HUDSON TUNNEL PROJECT

Similar documents
Project Purpose. Federal Railroad Administration

Executive Summary S.1 INTRODUCTION

22.1 INTRODUCTION 22.2 ANALYSIS METHODOLOGY REGULATORY CONTEXT

Chapter 4: Analysis Framework 4.1 INTRODUCTION

L Project Update. New Design Recommendations Overall Project Update. January 15, 2019

THE GATEWAY PROGRAM. James Richter, P.E Dana Shaeffer, P.E. Number of words: 4006

Brooklyn Station Construction Open House

PUBLIC HEARING April 24, 2017

Case study The construction of the West Rail Tsing Kwai Tunnel from Mei Foo to Tsuen Wan

Réseau express métropolitain

UC Press Building 2120 Berkeley Way Berkeley, CA

EXHIBIT LIST No Exhibit Name Page 1 P6 Tunnel Presentation.pdf (P6) 2-25

Purple Line Extension. Beverly Hills Community Meeting August 22, 2016

Exposition Light Rail Transit Project

Trans Mountain Expansion Project Overview

2-2 ALTERNATIVES CONSIDERED AND ELIMINATED

O. NOISE. 1. Existing Conditions. 2. Future without the Proposed Project

Introductions Project Updates Summary of Proposed Community Improvements Construction Impacts Management Open House

Noise Assessments for Construction Noise Impacts

Progress update (November to March) 03/23/2009 2

Presented by: Frank Guyamier

Construction Ground-Borne Noise & Vibration

D7: TUNNEL CONSTRUCTION AND METHODOLOGY

Challenges in Urban Tunneling

Kiewit Approach for Tunnel Stabilization and Sewer Pipeline Replacement Project

Hudson River Tunnels, Mega Projects, and Risk A Designer s Perspective

Public Meeting. Draft Environmental Impact Statement (EIS) and Section 106 Consultation. Preferred Alternative Selection November 29, 2018

Eglinton Crosstown LRT Construction Liaison Committee

Regional Connector Transit Project Construction Update. June 9, 2016 Project Wide Community Meeting

OVERVIEW. Work Progress to Date Action Items Follow Up Community Relations Update Construction Phasing

Expo Operations & Maintenance Facility. Operations and Maintenance Facility Pre-Construction Meeting July 10, 2013

Chapter 5B: Transportation Services 5B.1 INTRODUCTION

Albany Park Stormwater Diversion Tunnel

Albany Park Stormwater Diversion Tunnel

Description of Phase 2 Modified Design

3.6 Construction Methods

Replacement of the Existing Water Siphons between Brooklyn and Staten Island Siphon Project

The project. The Follo Line Project is currently the largest transport

Welcome! Route 1 Viaduct Rehabilitation Project Chelsea Project File No

Organization. Project Management Institute, Olympia Chapter Date Nov. 20, 2012

Tonight s Agenda. 6:00 pm Open House 6:30 pm Presentation. 7:45 pm Return to Open House 8:30 pm Close. Introduction. Roosevelt Station Construction

MITIGATION MONITORING AND REPORTING PROGRAM CHABOT COLLEGE 2012 FACILITIES MASTER PLAN

Indirect and Cumulative Effects

Noise Variance Review

B. DESCRIPTION OF CONSTRUCTION ACTIVITIES

Indirect and Cumulative Effects

6 Preliminary Assessment of Construction Method and Constructability Issues

PORT OF MIAMI TUNNEL PROJECT Highlights & Where we are today!

Baltimore & Potomac Tunnel Project.

Funding was provided by the City of New York via the Hudson Yards Infrastructure Corporation and Hudson Yards Development Corporation.

Raritan River Bridge Replacement. Public Information Session September 2016

Greenhouse Gas Emissions and Resilience

Environmental Impact Statement (EIS)/ Section 106 Public Meeting Proposed Alternatives. December 14, 2017

COMMUNITY BOARD EIGHT

Promoters. Presentation. Tunnel. Tim Smart Head of Engineering & Operations. 20 th October

Promoters Tunnel Presentation

FINAL ENVIRONMENTAL IMPACT STATEMENT. Final EIS in Focus

ATTACHMENT C MITIGATED NEGATIVE DECLARATION AND MITIGATION AND MONITORING REPORTING PROGRAM

Purple Line Extension Section 2 Community Meeting September 28, 2017

In Your Area 2: North Acton to Northolt

Purple Line Extension. Wilshire/La Cienega and Wilshire/Rodeo Stations December 12, 2018

Stevens & Associates, Inc. Tunnel Construction Projects. Fact Sheets

STATUS REPORT On the

IEEE 18-May Intake. Tunnel. Outlet

LAKE + FOREST CONSTRUCTION TIMELINE

REAL TIME MONITORING OF TRACK WAYS DURING CONTINUOUS HIGH SPEED RAIL OPERATIONS

CROSSRAIL INFORMATION PAPER D24 TUNNELLING DURATION AND CONSTRUCTION STRATEGY

VTA s BART Silicon Valley Phase II Extension

PROJECT DESCRIPTION CONSTRUCTION

Exhibit G. Construction Mitigation Plan

COMMUNITY BOARD EIGHT

A. INTRODUCTION AND SUMMARY OF FINDINGS B. CONSTRUCTION SCHEDULE

BARRY S CORNER. Draft Construction Management Plan

Gautrain construction update

Metro Purple Line Extension

Appendix H Mitigation Monitoring Plan

Preliminary Project Assessment

Welcome. Welcome to the Wastewater Treatment Project Community Information Meeting.

Chapter 4 Environmental Setting, Impacts, and Mitigation 4.6 NOISE Environmental Setting. Approach to Analysis

SUMMARY OF MITIGATION OF CONCERNS RAISED IN FINAL ENVIRONMENTAL IMPACT STATEMENT

Neptune Cargill Overpass Extension

4.4 Vibration. Table 4.24 FTA and Swiss Standard SN a Construction Vibration Damage Criteria

Bellows Falls Tunnel

Tunnel Works. How we got here - Fort Wayne s Consent Decree. Tunnel Works Program Frequently Asked Questions

2. PROJECT DESCRIPTION

SEMMERING BASE TUNNEL LOGISTIC CHALLENGES

El Dorado Avenue

Appendix B Noise and Blasting Impact Assessment

12 Oct Virama Karya presentation on South Coast Highway. Therefore require a new route expressway

WHY THE CHANNEL TUNNEL WAS BUILT

Advanced Construction Techniques

Learning Legacy Document Duration of data recorded (approx.) 1


Legislative Council Panel on Transport Subcommittee on Matters Relating to Railways. Environmental Measures for New Railway Projects

Sydney Port Botany Terminal 3 Project Out of Hours Works Protocol

13.1 INTRODUCTION 13.2 ANALYSIS METHODOLOGY

Risk Management of the Restoration of Shanghai Metro Line 4

Purple Line Extension Section 1 Construction Community Meeting September 26, 2017

Canadian Niagara Power Inc. International Power Line Rebuild Project Fact Sheet

Transcription:

HUDSON TUNNEL PROJECT NORTH BERGEN COMMUNITY MEETING Lido Restaurant 2600 Tonnelle Avenue North Bergen, NJ January 30, 2018 6:00-8:00 PM

Agenda Project Overview Construction Activities in North Bergen Mitigation Measures to Reduce Impacts 2

Project Overview 3

Project Overview: Environmental Impact Statement (EIS) National Environmental Policy Act (NEPA) Before providing funds or issuing a permit, Federal agencies must consider the environmental effects of projects. This is achieved by preparing an Environmental Impact Statement (EIS) for the Project. Project Partners: (FRA): Federal lead agency for NEPA NJ TRANSIT: Co-lead, local agency for NEPA Amtrak: Project design & engineering Port Authority of NY & NJ: Project coordination & development 4

Project Overview: Need for the Project Existing Amtrak / NJ TRANSIT rail tunnel beneath Hudson River must be closed for full reconstruction to repair damage from Superstorm Sandy Need for repair is urgent: storm damage continues to degrade tunnel Existing train service (450 trains per day) must be maintained New tunnel will provide train capacity during reconstruction of existing tunnel and ongoing stability and redundancy once both tunnels are operating photos courtesy of Amtrak 5

Project Overview: Proposed Hudson Tunnel Project Rehabilitation of Existing North River Tunnel Preferred New Tunnel Portal Alternative (Tonnelle Ave) New Tunnel Portal (Tenth Ave) New Ventilation Fan Plant New Tunnel New Surface Tracks New Ventilation Fan Plant 6

Project Overview: New Hudson River Tunnel in the Palisades Existing North River Tunnel New Hudson River Tunnel 7

Project Overview: New Hudson River Tunnel in the Palisades 8

Project Overview: New Hudson River Tunnel in the Palisades 9

Construction Activities in North Bergen 10

Construction Activities: Construction at North Bergen 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 New tunnel construction March 2019 December 2026 Approach to Palisades and New Tunnel Portal Tunnel Excavation (Two Tubes) Tunnel Internal Concrete and Cross Passages Tunnel Tracks and Systems Most construction: 7 AM 11 PM, Monday - Friday Tunnel excavation construction: 24 hours a day (weekdays) for two years Surface tracks construction March 2019 November 2023 Rail Underpass beneath Tonnelle Ave Rail Embankment and Viaduct Rail Bridge over Secaucus Rd Rail Bridge over Freight Tracks Most construction: 7 AM 11 PM Monday - Friday Embankment and viaduct construction close to existing tracks: nighttime Existing tunnel rehabilitation January 2027 December 2030 Demolition of Existing Structures and Systems within Tunnel s Two Tubes Installation of New Structures and Systems Construction: 7:30 AM 3:30 AM Monday - Saturday 11

Construction Activities: Tonnelle Avenue Staging Area New Tunnel Grand Avenue Existing Tunnel Access Project Staging New Tunnel Access Project Staging New Tonnelle Ave Bridge over Tracks New Surface Tracks 12

Construction Activities: Tonnelle Avenue Truck Routing Existing Tunnel Access Project Staging Grand Avenue Project Staging New Surface Tracks 13

Construction Activities: Truck Volumes on Tonnelle Avenue New tunnel construction (2019-2026): Peak of 26 trucks per hour during new tunnel excavation (up to two years) Fewer trucks during other activities Trucking Monday-Friday, 7 AM 11 PM Existing tunnel rehabilitation (2027-2030): Peak of 14-17 trucks per hour (approximately two years) Fewer trucks during the other two years Trucking Monday-Saturday, 7 AM 3:30 AM 14

Construction Activities: New Tunnel Tunnel Excavation Tunnel Boring Two Tunnel Boring Machines 28 feet in diameter and assembled at the staging and launch site Tunneling advances an average of 35 feet per day Excavated materials ( spoils ) removed from tunnel by conveyor behind machine to staging area 15

Construction Activities: New Tunnel Tunnel Excavation Tunnel Boring Voids behind rings will be filled with cement grout Tunnel will be lined with concrete rings 16

Construction Activities: New Tunnel Cross Passages and Internal Concrete Cross passages between tunnel tubes will be excavated through controlled drilling and blasting (2 weeks per cross passage) Reinforcing steel and concrete will be placed in bottom of tunnel to form trackbed and benchwalls 17

Construction Activities: Surface Tracks Tracks through Meadowlands to Tonnelle Avenue Rail underpass at Tonnelle Avenue Pile driving for new viaduct and bridges in the Meadowlands 18

Construction Activities: Existing Tunnel Rehabilitation Demolish and Reconstruct Tunnel Interior For each tube of the existing tunnel: 1. Decommission tracks and set up work zone (3 months) 2. Demolish and remove existing bench wall system (6 months) 3. Install new bench wall system (10 months)* 4. Demolish and remove existing tracks; install new tracks and catenary system (6 months) Total time = 23 months per tube * Step 3 overlaps with Steps 2 and 4 19

Construction Activities: Existing Tunnel Rehabilitation Tonnelle Avenue Staging Area Platform over Live Track Existing Tunnel Access Project Staging Grand Avenue Possible Platform over New Tracks Project Staging Existing Tracks One in Use New Surface Tracks in Use 20

Mitigation Measures to Reduce Impacts 21

Mitigation Measures to Reduce Impacts: Active and Responsive Community Engagement 24-hour hotline for emergencies, construction complaints Neighborhood Project outreach office Project liaison always available to address concerns and work with community to accommodate special events where possible Regular meetings and coordination to identify concerns and provide information about upcoming construction Email/text notification for construction activities and meetings 22

Mitigation Measures to Reduce Impacts: Sound-Reducing Windows Sound-reducing windows and alternative ventilation (air conditioning) for residences above site and along truck route Grand Ave, Paterson Plank Rd Tonnelle Ave, 10 th St Secaucus Rd Sound-reducing windows Grand Avenue lower audible noise noticeably by up to half (depending on building construction) Permanent improvement for residences Grand Avenue 23

Mitigation Measures to Reduce Impacts: Vibration Monitoring Program Vibration may be perceptible above TBM but not at a level to cause building damage Pre-construction surveys of buildings Installation of vibration sensors in buildings Vibration monitoring during construction Post-construction inspection for damage 24

Mitigation Measures to Reduce Impacts: Other Mitigation Measures Multi-approach dust control plan Enclosed conveyor for spoils removal, mufflers and baffles on equipment Downward-directed, shielded site lighting Maintenance and protection of traffic plan 25

Thank you. Questions? 26