APS Cleaning Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

Similar documents
Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

Machined Integrations, LLC

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

25 D.L. Martin Drive Mercersburg, PA (717)

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

4. Quality Management System 4.1 GENERAL REQUIREMENTS

ISO9001 QUALITY POLICY MANUAL

INTERNATIONAL STANDARD

UPGRADE ASSESSMENT CHECKLIST

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

OPERATIONS MANUAL ISO 9001 Quality Management System

Eagle Machining, Inc.

CHAPTER 8 INTEGRATION OF QMS AND LMS

Quality System Manual

QUALITY SYSTEM MANUAL

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

INTERNATIONAL STANDARD

ISO 9001:2000 Revision G

INTERNATIONAL STANDARD

Quality Assurance Manual, Revision F Page 1 of 20

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

Quality Commitment. Quality Management System Manual

Sensor Scientific, Inc.

Continental Steel & Tube Co. Quality Manual

Project Procedure 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES 4.0 DEFINITIONS. No.: P /21/2012 PAGE 1 OF 8 INTERNAL QUALITY AUDITS

Awareness to ISO 9001:2000

Proprietary Document Disclosure Restricted To Employees and Authorized Holders

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

Quality Manual. AARD Spring & Stamping Quality Manual

Railroad Friction Products Corporation

Quality Systems Manual

Everest Engineering Works ISO REVISION DATE ISSUE

ISO 9001:2000 The International Quality Management Business System

AS 9100 Rev C Quality Systems Manual AS-050C-QM

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

Atlantic Technical Systems, Inc. 415 Headquarters Drive # 2 Millersville, MD USA Office: (410) Fax: (410)

ISO 9001:2015. Quality Management System. Manual

MALAYSIAN STANDARD. Licensed to UNIMAP LIBRARY / Downloaded on : 22-Dec :14:03 PM / Single user license only, copying and networking prohibited

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

ISO 9001:2008 Quality Management System QMS Manual

PRINTED COPY IS NOT CONTROLLED

QUALITY MANUAL ECO# REVISION DATE MGR QA A 2/25/2008 R.Clement J.Haislip B 6/17/2008 T.Finneran J.Haislip

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

MALAYSIAN STANDARD QUALITY MANAGEMENT SYSTEMS - REQUIREMENTS (FIRST REVISION) (ISO 9001:2008, IDT) (PUBLISHED BY STANDARDS MALAYSIA IN 2009)

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

AEROSPACE STANDARD. Quality Systems - Aerospace - Model for Quality Assurance in Design, Development, Production, Installation and Servicing

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

ISO9001:2008. Quality Manual. Hyundai Heavy Industries South Huron Drive Santa Ana, CA USA. Quality Manual QM001 Revision A Page 1

Quality Management System Manual

14620 Henry Road Houston, Texas PH: FX: WEB: QUALITY MANUAL

Revision. Quality Manual. Multilayer Prototypes. Compliant to ISO / AS9100 Rev C

Odyssey Electronics, Inc Fairlane Livonia, MI 48150

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

Quality Manual In support of ISO 9001:2015 ANSI/NCSL Z , ISO/IEC17025 ISO10012

J. McCann & Co (Nottm) Ltd McCann House 110 Nottingham Road Chilwell Nottingham NG9 6DQ. Quality Manual

The Standard Illustrations ISO The International Standard for Quality Management Systems. Year 2000 Edition. Leland R.

CAPITAL AVIONICS, INC. Quality Manual

QM-1 QUALITY MANAGEMENT SYSTEMS MANUAL. Revision 10

1 Management Responsibility 1 Management Responsibility 1.1 General 1.1 General

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

DEC STD ISO Quality Systems - Model for Quality Assurance in Design /Development, Production, Installation and Servicing

Quality Manual ISO 9001:2008 ISO 9001:2015

Harmony Castings LLC Aluminum V-Process Castings Quality Manual Section: Page 1 of 27

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

The Skyworks Quality Management System strives to:

Main changes to ISO 9001 from the 2000 version to the 2008 version

QUALITY ASSURANCE MANUAL

UNCONTROLLED DOCUMENT

TOOL ENGINEERING OLD GROVE RD. SAN DIEGO, CA

Webster - Hoff Corporation. Quality Manual

1050 Day Hill Road Windsor, Connecticut Telephone (860) Fax (860) SUPPLIER SURVEY DATE OF SURVEY TYPE OF SURVEY

ISO /TS 29001:2010 SYSTEMKARAN ADVISER & INFORMATION CENTER SYSTEM KARAN ADVISER & INFORMATION CENTER

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL ISO 9001:2008

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008

Quality management systems Requirements

Brumund Foundry Inc.

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

CORPORATE QUALITY MANUAL

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

Quality Systems Manual

External approval and/or acknowledgment requirements apply prior to issuance or revision of this document: Yes No. Yes PROPRIETARY DOCUMENT No

Quality Manual. Ingenuity at its best WEST INDUSTRIES LLC Silverton, Suite 924 San Diego, CA USA

0. 0 TABLE OF CONTENTS

Reliance Aerospace Solutions

PRECISE INDUSTRIES INC. Quality Manual

QUALITY MANAGEMENT SYSTEM QUALITY MANUAL

EPICOR, INCORPORATED QUALITY ASSURANCE MANUAL

Quality Systems Manual Rev. NC Issued July 9 / 2018

QUALITY MANUAL BAGLIETTO S.R.L.

QUALITY MANUAL. Revision K. JADE PRECISION MEDICAL COMPONENTS, LLC 3063 B Philmont Avenue Huntingdon Valley, PA 19006

CERTIFICATE OF REGISTRATION

Reference Paragraphs. Appendix B AQS Auditor Handbook

SYSTEMKARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM ISO9001:

Transcription:

Quality Management System Scope of Certification The provision of commercial and industrial cleaning services throughout Queensland.

Table of Contents Contents 1. Introduction... 3 1.1. Process Approach... 3 1.2. Definitions... 3 2. SCOPE... 4 2.1. General... 4 2.2. Permissible Exclusions... 4 2.3. Quality Management Scope... 4 3. QUALITY MANAGEMENT SYSTEM... 4 3.1. General Requirements... 4 3.2. Documentation... 5 3.3. Business Processes... 5 3.4. Document Control... 6 4. MANAGEMENT RESPONSIBILITY... 6 4.1. Management Commitment... 6 4.2. Customer Focus... 6 4.3. Quality Policy... 6 4.4. Planning... 7 4.4.1. Quality Objectives... 7 4.4.2. Quality Management System Planning... 7 4.5. Responsibility, Authority and Communication... 7 4.5.1. Responsibility and Authority... 7 4.5.2. Management Representative... 7 5. Management Review... 7 6. Resource Management... 8 6.1. Provision of Resources... 8 6.2. Human Resources... 8 6.3. Facilities... 9 6.4. Work Environment... 9 7. Product Realisation... 9 8. MEASUREMENT, ANALYSIS AND IMPROVEMENT... 12 2 Page All Hardcopy Documents Are Uncontrolled Version 1.1

1. Introduction 1.1. Process Approach This Manual has adopted the process approach to quality management. Figure 1, is a conceptual illustration of the process approach. Revision and Version Status VERSION NO. SECTION NO. REVISION NO. DATE ISSUED CHANGES MADE 1 Entire manual 1 Entire Manual 1 Entire Manual 0 24/4/2014 First draft for review and approval 0 24/4/2014 First issue 1 01/06/2015 Annual Review This manual is issued by The Management Representative with the approval of The Management Team and is reviewed in accordance with the Document Control procedure. 1.2. Definitions 3 Page All Hardcopy Documents Are Uncontrolled Version 1.1

QMS Quality Management System Product only applies to: a) a product intended for or required by the customer; b) any intended output resulting from the product realisation processes; c) wherever the term product occurs, it can also mean service Work Environment The conditions under which work is performed including physical, environmental and other factors (such as noise, temperature, and humidity, lighting or weather) Statutory and Regulatory requirements can be expressed as legal requirements. Documented Procedure The procedure is established, documented, implemented and maintained. A single document may address the requirements for one or more procedures. A requirement for a documented procedure may be covered by more than one document. The terms used in this Manual describe the supply-chain as follows: SUPPLIER ORGANISATION CUSTOMER 2. SCOPE 2.1. General This document specifies requirements for a quality management system in which The Organisation: demonstrates its ability to consistently produce product that meets customer and applicable statutory and regulatory requirements, aim to enhance customer satisfaction through the effective application of the quality system, including processes for continual improvement and the assurance of conformity to customer and applicable statutory and regulatory requirements 2.2. Permissible Exclusions The Organisation does not provide post-delivery activities at customer locations per section 7.5.1 F of the ISO9001:2008 standard. The Organisation does not provide design & development as per section 7.3 of ISO 9001:2008 2.3. Quality Management Scope The quality system covers all situations where: the specified requirements for product/service are stated in terms of an established design or specification, and confidence in product/service conformance can be attained by adequate demonstration of the Company's capabilities in servicing. 3. QUALITY MANAGEMENT SYSTEM 3.1. General Requirements 4 Page All Hardcopy Documents Are Uncontrolled Version 1.1

The Organisation establishes, documents, implements, maintains and continually improves its quality management system in accordance with the requirements of ISO9001:2008. To implement the quality management system, The Organisation: determine the processes needed for the quality management system; determines the sequence and interaction of these processes; determines criteria and methods required to ensure the effective operation and control of these processes; ensures the availability of resources and information necessary to support the operation and monitoring of these processes; monitor, measure where applicable and analyzes these processes, and implements action necessary to achieve planned results and continual improvement, implement action necessary to achieve planned results and continual improvement of these processes. 3.2. Documentation The Organisation QMS is documented in a five-tiered structure: Quality Policy a statement of The Organisation commitment to Quality and Quality Objectives. This is issued by the Management Team and is reviewed regularly. Quality Manual outlines what we will do to meet the requirements of each element of ISO 9001: 2008 and quality objectives, targets and programs. In fulfilling these requirements we expect to satisfy the objectives of our Quality Policy. The Quality Manual is issued by the Management Representative with the approval of the Management Team and will be reviewed regularly. Procedures describes in detail how we will satisfy each element of I ISO 9001: 2008 and how we control other critical processes in order to meet the commitments outlined in the Quality Policy. Quality Procedures are issued by the Management Representative and are reviewed as required due to changing circumstances. Work Instructions details the necessary steps for each quality -related or critical-related activity in logical sequence so that the activities can be consistently repeated to the standard required in the procedures. Work Instructions are issued by the Management Representative in consultation and are reviewed as required to reflect changing circumstances Documentation & Document control - Records provide evidence of conformity to requirements. Certain records are "controlled" and as such a procedure defining who controls where and for how long records are stored and the method of disposition has been issued by the Management Representative. Refer Procedure Documentation 3.3. Business Processes The Organisation s operational processes are shown below, with the Quality Management procedures that apply to each: 5 Page All Hardcopy Documents Are Uncontrolled Version 1.1

Sales Operations Quality Management Finance Contract Review Customer Satisfaction Purchasing Operational Control Goods Handling Work Environment & Infrastructure Training Analysis of Data Continual Improvement Quality Objectives Documentation Document Control Control of Records Corrective & Preventative Action Internal Audit Management Review Excluded 3.4. Document Control The Organisation controls system documents in a consistent manner across all of its management systems. Refer Procedure: Document Control 4. MANAGEMENT RESPONSIBILITY 4.1. Management Commitment The Organisation Management provide evidence of its commitment to the development and improvement of the quality management system by: a) Communicating to the organisation the importance of meeting customer as well as regulatory and legal requirements, b) Establishing the quality policy and quality objectives, c) Conducting management reviews, and d) Ensuring the availability of necessary resources The Organisation Chart is shown in the Management System Manual 4.2. Customer Focus The Organisation ensure that customer needs and expectations are defined during Contract Review, converted into requirements and fulfilled with the aim of achieving customer satisfaction. 4.3. Quality Policy The Management Team have defined The Organisation Quality Policy. This policy: 6 Page All Hardcopy Documents Are Uncontrolled Version 1.1

a) is appropriate to the operations of The Organisation, b) includes a commitment to meet requirements and to continually improve the Quality Management System, c) provides a framework for defining, establishing, documenting and reviewing quality objectives, d) is communicated and understood at appropriate levels within the company; and e) is reviewed for continuing suitability during Management Review 4.4. Planning 4.4.1. Quality Objectives The Management Team ensure that the Organisation set objectives and updates them annually. These objectives are measurable and consistent with the quality policy and designed to help meet customer requirements and ensure the success of the business. The objectives are communicated to all levels of The Organisation and progress is reviewed periodically. Refer Procedure Quality Objectives 4.4.2. Quality Management System Planning Manager/Supervisors ensure that the resources needed to achieve the quality objectives are identified and planned. The quality plan is documented and kept according to procedure, Goods Handling. The Management Representative ensures that change is conducted in a controlled manner and that the integrity of the quality management system is maintained during this change. 4.5. Responsibility, Authority and Communication 4.5.1. Responsibility and Authority The Management Team shall identify functions and their interrelations within The Organisation through organisation charts and procedures. 4.5.2. Management Representative The Management Team have appointed the Office Administrator as the management representative who, irrespective of other responsibilities, has the responsibility and authority for: a) ensuring that processes of the quality management system are established, implemented and maintained; b) reporting to on the performance of the quality management system, including needs for improvement; c) promoting awareness of customer requirements throughout The Organisation; d) liaison with external parties on matters relating to the quality management system; e) organisational freedom to resolve quality matters; 5. Management Review The Organisation will conduct a regular review of its management systems. The QMS Review includes the following key elements: 7 Page All Hardcopy Documents Are Uncontrolled Version 1.1

internal quality audit results; feedback from internal and external customers; process performance and product conformance; status of preventive and corrective actions; follow-up actions from earlier management reviews; changes that could affect the quality management system; recommendations for improvement; The Management Review will include actions related to: improvement of the quality management system and its processes; improvement of product related to customer requirements; resource needs; Refer Internal Audit in the Management System Manual Refer Procedure: Management Review 6. Resource Management 6.1. Provision of Resources The Management Team working with Managers & Supervisors review resource needs, as required. The Organisation determine and provide the resources needed to implement and maintain the quality management system and continually improve its effectiveness, and to enhance customer satisfaction by meeting customer requirements. 6.2. Human Resources 6.2.1 General The Organisation personnel performing work affecting conformity to requirements shall be competent on the basis of appropriate education, training, skills and experience. 6.2.2 Competency, Training and Awareness The Organisation will ensure that everyone in a role affecting conformity to requirements is aware of the quality policy and each has the responsibility of achieving conformance with the policy and procedures in order to comply with the requirements of the QMS. Staff is selected for their role after careful consideration has been given to their previous work history, both within and outside The Organisation, their relevant academic study and any taskrelated training already completed. Where a need for training is identified, this will be arranged to an agreed priority and a record of this training will be kept. Our Management Representative is responsible for identifying training needs in consultation with the CEO and Business Owners and will arrange and monitor all training programs. 8 Page All Hardcopy Documents Are Uncontrolled Version 1.1

Refer Procedure: Training 6.3. Facilities The Organisation provides and maintains its facilities to achieve the conformity, including: workspace and associated facilities, equipment, hardware and software, and supporting services (such as transport, communication or information systems) 6.4. Work Environment The Organisation maintains its facilities and equipment to identify and manage the human and physical factors of the work environment needed to achieve conformity, as appropriate. 7. Product Realisation 7.1. Planning of Realisation Processes The sequence of processes required to achieve the product defines product realisation. Planning of product realisation processes shall be consistent with the other requirements of The Organisation quality management system and is documented in forms suitable for The Organisation method and areas of operation. In planning the processes for realisation of product The Organisation has determined the following, as appropriate: a) quality objectives for the product, project or contract, b) the need to establish processes and documents, and to provide resources specific to the product, c) verification, validation, monitoring, measurement, inspection and test activities specific to the product, and the criteria for product acceptance, d) records are necessary to provide confidence of conformity of the processes and resulting product, and e) identification of resources to support operation and maintenance of the product Documentation that describes how the processes of the quality management system are applied for a specific product, project or contract can be referred to as a quality plan. 7.2. Identification of Customer Related Processes 7.2.1. Customer Requirements The Organisation determines customer requirements including: a) product requirements specified by the customer, including the requirements for delivery and post delivery support (includes warranty and contract obligations when applicable), b) product requirements not specified by the customer but necessary for intended or specified use, c) statutory and regulatory requirements applicable to the product, and d) any additional requirements considered necessary by The Organisation 9 Page All Hardcopy Documents Are Uncontrolled Version 1.1

7.2.2. Review of Product Requirements The Organisation reviews the identified customer requirements together with any additional requirements determined as specified in the procedure Contract Review. Contract review is conducted prior to the commitment to supply a product to the customer (e.g. submission of a tender, acceptance of a contract or order) and ensures that: a) product requirements are defined, b) contract or order requirements differing from those previously expressed (e.g. in a tender or quotation) are resolved, c) The Organisation has the ability to meet defined requirements, and d) risk has been evaluated Where the customer provides no documented statement of requirement, the customer requirements are confirmed before acceptance. The results of the review and subsequent follow-up actions are recorded. The Organisation communicates any changes to relevant personnel to ensure they are made aware of the changed requirements. 7.2.3. Customer Communication The Organisation arranges communication as appropriate, with customers relating to, but not limited to: a) product information, b) inquiries, contracts or order handling, including amendments, c) Customer feedback 7.3. Purchasing 7.3.1. Purchasing Process The Organisation has a process to ensure that purchased product conforms to specified purchase requirements. The type and extent of control to be exercised depends upon the type of product, the impact of purchased product on the quality of final product, and previously demonstrated capability and performance of Suppliers as specified in procedure Purchasing. The Organisation: a) evaluates and selects its suppliers based on their ability to supply product in accordance with its requirements, b) establishes and maintains a list of Approved Suppliers, c) selection criteria for initial and ongoing evaluation and re-evaluation shall be established, and d) records of the results and any necessary actions shall be maintained 7.3.2. Purchasing Information Purchasing documents contain information describing the product to be purchased, including where appropriate: a) requirements for approval of: -product, 10 Page All Hardcopy Documents Are Uncontrolled Version 1.1

-procedures, -processes, -equipment b) requirements for qualification of personnel; c) quality management system requirements; 7.3.3. Verification of Purchased Products The Organisation identifies and implements the activities necessary for verification of purchased product. Where The Organisation or its customer proposes to perform verification activities at the supplier s premises, The Organisation may specify the intended verification arrangements and method of product release in the purchasing information. Verification may include: a) obtaining objective evidence of the quality of the product from suppliers; b) inspection and auditing at supplier s premises; Where specified by contract, the customer, or regulatory representatives shall be afforded the right to verify at the supplier s premises and The Organisation premises that subcontracted product conform to requirements. 7.4. Production and Service Provision 7.4.1. Control of Production and Service Provision The Organisation controls production and service operations through: a) the availability of information that specifies the characteristics of the product, b) the availability of work instructions that accurately reflect the require work where necessary c) the use and maintenance of suitable equipment for production d) the availability and use of measuring and monitoring equipment, e) the implementation of monitoring and measuring activities, and f) the implementation of product release, delivery and applicable post-delivery activities 7.4.2. Validation of Processes Validation demonstrates the ability of the processes to achieve planned results. The Organisation validates any production processes where the resulting output cannot be verified by subsequent measurement or monitoring. This includes any processes where deficiencies may become apparent only after the product is in use or has been delivered. The Organisation has defined arrangements for validation that Include the following, as applicable: a) defined criteria for review and approval of the processes, b) approval of equipment and personnel, c) use of defined methodologies and procedures, d) requirements for records, and e) re-validation. 7.4.3. Identification & Traceability 11 Page All Hardcopy Documents Are Uncontrolled Version 1.1

The Organisation identifies, the product, where appropriate, by suitable means throughout product realisation. Product status is identified with respect to measurement and monitoring requirements throughout the product realisation. The Organisation controls and records the unique identification of the product where traceability is a requirement and records are maintained. 7.4.4. Customer Property Care will be exercised while customer property is under control or being used by The Organisation. The Organisation will identify, verify, protect and maintain customer property (including intellectual property and personal data given in confidence) provided for use or incorporation into the product. In the event of any customer property that is lost, damaged or otherwise found to be unsuitable for use it will be recorded in accordance with the procedure Goods Handling and reported to the customer as required. Records of such activity are maintained. 7.4.5. Preservation of Product The Organisation preserves product conformity to customer requirements during internal processing and delivery to the intended destination in order to maintain conformity to requirements. This includes identification, handling, packaging, storage and protection. Refer Procedure: Goods Handling 7.5. Control of Monitoring and Measuring Equipment The Organisation identifies the measurements to be made as well as the measuring and monitoring equipment required to assure product conformity to specified requirements. Equipment used, are controlled to ensure that measurement capability is consistent with the measurement requirements. Where applicable, measuring and monitoring equipment shall: a) be calibrated, verified or both and adjusted periodically or prior to use, against devices traceable to international or national standards; where no such standards exist, the basis used for calibration is recorded; b) be adjusted or re-adjusted as necessary; c) have identification in order to determine its calibration status; d) be safeguarded from adjustments that would invalidate the calibration; e) be protected from damage and deterioration during handling, maintenance and storage; The Organisation has the validity of previous results re-assessed if they are subsequently found to be out of calibration. When deemed necessary, Corrective Action is taken; on the equipment and any product affected. Non-commercial or customised software used for measuring and monitoring of specified requirements is validated prior to use. Note: Software used is verified to ensure it is suitable for use for the intended application. Refer Procedure: Monitoring & Measuring 8. MEASUREMENT, ANALYSIS AND IMPROVEMENT 12 Page All Hardcopy Documents Are Uncontrolled Version 1.1

8.1. General The Organisation defines plans and implements the measurement and monitoring activities needed to assure conformity of the product requirements and QMS and to achieve continuous improvement. This includes the determination of the need for, and use of, applicable methodologies including statistical techniques. 8.2. Measurement and Monitoring 8.2.1. Customer Satisfaction The Organisation monitors information on customer satisfaction as one of the measurements of performance of the quality management system. How The Organisation monitors the customer perception may include but not limited to: Customer Satisfaction Surveys Capturing customer complaints Processing Customer Returns Refer Procedure Customer Satisfaction 8.2.2. Internal Audit The Organisation conducts internal audits at planned intervals to determine whether the quality management system conforms to the requirements of ISO9001:2008 and has been effectively implemented and maintained. The Organisation plans the audit program annually, taking into consideration the status and importance of the activities and areas to be audited as well as the results of previous audits. The audit scope, frequency and methodologies are to be re-defined at that time. Audits are conducted by personnel other than those who perform the activity being audited. Refer Procedure: Internal Audit 8.2.3. Measurement and Monitoring of Processes The Organisation applies suitable methods for measurement and monitoring of those realisation processes necessary to meet conformity to product requirements and on the effectiveness of the quality management system. These methods confirm the continuing ability of each process to satisfy its intended purpose. When planned results are not achieved, appropriate Corrective Action is taken. 8.2.4. Measurement and Monitoring of Product The Organisation measures and monitors the characteristics of the product to verify that requirements for the product are met. This is carried out at appropriate stages of the product realisation process. Evidence of conformity with the acceptance criteria is documented and maintained on the applicable process traveler. Records will indicate the authority responsible for the release of the product for delivery to the customer. Acceptance of product and service for delivery to the customer will not proceed until all the specified activities have been satisfactorily completed, unless otherwise approved by the customer. 8.3. Control of Nonconforming Product 13 Page All Hardcopy Documents Are Uncontrolled Version 1.1

The Organisation ensures that product which does not conform to requirements is identified and controlled to prevent unintended use or delivery and takes appropriate action to eliminate the detected nonconformity. Procedure Goods Handling defines the controls and related responsibilities and authorities for dealing with nonconforming product/.material. The Organisation deals with Nonconforming product by one or more of the following ways a) by taking action to eliminate the detected nonconformity; b) by correcting and subjecting to re-verification after correction to demonstrate conformity, c) by authorizing its use, release or acceptance under concession by a body of designated The Organisation employees and where applicable by the customer, d) by taking action to preclude its original intended use or applications, e) by taking action appropriate to the effects, or potential effects, of the nonconformity when nonconforming product is detected after delivery or use has started 8.4. Analysis of Data The Organisation collects and analyses appropriate data to determine the suitability and effectiveness of the quality management system and to identify improvements that can be made. This includes data generated by measuring and monitoring activities and other relevant sources. Analysis of Data documents this process. The Organisation analyses this data to provide information on: 8.5. Improvement a) customer satisfaction and/or dissatisfaction, b) conformance to customer requirements, c) characteristics of processes, product and their trends, and d) suppliers 8.5.1. Planning for Continual Improvement The Organisation plans and manages the processes necessary for the continual improvement of the quality management system. The Organisation facilitates the continual improvement of the quality management system through the use of the quality policy, objectives, audit results, analysis of data, corrective and preventive action and management review. Refer Procedure Continual Improvement 8.5.2. Corrective & Preventative Action The Organisation takes corrective action to eliminate the causes of nonconformities in order to prevent recurrence. Corrective action is to be appropriate to the impact of the problems encountered. Refer Procedure: Corrective Action & Preventative Action 14 Page All Hardcopy Documents Are Uncontrolled Version 1.1