Figure 1 Demands on Lake Athens

Similar documents
Region C Water Planning Group Meeting. TRA Central Wastewater Treatment Plant April 25, 2005

MEMORANDUM. Supplemental Reservoir Screening Study July 23, 2010 Page 2 of 12

Region C Water Planning Group (RCWPG) Public Notice of Possible Amendments of the 2001 Region C Water Plan PUBLIC NOTICE

The Path to 2060: Dallas Water Plan Update Reuse Partnership with North Texas Municipal Water District

Water Supply Strategies 5 6. Water Master Plan City of Waco

Public Notice of a Proposed Amendment of the 2001 Region C Water Plan

8.3 Somervell County Water Supply Project

3. Analysis of Water Supply Currently Available to Region C

3. Analysis of Water Supply Currently Available to Region C

Project Name: St. Johns River/Taylor Creek Reservoir

7 Management of Existing Supplies

Honorable Members of the Mobility Solutions, Infrastructure and Sustainability Committee

APPENDIX W WATER SUPPLY STUDY FOR KAUFMAN COUNTY

Importance of Rural Water to Southern Iowa s Livestock Industry. Forty-Second Annual Cornbelt Cow-Calf Conference

DALLAS WATER UTILITIES LONG RANGE PLANNING FOR SUSTAINABILITY

Update on California WaterFix

Water Supply in North Texas: Where Does (and Where Will) it Come From?

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc.

8.4 West Central Brazos Water Distribution System

City of Corpus Christi Raw Water Supply Strategies

City of Dallas Drought Update. Dallas Water Utilities February 1, 2012

PRELIMINARY REGIONAL WATER IMPACT FEE FACILITIES PLAN & ANALYSIS CALCULATIONS WASHINGTON COUNTY, UTAH

Oakland Storage. in Oakland. part of the. Water water. being. Demand. Treatment. Required Storage (gallons) Population. Condition.

Water Resource Planning in Washington County, Utah and the Lake Powell Pipeline

Glades Reservoir Environmental Impact Statement (EIS)

2003 ANNUAL REPORT on INTERBASIN TRANSFERS For RTP South and the Towns of Cary, Apex, and Morrisville

The Evolution of the City of Asheville Water System. Presented by Leslie Carreiro and Bill Hart

Appendix VIII. Hazen and Sawyer Technical Memorandum: Option 4: Permanent Haw River Intake. and. Supporting Tables Showing Results of OWASA Analysis

APPENDIX I WATER SUPPLY AVAILABLE TO REGION C

Appendix V. Hazen & Sawyer Technical Memoranda: A. Option 1: Expand Stone Quarry Reservoir and Supporting Tables With Results of OWASA Analysis

Texas Groundwater Summit

Public Hearing on. Region C Water Plan. May 25, 2010

APPENDIX I WATER SUPPLY AVAILABLE TO REGION C DRAFT

APPENDIX I WATER SUPPLY AVAILABLE TO REGION C

Volume 1 Executive Summary

WATER CONSERVATION PLAN. for. Morgan County Quality Water District CR 20 Fort Morgan, CO 80701

Breckenridge Second Water Treatment Plant. Public Open House. April 11, HDR, all rights reserved.

2013 ANNUAL REPORT on INTERBASIN TRANSFERS for RTP South and the Towns of Cary, Apex, and Morrisville

STORMWATER HARVESTING FOR ALTERNATIVE WATER SUPPLY IN VOLUSIA COUNTY, FLORIDA

SCAMA / NOGALES WATER STORAGE STUDY APPRAISAL STUDY

Cypress Waters: TIF Plan and MOU Amendments, Related Service Plan/Development Agreements and Boundary Adjustments

APPENDIX A CALCULATION OF NET PRESENT VALUE OF WATER SUPPLY PACKAGES. Total Capital Total Annual O&M Net Present Value ($) ($ per year) ($ Millions)

City of Davis Conversion of Well #11 from Potable to Irrigation Supply, Challenges and Benefits. Tim Williams, Kennedy/Jenks Consultants Oct 21, 2014

Fort Collins WSDMP Update Additional Supplies and Facilities. Community Working Group Meeting #4 June 22, 2011

PRELIMINARY WASTEWATER CAPACITY STUDY

AECOM (805) tel 1220 Avenida Acaso (805) fax Camarillo, CA 93012

Task Order 6 System Interconnects

EXECUTIVE SUMMARY. The capital improvements costs through Year 2025 have been summarized as follows: RECOMMENDED IMPROVEMENTS (Ref.

John M. Stomp III, PE

Raw Water Supply Master Plan Development

Water Conservation and Emergency Water Management Plan

City of Vacaville Recycled Water Master Plan Feasibility Study

Region C Water Planning Group Meeting. TRA Central Wastewater Treatment Plant October 6, 2003

This is a digital document from the collections of the Wyoming Water Resources Data System (WRDS) Library.

DESIGN CRITERIA FOR TERMINAL STORAGE RESERVOIRS

Report on Feasibility Assessment and Proposed Consolidation Agreement Maumelle Water Management September 22, 2015

New Braunfels population growth ranks second in U.S. San Antonio Business Journal WHY ASR FOR NEW BRAUNFELS UTILITIES

North Texas Municipal Water District Regional Service Through Unity Meeting Our Region s Needs Today and Tomorrow

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

Overview of Local Facilities. Integrated Resource Planning Advisory Committee

Green River Basin Plan Executive Summary

2006 Water Master Plan

APPENDIX D Water Agency Profile: City of San Diego

Regional Service Through Unity Meeting our Region s Needs Today and Tomorrow BOIS D ARC RESERVOIR

Capital Improvements Plan (CIP) Water Delivery / System Development. Capital Improvements Advisory Committee September 5, 2018

Potable Reuse as an Alternative Water Supply. AWRA Conference Orlando, FL

City Of Wichita Falls Water Reuse Projects. August 8, 2013

City Council Work Session Handouts. July 21, I. Review and Discuss North Texas Municipal Water District Water Supply Plan and Projects

Notice of Preparation of an Environmental Impact Report and Scoping Meeting

Upper Sabine Basin Water Supply Study

Table A Summary Water System Data Data

Planning and Economics of Forage Irrigation

Partnership Funding for Water Reuse Revenue for Municipalities, Insurance for Industry

Horizon 2020 Steering Committee Water and Wastewater Master Plan Overview

Supplemental Guide V-Feasibility Study Guidance Document CONTENTS

4B.6 Desalination 4B Description of Option. Desalination of Lake Granbury Water for Johnson County Regional Plan.

UPDATE: SNWA Groundwater Development Project Activities. August 20, 2009

Region C Water Planning Group. 1 Description of Region C. 1.1 Economic Activity in Region C. 1.2 Water-Related Physical Features in Region C

EXISTING EID WATER SUPPLY SOURCES

City of Santa Rosa Groundwater Master Plan. Presentation to BPU Study Session June 6, 2013

Texas Water Plan and Region C Water Plan. UTA Water Systems Design Class March 26, 2009

-For SAC Discussion Purposes Only- Page 1 of 17

5.10 Falls County Water Supply Plan

Implementing the Second Stage Short-Term Drought Response Strategy GMP No. 3 Garney Companies and Pepper Lawson. June 25, 2015

Coping With an Increase in Energy Usage. Cynthia Lane American Water Works Association

CHAPTER 8 CAPITAL IMPROVEMENT PLAN

CULINARY WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix B

INNISFIL WATER AND WASTEWATER MASTER SERVICING PLAN UPDATE

Cane Engineering. March 9, Thunder Ridge Water System

5.10 Falls County Water Supply Plan

Oshkosh Water Filtration Plant Clearwells Replacement Project. Public Information Meeting October 16, 2017

ROWE PROFESSIONAL SERVICES COMPANY. Large Firm Resources. PersonalArtention. January 7, 2013

7.6 Lake Aquilla Storage Reallocation

Culinary Water Impact Fee Facilities Plan

DRAFT. TO: Stephanie Griffin, P.E. PROJECT: Region C Water Supply Plan Freese and Nichols, Inc.

City Of Wichita Falls Status of Water Resources. November 10, 2014

City of Rifle. Water Conservation Plan FINAL REPORT JULY 2008

City of Port Orford Water Supply Expansion. Phase I Distribution System Phase II Hubbard Creek Impoundment

West Bountiful City. Water System Capital Facilities Plan

Monetizing Spare Water Treatment Capacity for Transfers: What it Takes to Get it Done

Transcription:

Table 1 Projected Demands for Athens MWA and Lake Athens Water User Group Demand on Lake Athens 2010 2020 2030 2040 2050 2060 Comments City of Athens 2,326 2,832 3,431 4,111 5,003 6,108 Henderson Co. Irrigation 159 164 169 174 179 185 Local irrigation at lake Henderson County Livestock 3,023 3,023 3,023 3,023 3,023 3,023 Fish Hatchery Henderson County Manufacturing (60% - Reg C) 66 71 80 91 103 117 Total Demand 5,574 6,090 6,703 7,399 8,308 9,433 Future Customers Henderson County Manufacturing 33 35 40 45 52 59 Total Demand Current and Future 5,607 6,125 6,743 7,444 8,360 9,492 Figure 1 Demands on Lake Athens 10,000 Acre-Ft/Year 8,000 6,000 4,000 2,000 Hatchery Athens MWA 0 2010 2020 2030 2040 2050 2060

Table 2 Currently Available Supplies and Demands for Athens MWA and Lake Athens - Values in Acre-Feet per Year - Source 2010 2020 2030 2040 2050 2060 Currently Available Supplies Lake Athens (firm yield) 6,064 5,983 5,903 5,822 5,741 5,660 Lake Athens (safe yield) 5,172 5,084 4,996 4,908 4,820 4,730 Lake Athens (operational yield) 2,900 2,900 2,900 2,900 2,900 2,900 Reuse (limit- 2,677) 0 0 0 0 0 0 Total Supplies (Limited by constraints) 2,900 2,900 2,900 2,900 2,900 2,900 Projected Demands 5,607 6,125 6,743 7,444 8,360 9,492 Projected Surpluses or (Shortages) (2,707) (3,225) (3,843) (4,544) (5,460) (6,592) Figure 2 Supply and Demands on Lake Athens 10,000 Acre-Ft/Year 8,000 6,000 4,000 2,000 Lake Athens Demands 0 2010 2020 2030 2040 2050 2060

Strategy Quantity (Ac- Ft/Yr) Capital Cost Table 3 Summary of Costs and Impacts of Potentially Feasible Strategies for Athens MWA and Lake Athens Unit Cost ($/kgal.) Pre-Amort. Post-Amort. Reliability Environmenta l Factors Agricultural/ Rural Impacts Other Natural Resources 3rd Party Impacts Key Water Quality Parameters Temporary Pumping for Fish Hatchery 1,500 $432,500 $0.14 NA High Low Low Low Medium low Low Indirect Reuse 2,677 $3,601,700 $0.48 $0.18 High Low Low Low Low Medium low Forest Grove (all to Lake) 4,500 $6,105,700 $0.41 $0.11 High Medium low Low Low Positive Medium low Forest Grove (split to Lake and City) 4,500 $5,696,900 $0.38 $0.10 High Medium low Low Low Positive Medium low Palestine 4,000 $9,361,100 $0.80 $0.28 High Low Low Low Low Low Dallas 4,000 $1,333,125 $0.50 $0.42 High Low Low Low Medium low Low 5 MGD New WTP at Lake $17,476,500 $1.84 $0.44 High Low Low Low Low Low 1.5 MGD WTP Expansion at Lake $4,150,100 $1.50 $0.40 High Low Low Low Low Low 3.5 MGD New WTP at City $11,423,800 $1.65 $0.35 High Low Low Low Low Low Implementation Issues Requires change in permitted use and agreement with TXU Requires change in permitted use and agreement with TXU Requires contract with UNRMWA Requires contract with DWU Comments May impact recreational use Will improve property values around lake. Will improve property values around lake.

12,000 Figure 3 Athens MWA 10,000 Forest Grove w/ Trmt at City 8,000 Forest Grove w/ Add. Trmt at Lake Acre-ft/year 6,000 4,000 Forest Grove raw water Temporary pump Reuse Conservation Lake Athens Demand 2,000 0 2010 2020 2030 2040 2050 2060

Table 4 Recommended Water Management Strategies for Athens MWA that Provide Additional Water Supply Source 2010 2020 2030 2040 2050 2060 Existing Supplies Lake Athens 2,900 2,900 2,900 2,900 2,900 2,900 Water Management Strategies Conservation 25 194 346 469 609 790 Reuse 1,662 1,966 2,325 2,677 2,677 2,677 Temporary pump 1,500 Forest Grove raw water 0 2,000 1,660 1,660 1,660 1,660 Forest Grove w/ Add. Trmt at Lake 840 840 840 840 Forest Grove w/ Trmt at City 2,000 2,000 Total Supplies from Strategies 3,187 4,160 5,171 5,646 7,786 7,967 Total Supplies 6,087 7,060 8,071 8,546 10,686 10,867 Total from Conservation and Reuse 1,687 2,160 2,671 3,146 3,286 3,467 Percent of Supplies from Conservation and Reuse 27.7% 30.6% 33.1% 36.8% 30.8% 31.9% Demand 5,607 6,125 6,743 7,444 8,360 9,492 Surplus or (Shortage) 480 936 1,328 1,102 2,326 1,375 Table 5 Summary of Costs for Recommended Water Management Strategies Quantity Capital cost Annual Cost Cost/Ac-ft Raw Water $/1,000 gal Treated $/1,000 gal Reuse 2,677 $3,601,700 $418,718 $156 $0.48 Forest Grove (split to Lake and City) 4,500 $5,696,900 $559,500 $124 $0.38 1.5 MGD Expansion at Lake 840 $4,150,100 $411,700 $490 $1.50 3.5 MGD New WTP at City 1,960 $11,423,800 $1,053,400 $537 $1.65 Total $24,872,500

Probable Owner: Athens MWA Amount: 2,677 Acre-Feet/Year 2.4 MGD design TRANSMISSION FACILITIES Table A-1 Athens MWA Reuse Pipeline Size Quantity Unit Unit Price Cost Pipeline Urban 12 in. 19,000 LF $42 $798,000 Pipeline Urban 10 in. 23,800 LF $36 $856,800 Right of Way Easements (Rural) 0 ft. 0 Acre $3,000 $0 Right of Way Easements (Urban) 20 ft. 10 Acre $30,000 $300,000 Engineering and Contingencies (30%) $496,000 Subtotal of Pipeline $2,450,800 Pump Station(s) Pump Station at West WWTP 50 HP 1 EA $400,000 $400,000 Pump Station at North WWTP 100 HP 2 EA $620,000 $1,240,000 Engineering and Contingencies (35%) $574,000 Subtotal of Pump Station(s) $974,000 Permitting and Mitigation 1 LS $32,900 CONSTRUCTION TOTAL $3,457,700 Interest During Construction (12 months) $144,000 TOTAL CAPITAL COST $3,601,700 ANNUAL COSTS -RAW WATER Debt Service (6% for 30 years) $261,660 Raw water purchase NA Electricity ($0.06 kwh) $88,000 Facility Operation & Maintenance $69,058 Total Annual Costs $418,718 UNIT COSTS (During Amortization) Per Acre-Foot of raw water $156 Per 1,000 Gallons of raw water $0.48 UNIT COSTS (After Amortization) Per Acre-Foot of raw water $59 Per 1,000 Gallons of raw water $0.18

Probable Owner: Athens MWA Amount: 4,500 Acre-Feet/Year 5 MGD design Table A-2 Obtain Water from Forest Grove Reservoir and Transport All to Lake Athens TRANSMISSION FACILITIES Pipeline Size Quantity Unit Unit Price Cost Pipeline Rural 24 in. 41,560 LF $66 $2,743,000 Pipeline Urban 24 in. 2,000 LF $99 $198,000 Right of Way Easements (Rural) 30 ft. 29 Acre $3,000 $87,000 Right of Way Easements (Urban) 30 ft. 1 Acre $30,000 $30,000 Engineering and Contingencies (30%) $882,000 Subtotal of Pipeline $3,940,000 Pump Station(s) Intake and Pump Station - FG 290 HP 1 EA $1,200,000 $1,200,000 Engineering and Contingencies (35%) $420,000 Subtotal of Pump Station(s) $1,620,000 Permitting and Mitigation 1 LS $49,700 CONSTRUCTION TOTAL $5,609,700 Interest During Construction (18 months) $346,000 Permitting associated with Water Rights Transfer $150,000 TOTAL CAPITAL COST $6,105,700 ANNUAL COSTS RAW WATER Debt Service (6% for 30 years) $443,572 Raw water purchase $0 Electricity ($0.06 kwh) $90,000 Facility Operation & Maintenance $71,300 Total Annual Costs $604,872 UNIT COSTS (During Amortization) Per Acre-Foot of raw water $134 Per 1,000 Gallons of raw water $0.41 UNIT COSTS (After Amortization) Per Acre-Foot of raw water $36 Per 1,000 Gallons of raw water $0.11

Table A-3 Obtain Water from Forest Grove Reservoir and Transport Portion to Lake Athens/ Transport Portion to New WTP Near Athens Probable Owner: Athens MWA Amount: 4,500 Acre-Feet/Year 5.8 MGD design Raw water to Lake Athens 2500 ac-ft/yr 2.79 MGD design Raw water to City 2000 ac-ft/yr 3.57 MGD design TRANSMISSION FACILITIES Pipeline Size Quantity Unit Unit Price Cost Pipeline Rural 24 in. 13,500 LF $66 $891,000 Pipeline Rural 18 in. 29,500 LF $42 $1,239,000 Pipeline Urban 18 in. 4,400 LF $63 $277,200 Right of Way Easements (Rural) 30 ft. 30 Acre $3,000 $90,000 Right of Way Easements (Urban) 30 ft. 3 Acre $30,000 $90,000 Engineering and Contingencies (30%) $722,000 Subtotal of Pipeline $3,309,200 Pump Station(s) Intake and Pump Station 360 HP 1 EA $1,400,000 $1,400,000 Engineering and Contingencies (35%) $490,000 Subtotal of Pump Station(s) $1,890,000 Permitting and Mitigation 1 LS $25,700 CONSTRUCTION TOTAL $5,224,900 Interest During Construction (18 months) $322,000 Permitting associated with Water Rights Transfer $150,000 TOTAL CAPITAL COST $5,696,900 ANNUAL COSTS RAW WATER Debt Service (6% for 30 years) $413,900 Raw water purchase $0 Electricity ($0.06 kwh) $78,000 Facility Operation & Maintenance $67,600 Total Annual Costs $559,500 UNIT COSTS - (During Amortization) Per Acre-Foot of raw water $124 Per 1,000 Gallons of raw water $0.38 UNIT COSTS - (After Amortization) Per Acre-Foot of raw water $32 Per 1,000 Gallons of raw water $0.10

Probable Owner: Athens Fish Hatchery Quantity: 1,500 AF/Y 1.67 MGD TRANSMISSION FACILITIES Table A-4 Henderson County Livestock Additional Use from Lake Athens through Temporary Pumping Pipeline Size Quantity Unit Unit Price Cost Pipeline Rural 16 in. 5,000 LF $34 $170,000 Pipeline Urban 16 in. 0 LF $0 Right of Way Easements Rural (ROW) 0.0 ACRE $2,000 $0 Right of Way Easements Urban (ROW) 0.0 ACRE $20,000 $0 Engineering and Contingencies (30%) $51,000 Subtotal of Pipeline $221,000 Pump Station(s) Temporary Lake Pump 10 HP 1 LS $150,000 $150,000 Booster Pump Station 0 HP 1 LS $0 $0 Engineering and Contingencies (35%) $52,500 Subtotal of Pump Station(s) $202,500 Ground Storage Ground Storage Tanks at Booster 0.00 MG 0 LS $0 $0 Engineering and Contingencies (35%) $0 Subtotal of Ground Storage $0 Surface Water Treatment Water treatment plant 0 MGD 0 LS $0 $0 CONSTRUCTION TOTAL $423,500 Permitting and Mitigation $0 Interest During Construction (6 months) $9,000 TOTAL COST $432,500 ANNUAL COSTS Debt Service (6% for 10 years) $59,000 Electricity ($0.06 kwh) $3,000 Operation & Maintenance $7,000 Raw Water Purchase Kgal $0.00 $0 Treatment Kgal $0.00 $0 Total Annual Costs $69,000 UNIT COSTS (During Amortization) Per Acre-Foot of treated water $46 Per 1,000 Gallons $0.14

Table A-5 1.5 MGD Water Treatment Plant Expansion at Lake Athens Probable Owner: Athens MWA Amount: 840 Acre-Feet/Year Expansion at Lake Athens 840 ac-ft/yr 1.5 MGD design Pump Station(s) Expand intake at Athens by 1.5 MGD 1 LS $150,000 $150,000 Engineering and Contingencies (35%) $53,000 Subtotal of Pump Station(s) $203,000 Permitting and Mitigation 1 LS $1,800 WATER TREATMENT FACILITIES Additional Treatment Capacity at Lake 1.5 MGD $2,775,000 Engineering and Contingencies (35%) $971,000 Subtotal of Treatment $3,746,000 Permitting of treatment plant $33,300 CONSTRUCTION TOTAL $3,984,100 Interest During Construction (12 months) $166,000 TOTAL CAPITAL COST $4,150,100 ANNUAL COSTS TREATED WATER Debt Service (6% for 30 years) $301,500 Electricity ($0.06 kwh) $9,900 Facility Operation & Maintenance $4,500 Water Treatment ($.35/1,000 gal finished water) 840 af/y $95,800 Total Annual Costs $411,700 UNIT COSTS (During Amortization) Per Acre-Foot of treated water $490 Per 1,000 Gallons of treated water $1.50 UNIT COSTS (After Amortization) Per Acre-Foot of treated water $131 Per 1,000 Gallons of treated water $0.40

Table A-6 Water Treatment Plant Expansion at Lake Athens - Forest Grove Option B Probable Owner: Athens MWA Amount: 1,960 Acre-Feet/Year New WTP at City 1,960 ac-ft/yr 3.5 MGD design WATER TREATMENT FACILITIES New Treatment Plant at City 3.5 MGD $7,900,000 Engineering and Contingencies (35%) $2,765,000 Subtotal of Treatment $10,665,000 Permitting of treatment plant $94,800 CONSTRUCTION TOTAL $10,759,800 Interest During Construction (18 months) $664,000 TOTAL CAPITAL COST $11,423,800 ANNUAL COSTS TREATED WATER Debt Service (6% for 30 years) $829,900 Electricity ($0.06 kwh) $0 Facility Operation & Maintenance $0 Water Treatment ($.35/1,000 gal finished water) 1960 af/y $223,500 Total Annual Costs $1,053,400 UNIT COSTS (During Amortization) Per Acre-Foot of treated water $537 Per 1,000 Gallons of treated water $1.65 UNIT COSTS (After Amortization) Per Acre-Foot of treated water $114 Per 1,000 Gallons of treated water $0.35