WisDOT Projects Old and New Technology

Similar documents
Storm Drain Inlet Protection for Construction Sites (1060)

Bowling Green, Kentucky Stormwater Best Management Practices (BMPs) Sediment Management Practices (SMPs) Activity: Temporary Inlet Protection (TIP)

George Hild Hild & Associates, Inc. River Falls, WI

Construction Best Management Practices Handbook BEST MANAGEMENT PRACTICES

Storm Drain Inlet Protection

Total Suspended Solids: The Hows & Whys of Controlling Runoff Pollution

Figure Inlet protection (Source: Minnesota DOT)

Soil Erosion and Sedimentation Control Application Packet 2011

Exposed Soil = Pollution How You Can Save 100 Feet of Waterway/ Hour Ensuring Good Construction Site Erosion Control!

Construction Phasing Bad

Common Construction-Site BMPs Quick Reference Guide

Schedule A DISTRICT OF MAPLE RIDGE Watercourse Protection Bylaw

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Rock Sock (RS) Rock Sock height.

Section 208. SOIL EROSION AND SEDIMENTATION CONTROL

Chapter CONSTRUCTION SITE EROSION CONTROL

Chemical Treatment. Batch treatment required, flow through continuous treatment not allowed

The Construction General Permit and Erosion Prevention and Sedimentation Control

CITY OF CHICO. Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects. Project Address: Building Permit Number:

City of West Sacramento Erosion and Sediment Control Plan (ESCP) Worksheet for Small Construction Projects

Organic Filter Tubes. Fe= (Depends on soil type)

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Order of road works and servicing construction to be carried out in accordance with the staged contract construction sequence specified below.

CHAPTER 2 EROSION CONTROL

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

Reclamation Plan for the Non-metallic Mining Site owned and operated by Birds Eye Foods, LLC.

Don t go into detail on the C&D (construction and development) Rule here, but mention that the history is covered in more detail in the next slide

Performance Standards Compliance Checklist

Project Information. Check all that are applicable to the construction project site: RIPDES CGP (construction) RIPDES RGP (dewatering)

Storm Water Permitting Requirements for Construction Activities. John Mathews Storm Water Program Manager Division of Surface Water

New Erosion and Sediment Control Guidance for the Greater Golden Horseshoe Area

CCI107 ONLINE PROGRAM. Stormwater Management. Stormwater Management for Construction Activities Alberta. Market Type: Construction Level: 1

Erosion Control Inspection Form

Temporary Erosion and Sediment Control (TESC) Report and Stormwater Pollution Prevention Plan For Construction Activities

Salt-Clay Interactions: Reducing Sediment Loads and Erosion at Snow Storage Sites

Manual for Erosion and Sediment Control Updates

Review of State and Federal Stormwater Regulations November 2007

Tips with Creation of your Erosion and Sediment Control Plan

Section 1I-3 - Bioswales

[] The Red Cedar River and its Streams (Fall 2001)

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

City of Doral 8401 NW 53 rd Ter. Doral, FL 33166

Pavement Surface Evaluation and Rating. Manual RATING RATING RATING PASER RATING. Concrete Roads

INSPECTION, MAINTENANCE AND HOUSEKEEPING PLAN

LIST OF STANDARD DRAWINGS H2-2 - SERIES 2: Grading

Constructed Wetland Use in Nonpoint Source Control

2010 California Green Building Standards Code. Residential and Non-Residential Development

Design Specifications & Requirements Manual

Inlet Protection. Fe= (Depends on soil type)

CEAA ENVIRONMENTAL ENVIRONMENTAL IMPACT ASSESSMENT AMBASSADOR BRIDGE ENHANCEMENT PROJECT. Replacement Span and Plaza Expansion APPENDIX E

NDDOT Erosion & Sediment Control Construction Course

Amendment to OPSS 518 (Nov 2011) Construction Specification for Control of Water from Dewatering Operations

SECTION EROSION AND SEDIMENTATION CONTROLS

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Building Better Storm Water Quality

Upper South Platte Source Water Assessment and Protection Plan

SECTION TRENCHING, BACKFILL AND COMPACTION

MINNEHAHA CREEK WATERSHED DISTRICT BOARD OF MANAGERS REVISIONS PURSUANT TO MINNESOTA STATUTES 103D.341. Adopted April 24, 2014 Effective June 6, 2014

Module 1: Construction Site Erosion Control

Trees, Soil, and Water:

Suitable Applications Where concentrated flow of surface runoff must be conveyed down a slope in order to prevent erosion.

City of Langford Rainwater Management

Slash Water Bar Video

Polyacrylamide. Rough graded soils that will be inactive for a period of time. Temporary haul roads prior to placement of crushed rock surfacing.

SE-6 GRAVEL BAG BERM. Objectives. Potential Alternatives

Rainfall, runoff and sediment transport in the Napa River watershed: now and a possible future

BMP-5. A temporary sediment barrier consisting of a synthetic filter fabric stretched across and attached to supporting posts and entrenched.

PERMIT APPLICATION for Part 91 SOIL EROSION AND SEDIMENTATION CONTROL

Nonmetallic Mining Reclamation & Operation Plan. Amendment No. 1 (Includes modifications for Wash Plant construction) DRAFT

WAKULLA SITE PLANNING

Fabric Drop Inlet Protection

Paving and Grinding Operations

D EROSION AND SEDIMENT CONTROL. Table of Contents

INSPECTION REPORTS, WHAT TO LOOK FOR IN THE FIELD & PROPER INSTALLATION OF COMMON BEST MANAGEMENT PRACTICES (BMPS)

Chapter 2: Selecting Best Management Practices (BMPs)

GRADING, EROSION AND SEDIMENTATION CONTROL

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 800 EROSION AND SEDIMENT CONTROL

Technical Solutions for Erosion Control and Water Clarification using Polyacrylamide (PAM) and PAM Blends

B. Install storm drain inlet protection to prevent clogging of the stormsewer and sediment loads to downstream stormwater facilities or waterbodies.

Dr. Britt Faucette, PhD, CPESC, LEED AP Ecosystem Scientist. Designing with Nature: Compost Blankets & Filter Socks for Erosion & Sediment Control

Stormwater Runoff Water Quality Characteristics From Highways in Lake Tahoe, California

West Fork White River Watershed Conservation Map Summaries. Prepared for the Beaver Watershed Alliance. By the Watershed Conservation Resource Center

Depressed Grade (Curb Cut-Back) Sediment Trap

Alternative BMPs for Erosion Prevention & Sediment Control

LAND DISTURBANCE PERMIT

Recommended Resources: The following resources may be useful in teaching this lesson:

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

CIP-01: Stream Channel Stabilization, Silver Creek

Stormwater Management - Basic Overview for Municipal Employees

SC-01 Surface Outlet and Baffle Sediment Basin

Bioreactor Landfill Design

City of Glendale Stormwater Management Plan Checklist

February beneath the treatment train is lined with black visqueen to create a temporary swale.

Stormwater Utility. Frequently Asked Questions

Erosion & Sedimentation Control Policy

Construction Site Erosion Control and Phase II of the Stormwater Permit Program

Oklahoma DOT E&SC Workshop June 13, 2016

Construction Stormwater Best Management Practices

Transcription:

WisDOT Projects Old and New Technology Michelle Reynolds Erosion & Sediment Control Specialist F o r e s t r y M o w i n g 1

Infiltration Ponds 2

Subsoiling Rain Gardens None of us is as smart as all of us. - Japanese proverb Composting is a Manufacturing Process Composters are Product Manufacturers! Biofiltration Device Not Manure or Aged Manure or Decomposing Garbage Urban Ponds 3

Promoting the proper use of compost products, reduces failures in the field Which hurts end users and composters! Seal of Testing Assurance Program WHAT IS IT? Compost testing and information disclosure program (employing standardized practices) PURPOSE To assist compost end users purchase the product they require for their particular project To assure that compost end users know the characteristics of the compost products they purchase To improve overall customer confidence in compost selection and utilization GOALS: To improve customer confidence in compost selection (and utilization) To improve overall customer satisfaction, as well as field results To improve compost purchasing decisions To promote customer-oriented composters Move industry towards standardized test methods 4

Dust Control includes street sweeping 1958 dedication of WI s 1 st Interstate segment Keep dust contained within the project area 1961 Interstate 90 Dedications American Recovery & Reinvestment Act ARRA Focus on transportation projects Accelerating projects More money for local projects Reinvigorate the economy People who work together will win, whether it be against complex football defenses, or the problems of modern society. - Vince Lombardi 5

I have noticed over the years that only those people who are unfamiliar with the challenges of controlling erosion and sediment transport on highway construction projects, think that 100% compliance is achievable. Ken Stone, Washington State DOT Overall, the key is changing behaviors AGC/NDOR Partners in Construction Environmental Mistakes are Costly Loss of habitat that may not be recoverable Restoration costs Lost time and resources from other issues Attraction of management to your issues Loss of agency trust Do not think of knocking out another person's brains because he differs in opinion from you. It would be as rational to knock yourself on the head because you differ from yourself ten years ago. Horace Mann must stick with the tried and true Must build safe roads must destroy natural resources must try all new devices and tricks Erosion Control is A Risk Management Activity Based on collecting facts and information TRANS 401 offers NO IMMUNITY for WisDOT! SUCCESSFUL Compliance = NO RELEASES to waters of the state Use the cookie cutter method Design an innovative method Take a gamble 6

Identify and Assess Environmental Risk Factors (Professional Judgment) Receiving Waters Drainage Pattern Winter Close Out Soil Types Slopes Staging High Value Adjacent Resources Time of Year for Earth Disturbing Activities USACE Permit, DNR Letters, Environmental Commitments Political Notoriety (Brule, Kinnickinnic Rivers) Settling Time 1 Micron size particle takes 55 hours to settle 1 foot Soil Particle Size Reality for Some Soil Types* Any runoff from a project can produce a release The relationship of soil type, moisture content and runoff volume determine whether you have a release 2-year 24 hour is the design standard *Even without human error Do Clay Particles Settle? Colloidal solids, also called non-settable solids will not settle out for years Flocculants can change the electrical charge of clay particles causing them to coagulate and settle out Requires testing to determine chemical makeup, mixing time, and settling time May be practicable for small pumping operations and small drainage areas with large storage options Does not work on all soils Polymers cause coagulation of sediment particles which then allows for more effective gravity settling Great for silt and clay applications Must be on DNRs approved list Polymers 7

Creativity comes from a conflict of ideas. Donatella Versace Time 0 1 min. 15 min. 2 hours Polymers Not on PAL Long and narrow traps are generally more effective than round or square configurations No special provision or standard detail drawings currently available Prior to utilizing on a WisDOT project, call Mary Anne Lowndes for toxicity testing approvals (608-261-6420) for the product WisDOT/Contractor is proposing to use 8

Now this is a DITCH CHECK Running Clear 9

Inlet Protection Pop up inlet protection 10

Heavy Duty Silt Fence Poor: if one BMP is not effective more of the same will give the same results Good: utilize different methods in series if one method doesn t work 11

Don't let what you cannot do interfere with what you can do. - John Wooden Excelsior Block Natural Dissipaters Placing willow switches 12

We're all working together; that's the secret. - Sam Walton 13

High Grade Turbidity Barrier Resolution, like responsibility, is a product of ownership, and kids can't resolve a conflict until they figure out how they contributed to it. Richard Eyre Doesn t Include 14