Stream Simulation in Very Low Gradient Channels

Similar documents
Stream Restoration at Road Crossings in Northern Wisconsin. Dale Higgins, USDA Forest Service

Session A3- culvert Design for aquatic organism passage

Designing roads for fish, floods and foxes

Hydraulic Modeling with HY-8

Follow this and additional works at:

Session A6- Mannings "n" roughness characteristic occurring in semi-smooth turbulent flow of nature- Iike fishways

Concurrent Sessions D: Design and Performance of Roughened Channels - Rock Weir Fish Passage Challenges

Prototype modifications within a flood control channel to improve fish passage in Mill Creek near Walla Walla, WA

Forest Service AOP Policy and Program. John R. Kattell, P.E. Northern Region Structures Engineer

Tokul Creek Intake Diversion Dam and Fishway Replacement

Stream Crossings II: Bridges, Culverts, Flood Resiliency, and Connectivity

Case Study 12. Grubbs Concrete Slab Vented Ford

Hydraulic analysis and risk assessment of a proposed fish barrier for Johnson Creek, Utah.

Stream Simulation Design in High Gradient Channels

Massachusetts River and Stream Crossing Standards: Technical Guidelines

Stream Restoration Raccoon Creek A Case Study

Session C3 - A 10 Year Retrospective Look at the Current Condition and Success of Nature-Like Fishways Installed on Three Maryland Rivers

Temporary Watercourse Crossing: Fords

CLAY STREET BRIDGE REPLACEMENT

Wisconsin Hydraulic Geometry Regional Curves

Use of WARSSS in Stream Restoration and Watershed Planning. Michigan Aquatic Restoration Conference 2015

Amherst. University of Massachusetts - Amherst. Nathaniel Gillespie United State Department of Agriculture, Forest Service

Natural Channel Design and Dead River Case Study Stream Restoration in the Great Lakes Basin: Using In-stream Structures & Natural Channel Design

Design and Development of Fish Passage Facilities for Shortnose Sturgeon at a Northeast Hydropower Project

Fish Passage Design for Roughened Channels. Pre-Presentation Note

Design and Construction Practices for the Kenyon Mill Step-Pool Nature-like Fishway, Pawcatuck River, Rhode Island

Struggles for Flood Resiliency and AOP in Rhode Island

Removal of the Merrimack Village Dam

Chapter 10. Conduit Outlet Structures Introduction General Layout Information

Old Mill School Stream Restoration

DECISION MEMO USDA FOREST SERVICE (USFS)

Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects

Selection of Aquatic Organism Passage Design Methodology Based on Geomorphic Setting, Site Conditions, and Engineering Constraints

Stream Restoration in the Urban Environment Concepts and Considerations

IMPROVING OUTCOMES FOR STREAM ALTERATION PROJECTS

Session B4- Freshwater fish and aquatic macroinvertebrate biomonitoring of the Eel River Headwaters Restoration sites in Plymouth, Massachusetts

Culvert Prioritization Model: Aiding Communities in the Selection of Priority Restoration Projects

Case Study 5. Willow Creek Concrete Plank Ford

Session C7- Building on the $10 million/year H TAP program for culvert mitigation on national forest system lands

LITTLE SHADES CREEK RESTORATION PROJECT CWA Section 319(h) Nonpoint Source Implementation Grant Project Workplan #17 ADEM Contract #C

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

Amherst. University of Massachusetts - Amherst. Michael Forty Durham University; Ribble Rivers Trust,

LOW WATER CROSSINGS, fords, or drifts, as they

Culvert Sizing procedures for the 100-Year Peak Flow

Case Study 19. Mill Creek Embedded Box Culvert Vented Ford

Structure Shape Comments Number of Barrels X Width (ft) X Height (ft) Projecting. At Stream Grade Box Arch Pipe Diameter. Wing wall Headwall

Structure Shape Comments Number of Barrels X Width (ft) X Height (ft) Projecting. At Stream Grade Box Arch Pipe Diameter. Wing wall Headwall

Presented By: Scott Peedle US Forest Service

10(a) Bridge and culvert design information

Session A7 - A Systematic Approach to Improve Passage at Dams Necessary for Recovery of Endangered Atlantic Salmon in Maine

Bridge Planning Updates. Bridge Planning Practitioners Workshop April 2012

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

ILLINOIS URBAN MANUAL PRACTICE STANDARD TEMPORARY STREAM CROSSING (no.) CODE 975. Source: Hey and Associates, Inc.

Errata sheet for the Connecticut General Permits May 2, 2017

MILL CREEK FISH PASSAGE CONCEPTUAL DESIGNS FINAL REPORT

Errata sheet for the Connecticut General Permits March 26, 2019

Hydraulic Report. County Road 595 Bridge over Mulligan Creek. Prepared By AECOM Brian A. Hintsala, P.E

Penobscot II: Penobscot Habitat Blueprint Barrier Prioritization Tool: Assessing the Ecological Impacts of Barriers in the Penobscot River Basin

Bluff Creek One Water

3/21/2012. Dave Conkel State Aid Bridge Engineer. Brian Homan State Aid Bridge Plans Engineer

Channel stability and capacity considerations Ensure that vertical and lateral channel stability is adequate.

Low Gradient Velocity Control Short Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1]

Concurrent Sessions A: Dam Removal II - Integrated River and Floodplain Restoration on the Clark Fork River Following Removal of Milltown Dam

Lake Samish Comprehensive Stormwater Plan Capital Improvement Recommendations

Spatially explicit hydraulic analysis of the effects of whitewater parks on fish passage

Fish Passage Assessment at Road/Stream Crossings Nounan Reach of the Bear River 4/6/2015

2012 Mill Creek Watershed Habitat Assessment Level 3 Project Study Plan Results

South St. Vrain / Hall Meadows Restoration Planning August 20, 2015

Case Studies III: Skokomish River Ecosystem Restoration Washington State

Temporary Watercourse Crossing: Culverts

Case Studies II: Downstream Fish Passage at High Head Dams

MASSACHUSETTS RIVER AND STREAM CROSSING STANDARDS RIVER AND STREAM CONTINUITY PARTNERSHIP. Developed by the

Hydraulic Report. County Road 595 Bridge over Dead River. Prepared By AECOM Brian A. Hintsala, P.E

Session C3- A culvert too far: The failed attempt to update state culvert rules in Maine

Hydrotechnical Design Guidelines for Stream Crossings

Guide to Placement of Wood, Boulders and Gravel for Habitat Restoration

CHAPTER 7 HYDRAULIC SURVEYS

Facilities Development Manual

Lessons Learned from the Jocko River Demonstration Project

TEMPORARY STREAM DIVERSION

NCS Design Approach. Biology/Ecology Primer. Presented by: Jack Imhof, National Biologist Trout Unlimited Canada

- Site Location and Conditions. A. Project Location. B. Existing Conditions

Case Study 15. Moonlight Crossing Concrete Box Vented Ford

Treatment Strategies based on Stream Stratification Methodology by W. Barry Southerland Fluvial Geomorphologist, WNTSC, USDA, NRCS

May 15, Lower Squaw Creek Restoration Public Workshop. for The Friends of Squaw Creek Truckee River Watershed Council Sierra Nevada Conservancy

The Effect of Turbulence in Hydropower Dam Fish Passageways on Pacific Lamprey Passage

Sizing Hydraulic Structures in Cold Regions to Balance Fish Passage, Stream Function, and Operation and Maintenance Cost

WQPBWMSSOP-03 Rev# 01 03/15/2010 FIELD METHODOLOGY FOR THE ASSESSMENT OF TMDL SEDIMENT AND HABITAT IMPAIRMENTS

Appendix C, Attachment 4 June 11, Diversion Channel Outlet Hydraulic Modeling RAS and ADH

Emergency Pumping Plant Fish Protection Screens at California's Red Bluff Diversion Dam

Watershed Hydrology: Go with the flow. Greg Jennings, PhD, PE

Stream Crossings I: Culvert Baffle Evaluation

APPENDIX A CHECKLIST FOR PREPARATION OF H&H REPORTS

Adjusted Flood Prone Acres

RETENTION BASIN EXAMPLE

Freight Street Development Strategy

No. 6 December, Wisconsin s Forestry Best Management Practices for Water Quality Forest Roads

Rascal Goose. Reach 1. Rascal Goose. Reach 2. å å å. Main Goose Pit. Stream Reach 3. Main Goose Pit. Stream Reach 7

Holly Swartz and Jason Shirey

Maine s Land Use Regulations and Erosion Control Techniques

Transcription:

University of Massachusetts - Amherst ScholarWorks@UMass Amherst International Conference on Engineering and Ecohydrology for Fish Passage International Conference on Engineering and Ecohydrology for Fish Passage 2014 Jun 9th, 3:30 PM - 3:50 PM Stream Simulation in Very Low Gradient Channels D. Higgins University of Wisconsin - Madison Follow this and additional works at: http://scholarworks.umass.edu/fishpassage_conference Higgins, D., "Stream Simulation in Very Low Gradient Channels" (2014). International Conference on Engineering and Ecohydrology for Fish Passage. 63. http://scholarworks.umass.edu/fishpassage_conference/2014/june9/63 This Event is brought to you for free and open access by the The Fish Passage Community at UMass Amherst at ScholarWorks@UMass Amherst. It has been accepted for inclusion in International Conference on Engineering and Ecohydrology for Fish Passage by an authorized administrator of ScholarWorks@UMass Amherst. For more information, please contact scholarworks@library.umass.edu.

Stream Simulation In Very Low Gradient Channels Dale Higgins, Hydrologist Chequamegon-Nicolet National Forest

Overview Very low gradient stream simulation design Stream simulation design process Define very low gradient? Site assessment very low gradient Design very low gradient

Stream Simulation Design Process Site Assessment Alignment and Profile Bed and Banks Structure Sediment Mobility & Stability

Very Low Gradient <0.5% slope Sand bed channel No coarse bedload Natural tailwater provides good Depth and low Velocity for AOP Stream size and culvert length considerations

Very low gradient Water Surface Slope ~ 0.1% Tailwater Plunge pool

Site Assessment Field survey - Profile, profile, profile - And bankfull width Interpret profile for prior impacts

Field survey Benchmark Stream profile Stream x-sec (2 up, 2 dn) Road profile (and x-sec) Plan view sketch, or Topo survey w/total station Reference reach bankfull width Geotechnical investigation

Longitudinal Profile Survey: Pool-Run Channel 20-30 channel widths Streambed in thalweg Water surface, 0.01 ft Every bend & straight Every slope break Every channel width Some bankfull elev. Muck thickness Probe for gravel thalweg

Selecting a reference reach for bankfull width measurements Locate an unaffected reach with a straight segment Multiple measurements best at relatively narrow and straight sections.

Cross section locations Cross floodplain and channel at right angles For some broad, densely vegetated floodplains, obtain the edge from map or aerial photo Avoid hummocks in wetlands Tops grade controls WB Armstrong Crossing

Profile interpretation: Upstream ponding and aggradation from undersized culvert set too high Many low gradient streams have slopes of just 0.1-0.2% Culverts set 1.0 ft high can pond 100 s of feet upstream Channel aggrades with sand and muck

Profile interpretation: Upstream ponding and aggradation from undersized culvert set too high and high tailwater control Tailwater control forms at outlet of plunge pool May be above the upstream thalweg May be stable if composed of cobble and gravel tailwater control sand and muck over gravel gravel plunge pool

Profile interpretation: upstream ponding and downstream aggradation from frequent failures

Profile and planform interpretation: and high, braided tailwater control Braided tailwater control Stagnant backwater Road gravel deposit Sand and muck

Very low gradient stream simulation design Bankfull width (BFW) culvert Set at the proper elevation Natural tailwater control (TWC) provides good Depth and low Velocity for AOP Verified with hydrology and hydraulics Add bars and/or banks (as needed) Stream restoration (as needed)

Bankfull Width (BFW) Min = 7.0 feet Mean = 9.2 feet Range = 7.0-11.5 feet, n=6 Drainage Area = 2.25 sq mi BFW (E-Reg Eq) = 8.2 ft Bankfull width culvert Very low gradient stream simulation design Reference Reach Existing Culvert 4.75 x3.25 68% of BFW

Set at the proper elevation Very low gradient stream simulation design

Tailwater control Very low gradient stream simulation design Tailwater provides good Depth and low Velocity for AOP Culvert sides act as banks or banks are constructed Allows for natural transport of sand, organics and wood

Verified with hydrology and hydraulics 57 x38 CMP 68% of Min BFW Very low gradient stream simulation design HW/D=1.54 100-yr water level

BFW culvert passes Q 100 with HW/D<1 Very low gradient stream simulation design Stream Profile Hydraulic Analysis Top road 87 x63 Top culvert 500-yr water level 100-yr water level (flood flow estimates from WI regression equations) In N WI watersheds with low flood flows, BFW culverts typically pass the 100-yr discharge with a minor head increase and headwater below the top of culvert.

BFW, tailwater control, no bars/banks Very low gradient stream simulation design Drainage Area = 10.6 sq mi BFW Est (E Reg) = 16.5 Min BFW Graph = 12 Brule at FR 2193 Simpson at FR 2386 Elvoy at Rock Dam Road

If BFW is good, is wider better? Very low gradient stream simulation design Maybe not - in sand bed streams with low flows Without structure to create banks or a thalweg Sand spreads out to create a flat, uniform bed Shallow water may impede passage of some sp. Example of an open-bottom arch in Michigan.

Bridge Width = 16 >Bankfull width and sand beds Very low gradient stream simulation design Bridge Width/BFW = 138% Ave BFW = 11.7 Example of bridge on Spring Cr near Durango in SW WI.

>Bankfull width and sand beds Very low gradient stream simulation design Culvert Width = 7.0 Ave BFW = 5.0 Culvert Width/BFW = 140% Example of pipe-arch on Unt Marengo R in N WI.

Conceptual design for thalweg development Very low gradient stream simulation design Typically 10-14 bankfull widths Source: Rosgen,1996 (after Williams, 1986)

Rock Bars for Thalweg Development NB Oconto W Trib at Hwy 64 Culvert Width = 8.0 ft BFW = 8 ft (ave) Culvert Width/BFW = 100% Culvert Length = 135 ft CL/BFW = 16.9 1 wavelength = 8 x10=80 ft 5 bars/wavelength bar spacing=80/5=16 ft total bars=135 /16=8 bars bar spacing adjusted slightly to fit culvert Set tops of bars to match bankfull elevation

Rock bars for thalweg development NB Oconto Middle Trib at Hwy 64

Rock bars for thalweg development NB Oconto Middle Trib at Hwy 64

Rock banks and bars Very low gradient stream simulation design Allow passage of large mammals Torpee Cr at Hwy 32

Stream restoration: aggradation Very low gradient stream simulation design

Stream restoration: braided channel Very low gradient stream simulation design After Before

Stream restoration: cutoff meander Very low gradient stream simulation design Armstrong Cr

Summary Very low gradient stream simulation design Site assessment Profile, profile, profile Bankfull width Interpret profile for prior impacts Design Bankfull width culvert Set at proper elevation Natural tailwater control good D low V Verified with hydrology and hydraulics Bars and/or banks (as needed) Stream restoration (as needed)