Progress on Footprint Reduction at the Hanford Site

Similar documents
TRADEMARK DISCLAIMER. Printed in the United States of America

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Collaboration in Long-Term Stewardship at DOE s Hanford Site 13019

Hanford Site River Corridor Cleanup Effectiveness of Interim Actions and Transition to Final Actions

Overview of Hanford Site Risk Assessment to Support Cleanup Decision Making

Jane Hedges, Manager, Nuclear Waste Program Washington Department of Ecology

Washington Closure Hanford: Cleaning up the River Corridor

WM2012 Conference, February 26 - March 1, 2012, Phoenix, Arizona, USA

Update on the. Federal Facilities Task Force/ May 28, Assistant Secretary

WM2011 Conference, February 27 March 3, 2011, Phoenix, AZ. Establishing Final Action Cleanup Decisions for the Hanford Site River Corridor 11592

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Applying Lean Concepts to Waste Site Closure 13137

DOE Environmental Management Clean Up Focus for FY

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona, USA. Observational Approach to Chromium Site Remediation 13266

Central Plateau Inner Area Cleanup Principles

Overview of the U.S. Department of Energy Office of Environmental Management Mission

THE AMERICAN REINVESTMENT AND RECOVERY ACT: U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL CLEANUP OPERATIONS

Hanford Site Outlook

DOE Environmental Management

Hanford Overview. SITE OWNER US Dept of Energy. SIZE 586 square miles. NEARBY TOWNS Richland, Pasco, total pop ~250,000 WORKFORCE ~11,000

WM07 Conference, February 25 March 1, 2007, Tucson, AZ

DOE Environmental Management Brief

Emerging Issues With U.S. DOE Prime Contractors

1.0 Introduction. 1.1 Purpose and Scope. M. J. Hartman

Tank Farm Remediation Technology Development Project: An Exercise in Technical and Regulatory Collaboration

Nevada National Security Site Industrial Sites Project Closeout 12498

WM Symposia AND FY 2013 Budget Overview. David Huizenga Senior Advisor for Environmental Management February

Department of Energy s Legacy Management Program Development

DOE Response Actions:

Savannah River Site Missions, Accomplishments and Funding

Analysis of Approaches for Supplemental Treatment of Low-Activity Waste at the Hanford Nuclear Reservation

Savannah River Site Making Solid Investments for a Sustainable Future

The Positive Impacts of American Reinvestment and Recovery Act (ARRA) Funding to the Waste Management Program on Hanford s Plateau Remediation Project

LONG-TERM ENVIRONMENTAL STEWARDSHIP (LTES) PLANNING AND IMPLEMENATATON

Small Business Procurement and Contracting Opportunities with DOE and DOE Prime Contractors

EM Transportation Update

NUCLEAR ENERGY AND WATER USE IN THE COLUMBIA RIVER BASIN

D4 Project Innovations and Challenges. J.C. Fulton Washington Closure Hanford 2620 Fermi Avenue, Richland, Washington 99354, USA

Hanford Site River Corridor Cleanup. K.D. Bazzell U.S. Department of Energy, Richland Operations Office 825 Jadwin Avenue, Richland, Washington 99352

Supporting DOE EM 4.31, Office of Regulatory Compliance

HANFORD SITE MIXED WASTE DISPOSAL

RIVER PROTECTION PROJECT WASTE TREATMENT PLANT CONCEPT AND APPROACH. M. J. Lawrence, British Nuclear Fuels Ltd., Inc.

WM2012 Conference, February 26 March 1, 2012, Phoenix, Arizona, USA. Hanford Site Sustainability Program, Richland, Washington 12464

Long-Term Performance Monitoring of Metals and Radionuclides in the Subsurface at the Hanford Site. Thomas W. Fogwell, Ph.D., P.E.

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA

Nova Scotia Lands Inc. Crown Corporation Province of Nova Scotia Business Plan

WHAT IS THE COST FOR DOE LOW-LEVEL WASTE DISPOSAL? Karen Guevara U.S. Department of Energy

Linde FUSRAP Site Tonawanda, New York

Don J. Moak*, Glen C. Triner**, Lori D. West**, Richard L. Grondin*

HANFORD S GROUNDWATER/VADOSE ZONE INTEGRATION PROJECT PROTECTING THE COLUMBIA RIVER

RESTORING THE COLUMBIA RIVER CORRIDOR AT HANFORD S N REACTOR. R. Donahoe Bechtel Hanford Inc. D. Obenauer Bechtel National

The SENATE COMMITTTEE ON ENERGY AND NATURAL RESOURCES

Eligibility Requirements and Procedures for Risk-Based Remediation of Industrial Sites Pursuant to N.C.G.S. 130A to

Environmental Cleanup of the East Tennessee Technology Park Year One - Execution with Certainty SM

Efficiencies and Optimization of Weak Base Anion Ion-Exchange Resin for Groundwater Hexavalent Chromium Removal at Hanford 14202

An Approach to Characterizing and Evaluating Alternatives for the Decommissioning of Sub-Grade Structures at the Plutonium Finishing Plant

How does the WIPP shutdown Impact New Mexico, Idaho, and South Carolina?

W. T. (Sonny) Goldston Savannah River Nuclear Solutions phone fax

WM2013 Conference, February 24 28, 2013, Phoenix, Arizona USA. Thermal Removal of Tritium from Concrete and Soil to Reduce Groundwater Impacts 13197

AECL and Radioactive Waste Management

High School Environmental Science Produced by Columbia Riverkeeper HANFORD & THE RIVER

DESIGNING AND IMPLEMENTING A LIFE-CYCLE COST MODEL FOR FIRST-OF- A-KIND BUILDING DECOMMISSIONING

FFTF DECOMMISSIONING. FFTF Decommissioning Alternative 1: No Action. FFTF Decommissioning Alternative 2: Entombment

WM2010 Conference, March 7-11, 2010, Phoenix, AZ

LATA KY Remediation Project

CLEANING UP AMERICA S NUCLEAR WEAPONS COMPLEX

OFFICE OF INSPECTOR GENERAL U.S. Department of Energy. AUDIT REPORT OAI-L September 2017

Legacy Management Program of U.S. Department of Energy

US DOE Procurements and Contractor Delivery Challenges

Section 3.11: Hazardous Materials

PEAK DEMANDS. Civil & Environmental Consultants, Inc. PEAK DEMANDS. balancing utility reliability with regulatory change

Crown Corporation BUSINESS PLANS. Table of Contents FOR THE FISCAL YEAR Nova Scotia Lands Inc. Business Plan

Waste Management Systems for the 21st Century at Oak Ridge National Laboratory

APPENDIX H HAZARDOUS MATERIALS PROCEDURES AND RESULTS

DOE Oak Ridge Cleanup History Setting the Stage for Future Success Dirk Van Hoesen Strata-G, LLC

WM2014 Conference, March 2 6, 2014, Phoenix, Arizona, USA

Massachusetts Military Reservation Cleanup Update. Summer 2010

Ground Water Remedy Optimization Progress Report: Office of Superfund Remediation and Technology Innovation

Presentation to IAEA/ANDRA Conference Cherbourg, France. September Thomas C. Pauling Environment Team Leader USDOE Office of Legacy Management

Statistical Analysis of Post-Phase I Remedial Action Water Quality Data Operable Unit 2

Risk and Performance Analyses Supporting Closure of Waste Management Area C at the Hanford Site in Southeast Washington 14226

3.11 HAZARDOUS MATERIALS

U.S. DEPARTMENT OF ENERGY. PORTS D&D Project Update Piketon High School January 24, 2017

WIPP Overview. Betsy Forinash. Director, National Transuranic Waste (TRU) Program-HQ Office of Environmental Management, DOE

WM2011 Conference February 27 - March 3, 2011, Phoenix, AZ

Tonight s presentation will provide information about the status of the Luckey Site and about ongoing and future Corps activities.

Radioactive Tank Waste from the Past Production of Nuclear Weapons: Background and Issues for Congress

OVERVIEW CAPACITY & CONDITION

An Unprecedented Marvel of Science, Technology and Engineering

EM Program Update. Frank Marcinowski Deputy Assistant Secretary for Waste Management June 4,

Remediation Approach for the Integrated Facility Disposition Project at the Oak Ridge National Laboratory

Efficiencies in the Environmental Restoration Operations at Sandia National Laboratories, New Mexico

The Cleanup Process. Operation and Maintenance Construction Completion Post Construction Completion NPL Deletion Reuse

Nevada Environmental Response Trust Site Fact Sheet

General Motors (Central Foundry Division) Cleanup Progress Update Massena, St. Lawrence County, NY

Appendix V: Solid and Hazardous Waste

DEVELOPMENT OF AN INVENTORY REDUCTION PLAN FOR THE OAK RIDGE RESERVATION LOW LEVEL WASTE INVENTORIES

15A NCAC 02L.0106 CORRECTIVE ACTION (a) Where groundwater quality has been degraded, the goal of any required corrective action shall be restoration

Newport Chemical Depot, IN. Conveyance Progress Report

SURVEYING EXCESS DOE FACILITIES FOR TRANSFER TO DEACTIVATION AND DECOMMISSIONING

With this FY 2007 budget request, we are proposing several shifts between program offices with the completion of cleanup.

THE DEPARTMENT OF DEFENSE AND THE UNITED STATES ENVIRONMENTAL PROTECTION AGENCY

Transcription:

Progress on Footprint Reduction at the Hanford Site - 12406 Dale E. McKenney*, Paul Seeley** and Al Farabee*** *CH2M HILL, Plateau Remediation Company, Richland, Washington 99352 **Cenibark International, Inc., Richland, Washington 99352 ***U.S. Department of Energy, Richland Operations Office, Richland, Washington 99352 ABSTRACT The Department of Energy (DOE) Office of Environmental Management (EM) continues to reduce the footprint of legacy sites throughout the EM complex. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess contaminated facilities, soil and groundwater remediation, and solid waste disposition. All of these initiatives are being accomplished with established technologies in proven regulatory frameworks. Ultimately, completion of these environmental cleanup activities will reduce the monitoring and maintenance costs associated with managing large federal facilities, allowing EM to place more focus on other high priority cleanup efforts and facilitate a successful transition to land-term stewardship of these sites. Through the American Recovery and Reinvestment Act (ARRA) investment, the Department's cleanup footprint has been reduced by 45 percent to date, from 2411 km 2 (931 mi 2 ) to 1336 km 2 (516 mi 2 s). With this significant progress on footprint reduction, the Department is on track towards their goal to reduce its overall footprint by approximately 90 percent by 2015. In addition, some areas cleaned up may become available for alternate uses (i.e. recreation, conservation, preservation, industrialization or development). Much of the work to reduce the complex's footprint occurred at the Savannah River Site in South Carolina and the Hanford Site in Washington, but cleanup continues across the complex. Footprint reduction is progressing well at the Hanford Site, supported predominantly through ARRA investment. To date, 994 km 2 (384 mi 2 ) (65%) of footprint reduction have been achieved at Hanford, with a goal to achieve a 90% reduction by Fiscal Year 2015. INTRODUCTION The Department of Energy (DOE) Office of Environmental Management (EM) manages federal facilities in 11 states. The EM mission is to complete the safe cleanup of the facilities and environmental legacy waste generated during 5 decades of nuclear weapons development, production, and government-sponsored nuclear energy research. The optimization of the EM program through their Strategic Planning Initiative has identified footprint reduction as a focus area. Footprint reduction through environmental cleanup activities will reduce the management costs associated with the monitoring and maintenance of these federal facilities, ultimately reducing the EM life cycle cost and supporting transition to the long-term stewardship (LTS) program. The three EM federal facilities that have the largest footprint reduction opportunities are Hanford, Savannah River, and the Idaho National Engineering and Environmental Laboratory. 1

HANFORD SITE FOOTPRINT REDUCTION EFFORT The original Hanford Site footprint is 1518 km 2 (586 mi 2 ) (Figure 1). One of the major objectives of the Hanford Site cleanup effort is to shrink this footprint by completing cleanup actions that will protect the Columbia River, reduce site management costs, make some lands available for asset revitalization such as Energy Park development, and to demonstrate steady, measurable cleanup progress. Figure 1. Hanford Site Active cleanup footprint reduction can consist of a number of activities, dependent on the anticipated use of the land area. First and foremost, it involves completion of any cleanup actions required by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). For areas where CERCLA cleanups are complete, it can also include activities consistent with the anticipated land use or other designation (e.g. the Hanford Reach National Monument) or to reduce safety/liability concerns. Examples of these types of activities can include such things as the removal of excess facilities, infrastructure, and debris. Groundwater 2

restoration/cleanup actions (e.g. pump and treat activities), although critical to eventual cleanup of the Hanford Site, do not factor in to footprint reduction determinations. Reducing the footprint with active cleanup does not necessarily mean that DOE will physically reduce the site boundaries or excess the land. DOE will continue as the federal agency responsible for implementation of the Comprehensive Land-Use Plan for the Hanford Site and will continue site management through its LTS program. In its role as the responsible federal agency DOE has the ability to authorize use of some areas available for DOE s reuse consistent with the Hanford Comprehensive Land-Use Plan. Most of the Site has a land use designation of preservation or conservation (mining), with other smaller areas identified for recreation, industrial or industrial (exclusive) use (Figure 2.) [1]. DOE anticipates that the vast majority of the Hanford Site will remain under Federal management and control for the foreseeable future. Figure 2. Land Use Designations for the Hanford Site. 3

Cleanup of the Hanford Site, and subsequent footprint reduction, is taking a generalized outside-in approach. The Site has been subdivided in to the following principal components for active cleanup footprint reduction: Hanford Reach National Monument, River Corridor, Central Plateau - Outer Area, and Central Plateau - Inner Area (including tank waste)(figure 3.). River Corridor (~220 sq. mi.) 100 Area Reactor Areas Central Plateau, Outer Area (~65 sq. mi.) 200 Areas Central Plateau, Inner Area (~10 sq. mi.) Central Plateau 300 Area Hanford Reach National Monument (~290 sq. mi.) Figure 3. Principle Components of the Hanford Site Cleanup and footprint Reduction The successive stages of Hanford Site footprint reduction will focus on these principal components [2, 3]. 4

Hanford Reach National Monument (~751 km 2 (290 mi 2 )). The Hanford Reach National Monument is an area located north of the Columbia River and in the southwestern portion of the Site. The National Monument is a biologically diverse landscape with both a natural and historic legacy. The area was historically used for defensive installations for the Site and later as a buffer zone for the ongoing nuclear operations. CERCLA cleanup actions for the Hanford Reach National Monument were previously completed. Subsequent clean-up activities involved removal of dated support and research facilities, infrastructure removal, and removal of miscellaneous debris. Items required to be left by cultural laws/requirements, on-going DOE programs, and U.S. Fish and Wildlife programs were not removed. River Corridor (~570 km 2 (220 mi 2 )). Area located along the Columbia River, primarily the production reactor areas and associated waste sites (known as the 100 Areas) and the area north of the city of Richland, used for fuel fabrication activities, nuclear research and development facilities, along with associated waste sites (known as the 300 Area). Groundwater in the River Corridor was also impacted by the production and research activities conducted there. The River Corridor also includes the contiguous areas that extend from the 100/300 Areas to the Central Plateau area of the site. Cleanup activities involve interim safe storage of reactor buildings, removal of ancillary support buildings, waste site remediation (i.e. burial grounds, liquid disposal facilities, miscellaneous releases) and ongoing remediation of groundwater (e.g. pump and treat). Cleanup of the River Corridor is being conducted predominantly under CERCLA. Interim record of decisions (RODs) were developed to guide expedited cleanup with a bias for action in order to protect the Columbia River. Cleanup under these interim RODs, including actions to remediate groundwater, have been going on for some time. Development of CERCLA final RODs for the River Corridor is underway. The adequacy of the interim cleanup actions will be judged against the criteria in the final RODs, and although not anticipated in most cases, it may be determined that additional cleanup actions are required beyond those carried out under the interim RODs. Central Plateau Outer Area (~168 km 2 (65 mi 2 )). The Central Plateau Outer Areas is located in the central portion of the Hanford Site. Most of the waste sites in the Outer Area are small near-surface sites that will be removed for treatment as needed for onsite disposal or sampled to confirm that no additional action is required, except for implementation of appropriate institutional controls. The largest components of the Outer Area are the ponds where cooling water and other effluents were discharged, and the B/C control area, where surface contamination was spread because of wildlife intrusion into a waste site. The Outer Area also includes impacted groundwater. The plan is for cleanup of the Central Plateau Outer Area involves the removal of miscellaneous buildings and pipelines, remediation of waste sites (i.e. liquid disposal sites and miscellaneous releases), and ongoing remediation of groundwater, conducted 5

primarily under CERCLA. The approach will be to remediate the area to unrestricted surface levels, comparable to those for the adjacent River Corridor. Central Plateau Inner Area (~26 km 2 (10 mi 2 )). Located within the most central portion of the Site, this was the primary area for production/waste management operations. Because of the concentration of waste management operations facilities (burial grounds, storage complexes, etc.) and former production facilities (large canyon buildings, evaporators, etc.), tank farms, pipelines, and facilities necessary to Site cleanup (laboratories, Waste Treatment Plant, etc.); cleanup of the Inner Area represents a considerable challenge and will take some time to complete. Even after cleanup to ensure protection of the public and the environment, this area will continue be used for waste management and containment of residual contamination for the foreseeable future. An important component of Hanford Site footprint reduction is the evaluation of nonoperational property (NP). Non-operational property refers to regions of land that exist within, and between, the production facilities and identified waste sites. In many cases, the impact of site production operations might be absent from these areas, or be below levels of environmental concern. These regions are undergoing evaluation to determine if additional cleanup actions are required. An approach for NP evaluation at the Hanford Site has been established to determine if an area is available for footprint reduction [4]. Information gathered from the NP evaluation will be considered in the CERCLA remedial investigation/feasibility study. The process uses a weightof-evidence approach, based on the application of a number of different methods to determine whether areas have been significantly impacted by site operations. The activities conducted as part of a NP evaluation can be summarized as follows: Review and summarize information from existing Hanford Site programs, environmental surveillance efforts, and data that monitor and analyze the nature and extent of contamination outside the boundaries of the operational facilities and identified waste sites. Review and evaluate information sources such as aerial photography, geographic information system (GIS), and Light Detection and Ranging (LiDAR). A statistical analysis is a key part of the footprint reduction evaluation. The statistical approach considers locations of known waste sites and contaminant sources that may have the potential to impact the NP. This process facilitates the potential discovery of new waste sites, as well as areas of the NP that may have been impacted by site operations. Evaluate the potential for contaminant migration via the credible pathways of overland transport (e.g. wind and water), facility emissions, human activities, and animal or plant biointrusion. Quantify the confidence level that undiscovered waste sites do not exist. 6

Provide recommendations, if needed, for potential future environmental surveillance, data collection and analysis, or cleanup investigations based on the findings of the NP effort. FOOTPRINT REDUCTION GOALS AND STATUS The DOE EM has established footprint reduction goals for the Hanford Site. Achieving footprint reduction at Hanford has involved the development of completion subareas within the principle cleanup area components and are illustrated on Figure 4. These completion areas allow progress to be planned and credited in discrete, measureable steps. Figure 4. Principle Component Completion Subareas. 7

As of the beginning of this fiscal year (FY-12) the following accomplishments have contributed to the Hanford cleanup footprint reduction: North Slope: DOE contractor CH2M HILL Plateau Remediation Company partnered with Sealaska, a Native American-owned small business, to clean up debris in the 438 km 2 (169 mi 2 ) area near Hanford s main facilities. The North Slope is located northeast of those facilities, across the Columbia River (~453 km 2 (175 mi 2 )). Central Plateau: CERCLA cleanup activities (mostly near surface waste sites) and building demolitions allowed cleanup of several segments of the Central Plateau Outer Area (~91 km 2 (35 mi 2 )). Arid Lands Ecology Reserve: Once a buffer area for the U.S. Army, the Arid Lands Ecology Reserve is where workers removed more than 20 facilities and hundreds of debris sites and completed the first footprint reduction for the Hanford Site (~298 km 2 (115 mi 2 )). River Corridor: The Richland Operations Office River Corridor contractor, Washington Closure Hanford, has completed footprint reduction activities in two inland areas of the River Corridor (~155 km 2 (60 mi 2 )). To date, the Hanford Site has completed ~997 km 2 (385 mi 2 ) of footprint reduction (~65%), exceeding the EM goal. Relative to the original Hanford Site footprint of 1518 km 2 (586 mi 2 ), the goals and progress to date are shown in Table 1. Table 1. Hanford Site Footprint Reduction Goals and Status Fiscal Year 2011 Goal Fiscal Year 2011 Achieved Fiscal Year 2015 Goal Fiscal Year 2015 Projected Fiscal Year 2020 Projected Square Miles Completed 290 49% 385 65% 527 90% ~539 92% ~576 98% Percent Footprint Reduction CONCLUSIONS The DOE EM and DOE Richland Operations Office, continue to make great progress to reduce the legacy footprint of the Hanford Site. Footprint reduction is being accomplished by focusing cleanup activities on decontamination and demolition of excess facilities, both contaminated and 8

uncontaminated, waste site cleanup activities, and debris pile removal. All of these activities can be accomplished with proven technologies and within established regulatory frameworks. Footprint reduction goals for Fiscal Year 2011 were exceeded, largely with the help of ARRA funding. As cleanup projects are completed and the total area requiring cleanup shrinks, overall costs for surveillance and maintenance operations and infrastructure services decrease. This work completion and decrease in funding requirements to maintain waste sites and antiquated facilities allows more focus on high priority site missions (i.e. groundwater remediation, tank waste disposition, etc.) and moves Site areas closer to transition from EM to the Legacy Management program. The progress in the Hanford footprint reduction effort will help achieve success in these other important mission areas. REFERENCES 1. 64 FR61615, 1999, Record of Decision for Hanford Comprehensive Land-Use Plan Environmental Impact Statement, Federal Register, Vol. 73, Number 188, pp.55824-55826 (November 12, 1999). [need to also include the supplemental analysis and updated ROD] 2. Hanford Site Cleanup Completion Framework, DOE/RL-2009-10, Revision 0, July 2010. 3. Hanford Site Active Cleanup Footprint Reduction, DOE/RL-2010-18, Revision 1, March 2011. 4. Zone 1 Footprint Reduction Evaluation in the Hanford Site Central Plateau Outer Area, HNF-49277, Revision 1, August 2011. 9