Valley View Middle School

Similar documents
Carbon Neutral 60% 70% 80% 90% Today

GREEN BUILDINGS Innovative Urban Solutions

Design Standard Sustainability

Energy Assessment Report Clayville Elementary School DRAFT October George Washington Highway, Clayville, RI DRAFT

Laurel School Upper Campus Building Features

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

Winchester High School

University of Minnesota Duluth Civil Engineering Building

CLARK BROCKMAN, SERA ARCHITECTS

Holistic Design Approach For Energy Efficiency ASHRAE TECHNOLOGY AWARD CASE STUDIES

ENERGY AND ENVIRONMENT DESIGN AND CONSTRUCTION STANDARDS ENERGY AND ENVIRONMENT

OSU Cascades Net Zero Campus. Recommendations

2013 ASHRAE TECHNOLOGY AWARD CASE STUDIES

How LEED v4 Impacts Energy Professionals and Mirrors Broader Sustainability Trends. Dan LeBlanc Senior Sustainability Manager

Case Study: Golisano Institute for Sustainability

Energy Efficiency, GeoExchange Systems and Renewable Energy MiAPPA Winter 2010

Bullitt Center s Energy Performance

W. EDWARD BALMER SCHOOL

Colorado Mountain College: Sustainable Design Standards

Analysis 1. LEED Analysis of Laboratory Buildings. Penn State School of Forest Resources University Park, PA

The Creative and Performing Arts High School (CAPA) Pittsburgh, PA 9/30/2002 Andrew Tech Mechanical Option Prof. S. A. Mumma

Speakers. Scott Shell, AIA, LEED AP Principal EHDD Architecture Principal-in-Charge

University of Illinois Business Instructional Facility LEED Gold Design. University of Illinois. University of Illinois

43% reduction in water use below code maximum 100% 100% 14% reduction in lighting power density. 56% of offices have thermal comfort controls 100%

What s My Baseline? ASHRAE

GLADYS VALLEY HALL. Materials & Resources Innovation & Design Process

Mind the Gaps: Post-Occupancy Discoveries from Design to Operation

how to read an energy model

White Paper ENVELOPE-FIRST APPROACH TO NET-ZERO ENERGY BUILDINGS

Residence Hall Retrofit: A Project to Reuse, Renew, Revive, Recycle, Recruit and Retain

Tate Laboratory of Physics Building Analysis

Grunenwald Science and Technology Building

Special Mention, Architecture + Sustainability

One That is Already Built.

Passive Design Solutions. Passive House The Road to Net-Zero

Green Building: Today s Practices Tomorrow s Challenges

Paving a Path for Zero Energy Schools ASHRAE TECHNOLOGY AWARD CASE STUDIES

Bryant University s Energy Guidelines for Sustainability


TD CANADA TRUSTCREDIT VALLEY TOWN PLAZA

DLR Group is ranked #1 by ARCHITECT, the official publication of the American Institute of Architects, in its 2012 ARCHITECT 50 ranking of U.S.

23-28 = -5. Zero Net Energy Case Study WEST BERKELEY PUBLIC LIBRARY OVERVIEW. Planning & Design Approach. Measured Energy Stats

Energy Reduction Strategy Through 2020

April 16 th Linda Morrison Jesse Stanley

LEED LEED LEED. Earth Tech, Inc. Earth Tech, Inc. A Firm With Experience. A Firm With Experience. Operational Efficiencies & Resources Preservation

Re: College of Lake County: AB Wing HVAC Remodeling Programming Mtg #3 Architect s Project Number: Meeting Minutes

Sonoma County Energy Independence Program APPENDIX A ELIGIBLE IMPROVEMENTS

How Rigorous Planning and Effective Design Help Hit Ultra Low Energy Goals

Building Typology Draft Metrics

COLGATE UNIVERSITY'S

Net Zero Construction with Sean Moran of Skender Getting to Net Zero with Solar Energy

Virtual Tour and Case Study - Sartorius Stedim Filters

Multifamily Net Zero Retrofit Market: Technical and Cost Benchmarks for San Francisco

2018 ENERGY REPORT. Mark J. Ferguson, P.E. Campus Operations & Plant Manager

and LEED Energy and Atmosphere Credits Jean Ascoli, LEED AP BD+C Architect, Energy Specialist

Better By Design Energy Efficiency in Needham s Public Construction Projects

Energy Strategies That Work

Green Retrofit. Why you should consider it, what it means, and how to get it done

SOUTHERN CALIFORNIA EDISON DATA CENTER GREEN BUILDING EDUCATION: VIRTUAL TOUR

Finn Hill Middle School

ADEC S SUSTAINABLE FUTURE SCHOOLS PROGRAM

2012 Green Homes Tour

Overview of Green Home

Ocean Discovery Institute: Designing for Zero Net Energy

We created a beautiful, high-performance building that s good for the environment. And it didn t cost us any more to do it.

Georgetown University New Science Center

Single Family Homes - over 3,000 sqft. Parfitt Residence

35% reduction in water use below code maximum 83% 88% 49% reduction in lighting power density 12%

Net Zero Building Commissioning. Phillip Saieg, CEM, LEED AP O+M Josh Harwood

Green Buildings Make Cents

DISCOVERIES AT NET ZERO. Michael Leckman Diamond Schmitt Architects Chris Piche Integral Group

Italcementi Center for Research and Innovation

Capitalaire. Adapt Today to Shape Tomorrow. National Capital Chapter Capitalaire. Monthly Newsletter. 1

Student Experience. Student Study Spaces

The baseline building system for compliance with Senate Bill 668 is defined by Appendix G,

NEW FOUR STORY MIXED USE RESTAURANT, RETAIL, LODGING, AND OFFICE BUILDING OWNER S PROJECT REQUIREMENTS

The Application of LEED Green Building Rating System in Indonesia

PROPOSED INCENTIVES TO REDUCE CANADA S CARBON EMISSIONS. July 2017

Existing Earth and Ocean Sciences (EOS) Building

= Verified Zero Net Energy Building Case Study BAGATELOS ARCHITECTURAL GLASS SYSTEMS MANUFACTURING FACILITY OVERVIEW

Example LEED-NC v2.1 Energy & Atmosphere Credit 1 Submittal

ENSURING A PRODUCTIVE ENERGY MODELING PROCESS

Presenters: Dominick Balletta Managing Director Jacob Burns Film Center

Update on GBI Malaysia

ENERGY MANAGEMENT IN SCHOOLS SAVING ENERGY, IMPROVING PERFORMANCE, AND REDUCING COSTS

High Performance Schools The Kentucky Experience

MECHANICAL PROJECT PROPOSAL (Revised)

Energy Efficiency and Reduction. Tribal Lands and Environment Forum August 15, 2016

Creative Arts Building. Bae-Won Koh, AIA, LEED AP BD+C Innovative Design

DPR Phoenix Regional Office Net Zero Certification

CAMPUS FACILITIES PLANNING BOARD PRESENTATION April 7, KUYKENDALL RENOVATION CFPB PRESENTATION April 7, 2011 modified for RFSOQ, March 23,2012

IFMA's How-To Guide Highlight: Getting Started on the Path to Sustainable Facility Management. Facility Engineering Associates

SMART HVAC & LIGHTING SYSTEMS. Savings From Two Major C&I End Uses

Project Summary. Sustainability Facts. LEED for New Construction Rating (out of 69 possible points) Total Score 40 Sustainable Sites 7

Advanced Energy Design and Retrofit Guides

Energy Efficiency / Renewable Energy (EE/RE) Projects in Texas Public Schools

Retail Effects of ANSI/ASHRAE/IES Standard

OPTION 1: PERFORMANCE RATING METHOD

Be Aggressive About the Passive Solutions

ASHRAE s LowDown Showdown

Transcription:

Building at a Glance Valley View Middle School Location: Snohomish, Washington Owner: Snohomish School District Architect: Dykeman Civil Engineers: Harmsen & Associates, 2020 Engineers Mechanical/electrical engineer: Hargis Engineers Structural Engineer: Coughlin Porter Lundeen Landscape Architect: Cascade Design Collaborative Principal Use: Public middle school, grades 7 & 8 Includes: Geothermal heating, 90% heat recovery, displacement ventilation, natural cooling, radiant heating, rainwater harvesting, and advanced lighting and controls Employees/Occupants: 100 staff/ 950 students Square Footage: 168,000 sf Unconditioned Space: 19,062 sf Substantial Completion/Occupancy: Sept. 2012 Original Budget: $60,300,000 Total Cost: $59,805,429 National Distinctions/Awards: 2015 ASHRAE Technology Award AIA Washington Council 2014 Civic Design Merit Award 2014 US Glass Green Design Award CEFPI Exhibition of School Planning & Architecture, Project of Distinction 2014 2014 Excellence in Masonry Design Award Merit Award K-12 By Brian Haugk, PE, LEED AP; Brian Cannon, PE, LEED AP Valley View Middle School (VVMS) in Snohomish, Washington is a new three-story, 168,000 sf facility that replaced a much smaller and outdated building. Mirroring the district s commitment to resource conservation, the design team used the Living Building Challenge as a guide for defining its sustainable approach. The team strategized on harnessing the greatest contributors to resource conservation: renewable energy sources to be implemented; capturing and reusing emitted energy to offset draw from the grid; reducing consumption through system selection; and supporting behavioral changes inspired through monitoring and reporting. The school, owned by the Snohomish School District, houses 950 students and uses less energy than the previous 1981 school that was half the size. About the Authors Brian Haugk, PE, LEED AP is a principal and Brian Cannon, PE, LEED AP is an associate principal at Hargis Engineers in Seattle, Washington. Design Collaboration The project was the first for the district to consider the Living Building Challenge for a Net Zero-ready school. At the time, schools built prior to Valley View were too new to have adequate data to provide a benchmark for previous sustainable initiatives the district was enhancing and implementing. It also presented an opportunity to further define and measure its sustainable approach goals, objectives and performance. The district s sustainable management goals balance and encompass facilities, operations and health of the building s occupants. Their approach incorporates 1) using durable materials and integrating building components and systems to withstand the wear and tear, 2) targeting a 50-year plus life cycle, 3) reducing maintenance and operations costs, 4) reducing the use of resources and energy consumption beyond code and state requirements, and 5) provide excellent indoor air quality and comfort. They also wanted to create a space embraced by the community. A committee was engaged to represent a cross-sector of community and school district stakeholders. Street presence, maximized views, View of the classroom wing with daylight harvesting and rooftop water collection system in bottom left-hand corner. classroom orientation for optimum daylighting, promotion of community use after-hours, functionality, visibility and security were articulated design criteria by this group. Community-accessible spaces were configured within the campus to accommodate outdoor athletic fields, two gyms, commons area, library and lecture hall. Applying the functional goals, the professional team developed options for meeting the performance and program- Aerial of site (August 2012) w/ overlay of pre-existing buildings. For energy consumption the old buildings used 1,325,514 kwh/yr combines while the new building only uses 1,239,965 kwh/yr.

System Attributes Benefit Power 960KW PV-ready Provides net-0 energy usage Renew Heating/ Cooling Geothermal Uses free cooling of the Earth Ventilation 90% heat recovery Energy efficiency Displacement ventilation Heating/ Geothermal Exchanges heating/cooling energy Cooling Reuse Water Rainwater harvesting with 75,000 gal. central tank All urinals & water closets served through system Reduce LIGHTING LED fixtures Daylight harvesting Automated dimming controls Occupancy sensors Automated motorized shades Optimized window configuration for natural daylighting Energy usage is minimized through an integrated lighting and shading strategy Occupant comfort and convenience Occupant required interaction with system is removed Energy reduction; performance based on payback for solar panel array BUILDING ENVELOPE Roof = R-60 Walls = R-48 Windows, Triple Glazed, U = 0.24 HEATING Centralized water-to-water heat pump using geothermal wells Passive heating by convectors and radiant floor Maintenance costs reduction Energy reduction Reduce fan energy with passive heating System efficiency HEATING (DOMESTIC) Water heaters Energy management system (EMS) controlled COOLING Geothermal well temperature Compressor energy reduction Figure 1: Valley View Middle School hydronic and air system Overview VENTILATION Displacement ventilation Variable air volume (VAV) units Increase economizer range from 55F to 72F No fans/filters with VAV units Minimize fan and pump energy Variable fan speeds with capabilities to reduce by 50% Energy reduction in operations matic objectives. Building placement played an important role in influencing the design approach and upholding the conservation goals. Energy Efficiency The school capitalizes on strategic approaches to maximize system efficiency and reduce the overall building energy consumption. These can be divided into three main categories: Reduce - infusing higher efficient systems that align with performance objectives Reuse redirecting typically wasted energy/resources back into the building s operations Renew - introducing new sources to the site without requiring further demands on mass utilitie. The following Table 1 outlines the energy conservation approach in relationship to the school s triple bottom line. Note over the last year the school operated at 26 EUI. Fan/pumps Variable primary pumps Fan wall technology ECM fans or VFD Kitchen Energy Star rated kitchen residential appliances Power Use thin client computers Network-based server software METERING Electrical meters Domestic water Gas meters Computer power load reduction within the building Security of network Reduction in electrical loads and computer loads Creating a virtual environment

Innovation The geographical location presented opportunities for technical innovations for this type of facility. Sited in western Washington, this building is predominantly in a heating environment. Year after year of continuous heating operation will slowly lower the temperature of the ground degrading the capacity to absorb heat from the ground, impacting the efficiency of the water-to-water heat pump (WWHP). As part of the design, cooling loads were used to offset this inherent load imbalance, the 24/7 cooling spaces (main electrical, distributed transformer rooms and MDF and IDF telecom spaces) are all served by a separate, central plant system to effectively recharge the ground loop. Immediate impacts of this approach will not be seen as the temperature change of a well field is subtle, providing long term energy savings. The ground loop return water temperatures are being monitored. Capitalizing on Thermal Dynamics of Water TheWWHP/displacement ventilation (DV) system combination affords greater control in maintaining occupant comfort. This project was one the first to use this product in the region and fully integrate the factory controls with the building EMS. The ground source heat pump system was sized for 100% of the central plant heating and cooling capacity. Integrating the WWHP was critical to the DV approach, as it requires very tight discharge air temperature (DAT) control to maintain occupant comfort. At the time this article was written, water-to-air heat pumps on the market were unable to achieve the DAT control required. Reducing Energy, Improving IAQ The classroom DV system utilizes a custom toe kick space supply grille under the casework as opposed to conventional grilles provided by major manufacturers. CFD model simulations and actual installed systems have vetted this custom approach that improves the integration in a typical classroom layout. Convectors were used at the exterior under the windows. The library integrated benches at the windows with DV as well as internal wall style conventional DV grilles. The DV system in the administrative spaces utilized wall DV manufacturer style grilles with radiant floor at the perimeter. Customizing and Integrating Low-traffic Spaces An opportunity was identified to utilize energy efficiency in toilet rooms, staff break rooms and copier rooms. General exhaust fans serving these spaces are interlocked with lighting control systems occupancy sensors to control the exhaust fans operation. Systems that provide exhaust for multiple spaces include motorized dampers that isolate the unoccupied spaces and have either VFDs or ECM motors to control fan speed for the variable exhaust volumes. This approach also optimized the quantity of air going through the heat recovery system. A screenshot of the Competition Zone dashboard that can be accessed by any staff member to see, in real time, the direct effects of their room s energy consumption vs other areas of the campus. Operations and Maintenance Both the maintenance and repair/replacement costs for the O&M for the final design are at least 10% better than any of the alternative options including the ASHRAE 90.1 baseline with 50% heat recovery. Strategies that fueled these results include:

Figure 2: Metering for of the campus energy usage by category over the course of a week in October of 2013 to support Cx process. Considerations Analyzed Total utility usage Total cost of ownership of the school Replacement cost and regular maintenance costs Enhanced Optimization Opportunities Based on Review All filters are centrally located at the main air handlers Eliminated fans utilizing VAV boxes without filters in the system Filters are 12 deep to minimize scheduled filter changes Utilizing direct drive fans to avoid belt-driven fan maintenance Larger AHUs utilizing fan wall technology Design Options Comparison 4 alternative systems ASHRAE 90.1 baseline with 50% recovery Washington State Energy code baseline Final design Total Cost of Ownership Total cost of ownership was a driving factor in the sustainable discussions. The district was savvy to understand that while sustainable systems are possibly more expensive upfront, they can reduce a building s lifetime operating costs significantly. First costs for construction on the ground source WWHP, VAV reheat, radiant floor heating and 90% effective energy recovery unit systems was the greatest value to the owner. Energy usage and costs show the district would end up spending less money on annual utility and maintenance costs Figure 3: Lowest 30 yr life cycle cost and lowest EUI (Alt No. 2) compared to ASHRAE 90.1 Baseline Alt No.1. Alternate options not shown. compared to the alternative with no first-year cost. The alternative exceeds the cost effectiveness in total yearly costs, as well as a Washington State required 30-year life cycle cost analysis when compared to other systems. Total cost of ownership was reviewed to ensure that the sum of the lowest maintenance and energy costs combined would be realized. $101,244/yr 57 EUI Code Baseline COST SAVINGS 26 EUI Alternating Currency 149 18 8 Indoor Air Quality and Thermal Comfort Upholding the district s fifth goal for occupant comfort, the DV system was adopted. The DV system is a proven approach to enhance energy performance through an extended economizer range and reduced fan energy while improving indoor air quality. Hargis designed and is tracking the performance of these systems in 40+ K-12 schools constructed since 2006. Air is supplied down low, conserving energy by only heating or cooling the air near the occupants. The introduction of fresh air and removal of pollutants at the ceiling level is at a minimum, 50% better than a comparable overhead air distribution system. Specifically, a district where Hargis has completed six schools to date with DV, have also shown 3-6% improvement in attendance that can be attributed to a healthier building due to improved ventilation. DV also exceeds the noise criteria dictated by the Washington State health department. From a sound level code value of NC-35, the teaching environment is improved to a NC level less than 20. Enviromental, Social and Behavioral Impact Responsive to constituents adoption of sustainability, public institutions are using facilities as an opportunity to express their conservation philosophy and commitment. Environmental design elements utilizing integrated strategies included reduced energy demand via envelope design, solar technology, geothermal technology, rainwater harvesting and integrated value messaging. The school fulfilled the community s criteria, as well as becoming a source of operational efficiency for the district. The district utilizes VVMS to host a majority of the off-hour functions as energy and maintenance dollars are approximately half of the district s other comparable pre-1990s facilities. The following Table 2 outlines the environmental components and their contribution to the sustainable development An EMS-based energy dashboard system with touch screen monitors at multiple locations allows staff and students to learn about the sustainable features of the building. The system is also webbased, allowing faculty to use the system as a teaching tool. To further spark students interest, the EMS metering design of the lighting, plug and HVAC systems allowed for competitive zones to be created in six classroom pods. This allows students to interact with the building systems to see Barrels of crude oil that will not be consumed per year. Football fields worth of dense forest planted every year. Homes unplugged from the electric grid for a year. 640metric of tons CO2 Actual Usage = A reduction of 1,581,951 kwh per year or 640 metric tons of CO 2 emissions.

throughout the life cycle of the building to inform and guide generations of children and staff that pass through its doors, providing them with a better understanding of their environment well beyond the team s M&V involvement. Valley View Middle School: Site Characteristics & Building. Environmental Components Contribution Fossil Fuels Natural gas was limited to science and vocational requirements, otherwise not used as a heating source Infrastructure for a future 960 kw PV array installed Ground loop well field sized for 100% of the load, allowing removal of any gas fired HVAC equipment CFCs No CFCs were used on this site Only refrigeration equipment is at the WWHP, elevator machine rooms AC units & kitchen cooler/freezer Waste All waste is treated on site through a septic system. A future living machine for providing potable water can be installed in the future. Water Low-flow plumbing fixtures were utilized A rooftop rainwater collection system with a centralized system that can store 75,000 gallons of non-potable water for use in flushing water closets, urinals and irrigation. Other storage units around the building, with a total capacity exceeding 200,000 gallons. (Enough water to fill 4,000 average sized bath tubs or support the daily water usage of an US family of 4, for nearly a year and a half) Recycling & Concrete from the original building was reused as a sub-base for driveways Reuse Storm water management and parking areas. The largest pervious pavement installation in the northwest filters water directed to onsite wetlands. what kind of impact they have on the overall energy usage. The dashboard was also integrated with the support of the staff to allow for the integration of lunch menus, sports scores, way-finding, school events, etc. Committed to energy conservation and the sustainability of the site, the interaction of competitive zones and interpretive signage throughout the school are being used as a teaching tool to educate occupants on the sustainable design elements and new technologies integrated into the building and site. These teaching components will continue