Asset Integrity Management a risk based approach Turning Policy into operational practice

Similar documents
OIL & GAS DNV GL. The technical advisor to the global oil and gas industry SAFER, SMARTER, GREENER

Wind Turbine Life Extension

Risk & Integrity Management Centralized Approach Supporting Daily Decision Making Activities. ROSEN Integrity Solutions Matthias Lohaus 23-Oct-2012

DIGITAL SOLUTIONS TRAINING CATALOGUE. RAM analysis. Maros and Taro SAFER, SMARTER, GREENER

We are a global classification, certification, technical assurance and advisory company Ungraded

Type Certification vs. Project Certification

Management System. Updated Document Review

TÜV Rheinland and Lloyd s Register certify Loctite Composite Repair System for steel pipes and pipelines

Development of Pipeline Integrity Management System (PIMS)

Taking a broader view

Manufacture of welded products - Welding workshop

EAMS for Future Grids

Can Today s Fracture Mechanics address Future Pipelines Integrity?

ASSet InteGrIty MAnAGeMent PArtnerInG to ACHIeVe your InSPeCtIOn, MAIntenAnCe, AnD SAFety OBJeCtIVeS

Certification of Marine Renewables

A DIRECT ASSESSMENT MODULE FOR PIPELINE INTEGRITY MANAGEMENT AT GASUNIE

Integrity Program Evaluation Using Meaningful Performance Metrics

ENVIRONMENTAL RISK MANAGEMENT

From KEMA to DNV GL Energy

Roadmap to a succesfull risk assessment with Bowstar

STANDARD. Competence management systems DNVGL-ST-0049: DNV GL AS

DNVGL-CP-0098 Edition March 2016

Opportunity of a Lifetime. An integrated approach to asset life extension. Graeme McCann 10 DECEMBER 2014 ENERGY

WEBINAR: ISO 9001:2015 TRANSITION EXPERIENCES

DIGITAL SOLUTIONS TRAINING CATALOGUE. QHSE and risk management. Synergi Life SAFER, SMARTER, GREENER

AN INNOVATIVE APPROACH TO MANAGING THE INTEGRITY OF OIL AND GAS PIPELINES: PIPELINE INTEGRITY MANAGEMENT SYSTEM

PG&E Gas Operations. Gas Safety Excellence API 1173

Improving Industrial Energy Efficiency by Changing the Energy Culture

LNG Powered Vessel: Trends and Technical Aspects

Introduction of MECADA Joint Industry Project

Digital Transformation of Energy Systems

The Smart Urban Energy Landscape

Hydrogen and other routes to decarbonization of the gas network

Clad steel and steel-aluminium transition joints

Challenges and trends ahead - out of the perspective of a classification society Paris, 1 December 2016

Liquid Petroleum Pipelines Safe, Efficient and Improving

Wind Turbine Certification

Qualification of manufacturers of special materials

New Recommended Practises for Low Temperature and Icing Climate Conditions

The scope of this DNV GL verification statement is limited to the CBS v2.1 and the following associated Sector Technical Criteria:

Roles and Responsibilities for Incident Management in Gas Transportation

Hull damage experience in CSR tankers

Pipeline Compliance and Risk Management Pipeline Risk Assessment Line 9B Reversal and Line 9 Capacity Expansion Project

BUSINESS ASSURANCE GUIDANCE FOR THE TRANSITIONING FROM ISO 9001:2008 TO ISO 9001:2015 SAFER, SMARTER, GREENER

Renewable energy and electric grids

Protective coating systems for seawater ballast tanks and double-side skin spaces - Non-metallic materials

DNVGL-CP-0432 Edition April 2016

ILI: An Improvement Over Pressure Testing for Pipeline Integrity Management

Challenges on HDD Pipeline Shore Approach

COPEX 2010 BRUSSELS, March 25 & 26. How to deal with a large amount of features from an in-line inspection?

DNVGL-CP-0248 Edition May 2016

Environmentally Assisted Fatigue and Fracture of Offshore Pipelines Current Status and Future Needs

Pipeline Integrity. QuestIntegrity.com CHALLENGE CONVENTION

PIPELINE INTEGRITY SOLUTIONS

Pipeline Integrity Management

MANAGING RISK AND INTEGRITY OF AGING GAS TRANSMISSION PIPELINE. Arie Wisianto, Gas Transmission Dept PT PERTAMINA EP, Java Region.

Just around the corner. at 490 locations worldwide.

The Aspen Fidelis Reliability Difference: Minimize Risk, Maximize Profitability

Integrated Resource Planning: CAPEX & Wind Generation Modeling

A correct octane number for LNG

World s First Dual-Fuel Cruise Ship Challenges and perspectives

DNV GL Digitalization Drive from Vision to Solution

Global trends shaping future shipping

Fibre reinforced thermosetting plastic piping systems - Non-metallic materials

Balance-of-Plant Corrosion

Shaping the future of digital standards, requirements and information management

WIN WIN - Wind-powered water injection Industry innovation and the development of an «impossible» idea

The Sustainability Revolution

BSR GPTC Z TR x GM Referenced Standards Page 1 of 12

SYMPOSIUM ON INDUSTRIAL APPLICATIONS OF GAS TURBINES

What lies below the curve

ISO 9001:2015. Main changes in the world s most popular QMS standard SAFER, SMARTER, GREENER. DNV GL 2015 rev 2

Japan-Norway Hydrogen seminar Collaboration within hydrogen future market and value chain. Petter Ellingsen 28th February 2017.

GIS-enabled ILI Repair Prioritization and Follow-Up. An integrated workflow from the submission of the Final Report to the Validation of Dig Results.

Anchor chain cables and accessories

122 Norwegian Oil and Gas Recommended Guidelines for the Management of Life Extension

Implementation of Statistical Analysis of Inspection Data to Improve Integrity Management Process

Integrity Management Program for

MARITIME SAFETY SURVEY

Risk Management in Interconnector Projects

Pipeline Safety Management Systems Initial Implementation Strategies and Lessons Learned WRGC

ISO/IEC Service Management. Your implementation guide

Dexion Storage Solutions SRL

Solutions for the Mining Industry ensure performance at highest level

Total Pipeline Integrity Management System PETRONAS Gas Berhad s Practices

Barriers for integration of energy storage in the current regulatory and market framework

APPROVal of Engineering Design models

LNG as fuel for shipping Norsk gassforum Brussels, 15 September 2016

Implementing an Advanced Hull Integrity Management System to Reduce Technical Operating Costs and TCO

Risk and Reliability for Tidal Turbines

PECANHOOD INTEGRITY. Engineering Analytics Project Management Est for more information, please visit

Core materials for use in sandwich plate system (SPS) or similar

IBM Maximo Asset Management solutions for the oil and gas industry

IAM Certificate in Asset Management. Contents are subject to change. For the latest updates visit

Future Energy Markets

Digital Transformation of Energy Systems

Form 1: Proposal for a new field of technical activity

Lessons Learnt From Qualification Testing In The US

Notice of Proposed Rulemaking (NPRM) Huy Nguyen Western Region

Asset Integrity Services. A commitment to excellence in Non-Destructive Testing & Inspection.

Transcription:

Asset Integrity Management a risk based approach Turning Policy into operational practice 5 th February 2014 Pipeline Integrity Management Forum 2014 Roy van Elteren Head of Section Gas Infrastructure & Transport DNV GL Oil & Gas SAFER, SMARTER, GREENER

Outline Introductionto DNVGL Oil & Gas; Asset Management Policy Operational practice threat Identification Risk prioritization Inspection planning Respond & process improvement Questions 2

DNV GL Group 3

DNVGL: A new company with 150 years of experience DNV and GL Noble Denton joined forces in September 2013. We ve drawn upon our proud heritages to create: Greater technical expertise Enhanced innovation capabilities Extended global reach An integrated service portfolio 4

An integrated approach across the asset lifecycle Our common way of working and global sales model delivers industry best practice across the asset lifecycle. Core service areas include: Risk management advisory Technical advisory Noble Denton marine assurance & advisory Technical assurance Certification and verification Inspection and quality assurance Offshore classification 5

Serving the diverse needs of the entire oil & gas value chain Exploration & Production Transport & Distribution Enabling Operational Excellence Verification & Certification Services Technology Innovation Services Energy Business Decision Support Delivery & Use

Asset Management Policy 7

Asset Management Policy Challenges for Asset owners/pipeline Operators; Prolong lifetime of Assets in operation Public awareness Pressure from authorities Accidents v.s near misses Accommodate Renewables & Unconventionals? Compliance to new standards and regulation Operators are in the spotlight: Show me you are in control. Creating an umbrella for all the (inter)national- and company standards Example; PAS55/ISO55000 8

PAS55/ISO55000 overview PAS55 : 2004 Physical Infrastructure Assets The IAM Tool PAS55 : 2008 Physical Assets ISO55000 : 2014 Assets 9

PAS 55 Improvements with ISO 55000 Worldwide recognition in comparison to U.K. based PAS55 PC 251 Structure Structure of Asset Management is better acknowledging what large companies do and want (ownership; asset management; service provider) It puts emphasis on involvement of top management and leadership ISO 9001 quality Includes finance and accounting requirements ISO 27000 inform. security ISO 550000 ISO 14001 environ ment Risk based decision has a prominent place in the overall asset management system ISO 31000 risk 10

Structured approach Links to roles in the organization Asset Owner Business Strategy Performance indicators Business Asset performance Management Asset performance Policy Benchmarking Asset Manager Asset Strategy Asset Lifecycle Management Decision Strategic support data Probability, impact, risk Cost Asset data Management Scenario s, alternatives Plan Service Provider Operational areas High quality asset data Fixed Asset asset Management data Condition / health Plans Assessment knowledge 11

Practical build up: from asset details to company criticality Netwerk configuration Station configuration Maintenance/ Performance Data Networks Facilities / Pipelines Components Parts Criticality Failure modes Asset Health 12

PAS55/ISO55000 in practice Benchmark of company procedures vs standards Establishing Asset Register Asset Condition Assessment Threat Identification Risk prioritization Selection of Inspection methods Maintenance planning/re-inspection Constructing Asset Management plans Risk evaluation cycle Integrity Management Systems software support 13

Asset Integrity in Operation 14

Risk based Asset Integrity in Operation Continuous improvement Efficient processes Identify Threats Failure Mechanisms Improve Prioritize Quality Management Integration of Data Risk Assessment Prioritize risks Respond Plan & Select Plan Inspections Appropriate Methods 15

Identify Identify threats Improve Prioritize All threats to pipeline/asset integrity shall be considered Consider future changes in operating conditions that may introduce new degradation mechanisms (e.g. pressure fluctuations, gas quality) Respond Guidance given by for example ASME B31.8S Managing System Integrity of Gas Pipelines : Time-dependent (e.g. external corrosion, internal corrosion, stress corrosion cracking) Stable (e.g. manufacturing, welding, equipment related defects) Time-independent (e.g. third party damage, incorrect operational procedure, weather related and outside force) Plan & Select 16

Identify Inspection planning and selection Improve Prioritize Inspection methods can be divided mainly into inline inspection (ILI) methods and aboveground surveys to be used in assessment methodologies. Respond Plan & Select About 40% of the gas pipelines worldwide cannot be inspected inline. Assessment methods: External Corrosion Direct Assessment (ECDA) Dry Gas Internal Corrosion Direct Assessment (DG-ICDA) New developments in ILI technology Combining inspection results to increase accuracy of defect growth prediction-> leading to effective re-inspection 17

Identify Prioritize; risks Improve Prioritize Scope: Rank pipelines based on probability of failure and failure mode for external corrosion Respond Plan & Select Build a failure model to determine the failure frequency of a defect based on the: leak vs. rupture (ASME B31G) Time to fail for a single defect Failure frequency of a defect (Monte Carlo simulation) Based on data from ILI-runs, the ECDA program, PIMS, international databases and from expert judgment Leading to a ranking tool to prioritize inspections based on risk: Incorporate consequence factors (e.g. population density, environmental damage, security of supply etc.) 18

Identify Respond; Inspect and repair Improve Prioritize External corrosion (MIC) Respond Plan & Select

Identify Process Improvement; (P)IMS Improve Prioritize Scope: Development and Implementation of a (Pipeline) Integrity Management System Our contributions: Getting a company ready to use PIM software Asset Management Policy development (Gap) Implementing company procedures Training company experts Functional specification customer requirements Integrity Management support (Risk, inspection) Respond Plan & Select Supported by a unique Software package Data Quality & data management is key! First get Asset Integrity procedures in place.

Thank you for your attention! www.dnvgl.com SAFER, SMARTER, GREENER 22