FDEP INSPECTIONS OF CONTOL AUTHORITY PRETREATMENT PROGRAMS

Similar documents
OVERVIEW OF POTW PRETREATMENT PROGRAM REQUIREMENTS

Essential Pretreatment program knowledge and requirements in accordance with 40 CFR 403

The City of Grand Forks Industrial Pretreatment Program

2016 Industrial Waste Pretreatment Seminar A "How To" Guide for Pretreatment. November 2, 2016

Joshua Balentine Tetra Tech, Inc. CWEA Conference Napa, CA February 3, 2015

U.S. DEPARTMENT OF HUD 04/11/2017 STATE: FLORIDA HOUSING TRUST FUND INCOME LIMITS

1 PERSON 2 PERSON 3 PERSON 4 PERSON 5 PERSON 6 PERSON 7 PERSON 8 PERSON

Certified Domestic Violence Centers

Florida. Logistics & Distribution Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

ARKANSAS DEPARTMENT OF ENVIRONMENTAL QUALITY PRETREATMENT COMPLIANCE INSPECTION (PCI) REPORT. Program Tracked under NPDES Permit Number: AR

RE: AFIN: NPDES Permit No.: AR

UNITED STATES ENVIRONMENTAL PROTECTION AGENCY Washington, D.C NPDES Compliance Inspection Report. Section A: National Data System Coding

Florida. Manufacturing Industry Edition. Source: Florida Department of Economic Opportunity, Bureau of Labor Market Statistics

EPA Pretreatment Enforcement

Pretreatment Streamlining Rule

NPDES Electronic Reporting Rule 40 CFR 127

POTW Pretreatment Program. Industrial Site Visit

SPARTANBURG SANITARY SEWER DISTRICT SIGNIFICANT INDUSTRIAL WASTEWATER DISCHARGE PERMIT PERMIT NO. SIC NO. (S)

2016 Reuse Inventory ii

Información en español: Sirvase llamar a la oficina del supervisor de elecciones de su condado si le interesa obtener este formulario en español

Use of Reclaimed Water at Nurseries

Fertilizer. It s Use within the. Indian River Lagoon. Watershed

Florida Water Environment Association Utility Council

Peltier, Hannah. Rufus,

RENEWAL OF FDEP FACILITY PERMITS: THE PRETREATMENT PERSPECTIVE

FACT SHEET and NPDES WASTEWATER DISCHARGE PERMIT EVALUATION. Department of Environmental Quality Western Region-Salem Office

Pretreatment Compliance Inspection. Summary Report

Upper Blackstone Water Pollution Abatement District

May 4, John Rimmer, General Manager City of West Memphis Utilities P.O. Box 1868 West Memphis, AR RE: City of West Memphis WWTP

PRETREATMENT LOCAL LIMITS WHAT IT MEANS TO INDUSTRIES

Overview of Washington State s Pretreatment Program Scott Mallery, P.E. Pretreatment Engineer September 2012

PRETREATMENT STREAMLINING FINAL RULE FINALLY APPROVED

2017 Regional Load & Resource Plan

$300, law enforcement officers from 39 law enforcement agencies, including 23 sheriff s offices, 10 police

SIGNIFICANT USER WASTEWATER DISCHARGE PERMIT. City of Las Cruces, at. Utilities Department Regulatory Environmental Services Section

Streamlining a Pretreatment Program

HOW TO REALLY SURVIVE AN EPA AUDIT Greg V. Arthur, US EPA, Region 9

A Class I Permit is issued to any user who meets any one of the following conditions:

Florida Department of Environmental Protection Aquatic Plant Management Permits 1

Appendix O. NPDES Permit

INDUSTRIAL PRETREATMENT PROGRAM 101. MWEA IPP Seminar 2017

Classification and Compensation Study Pinellas County, Florida Personnel Board Update

Public Notice. Issuance of Industrial Waste Discharge Permit

PHASE II PLANS 7/16/2018

Compliance and Significant Non-Compliance (SNC) Bill Gintert Charlotte Water

Section 1. Town of Braselton Industrial Pretreatment Program. Background, Legal Authority and Introduction

The Hotel Burbridge is Worthy ol Your Patronage

Industrial Pretreatment What s it all about? Grace Scott Pretreatment Coordinator Water Division Michigan DNRE michigan.

Public Notice. Issuance of Industrial Waste Discharge Permit

Likely Voters Oct. 9-13, % 44% 9% * 2% 2% Registered Voters Oct. 9-13, % 40% 10% * 5% 3%

MARTIN COUNTY BOARD OF COUNTY COMMISSIONERS

Frequently Asked Questions for Permitting

NPDES COMPLIANCE MONITORING STRATEGY AND ANNUAL COMPLIANCE INSPECTION PLAN OCTOBER 1, SEPTEMBER 30, 2018

Manifest Signature Certification

SHRM: Your Career Partner. Shelly Trent, SPHR; Southeast Regional Manager

City of Westbrook DEPARTMENT OF PLANNING, ENGINEERING & CODE ENFORCEMENT

AMENDED DECISION DOCUMENT REGARDING FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION S SECTION 303(d) LIST AMENDMENTS FOR BASIN GROUPS 1, 2, AND 5

RFT Annual Conference Florida Solid Waste Management: State of the State June 12 st, 2017 Tim Townsend, Steve Laux, Malak Anshassi, Matthew Morse

COMPLYING WITH YOUR INDUSTRIAL PRE-TREATMENT PERMIT INDIANA CHAMBER OF COMMERCE CONFERENCE OCTOBER 24, 2017 PERMIT AGENDA

THOUGHTS ON THE PANAMA CANAL EXPANSION. Bruce Lambert Executive Director Institute for Trade and Transportation Studies

ENFORCEMENT RESPONSE PLAN

EVALUATING CURRENT AND HISTORICAL ASR SYSTEM PERFORMANCE IN FLORIDA

Justification Review

Professional Engineering Services for Studies and Reports PNC P1 LOCAL PRESENCE EXTENSIVE EXPERIENCE EFFECTIVE SOLUTIONS

CITY OF SIOUX FALLS ADMINISTRATIVE RULES. Chapter 77 Public Works / Water Reclamation. Article 77:01 INDUSTRIAL PRETREATMENT PROGRAM

Wastewater Pretreatment 101

Arapahoe County Water and Wastewater Authority Rules and Regulations APPENDIX C

SURFACE WATER MANAGEMENT ELEMENT

INDUSTRIAL PRETREATMENT PROGRAM FOR THE K.I. SAWYER WWTP MARQUETTE COUNTY GWINN, MICHIGAN

Reclaimed Water and Altnerative Sources

WHERE DO THE PRETREATMENT PERMIT LIMITS COME FROM??? Amy Varinoski City of Mebane

Subject: Agency Disciplinary Actions Completed July 1, 2017 through September 30, 2017

Please mail or fax completed applications and all required documentation to:

BOROUGH OF NORTH EAST PRETREATMENT ORDINANCE ORDINANCE NUMBER 884

Overview of City of Marietta Pretreatment Program

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT. St. Francis Wastewater Treatment Facility Project Description

City of Tallahassee, Florida

PRETREATMENT PROGRAM LOCAL LIMITS

1. The facility had several thermometers which had not been calibrated in over a year.

INDUSTRIAL WASTEWATER PRETREATMENT POLICY MANUAL

SEWER USE ORDINANCE (INDUSTRIAL PRETREATMENT RULES AND REGULATIONS) OF THE CAMDEN COUNTY MUNICIPAL UTILITIES AUTHORITY CAMDEN, NEW JERSEY

ARTICLE 6 SPECIAL PERMITS FOR SIGNIFICANT INDUSTRIAL USERS INTO TOWN'S WASTEWATER SYSTEM

A T L A N T I C O C E A N

A. Narrative Statement

Industrial User Survey

CareerSource Florida Board Meeting February 8, 2017

N.J.A.C. 7:14A-1 POLLUTANT DISCHARGE ELIMINATION SYSTEM SUBCHAPTER 21. REQUIREMENTS FOR INDIRECT USERS

Florida Sinkholes and Grout Injection Stabilization

All Citrus Acreage, by Variety and Survey Year, and Changes Between Surveys Florida: Specialty fruit. Total

Total Polychlorinated Biphenyls (PCBs).

Economic Contributions of the Environmental Horticulture Industry in Florida in 2015

PURPOSE OF THIS APPLICATION

Working with Transportation Concurrency Exception Areas

PERMIT APPLICATION FOR RECLAIMED WATER REUSE (RWR)

Address1 Address2 City State Zip Date Event Association Count Low Dissolved Spanish Kay Drive Brevard Merritt Island FL 1/2/2014 Fish Kill

MUNICIPAL WATER POLLUTION PREVENTION (MWPP) ANNUAL REPORT

Rail Enterprise Presentation

3:00 p.m. - 3:30 p.m.

In-Water Boats: Main Hall Boats:

June 12, Honorable Marion Gill, Mayor City of Dumas P.O. Box 157 Dumas, Arkansas RE: Waste Water Treatment Facility.

Transcription:

Florida Department of Environmental Protection FDEP INSPECTIONS OF CONTOL AUTHORITY PRETREATMENT PROGRAMS Industrial Pretreatment Program Sam Jinkins, Pretreatment Specialist

OVERVIEW Regulatory Authority EPA Requirements Inspection Types Inspection Requirements Inspection Interview File Review Recommendations

REGULATORY AUTHORITY 1972 and 1977 Federal Water Pollution Control Act Amendments (FWPCA, 1948) Goals Prevent Pass-through and interference Regulation of nondomestic industrial users FDEP designated as the industrial pretreatment Approval Authority May 1,1995 National Pollutant Discharge Elimination System (NPDES) delegation

EPA GENERAL REQUIREMENTS As the Approval Authority (AA) - FDEP Must: 1. Determine if the local program/control authority (CA) is properly implementing and enforcing its program 2. Ensure that CAs and industrial users comply with applicable local pretreatment standards 3. Evaluate the progress of each CA 4. Identify any aspects of CA programs that need improvement 5. Serve as CA if no approved program exists

EPA 106 WORKPLAN REQUIREMENTS CA Inspections 80% of fully active CAs receive a pretreatment compliance inspection (PCI) by Department Staff 20% of fully active CAs receive a pretreatment program audit (PPA) by Department Staff CA submissions 100% of all submissions must be reviewed

WHY WE INSPECT The inspection is designed to answer the following questions: Is the CA complying with existing requirements in its permit, approved program, and the General Pretreatment Regulations? Are any changes that the CA is proposing to make in its program appropriate and should such changes be officially incorporated via program/permit modification?

WHY WE INSPECT The inspection is designed to answer the following questions: Can the CA benefit from specific and available resources which the Approval Authority can provide such as guidance documents, computer programs, etc.? What follow-up actions on the part of the CA are recommended to improve the effectiveness of the existing program?

INSPECTION FORMAT Email with Inspection Schedule CA MUST confirm the inspection date Provides consent Opening Conference and Introduction Interview followed by a discussion of the findings File Review and discussion of findings Closing- discuss expected comments SIU Inspections and closing (PPA s only)

INSPECTION TYPES - AR Annual Pretreatment Reports (AR) Equivalent to a PCI in determining program implementation Industrial Pretreatment Discharge Monitoring Report (DMR) - Must be submitted with AR if required by WWTF permit; Or summary of analytical results for influent, effluent, and residuals priority pollutant scans if no DMR requirement Summary of analytical results and removal rates for conventional pollutants (BOD, TSS, ph, and O&G)

INSPECTION TYPES - PCI For a PCI the Department must: Complete and document the interview Complete and document file reviews Review any outstanding issues from previous annual reports, DMRs, previous inspections Review analytical reports used to complete the DMRs

INSPECTION TYPES - PPA For a PPA the Department must: Complete and document the interview Complete and document file reviews Complete a minimum of 2 oversight inspections at 2 industrial users Review any outstanding issues from previous annual reports, DMRs, previous inspections Review analytical reports used to complete the DMRs

INSPECTION TYPES - PPA For a PPA the Department must: Review the CA s sewer use ordinance, enforcement response plan, and any applicable multijurisdictional agreements Review will be completed after the audit Please submit copies of these documents during the PPA

INSPECTION INTERVIEW Applies to both PCIs and PPAs Typically the first portion of the inspection Goal: Evaluate the portions of program implementation that can not be evaluated adequately during the IU file review Inspection Form to be completed by CA before the inspection

FILE REVIEW IU CONTROL MECHANISM Issuance or reissuance of control mechanism Statement of duration (< 5 years) Statement of nontransferability without, at a minimum, prior notification to the control authority and provision of a copy of the existing control mechanism to the new owner or operator. Applicable effluent limits

FILE REVIEW IU CONTROL MECHANISM Self-monitoring requirements Identification of pollutants to be monitored Sampling frequency Sampling locations/discharge points Sample types (grab or composite) Reporting requirements Record-keeping requirements Statement of applicable civil and criminal penalties Compliance schedules

FILE REVIEW IU CONTROL MECHANISM Notification requirements Slug loading (immediate oral notice and 5 days for follow-up written report) Bypasses (anticipated: 10 days prior to bypass, unanticipated: 24-hour oral notice and 5 days for follow-up written report) Upsets (24-hour oral notice and 5 days for follow-up written report) Significant change in discharge (prompt notification is required) 24-hour notification of violation/resample requirement

FILE REVIEW IU CONTROL MECHANISM Slug discharge control plan requirements, if plan is required

FILE REVIEW CA APPLICATION OF IU PRETREATMENT STANDARDS Calculation and application of categorical standards Classification by category/subcategory Classification as new/existing source Application of limits for all regulated pollutants Application of local limits Document mass based limit allocations (if applicable) Calculation/application of production-based standards

FILE REVIEW CA APPLICATION OF IU PRETREATMENT STANDARDS Calculation/application of CWF or FWA Application of most stringent limits

FILE REVIEW CA COMPLIANCE MONITORING Sampling at least once a year Documentation of sampling activities Analysis for all parameters Appropriate analytical methods Inspection at least once a year Documentation of inspection activities Evaluation of need for slug discharge control plan Calculation of SNC

FILE REVIEW IU SELF-MONITORING AND REPORTING Self-monitoring at frequency specified in permit/regulation Analysis of all required pollutants Submission of BMR/90-Day Report Periodic self-monitoring report Reporting all required pollutants Signatory/certification of reports

FILE REVIEW IU SELF-MONITORING AND REPORTING Submission of compliance schedule reports by required dates Notification within 24 hours of becoming aware of: Discharge violations Slug loads Accidental spill

FILE REVIEW IU SELF-MONITORING AND REPORTING Resampling/reporting within 30 days of knowledge of violation Notification of hazardous waste discharge Submission/implementation of slug discharge control plan Notification of significant changes

FILE REVIEW CA ENFORCEMENT ACTIVITIES Identification of violation Discharge Violations Monitoring/reporting violations Compliance schedule violations Adherence to approved ERP Escalation of enforcement

FILE REVIEW IU COMPLIANCE STATUS Noncompliance with discharge limits but not SNC SNC: Chronic violations TRC violations Spill or slug load violations Other discharge violations

FILE REVIEW IU COMPLIANCE STATUS Noncompliance with reporting requirements but not SNC SNC with reporting requirements Publication for SNC

PROGRAM ASSIGNMENTS John Palenchar (850) 245-7566 Altamonte Springs, City of Apopka, City of Auburndale, City of Clearwater, City of Hillsborough County Lakeland, City of Largo, City of Oldsmar, City of Pasco County Pinellas County Plant City, City of Sanford, City of Seminole County St. Petersburg, City of Tampa, City of Tarpon Springs, City of Winter Haven, City of

PROGRAM ASSIGNMENTS Charlotte Cope (850) 245-8607 Broward County Clay County Daytona Beach, City of Deland, City of Ft. Pierce, City of Gainesville, City of JEA (Jacksonville, City of) Lake City, City of Loxahatchee ECD Martin County Orange County Orlando, City of Ormond Beach, City of Palm Beach County Port Orange, City of Reedy Creek Improvement Dist Seacoast Utilities Authority South Central WWTP St. Augustine, City of St. Johns County Tallahassee, City of West Palm Beach, City of Winter Garden, City of

PROGRAM ASSIGNMENTS Sam Jinkins (850) 245-8609 Bay County Cocoa Beach, City of Collier County Davie, Town of Escambia County Ft. Lauderdale, City of Ft. Myers, City of Hollywood, City of Indian River County Lee County Leesburg, City of Manatee County Marion County Melbourne, City of Miramar, City of Ocala, City of Okaloosa County Palm Bay, City of Panama City, City of Perry, City of Plantation, City of Port St. Joe, City of Rockledge, City of Titusville, City of Vero Beach, City of Wildwood, City of

RECOMMENDATIONS Review the inspection requirements in The State of Florida Guidance Manual for Pretreatment Programs (FGM) when preparing for upcoming inspections Review DMR Instructions and include the results of all monitoring conducted at the compliance point DMRs are required to be submitted with AR and only need to be submitted to the Department s Tallahassee Office Conduct a review of all CA issued permits Complete a Permit Fact Sheet (Appendix 6b, FGM) Document any interaction with or notifications by industrial users, including meeting notes, telephone logs, etc., for IU file

RECOMMENDATIONS Include documentation of CWF/FWA calculations, including discharge flow schematic, in IU files or permit fact sheet Include documentation of alternative local limit allocations Retain the Baseline Monitoring Reports and 90-Day Reports Ensure that all CIU files or permit fact sheets contain justification for the categorical determination: Schematics of all discharge lines Process descriptions Date the company began operation Consult your program s assigned inspector we love providing technical assistance Treat all inspections as a learning experience

Questions Contact: Samuel Jinkins Environmental Specialist III Domestic Wastewater Pretreatment Program sam.jinkins@dep.state.fl.us 850-245-8605