Summary of ISO 9001:2015 New and Changed Requirements

Similar documents
ISO/DIS 9001: 2014 comparison with ISO 9001:2008. ISO 9001:2015 Updates. (Based on Draft International Standard, DIS) ISO/DIS 9001 ISO 9001:2008

ISO 9001:2015. October 5 th, Brad Fischer.

Clause Map IATF 16949:2016 to ISO/TS 16949:2009

Comparison Matrix ISO 9001:2015 vs ISO 9001:2008

Subject: Quality Management System. Clause 8 - Operation

ISO 9001:2015 Gap Analysis Check Sheet

Supplier Quality Survey. 1. Type of Business: g) Commodities supplied? Supplier Changes/comments: 2. Headcount breakdown by group: Purchasing

Correlation matrices between ISO 9001:2008 and ISO 9001:2015

ISO 9001:2015 AWARENESS

ISO 9001:2015 Checklist with 9001:2008 Comparisons Observations/comments

Mapping ISO/IEC 27001:2005 -> ISO/IEC 27001:2013

SYSTEMKARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM ISO9001:

ISO 9001: 2015 Quality Management System Certification. Awareness Training

Correlation Matrix & Change Summary

QUALITY ASSURANCE MANUAL

ISO 9001:2015 GAP ANALYSIS CHECKLIST

AESOP 15604; ISSUE 2; STATUS PENDING APPROVAL; AUTHORITY CARL BLAZIK This document is the property of NSF ISR. Page 1 of 9

INTERNATIONAL STANDARD

ISO 9001: 2000 (December 13, 2000) QUALITY MANAGEMENT SYSTEM DOCUMENTATION OVERVIEW MATRIX

CORPORATE MANUAL OF INTEGRATED MANAGEMENT SYSTEM

ISO 9001:2015 Readiness Review

QUALITY MANUAL. Number: M-001 Revision: C Page 1 of 18 THIS DOCUMENT IS CONSIDERED UNCONTROLLED UNLESS ISSUED IDENTIFIED AS CONTROLLED

ISO 9001:2015 QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Monroe Engineering is committed to customer satisfaction; we strive for Continuous Improvement in our products and our people.

Quality Manual. This manual complies with the requirements of the ISO 9001:2015 International Standard.

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Contact: URS Certification Services LLC, P O Box , Dubai, UAE Ph , web:

Machined Integrations, LLC

ISO9001:2008 SYSTEM KARAN ADVISER & INFORMATION CENTER QUALITY MANAGEMENT SYSTEM SYSTEM KARAN ADVISER & INFORMATION CENTER

LMS Certification Ltd. ISO 9001 and ISO Transition

LMS Certifications Pvt. Ltd. ISO 9001 and ISO Transition

CAPITAL AVIONICS, INC. Quality Manual

Pre Audit Transition Gap Analysis QMS and EMS

Pre Audit Transition Gap Analysis QMS (ISO 9001 Only)

Sections of the Standard. Evidence / Comments. (Y) / Nonconforming (NC)

Quality Commitment. Quality Management System Manual

NOT YOUR FATHER S STANDARD. Wali Alam Quality Institute of America ASQ-Houston Section 1405-May

ISO 13485: :2015 CLIENT TRANSITION CHECKLIST

ISO High Level Standards (HSL)

ISO9001 QUALITY POLICY MANUAL

ISO 9001:2000 The International Quality Management Business System

UPGRADE ASSESSMENT CHECKLIST

ISO 9001:2015 Quality Management System. New/Revised Requirements

CHAPTER 8 INTEGRATION OF QMS AND LMS

DOCUMENTATION FOR QUALITY MANAGEMENT SYSTEM AS PER IS/ISO 9001 : 2015

QUALITY SYSTEM MANUAL

4. Quality Management System 4.1 GENERAL REQUIREMENTS

Why Is ISO 9001:2015 the Best Blueprint for Building the Most Powerful QMS. Presenter: Michael Prior, CQA

OPERATIONS MANUAL ISO 9001 Quality Management System

ISO 9001:2015 READINESS CHECKLIST YOU RE CLOSER THAN YOU THINK EXECUTIVE SUMMARY CLAUSE 4 - CONTEXT OF THE ORGANISATION CLAUSE 5 - LEADERSHIP

9110 Correlation matrices

Perry Johnson Registrars, Inc. Licensed Copy #2 RECYCLING INDUSTRY OPERATING STANDARD. Prepared for ISRI Services Corporation

ISO 14001:2015 Gap Analysis Check Sheet

AS 9100 Rev C Quality Systems Manual AS-050C-QM

AAMI Quality Systems White Paper

INTERNATIONAL STANDARD

PCA ELECTRONICS, INC. Quality Manual

ISO 9001:2015. Quality Management System. Manual

POLYCRAFT INCORPORATED QUALITY MANUAL Quality Manual QM -10 Approval: D. Wheeler.

The following is an example systems manual from a low volume (TE, but not an automotive supplier) company.

9100 revision Changes presentation clause-by-clause. IAQG 9100 Team November 2016

INTERNATIONAL STANDARD

<Full Name> Quality Manual. Conforms to ISO 9001:2015. Revision Date Record of Changes Approved By

Specification for Quality Programs for the Petroleum, Petrochemical and Natural Gas Industry

QUALITY MANAGEMENT SYSTEM POLICIES AND PROCEDURES

Quality Manual QM -07 Approval: D. Wheeler. AARD Spring & Stamping Quality Manual. Quality Manual. Page 1 of 24

RULES FOR A QUALITY STANDARDS SYSTEM (QSS) IN MARITIME ACADEMIES/INSTITUTIONS

ISO 22000:2018 Transition Workshop (Auditors)

Global Manager Group

25 D.L. Martin Drive Mercersburg, PA (717)

ISO 9001: Understanding the changes

Summary of changes between ISO 9001:2008 and ISO/CD 9001

Moving from ISO/TS 16949:2009 to IATF 16949:2016. Transition Guide

Stanley Industries, Inc. ISO 9001:2008 Quality Policy Manual

ISO 14001:2015 Transition Presentation. Presented by Fredric Leung

ISO/TC 176/SC 2 Document N1224, July 2014

Comparison ISO/TS (1999) to QS 9000, 3 rd edition (1998)

CUSTOMER RELATIONSHIPS FURTHER EXCELLENCE GENERIC STANDARDS TRAINING SERVICES THE ROUTE TO ISO 9001:2015 AVOIDING THE PITFALLS

Sensor Scientific, Inc.

4. Quality management system 4. Context of the organization. 5 Management responsibility 5 Leadership

NMT Specialized Machining Inc & NMT General Machining Inc AS 9100 Rev C Quality Systems Manual

Quality System Manual

ISO 45001:2018 Migration Self-Assessment Guide. How ready are you for ISO 45001?

PRECISE INDUSTRIES INC. Quality Manual

P. 1. Identify the Differences between ISO9001:2000 與 ISO9001:2008 ISO9001:2008 ISO9001:2000 版本的異同. 5 January 2009 ISO 9000 SERIES

Executive Overview. Transitioning to ISO 9001:2015 Quality Management System. Biafore Associates Inc. Overview Objectives

INTEGRATING ISO 9000 METHODOLOGIES WITH PROJECT QUALITY MANAGEMENT

Continental Steel & Tube Co. Quality Manual

Transition to ISO 9001:2015

QMS Team: MR and all HODs (Internal Auditors) MR March 10. Quality policy Define quality policy The Steering committee Objectives and targets

Awareness to ISO 9001:2000

ISO 9001:2015 Expectations

Supplier Quality System Survey

ISO 9001:2015. Presented By: ASEAN Eng. DEXTER T. CHUA, PIE. Conference Room, University of Mindanao March 17, 2017

Quality Manual ISSUED JANUARY Approved By: January 12, 2004 (President & Chief Executive Officer)

Document Number: QM001 Page 1 of 19. Rev Date: 10/16/2009 Rev Num: 1. Quality Manual. Quality Manual. Controlled Copy

Luminus Devices, Inc Quality Management Systems Manual ISO 9001:2008

Quality Assurance Manual, Revision F Page 1 of 20

Vendor Qualification Survey

Transcription:

This is a summary of the new and changed ISO 9001:2015 requirements compared to ISO 9001:2008. 4. Context of the Organization 4.1 Changes Understanding the Organization and its Context New requirement on context of organization Links quality system and business system See new NOTES for examples of external and internal issues Organization may already monitor and review external and internal issues Will need evidence of determination, monitoring, and reviews 4.2 Changes Understanding the Needs and Expectations of Interested parties New requirement on interested parties An interested party is A person or organization that can affect, be affected by, or perceive itself to be affected by a decision or activity. Interested parties may be: customers, owners, employees, providers, bankers regulators, unions, partners, community, news media competitors, law enforcement, emergency responders Relevant interested parties may change Relevant requirements of interested parties may change Will need evidence of determination, monitoring, and reviews 4.3 Changes Determining the Scope of the Quality Management System Specification of quality management system scope is not new Now must explicitly consider issues, interested parties, and products and services Clause replaces old clause 1.2, Application Exclusions are no longer limited to old clause 7, Product Realization If performing functions addressed by ISO 9001, they must be included in scope statement See Annex A.5 for Applicability discussion 4.4 Changes Quality Management System and its Processes Replaces old clause 4.1 on general process-based requirements Adds determining inputs and expected outputs Adds determining and addressing process-related risks and opportunities New focus on performance indicators for effective operation and control Discussion of outsourcing in old clause 4.1 was moved to new clauses 8.1 and 8.4 5. Leadership 5.1 Leadership and Commitment 5.1.1 Changes - General Replaces old 5.1 on Management Commitment Expands that management must demonstrate leadership and accountability Now requires that quality policy and objectives be compatible with strategic direction Includes new focus on process approach and risk-based thinking (don t implement standard just to get certified, use it to better manage your business) QMS requirements must now be integrated into business processes More of a hands-on role for top management Notice number of ensure requirements; someone else can do it (vs. take, promote, communicate, engage, support) More questions will be directed to top management by internal and external auditors Changes V1.12 2015 2017 Whittington & Associates, LLC Page 1 of 9

5.1.2 Changes Customer Focus Replaces old clause 5.2 on Customer Focus Includes determining legal requirements from old clause 7.2.1 Primary clauses for customer requirements are in new 8.2.2 and 8.2.3 Adds requirement to determine and address risks and opportunities that affect conformity Note that this clause can be met by effectively addressing all the other parts of the standard 5.2 Changes - Policy Replaces old clause 5.3 on Quality Policy. Quality Policy must now: Support the strategic direction Be available and maintained Be applied, not just communicated and understood Made available to relevant interested parties, as appropriate 5.3 Changes Organizational Roles, Responsibilities, and Authorities Replaces old clause 5.5.1 on Responsibility and Authority Adds responsibilities to be assigned and understood Identifies specific responsibilities to be assigned May not have management representative for assignments Old duties could be spread among top management Registrars will still need a nominated point of contact Doesn t preclude a management representative being appointed 6. Planning 6.1 Changes Actions to Address Risks and Opportunities This is a new clause on risks and opportunities. Expands on old clause 5.4.2 on Planning Replaces old clause 8.5.3 on Preventive Action Need methodology to identify and address risks Could decide to accept risk and take no action ISO 9001:2008, clauses 4-8, does not mention risk. ISO 9001:2015, clauses 4-10, mentions risk 16 times. Alternative: Crisis Management 6.2 Changes Quality Objectives and Planning to Achieve Them Replaces old clause 5.4.1 on Quality Objectives Expands to establish quality objectives for relevant processes Adds quality objectives for service conformity and enhancement of customer satisfaction Quality objectives must also consider applicable requirements Adds planning approach (what, who, when, how) for achievement of quality objectives 6.3 Changes Planning of Changes Replaces old clause 5.4.2.b in Quality Management System Planning Adds consideration of potential consequences, resources, and responsibilities Changes V1.12 2015 2017 Whittington & Associates, LLC Page 2 of 9

7. Planning 7.1 Resources 7.1.1 Changes - General This clause updates old clause 6.1 on Resources Removes mention of customer satisfaction (still multiple other references, including 9.1.2) Adds consideration of internal resources and external providers 7.1.2 Changes - People This clause focuses on the people resource from old clause 6.1, Provision of Resources Adds for operation and control of processes People are addressed in more actionable ways in: 7.1.6 Organizational knowledge 7.2 Competence 7.3 Awareness 7.4 Communication 7.1.3 Changes - Infrastructure Updates old clause 6.3 on Infrastructure Reworded infrastructure examples moved from requirements section to a NOTE 7.1.4 Changes Environment for the Operation of Processes Updates old clause 6.4 on Work Environment. Clarifies that now covers operation of processes. The NOTE: Adds social and psychological environments Adds physical factors of heat, airflow, hygiene 7.1.5 Changes Monitoring and Measuring Resources Replaces old clause 7.6 on control of monitoring and measuring equipment Adds verification of conformity of services General clause 7.1.5.1 refers to resources instead of equipment Humans may carry out activity without equipment Resources must be suitable and maintained for fitness for purpose Software version control now in clause 7.5.2 7.1.6 Changes Organizational Knowledge New requirement considers tribal knowledge Should be an input to 7.2 on Competence See Annex A.7 on Organizational Knowledge Safeguard from loss of knowledge, e.g., - staff turnover - failure to capture and share information Encourage knowledge acquisition, e.g., - learning from experience - mentoring; benchmarking Changes V1.12 2015 2017 Whittington & Associates, LLC Page 3 of 9

7.2 Changes Competence Replaces most of old clause 6.2 on Human Resources Old clause 6.2.2.d now in new clause 7.3 on Awareness Use of under its control includes contract, agency, and outsourcing See clause 8.4.3.c on competence of external providers Adds NOTE with examples of applicable actions Competence is defined as the ability to apply knowledge and skills to achieve intended results. Demonstrated competence is sometimes referred to as qualification. 7.3 Changes - Awareness Elevates old clause 6.2.2.d to a separate clause Expands personnel to persons doing work under organization s control Awareness now includes quality policy and quality objectives Adds awareness of the implications of not conforming with QMS requirements 7.4 Changes Communication Replaces old clause 5.5.3 on Internal Communication Explicit: What, When, to Whom, How, Who Expands to include external communication Note that customer communication moved from old clause 7.2.3 to new clause 8.2.1 7.5 Documented Information 7.5.1 Changes - General Replaces old clauses 4.2.1.c and 4.2.1.d on documentation requirements Changes from procedures and records to documented information NOTE on extent is from NOTE 2 in old 4.2.1 Drops requirement for documented procedure Lack of documented procedure requirement book burning Undocumented processes are difficult to communicate, monitor, review, and revise 7.5.2 Changes Creating and Updating Gathered from old clause 4.2.3.a, b, c, and e Adds description, format, and media examples Drops re-approval language, but approval applies to both creating and updating 7.5.3 Changes Control of Documented Information Gathered from old clause 4.2.3 (c, d, e, f) Includes requirements from old clause 4.2.4 Adds examples for protection (confidentiality, use, and integrity) Protection of evidence from unintended alteration No mention of obsolete documents or their retention; covered by version control No specific change identification language Adds NOTE on types of access See Annex A.6 on Documented Information Changes V1.12 2015 2017 Whittington & Associates, LLC Page 4 of 9

8. Operation 8.1 Changes Operational Planning and Control Replaces old clause 7.1, Planning of Product Realization Expands to control of processes; planned changes Reviews consequences of unintended changes Adds to act to mitigate adverse effects Includes outsourced processes from old 4.1 Refers to 8.4 for control of outsourced processes Planning of quality objectives is covered in 6.2 8.2 Requirements for Products and Services 8.2.1 Changes Customer Communication Replaces old clause 7.2.3 on customer communication Moves customer communication before step of determining requirements Adds communication of specific requirements for possible contingency actions Includes handling or controlling customer property See clause 9.1.2 regarding customer satisfaction See clause 8.5.3 for more on customer property 8.2.2 Changes Determining the Requirements for Products and Services Replaces old clause 7.2.1 on Determination of Requirements Related to the Product Expands that must meet claims for products and services offered to customers Does this involve Marketing and Sales? 8.2.3 Changes Review of Requirements for Products and Services Replaces old clause 7.2.2 on review of requirements related to product Clause 8.2.3.1 replaces old clause 7.2.2.c on ability to meet defined requirements Merges in requirements from old clause 7.2.1.a, b, and c 8.2.4 Changes Changes to Requirements for Products and Services Includes requirement from old clause 7.2.2 on review of product requirements Given own sub-clause for focus on changes Same text except addition of term services 8.3 Design and Development of Products and Services 8.3.1 Changes General New General design and development clause Adds that design and development process is to ensure subsequent provision of products and services 8.3.2 Changes Design and Development Planning Expands on old clause 7.3.1 with considerations for: nature, duration, and complexity of process activities internal and external resource needs involving customers and end users requirements for subsequent provision of products and services level of control by customers and other relevant interested parties documented information to demonstrate process requirements are met Changes V1.12 2015 2017 Whittington & Associates, LLC Page 5 of 9

8.3.3 Changes Design and Development Inputs Replaces old clause 7.3.2 - Design and Development Inputs Changes from must include to must consider Adds standards and codes of practice that organization is committed to implement Adds potential consequences of failure > risk 8.3.4 Changes Design and Development Controls Adds new controls clause to group together Reviews, Verification, and Validation Merges old clauses 7.3.4, 7.3.5, and 7.3.6 Includes old NOTE from 7.3.1 on Planning Drops validation completing prior to delivery or implementation of product, when practical (Validation of services is typically at delivery) 8.3.5 Changes Design and Development Outputs Replaces old clause 7.3.3 on design outputs Output expanded to include or reference monitoring and measuring requirements Drops providing information for purchasing, production, and service provision Replaces with output being adequate for subsequent processes Changes from safe and proper use to safe and proper provision (providing or supplying) Adds to retain documented information on the design and development outputs 8.3.6 Changes Design and Development Changes Replaces old clause 7.3.7 on control of design and development changes Verify and validate changes now covered by use of term control (also see 8.3.4) Drops mention of evaluating effect of change on constituent parts and delivered product (now addressed by avoiding adverse impact on conformity to requirements) Identifies the specific records to be retained 8.4 Control of Externally Provided Processes, Products, and Services 8.4.1 Changes General Replaces most of old clause 7.4.1 on purchasing process Includes outsourcing and drop shipments External provider is outside scope of system: purchasing from a supplier, arrangement with an associate company, outsourcing of processes. Adds monitoring of external provider performance See Annex A.8 on control of externally provided processes, products, and services 8.4.2 Changes Type and Extent of Control Expands old clause 7.4.1 on type and extent of control Old clause 4.1 NOTE 3 on outsourcing controls now auditable as a requirement Apply controls on external providers and their outputs Considers effectiveness of external provider s controls Considers potential impact of externally provided processes, products, and services Includes verification from old clause 7.4.3 on verification of purchased product 8.4.3 Changes Information for External Providers Includes requirements from old clauses 7.4.2, 7.4.3 Adds interactions with organization, e.g., Suppler Corrective Action Request Adds control and monitoring of external provider s performance Adds validation activities Changes V1.12 2015 2017 Whittington & Associates, LLC Page 6 of 9

8.5 Production and Service Provision 8.5.1 Changes Control of Production and Service Provision Replaces old clause 7.5.1 on control of production and service provision Changes work instructions to documented information Clarifies that documented information defines activities to be performed and expected results Adds verification that control criteria and acceptance criteria have been met Adds actions to prevent human error Use of suitable equipment expanded to use of infrastructure and environment for operation (see 7.1.3 for more on infrastructure; see 7.1.4 for more on environment) Adds appointment of competent persons, including any required qualification Moves old clause 7.5.2 on special processes into clause 8.5.1.f and lessens its emphasis 8.5.2 Changes Identification and Traceability Replaces old clause 7.5.3 on Identification and Traceability Changes from use of product to outputs Output = products, services, or process output 8.5.3 Changes Property Belonging to Customers or External Providers Replaces old clause 7.5.4 on Customer Property Expands to include external provider s property Could be a supplier s consigned inventory (See 8.5.2 for more on property identification; see 8.4 for more on property control) Expands NOTE on examples of property to include materials, components, tools and equipment, and premises 8.5.4 Changes Preservation Replaces old clause 7.5.5 on preservation of product Changes from product to outputs Moves types of preservation into new NOTE NOTE adds contamination control, plus transmission and transportation 8.5.5 Changes Post-Delivery Activities New clause on post-delivery requirements Expands old clauses 7.2.1.a, 7.5.1.f on post-delivery Adds consideration of: legal requirements; customer feedback potential undesired consequences nature, use, and lifetime of products and services Includes NOTE from old clause 7.2.1 for examples of post-delivery actions See clause 8.2 on product and service requirements 8.5.6 Changes Control of Changes New clause on control of changes Refer to clause 6.3 on planning of changes Clause 6.3 is more proactive, strategic, system-wide Clause 8.5.6 is reactive, tactical, operations-related See clause 8.1 on operational planning and control 8.6 Changes Release of Products and Services Replaces old clause 8.2.4 on monitoring and measurement of product Expands on old clause 7.5.1.f on product release More focus on release, but verifying products and services still a requirement Changes V1.12 2015 2017 Whittington & Associates, LLC Page 7 of 9

8.7 Changes Control of Nonconforming Outputs Replaces old clause 8.3 on control of nonconforming product Changes from product to outputs Clarifies it also applies to services Includes segregation, containment, return, or suspension as ways to deal with nonconformity Adds informing customer as possible action Drops requirement for a documented procedure 9. Performance Evaluation 9.1 Monitoring, Measurement, Analysis, and Evaluation 9.1.1 Changes General Includes general requirements from old clause 8.1 (monitoring, measurement, analysis, improvement) Replaces improvement with evaluation Adds what and when for monitoring and measurement Adds when for analysis and evaluation Determine the methods to ensure valid results Retain appropriate documented information (records) as evidence of results Evaluate performance (not just conformity) See clause 9.1.3 for more on analysis and evaluation Moves mention of statistical techniques into NOTE under 9.1.3 See clauses 10.1 and 10.3 for more on improvement 9.1.2 Changes Customer Satisfaction Replaces old clause 8.2.1 on customer satisfaction Revises requirements to needs and expectations Changes methods to obtain and use to methods to obtain, monitor, and review Revises monitoring examples in NOTE - uses market-share analysis instead of lost business analysis - adds customer meetings What about social media ratings and reviews? See clause 9.3.2.c.1 on customer satisfaction being a topic for management review 9.1.3 Changes Analysis and Evaluation Replaces old clause 8.4 on analysis of data Changes from suitability to performance of system Adds use of analysis and evaluation to evaluate if planning was implemented effectively Assess performance of external providers instead of provide information on suppliers Evaluate degree of customer satisfaction, not just provide information on customer satisfaction Drops reference to preventive action Changes V1.12 2015 2017 Whittington & Associates, LLC Page 8 of 9

9.2 Changes Internal Audit Replaces old clause 8.2.2 on internal audits Considers changes affecting organization Moves to more risk-based internal audit May result in more updates to audit schedule Clarifies audit frequency and audit methods are planned for audit program Clarifies audit criteria and audit scope are defined for each audit Drops reference to a follow-up audit (see clause 10.2.1.d for review of effective corrective action) Drops need for documented procedure No mention of not auditing own work (still requires impartial and objective audits) Adds need for documented information as evidence of audit program implementation 9.3 Changes Management Review Replaces old clause 5.6 on management review Moves follow-up actions to top of review inputs Adds review of issues and strategic direction Adds focus on resources, performance, and trends Adds input on actions to address risks (see 6.1) Adds specific input topic for quality objectives Drops reference to preventive action Revises customer feedback to be customer satisfaction Adds feedback from relevant interested parties Evidence now results of not records from review 10. Improvement 10.1 Changes General New clause 10.1 added to Annex SL clauses Expands old clause 8.5.1 on Continual Improvement Determine and select improvement opportunities Improve products and services, not just QMS Improve for future needs and expectations New focus on undesired effects Adds NOTE on examples of improvement See clauses 5.3.c, 9.1.3.g, 9.3.2.f, 9.3.3.a, and 10.3 for more on opportunities for improvement. 10.2 Changes Nonconformity and Corrective Action Replaces old clause 8.5.2 on corrective action Drops need for old clause 8.5.3 on preventive action Drops requirement for documented procedure Adds control, correct, deal with consequences See if similar nonconformities exist or could occur Adds to make changes to system if necessary Adds to update risks and opportunities identified during planning, if necessary 10.3 Changes Continual Improvement Replaces old clause 8.5.1 on continual improvement Adds to consider needs or opportunities Drops references to policy, objectives, audit results, and corrective and preventive actions Changes V1.12 2015 2017 Whittington & Associates, LLC Page 9 of 9