Texas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds

Similar documents
Engineer/Trade Partner Collaboration

Prefabrication and Modular Construction: Providing Value from a Builders Perspective Shannon Lightfoot McCarthy Building Companies, Inc.

Design-Assist Delivery for Prefabricated Building Components

Construction coordination

Projectwide ROI. A team approach to gaining BIM Benefits (Arizona State University ISTB IV) Dan Russell / Sundt Construction / November 2, 2011

The benefits of reinventing the wheel BIM AND IPD BRING FUNDAMENTAL CHANGES TO ROLES IN A STRUCTURAL ENGINEERING FIRM

HEALTHCARE OF THE FUTURE INTEGRATED CARE + FACILITY DESIGN

Lean Practices from Competition through Construction

Minitab Headquarters

INTEGRATED PROJECT DELIVERY

BIM Competency Delivers Competitive Advantages

VICTAULIC VIRTUAL DESIGN

Lean Project Delivery Operating System

Meeting the Challenge of a Difficult Job GC The Beck Group Colorado Mills Mall Restoration 1

Measuring the Impact of BIM in Design-Bid-Build

Adolfson & Peterson Construction, Megan Bond; ; CATEGORY 3: Meeting the Challenge of a Difficult Job General Contractor

Taking Design to Operation

BRINGING THE BEST OF MANUFACTURING TO CONSTRUCTION January 29, 2018

6 BIM FAILURES. The design is complete, contracts are written, the project team is assembled and ready to build. Optimism is at its peak!

Enhancing the Environment in Which People Live, Learn, Heal, Work and Play. HEALTHCARE INTERIOR SOLUTIONS

Carolinas HealthCare System Case Study Collaborate Bid Build (CB 2 ) A Different Approach to Project Delivery

Off-Site Wood Construction:

Operational Modeling: Informed solutions for complex problems

Integrated Design Build and a Lean Delivery

LEAN PROJECT MANAGEMENT THE HARD WAY

AN OVERVIEW OF DESIGN-BUILD. Presented by: David Umstot, PE, CEM Umstot Project and Facilities Solutions, LLC January 20, 2014

LEGAL ISSUES WITH INTEGRATED PROJECT DELIVERY UNC Charlotte ERIK M. ROSENWOOD HAMILTON STEPHENS STEELE & MARTIN, PLLC

Design Build - Project Delivery Model Trends

Target Value Design and BIM: Delivering the targets of construction 2025

Dallas City Performance Hall: Building Information Modeling as a Decision-Making Tool

Session: Date: Thursday, September 29, 2016

Three Opportunities Created by Lean Construction

ADVERTISEMENT FOR QUALIFICATION AND PROPOSALS OF DESIGN/ASSIST TRADE PARTNER

Massive but Lean: How Design + Construction Efficiency Led One Mass Timber Project to Success

Offsite modular construction

Meeting the Standard of Care in an Evolving Project Delivery Environment

BU21079 Building Information Modeling to Facilities Information Management and Beyond

Structural Breadth Study

AIA 2009 BIM AWARDS. Category B: Design/Delivery Process Innovation Using BIM

PREFAB AND MODULAR SYSTEMS A CASE STUDY ON RISKS/REWARDS

Leveraging BIM to Reduce Risk. Kyle Holmes Vice President of Support Operations The Brandt Companies, LLC

Construction Fabrication Integration The Future is Here: Benefits of Advanced Technology for Subcontractors Presenter: Steve Hunt Dee Cramer, Inc.

Current Status of Building Information Modeling (BIM) Adoptability in the U.S. Electrical Construction Industry

Benjamin D. Hall Interdisciplinary Research Building

Analysis 1: Project Sequencing. Analysis 2: MEP Prefabrication. Analysis 3: Green Roof Implementation. Analysis 4: Alternate Delivery Method

Technology Transforms Existing Building Into 21st Century Workspace

Presentation Outline. Project Background. ANALYSIS#1: Multi-Trade Prefabrication Study. ANALYSIS#2: Cost Estimating Through 3D Modeling

LEAN design for life cycle information. Steen Sunesen Senior Project Manager / Digitalisation Lead LINK arkitektur

Tekla Structures for Precast Concrete Industry TRANSFORMING THE WAY THE WORLD WORKS

DALLAS-FORT WORTH INTERNATIONAL AIRPORT

Off-Site Wood Construction:

Different Ways to Contract for Lean Project Delivery. Joel Darrington San Diego COP 3/27/19

- DATA REQUIREMENTS BIM

Three Opportunities Glenn Ballard Lean Construction Institute University of California, Berkeley

Descriptive Data Sheet

BUILDING INFORMATION MODELING (BIM) THE WHOLE TRUTH 10:30am 12:00pm. Presenter: Rod Yeoh, Principal, Omicron Architecture Engineering Construction

Inspire. Educate. Unite.

Contracted Scope ABC of the Carolinas Excellence in Construction Awards Carolinas HealthCare System CMC Kitchen Healthcare.

Company Profile LYNX TRADING & CONTRACTING W.L.L. Delivering the promise

BIM Standard and Specifications for San Mateo County. Project Development Unit

Methodist Hospital for Surgery Addison, Texas. CLIENTS Methodist Health System Private Physician Consortium SRP Medical Medica Development

Integrated Project Delivery

IPD. Who Are We? 25/04/2017. The Red Deer Catholic Story. Red Deer is located between Edmonton & Calgary Population - 100,000

TOWSON TIGER ARENA TOWSON, MD. Derek Stoecklein Construction Management Option Advisor: Ray Sowers

Emergent models in integration Nature as model: Declaration of interdependence Lean thinking Building information modeling Lean thinking

AIA TAP / 2012 BIM Awards Leveraging BIM from Design Concept to Facility Management Category A: BIM Excellence Awards

Sunnyvale Plaza. Mid-Atlantic Region, United States. Nathan Braskey Construction Management. November 15, Technical Assignment #3

2012 Kristine Fallon Associates, Inc. Complete Facility Lifecycle Management

SECTION PAYMENT PROCEDURES

REQUEST FOR PROPOSAL. Design-Build Services for Intensive Care Unit and Patient Tower Expansion St. Charles Medical Center - Bend.

Insulated Cold-Formed Steel Wall Panels: A case study of a contractor-manufacturer

Continuing Education Credits

Bringing Order out of Chaos

Recent developments in contract procurement models

Architectural Services

Design & Detailing, or why every structural steel project is not profitable

Mueller Laboratory Renovation. Technical Report #3 By Mark Jackson Construction Management Option 11/14/14

For years, on-screen quantity takeoff has been the trusted

Building Information Modeling to Facilities Information Management and Beyond

TOWSON TIGER ARENA TOWSON, MD. Derek Stoecklein Construction Management Option Advisor: Ray Sowers

STRATEGIC ARCHITECTURAL DESIGN: HOW TO MEET BUSINESS GOALS AND MAXIMIZE ROI

Integrated Project Delivery: A Case Study on Process Improvement and Embracing a True Collaborative Team Approach.

Introduction to Lean Construction: What is Lean Construction and How Can It Benefit You?

REQUEST FOR PROPOSAL

1/4/2014. Alternative Project Delivery Methods 1. Agenda

Produkt og Procesmodeller (PPM) i byggeriet. Product and Process models in Construction. 6. Process Models

Section 5 Crew Requirements

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING

How to estimate the cost of new air conditioning system to an existing storage warehouse.

Design-Bid-Build Vs Design Build Projects: Performance Assessment of Commercial Projects In Sri Lanka

THE LEADER IN PREFABRICATED BATHROOM PODS

JOHNS HOPKINS HOSPITAL NEW CLINICAL BUILDING

6/10/2018. Building Information Modeling Overview. Pirtle s History with Building Information Modeling (BIM)

P6, Acumen Fuse & Risk, and Synchro Putting it all Together on a Major Infrastructure Program. Presented by: Project Controls Cubed (PC 3 )

[FISK CORPORATE HEADQUARTERS]

GETTING STARTED WITH LEAN CONSTRUCTION. A guide for project teams

Please comply with the Lean Construction Institute s Usage Policies and Attribution Guidelines at

Growing Already Lean Operations Without Additional Labor

CS21793 Transition to Operations with Building Ops: The (Eye) in BIM

Off-site manufacturing for construction. Response to the House of Lords Science and Technology Committee, 4 May 2018

Transcription:

Seminar Objectives 1) IPD and its impact on team behavior 2) Lean and its role in a collaborative process. 3) Pre-Fabrication 4) How Lean, BIM and collaborative processes impact project value.

The Project Texas Health Resources, Methodist Alliance Hospital, Fort Worth, Texas. Hospital; 188,000 s.f. $46.5m 58 beds with growth potential of 300 beds MOB; 74,000 s.f. $10m Project of identical scale completed within the last year set the base budget number.

The Project Text Text Text Text Text THR Presbyterian Hospital, Flower Mound, Texas Final Cost $43,500,000

The Project

The Project

The Project

The Project

Contractual Issues Perkins + Will in Dallas is the architect, no IPD experience, no Lean experience. Beck is the contractor, internal integrated experience, but no IPD experience, no Lean experience Owner representative, Denton Wilson, had become a national spokesman for IPD and Lean, left halfway through the project. Unique selection process

The Project Initial Budget; $43,500,00 Budget with Additional Scope; $46,500,000 Initial Design Estimate; $49,500,000 Mechanical Upgrades; $2,500,000 -Heat pump chillers -Additional Generator -Fanwall technology Final Cost; $46,500,000

Contractual Issues AIA C191 contract-multi party agreement, similar to C195 but does not require the formation of an LLC. Owner/Architect/Contractor agree to waive all claims. Not operating under a true C191 cost-plus model; Architect has a fixed fee Contractor has a GMP Project began $3m above baseline goal, project ended $800,000 below budget, with $2.5m in added value. No accounting for added value.

Incentive Plan Fee at risk; Beck $230,000 (.05%) P+W $230,000 (.05%) Savings incentive; Beck $230,000 (.05%) P+W $230,000 (.05%) THR retained savings; $460,000 Any additional savings beyond $1,380,000 will be split equally between the owner, architect, and contractor.

Incentive Plan Fee at risk recovered with four factors; 1-Overall client satisfaction achieved 2-Final cost less than target cost 3-Substantial completion achieved 4-Quality meets owner standards

Incentive Plan Project Savings Incentive Distribution based on the average survey score from a 20 question survey taken by the team. A sample; -Team members demonstrate trust and respect across all levels within the Team -Project participant's time is used wisely and productively -Team successfully incorporates and executes Building Information Modeling for the betterment of the project. -The project team uses LEAN principles for making project decisions that are based upon current relevant data and are for the betterment of the PROJECT.

Incentive Plan

Incentive Plan

Incentive Plan

Incentive Plan

Project Budget vs. Estimate Texas Health HM Alliance TARGET COST Base Budget Approved Alternates Approved Cost Benefit Analysis Pending Cost Benefit Analysis TARGET COST Current Estimate $50,500,000 $50,000,000 $49,500,000 $49,000,000 $48,500,000 $48,000,000 $47,500,000 $47,000,000 $46,500,000 $46,000,000 $45,500,000 $45,000,000 $44,500,000 $44,000,000 $43,500,000 $43,000,000 $42,500,000 $42,000,000 $41,500,000 $41,000,000 $40,500,000 $40,000,000 6/24/2010 7/19/2010 8/13/2010 9/7/2010 10/2/2010 10/27/2010 11/21/2010 12/16/2010 1/10/2011

Project Savings Distribution

Contractual Lessons The reward structure has to be sufficient to compensate the architect for the additional work. The reward structure modified the architect s behavior, but they felt that they would prefer to collaborate without the fee incentive. Not including Structural and MEP engineers in the reward structure caused problems on the team. Without an active and supportive owner the process will not succeed.

Contractual Lessons The waiver of liability was valuable in creating an environment of collaboration and BIM sharing. On another project with the same owner rep and ambition, but without the contract, the collaboration has been different.

Contractual Lessons

Contractual Lessons

LEAN Process

LEAN Process THR hired a Lean consultant to assist on the project. He was an Industrial Engineer with experience on refineries and industrial projects. The processes used were; A3; suggestions fit onto an 11x17 piece of paper Scorecards; the team s monthly self-rating Pull schedule; starting at the end result Weekly Work Plan; review tasks at the start of each week, PPC was not consistently carried out. Target value design; designing to a set budget Retrospective; a one month review of process

LEAN Process- Big Room

LEAN Process

LEAN Process-Promise Wall

LEAN Process Target Value Design

LEAN Process Target Value Design Hospital building structural steel system using target value design;.05% over budget MOB structural steel not using target based design; 8.0% over budget. Engineer was out of fee to continue meetings. Fabricator completed the steel detailing to minimize tube and angle steel, minimizing the labor while adding slightly to the tonnage.

Lean Lessons Very difficult to match the flow between architecture and construction. Architect felt financially challenged because of the process. 25% more hours than in a traditional process, half of those hours based on owner decisions. Architectural team found the process rewarding, architectural management not so much. Architectural management struggled with the risk and inability to predict profit on the job.

LEAN Lessons LEAN does not mesh with typical efficient architectural processes; go slow to go fast, target based design, many more meetings. If I had to do this on every project we would go broke. P+W Associate Principal...? Be careful when selecting a consultant, begin by implementing a few key processes; PPC, Last Planner, Pull Scheduling... The greatest benefits accrued to the owner

Pre-fabrication Strategy Value Proposition for Pre-fab Strategies Reduction in Project Schedule Reduction of peak manpower by leveling resources Significant reduction on labor (50-55%) Productivity loss due to weather Quality Controlled environment Repetition Quality control Safety

Pre-fabrication Strategy Prefabrication What systems were targeted? MEP Corridor Racks Typical rack length is 16 feet but total length is 20 feet Maximizes the use of stock length for piping, conduits, etc. Reduces material waste Work is done in somewhat controlled environment Work is also done at table height rather than on ladders, reduces hazards Prefabricating system offsite reduces the peak manpower on the project Patient Room Headwalls The quality of the work produced is high and consistent The coordination allows each system to be perfectly located on the wall The amount of rework is virtually eliminated Patient Room Toilets Finishes can be installed (ie. wall or floor tiles.) Coordination of everything in a toilet room is conducted resulting in consistent location of accessories, outlets, sinks, mirrors, etc. The efficiency of the process produces significant savings in labor

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy MEP Corridor Racks

Pre-fabrication Strategy Patient Room Headwalls

Pre-fabrication Strategy Patient Room Headwalls

Pre-fabrication Strategy Patient Room Headwalls

Pre-fabrication Strategy Patient Room Headwalls

Pre-fabrication Strategy Patient Room Headwalls

Pre-fabrication Strategy Patient Room Headwalls

Pre-fabrication Strategy Sequence of Headwalls and Pods

Pre-fabrication Strategy Modeling Studs with piping

Pre-fabrication Strategy Restroom Mock-Ups

Pre-fabrication Strategy Restroom pre-fabrication shop

Pre-fabrication Strategy Qnty Estimated MH's Actual MH's MH Reduction Estimated Labor $ Actual Labor $ Savings Savings / Unit Patient Rest Room 35 3,945 1,474 2,471 $96,653 $36,113 $60,540 $1,730 63% Headwalls 28 1,700 877 823 $47,318 $21,538 $25,780 $921 48% MEP System Racks* 35 1,120 861 259 $32,122 $24,693 $7,428 $212 23% TOTAL: 3,553 $93,748 53% Waste Reduction 19k lbs 9k lbs 10k lbs over 50% reduction in waste generation

Pre-fabrication Strategy Baseline vs. First-Run Study vs. Actual

Pre-fabrication Strategy Pre-fabrication Strategy; it will be very difficult without strong owner commitment. Implementation must start in design Early Approvals Detailed Planning Mind shift: Construction to Manufacturing Supply Chain Assemble the units do not build them Coordination of Shops (Navis)

Pre-fabrication Strategy Location Warehouse Shipping Storage Buy-out Strategy Self Perform Pod Manufacturer Timing!

BIM in IPD Signed the AIA E202 but referred to the P+W BIM protocol for more detail. Model is no longer primarily for 2D documentation, it is now a tool for estimating, coordination, and phasing. Everything gets modeled, eliminate 2D content in the 3D model. Accuracy of model is critical, floor and roof slopes modeled, walls modeled to correct height.

BIM in IPD P+W agreed to follow some key BIM standards from Beck, these have now been adopted for all their projects.

BIM in IPD 2.0 Separation of model elements into objects that match estimating elements. Coding all library items into cost database. Focus on model not drawings as building tool to minimize notation. Generating datapoints to feed directly into Trimble for layout. Model generated by the team for the team.

BIM final thoughts BIM is not a substitute for an experienced estimator. Without the IPD liability waiver true BIM cooperation becomes more challenging. He/she who controls the model controls the process. The general standard of architectural documentation is currently low, this will hurt the profession. How to get paid for higher quality?

Completed Project

Completed Project

Completed Project

Completed Project

Completed Project

Completed Project

Final result Compared to the comparable building used to set the base budget, this project was; -Delivered in three months less time. -Cost the owner $584,000 less. -Contained $2,500,000 of upgraded mechanical. -Significantly upgraded design.