YINGLI SOLAR TWINMAX MODULES Installation and User Manual

Similar documents
YINGLI SOLAR PV MODULES Installation and User Manual

Installation and Users Manual

SoliTek PV Modules INSTALLATION MANUAL

YINGLI SOLAR PANDA BIFACIAL MODULES Installation and User Manual

YINGLI SOLAR PANDA BIFACIAL MODULES Installation and User Manual

YINGLI SOLAR PV MODULES Installation and User Manual

IEC Installation Guide for SERAPHIM Photovoltaic Module

FOR JA Solar PHOTOVOLTAIC MODULES

FOR JA Solar PHOTOVOLTAIC MODULES

PERFORMANCE - High efficiency, multicrystalline silicon solar cells with high transmission

TallSlateTM Grandee Installation Manual

2016 V1 SERAPHIM ECLIPSE PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

2019 V1 SERAPHIM DG PHOTOVOLTAIC MODULE JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD. ADDRESS: JIANGSU CITY OF CHANGZHOU PROVINCE WANG ZHEN HENG

2017 V1 SERAPHIM PHOTOVOLTAIC MODULE TUV VERSION B JIANGSU SERAPHIM PHOTOVOLTAIC SYSTEM CO. LTD.

Installation Instruction for DMEGC Photovoltaic Module

Tindo Karra. Installation and Specifications Manual. Introduction

JA SOLAR PV MODULES INSTALLATION MANUAL

Installation and Operation Manual

Prism Solar Installation Manual

JA SOLAR PV MODULES INSTALLATION MANUAL

Monocrystalline Solar Module LGXXXS1C(W)-G4. Installation Instructions MFL

TRAPEZOIDAL SHEET METAL RAIL LIFT/VARIO for trapezoidal sheet metal roofs

INSTALLATION USE AND MAINTENANCE MANUAL OF MICRON PHOTOVOLTAIC MODULES by CAPPELLO ALLUMINIO

User instructions for photovoltaic modules 60Pxxx-V 60Mxxx-V 72Pxxx-V 72Mxxx-V 60Pxxx 60Mxxx 72Pxxx 72Mxxx

Crystalline Photovoltaic Modules

INSTALLATION MANUAL BIPVco FLEXTRON modules

rec Peak energy SERIEs

BILLION POWER. Your one stop Supplier for all kinds of Solar Modules and BOS. Scan this quickmark,to visit our website.

Installation manual. rec TwinPeak SERIEs. For the installation of REC TwinPeak Series solar panels certified according to IEC / 61730

TallSlate TM with BITERS Installation Manual

Installers Guide. Item

PM200M00 PM245P00 PM250M01 PM300P00 PM318B00 PM318B01 PM096B00. Version 1.1

a-si/μcsi Tandem Module Installation Manual Macsun Solar Energy Technology Co., Limited Applied to MS-SDXX

PV MODULE INSTALLATION MANUAL VSPB - VSMB

- Industry leading in-house manufacturing of polysilicon, ingots, - Robust, corrosion resistant aluminum frame independently tested to

INSTALLATION INSTRUCTIONS AS 2.1 CORRUGATED ETERNIT ROOF

INSTALLATION MANUAL. rec TwinPeak 72. series. For the installation of all REC TwinPeak 72 solar panels, certified according to IEC & IEC

Continuous Wave Single Frequency Lasers. SYMPHONY Series. 532nm 2000mW

Conergy SolarFamulus II

rec Peak energy SERIEs

Continuous Wave Single Frequency Lasers. SCHERZO Series. 532nm 300mW

SOLAR MODULES FOR ROOFTOP SYSTEMS AND SOLAR PARKS ENGLISH

INSTALLATION MANUAL REC 72-CELL MODULES

Installation Instruction photovoltaic modules E-PV 250W on the flat roof or fundation 10/2013 Get acquainted before the installation.

rec Peak Energy SERIEs

INSTALLATION MANUAL. Installation instructions for all REC Peak Energy 72 and REC TwinPeak 72 solar panels certified according to UL 1703:

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-BIPV-SM-P125-36

Microgeneration Certification Scheme: MCS 017

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P156-60

Microgeneration Certification Scheme: MCS 017

Installation Instructions

MANUAL. landscape orientation. portrait orientation. metal roof mounting system for solar panels METAL ROOF MOUNTING SYSTEM. Rev

Installation Instructions

PM060MW2/PM060MB2. Mono 60 cells with light weight series Back contact 96 cells series. Version 2.3

PHOTOVOLTAIC SYSTEMS. Syllabus. 1 Photovoltaic systems

rec TwinPeak SERIEs INSTALLATION MANUAL

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P125-72

PHOTOVOLTAIC SOLAR ENERGY POLYCRYSTALLINE MODULES - SI-ESF-M-P W

Owner s Manual & Safety Instructions

INSTALLATION MANUAL REC 60-CELL MODULES

crystalline solar photovoltaic A New Edition 钱峰 Paul Suzhou Talesun Solar Technologies Co., Ltd

Installation Guide EcoFoot5D High Density 5-Degree Ballasted Racking System Document No. ES10560

Radiant PV-Solar Tripod System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

MANUAL. portrait set-up. landscape set-up. ClickFit Evo mounting system for sloping roofs with roof tiles for solar panels

Installer Guide. Item

OptoLum MegaLine RGBW Luminaire

rec Peak energy SERIEs

CONTENTS. 2 REC Installation Manual - 60-cell panels - IEC / 61730

Model m x 1.98 m NPRM with Roof Pads For 1.2 m Antenna Systems

PHOTOVOLTAIC SOLAR ENERGY MONOCRYSTALLINE MODULES - SI-ESF-M-M W

AUO Photovoltaic Modules (IEC, ETL/UL) Installation Guide. Version 1.5

rec N-Peak Series Installation instructions to ul 1703 standards

Installation Guide EcoFoot2+ 10-Degree Ballasted Racking System Document No. ECO-002_850. Rev 1.6, January 2018

6 Closet light. Model Due to continuing improvements, actual product may differ slightly from the product described herein.

General Safety Information

rec Peak energy modules

Inspection Guide for PV Systems in One- and Two- Family Dwellings (For Rooftop Photovoltaic Systems meeting the Standard Plan)

GROUND MOUNT INSTALLATION MANUAL

PHOTOVOLTAIC SOLAR ENERGY MONOCRYSTALLINE MODULES - SI-ESF-M-BIPV-SM-M125-96

7 PIECE TUBE FLARING KIT

Y SIDE ALUMINUM TRUCK RACK

Owner s Manual & Safety Instructions

PORTABLE GARAGE CAR CANOPY

Installation manual. rec Peak energy 72. For the installation of all REC Peak Energy 72 solar panels, certified according to UL 1703.

Aurora Genmounts Install LT Installation Manual

Radiant Solar Tripod Planning and Installation Guide V1.2 With Australia AS/NZS1170.2

SECURE. UNIVERSAL. MOUNTING. Tilt Kit Installation Manual

INSTALLATION INSTRUCTION AEROCOMPACT S5

Radiant PV-RoofTopRac System Planning and Installation With Australia AS/NZS1170.2:2011 AMDT

INSTALLATION MANUAL UL

Bonding and Installation Manual for UNI-SOLAR PowerBond epvl

CONTENTS. 2 REC Installation Manual - 60-Cell Products - UL 1703

Levy Senior Center Solar Panel Installation RFP # ADDENDUM No. 1

rec Peak energy 72 series

Transcription:

YINGLI SOLAR TWINMAX MODULES Installation and User Manual Revision Date Aug 3rd, 2016 Applicable for IEC certified products This manual applies to photovoltaic TwinMAX modules ( TwinMAX modules, also commonly known as Double Glass Modules) manufactured by Yingli Green Energy Holding Co. Ltd. ( Yingli Solar ), and is explicitly written for qualified professionals ( Installer or Installers ), including without limitation licensed electricians and RAL Certified PV Installers. INTRODUCTION Thank you for choosing Yingli Solar as your TwinMAX module provider. We appreciate your business! This manual contains important information pertaining to the electrical and mechanical installation and maintenance of TwinMAX modules, and contains safety information that you must read carefully and be familiar with before handling, installing, and/or maintaining Yingli Solar TwinMAX modules. Yingli Solar does not assume responsibility and expressly disclaims liability for losses, damages, or expenses arising out of, or in any way connected with this Installation and User Manual. Yingli Solar assumes no responsibility for any infringement of patents or other rights of third parties, which may result from using Yingli Solar TwinMAX modules. No license is granted expressly or by implication or under any patent or patent rights. The information in this manual is believed to be reliable, but does not constitute an expressed or implied warranty. Yingli Solar reserves the right to make changes to its TwinMAX modules and other products, their specifications, or this manual without prior notice. Yingli Solar and its subsidiaries are not liable for any damages caused by inappropriate installation, use, or maintenance of Yingli Solar TwinMAX modules, including without limitation damages, losses, and expenses caused by non-observance of the instructions of this manual or caused by or in connection with products of other manufacturers. Yingli Solar TwinMAX modules are designed to meet the requirements for the standards IEC 61215 and IEC 61730, application class A. Modules rated for use in this application class may be used in systems operating at greater than 50 V DC or 240 W, where general contact access is anticipated. Modules qualified for safety through IEC 61730-1 and IEC 61730-2 and within this application class are considered to meet the requirements for safety class II. In the course of the TwinMAX module certification process, the compliance of this manual with the certification requirements has been verified by an independent certification laboratory. This Installation and User Manual is available in different languages. In cases of discrepancy between versions, the English language version shall control. Failure to comply with the requirements listed in this manual will invalidate the Limited Warranty for TwinMAX Modules as provided by Yingli Solar at the time of sale to the direct customer. Additional recommendations are provided to enhance safety practices and performance results. Please provide a copy of this manual to the PV system owner for their reference, and inform them of all relevant aspects of safety, operation, and maintenance. yinglisolar.com SAFETY General You must understand and follow all applicable local, state, and federal regulations and standards for building construction, electrical design, fire, and safety, and must check with local authorities to determine applicable permitting requirements before attempting to install or maintain TwinMAX modules. Rooftop TwinMAX systems should only be installed on dwellings that have been formally analyzed for structural integrity, and confirmed to be capable of handling the additional weighted load of TwinMAX system components, including TwinMAX modules, by a certified building specialist or engineer. For your safety, do not attempt to work on a rooftop until safety precautions have been identified and taken, including without limitation fall protection measures, ladders or stairways, and personal protective equipment (PPE). For your safety, do not install or handle TwinMAX modules under adverse conditions, including without limitation strong or gusty winds, and wet or frosted roof surfaces. TwinMAX modules are photovoltaic products made of tempered glass, packaging materials, inner conductor, cells, junction boxes. See Figure 1 is an illustration of the TwinMAX module components. Junction Box Cable Connector Cell 1. Glass 2. Encapsulant 3. PV Cell 4. Encapsulant 5. Glass 1 2 3 5 4 Figure 1: Module components and cross-section of the laminated assembly Electrical TwinMAX modules can produce current and voltage when exposed to light of any intensity. Electrical current increases with higher light intensity. DC voltage of 30 Volts or higher is potentially lethal. Contacting the live circuitry of a PV system operating under light can result in lethal electric shock. De-energize TwinMAX modules by removing them entirely from light or by covering their front surface with an opaque material. Regard the safety regulations for live electrical equipment when working with modules that are exposed to any light. Use insulated tools and do not wear metallic jewelry while working with TwinMAX modules. In order to avoid arcing and electrical shock, do not disconnect electrical connections under load. Faulty connections can also result in arcing and electrical shock. Keep connectors dry and clean, and ensure that they are in proper working condition. Never insert metallic objects into the connectors, or Yingli Solar TwinMAX Modules, Installation and User Manual page 1

modify them in any way in order to secure an electrical connection. Do not touch or handle TwinMAX modules with broken glass, unless the modules are first disconnected and you are wearing proper Personal Protective Equipment. Avoid handling TwinMAX modules when they are wet unless cleaning the TwinMAX modules as directed in this manual. Never touch electrical connections that are wet without protecting yourself with insulated gloves. Transport and Handling Yingli Solar TwinMAX modules must be transported in the supplied packaging only and kept in the packaging until they are ready to be installed. At time of receipt, please verify that the delivered product is in fact the product ordered. The product name, subname, and serial number of each laminate are clearly marked on the outside of each packing box. Leave the product in its original packing box until you are ready to install. Store pallets in a clean, cool, dry and flat place until the TwinMAX modules are ready to be unpackaged with relative humidity below 85% and ambient temperatures between -20 C and 50 C. Protect pallets against movement and exposure to damage during transportation. DO NOT exceed the allowable maximum height of pallets to be stacked, as indicated on the pallet packaging. Secure pallets from falling over. If pallets are stored temporarily outside please place a protective covering over the pallet to protect it from direct weathering and do not stack more than 1 pallet high. Check TwinMAX modules for damage due to transportation before installation DO NOT install damaged modules. Please contact the company you have purchased the Yingli Solar TwinMAX modules for information or complaints. TwinMAX module surfaces are susceptible to damage that could affect the performance or safety of the module. DO NOT damage or scratch the TwinMAX module surfaces. For your safety, do not disassemble or modify the modules in any way. Doing so may degrade performance or cause irreparable damage and will void any applicable warranties. If it is necessary to store TwinMAX modules prior to installation, the TwinMAX modules should remain inside the packaging and protected from exposure that could compromise the durability of the packaging. Fire Yingli Solar TwinMAX Modules have a class C fire resistance rating in accordance with the IEC 61730-2 certification. When TwinMAX modules are mounted on the rooftops, the roof must have a fire resistant covering suitable for this application. TwinMAX modules are electrical generating devices that may affect the fire safety of a building. The use of improper installation methods and/or defective parts may result in the unexpected occurrence of an electrical arc during operation. In order to mitigate the risk of fire in this event, TwinMAX modules should not be installed near flammable liquids, gases, or locations with hazardous materials. In the event of a fire, TwinMAX modules may continue to produce a dangerous voltage, even if they have been disconnected from the inverter, have been partly or entirely destroyed, or the system wiring has been compromised or destroyed. In the event of fire, inform the fire crew about the particular hazards from the PV system, and stay away from all elements of the PV system during and after a fire until the necessary steps have been taken to make the PV system safe. Figure 2: Pallet of TwinMAX modules At the installation site, take care to keep modules and their electrical contacts clean and dry before installation. If connector cables are left in damp conditions then the contacts may corrode. Any module with corroded contacts should not be used. Yingli Solar TwinMAX modules are heavy, and should be handled with care, so non-slip gloves are required when handling and installation. Please never use the junction box or cables as a grip. Do not exert mechanical stress on the cables. Never step on TwinMAX modules or drop or place heavy objects on them. Be careful when placing TwinMAX modules on hard surfaces, and secure them from falling. Broken glass can result in personal injury. TwinMAX modules with broken glass cannot be repaired and must not be used. Broken or damaged TwinMAX modules must be handled carefully and disposed of properly. For unpacking TwinMAX modules from the Yingli Solar supplied packaging, firstly, remove the pallet lid after removing securing straps, if provided and then remove the carton, paper corner and foam rubber. Remove TwinMAX modules one at a time by sliding them up the channel in the package with both hands (see Figure 3). You may need to secure the remaining TwinMAX modules in the pallet packaging to prevent them from falling over. APPLICATION INFORMATION Application Restrictions Yingli Solar TwinMAX modules must be mounted on appropriate mounting structures positioned on suitable buildings, the ground, or other structures suitable for TwinMAX modules (e.g. carports, building facades or PV trackers). TwinMAX modules must not be mounted on moving vehicles of any kind. Yingli Solar TwinMAX modules must not be installed in locations where they could be submerged in water. Yingli Solar TwinMAX modules must not be sited in locations where aggressive substances such as salt or salt-water, or any other type of corrosive agent, could affect the safety and/or performance of the TwinMAX modules. Artificially concentrated light must not be directed on Yingli Solar TwinMAX modules. Design Recommendations Yingli Solar recommends that TwinMAX modules shall be mounted at a minimum tilt angle of 10 degrees to allow for proper self-cleaning from normal rain showers. Partial or complete shading of a TwinMAX module or modules can significantly reduce system performance. Yingli Solar recommends minimizing the amount of shade throughout the year to increase the amount of energy produced by the TwinMAX modules. Lightning protection is recommended for TwinMAX systems that are to be installed in locations with high probability of lightning strikes. High system voltages could be induced in the event of an indirect lightning strike, which could cause damage to TwinMAX system components. The open area of wire loops should be minimized, as shown in Figure 4, in order to reduce the risk of lightning induced voltage surges. Figure 3: Packaging structure of TwinMAX modules Yingli Solar TwinMAX Modules, Installation and User Manual page 2

Series Wiring (Voltage Additive) Parallel Wiring (Current Additive) Cap + Fully engage and lock

with the diodes. Clamps or Hooks Refer to the Module Supplement distributed with this manual to determine how many connection points are required for a specific module series. The locations of mounting hooks and clamp tolerances are illustrated in the drawings located in the Module Supplement. Installation shall order the requirement below. If the installation method is different from this manual, please contact Yingli engineer for approval. Clamps Clamps selection Figure 7: Electrical circuitry of cells and bypass diodes In the event of a known or suspected diode failure, installers or maintenance providers should contact the company the TwinMAX modules were purchased from. Never attempt to open the junction box of a Yingli Solar TwinMAX module yourself. MECHANICAL INSTALLATION General Yingli Solar TwinMAX Modules have been certified for a maximum static load on the back of the module of up to 2400 Pa (i.e. wind load) and a maximum static load on the front of the module of up to either 2400 Pa or 5400 Pa (i.e. wind and snow load), depending on the module type (please refer to the data sheet for this information). Mounting structures and other mechanical parts must be designed and approved to withstand the design wind and snow loads applicable for a particular site. Yingli Solar TwinMAX modules must not be subjected to forces from the substructure, including forces caused by thermal expansion. Yingli Solar TwinMAX modules can be mounted in landscape or portrait orientation, as illustrated in Figure 8, provided that the mounting method follows one of the acceptable methods listed below. An appropriate mechanical secure of the modules should hinder them from falling down. Landscape Orientation The clamps length shall not be less than 120mm, and the installation depth shall be greater than 15 mm. In order to protect the glass, clamps shall have two protective layer of EPDM rubber, and the thickness of each layer of the rubber shall not be less than 3 mm. Minimum dimensions are shown in figure 9. As the module is bending during a mechanical load ensure a clearance of at least 100mm behind the module. φ8.5 15 3 3 Figure 9:Detail of a clamp As Bifacial series module can generate power from the front and back side, an installation with landscape orientation can eliminate shading from beams and improve the power output. If you have to install modules in portrait orientation, beams should be positioned so that shadowing of the cells is minimized e.g. between the cells, and safety hooks to mechanically hinder modules from falling down in case of rubber aging. Please find the installation drawings in the supplement document. Step 1: Place the clamps on the support beams at the correct position according to the module size. The exact values can be found in the supplement.according to the module size. Portrait Orientation C type steel installation Aluminium profile installation Figure 10:Examples of possible used support steels Step 2: Figure 8: Landscape and portrait mounting In order to maintain the fire class rating, the distance between the TwinMAX module front surface and the roof surface shall be at least 10 cm. This spacing also allows air flow to cool the TwinMAX module. Install TwinMAX modules with a minimum spacing of 1 cm between neighboring modules to allow for thermal expansion. Mounting Method The following methods are available: Insert the module into the clamps and tighten the bolts (It s recommended to fix the clamps by M8 screws and tighten the screw with 16 N m ~ 20 N m torque). Backrails/Hooks Step 1: Backrails/Hooks pre-assembled by Yingli can be installed by sliding the hook carefully into the U-shaped steel beam. The dimensions of the beam should fit to the hook position and dimension, which is shown in the installation drawings in the supplement document. Yingli Solar TwinMAX Modules, Installation and User Manual page 4

YINGLI SOLAR TWINMAX MODULES Module Supplement Revision Date Aug 3rd, 2016 Applicable for IEC certified products. This supplement refers to modules of the following types: Table 1: Module types FAMILY TwinMAX 60 Cell TwinMAX 72 Cell TwinMAX 60 Cell Standard Series Standard Series Bifacial Series YL250PG2530L-1 YL300PG2536L-1 YL270CG2530L-1 YL255PG2530L-1 YL305PG2536L-1 YL275CG2530L-1 TYPE YL260PG2530L-1 YL310PG2536L-1 YL280CG2530L-1 YL265PG2530L-1 YL315PG2536L-1 YL285CG2530L-1 YL270PG2530L-1 YL320PG2536L-1 YL290CG2530L-1 YL275PG2530L-1 YL325PG2536L-1 MOUNTING REQUIREMENTS Mounting Method: Clamps and Hooks Table 2: Mounting requirements of Clamps Modules that Require Four (4) Connection Points Modules that Require Six (6) Connection Points TwinMAX 60 Bifacial Series TwinMAX 72 Standard Series TwinMAX 60 Standard Series ELECTRICAL CHARACTERISTICS Nameplate ratings are average values. The electrical characteristics are within +/- 10 percent of the indicated values of Isc, Voc, and Pmax under Standard Test Conditions (irradiance of 1000 W/m², AM 1.5 spectrum, and a cell temperature of 25 C ). Refer to module datasheets for specific power output tolerances. Note that not necessarily all power classes are available for all module series given in the first column of Table 3. Please refer to Table 1 to see which power classes actually exist for which module series. Table 3: Electrical characteristics Series Module P max V mpp I mpp V oc I sc Max. system voltage Max. series fuse rating [W] [V] [A] [V] [A] [V] [A] YL325PG2536L-1 325 37.3 8.72 46.3 9.24 1500 15 YL320PG2536L-1 320 37.0 8.64 46.0 9.18 1500 15 TwinMAX 72 Cell Standard Series YL315PG2536L-1 315 36.8 8.56 45.7 9.12 1500 15 YL310PG2536L-1 310 36.3 8.53 45.6 8.99 1500 15 YL305PG2536L-1 305 36.1 8.45 45.4 8.93 1500 15 YL300PG2536L-1 300 35.8 8.37 45.2 8.86 1500 15 YL275PG2530L-1 275 31.0 8.90 37.9 9.35 1500 15 YL270PG2530L-1 270 30.7 8.80 37.9 9.27 1500 15 TwinMAX 60 Cell Standard Series YL265PG2530L-1 265 30.5 8.70 37.8 9.18 1500 15 YL260PG2530L-1 260 30.3 8.59 37.7 9.09 1500 15 YL255PG2530L-1 255 30.0 8.49 37.7 9.01 1500 15 YL250PG2530L-1 250 29.8 8.39 37.6 8.92 1500 15 YL290CG2530L-1 290 32.3 8.98 39.2 9.34 1500 15 TwinMAX 60 Cell Bifacial Series YL285CG2530L-1 285 32.0 8.91 39.0 9.30 1500 15 YL280CG2530L-1 280 31.7 8.83 38.8 9.25 1500 15 YL275CG2530L-1 275 31.4 8.75 38.6 9.21 1500 15 YL270CG2530L-1 270 31.1 8.68 38.4 9.16 1500 15 Yingli Solar TwinMAX Modules, Installation and User Manual page 6

12 3451 23451 2345 12 3451 23451 2345 CLAMP INSTALLATION DRAWINGS OF TWINMAX MODULES UNITS: mm TwinMAX 72 Cell module TwinMAX 60 Cell module 992 992 1658 3 52 ± 10 954 ± 10 3 52 ± 10 1968 348± 10 636 ± 10 636 ± 10 348± 10 Yingli Solar TwinMAX Modules, Installation and User Manual page 7

Hook installation drawings of TwinMAx 60 cell modules UNITS: mm 1 658 +2-1 1 96±1 600±1 1 96 50 1 96±1 600±1 1 96 50 500±1 500±1 B 366 900±0.5 392 992 +3 0 500 A 41 20 7 21 23.2 DETAIL A DETAIL B Yingli Solar TwinMAX Modules, Installation and User Manual page 8

Hook installation drawings of TwinMAx 72 cell modules UNITS: mm 1968 +2-1 196±1 600±1 196 50 196±1 600±1 196 50 500±1 500±1 B 396 1150±0.5 422 992 +3 0 500 A 41 20 7 21 23.2 DETAIL A DETAIL B Yingli Solar TwinMAX Modules, Installation and User Manual page 9