescribed by MoEF vide notification dated 14-02-2000 under the noise pollution (Regulation & Control), rules 2000 i.e. the noise levels will be less than 75 dba during day time and less than 70 dba during night time. 9.1 acres of extensive greenbelt (inclusive of existing) will be developed to further attenuate the noise levels. Hence there will not be any adverse impact due to noise on population in surrounding areas due to the proposed expansion project. 5.3 Prediction of impacts on Water Environment There will be no effluent generation in the coal washery unit, as closed circuit cooling system will be adopted. Sanitary waste water will be treated in septic tank followed by soak pit. The water required for the proposed expansion project will be met from Ground water source. Water drawl permission from Central Ground Water Board is under process. Hence there will not be any adverse impact on environment due to the proposed expansion project. PIONEER ENVIRO 6

5.4 Prediction of Impacts on Land Environment All the required air pollution control systems will be provided to comply with CPCB/CECB norms. All solid wastes will be disposed / utilized as per CPCB/CECB norms. 9.1 Acres of greenbelt (inclusive of existing) will be developed as per guidelines. Hence there will not be any adverse impact on land environment due to the proposed expansion project. 5.5 Socio - Economic Environment There will be lot of opportunities in employment to local people during construction as well as in operation phase. There will be further upliftment in Socio Economic status of the people in the area. Hence there will be further development of the area due to the proposed expansion project. 6.0 ENVIRONMENTAL MONITORING PROGRAMME Post project monitoring will be conducted as per the guidelines of CECB and MoEF are tabulated below. MONITORING SCHEDULE FOR ENVIRONMENTAL PARAMETERS S.No. Particulars Frequency of Monitoring Duration of sampling Parameters required to be monitored 1.Water & Waste water quality A. Water quality Once in a month Grab sampling As per IS: 10500 2. Air Quality A. Stack Monitoring Once in a month PM SO 2 & NO x B. Ambient Air quality Twice a week 24 hours continuously PM 2.5, PM 10, SO 2 & NO x C. Fugitive emission monitoring Once in a month 8 hours Particulate matter 3. Meteorological Data Meteorological data to be monitored at the plant. Daily Continuous monitoring Temperature, Relative Humidity, rainfall, wind direction & wind speed. PIONEER ENVIRO 7

7.0 PROJECT BENEFITS The local areas will be benefited by way of generation of employment opportunities, increased demand for local products and services. There will be an overall improvement in the income level of the local people. The expansion project creates direct employment of 75 and during the construction to around 150 persons. Priority will be given to locals for Semi-Skilled and Unskilled workers. With the development of this plant there will be lot of scope for more industrial investments which in turn will benefit the nation. 8.0 ENVIRONMENT MANAGEMENT PLAN 8.1 Air Environment The following are air emission control systems proposed in the expansion project. S.No. Stack attached Control Equipment Particulate emission 1. Coal Crusher Dust Extraction systems with Bag filters < 50 mg/nm 3 The main sources of dust pollution are raw material unloading areas, crushing operations of raw materials and their transfer points. Fugitive dust emissions are likely in the unloading areas, material transfer point, screening area etc. Fugitive emission in the material unloading area will be avoided by providing dust suppression system. Fugitive emission from material unloading operations, material transfer points will be controlled fully with total enclosure and all the transfer emission will be connected with extractor inlet point and will pass through a high efficiency Bag Filter before discharging into the atmosphere. Fugitive emissions will be regularly monitored in the plant area and CPCB stipulations regarding fugitive emission control and monitoring will be strictly followed. PIONEER ENVIRO 8

8.2 WATER ENVIRONMENT There will not be any process waste water from the coal washery unit as closed circuit water system will be adopted. The only waste water generation will be sanitary waste water of 8 cum/day and will be treated in septic tank followed by soak pit. Zero effluent discharge is being maintained in the existing plant and similar pattern will be continued in the expansion also. 8.3 NOISE ENVIRONMENT The major sources of noise in the proposed project will be DG set & crusher. All the machinery will be manufactured in accordance with MoEF norms on Noise levels. The employees working near the noise generating sources will be provided with earplugs. The extensive greenbelt development proposed within the plant premises in addition to the existing greenbelt will help in attenuating the noise levels further. Noise barriers in the form of trees are recommended to be grown around administrative block and other utility units. 8.4 LAND ENVIRONMENT There will be no waste water generation from process and cooling from the proposed expansion project. All the required Air emission control systems will be installed and operated to comply with CECB norms. Washery rejects will be given to power plants. Extensive greenbelt will be developed in the plant premises. Desirable beautification and landscaping practices will be followed. Hence there will not be any impact due to the proposed expansion project. Solid waste generation and disposal QUANTITY S.NO TYPE OF SOLID WASTE DISPOSAL PROPOSED (IN MTPA) 1 Washery rejects 0.42 Will be sold to power plants. PIONEER ENVIRO 9

8.5 GREENBELT DEVELOPMENT Greenbelt of 9.1 acres will be developed in the proposed project. Capital cost for environment protection is Rs. 1.0 Crore. 8.6 IMPLEMENTATION OF CREP RECOMMENDATIONS All the CREP recommendations will be strictly followed in the proposed coal washery plant. 8.7 POST PROJECT ENVIRONMENTAL MONITORING Ambient Air Quality, Stack monitoring & effluent analysis will be carried out regularly as per CPCB norms and the analysis reports shall be submitted to MoEF & CECB regularly. ********* PIONEER ENVIRO 10