MONITORING, MAINTENANCE OF MOORING SYSTEMS

Similar documents
MOORING INTEGRITY MANAGEMENT

WELAPTEGA operates globally with clients and projects in just about every region of the offshore oil and gas industry.

Finite Element Analysis for Structural Performance of Offshore Platforms

Strainstall Middle East L.L.C. INTRODUCTION Strainstall M.E. L.L.C. Corporate Profile OIL & GAS/ENERGY

Contents. 1 Overview of Ship-Shaped Offshore Installations Front-End Engineering Preface Acknowledgments How to Use This Book.

REGULATORY REVIEWS FOR FPSO s IN THE GULF OF MEXICO

FLOATING PRODUCTION UNITS

Offshore Liquid FPSO Measurement Systems Class 2450

FPSO. installation and offloading

Marginal Field Production Vessel The Solution For Marginal Fields & Early Production!

OINTRODUCTION. Technology Overview for Oil Services Companies: Using Flow Modeling to Lower Costs, Increase Reliability, and Reduce Risks

The Low Motion Floater (LMF)

THE TRANSFER OF LNG IN OFFSHORE CONDITIONS. SAME SONG NEW SOUND

Integrity management and operational experiences of flexible risers

DP INNOVATION. Dynamic Positioning of Underwater Vehicles - Tethered or Not

Platform Construction and Installation

Ageing and Life extension for structures. David Galbraith Ocean Structures / Sigma Offshore

The Low Motion FPSO (LM-FPSO) The SCR and TTR Friendly Floater in Harsh Environment

Early Production in Deep Waters. Mats Rosengren, Frontier Drilling do Brasil Vitoria, Brazil

Development and Testing of a Post-Installed Deepwater Monitoring System Using Fiber-Optic Sensors

DOCKWISE VANGUARD New generation of Heavy Marine Transport NOIA Fall Meeting October 20, 2012

Experience of Degradation of Mooring Systems used in the Offshore Oil and Gas Industry

Tough business in rough water Offshore Technology. Complete Drive and Control Solutions

Finding Petroleum FPSO Conference

Successful Fast Track Deepwater Project. Sanction to Production in 16 months. Ability to Expand to 6 Wells. Currently Working on Increasing Capacity

ECONOMIC COMPARISON BETWEEN OIL AND LNG FOR DECISION MAKING TO EVALUATE WHICH PRODUCT TO DEVELOP FROM A DEEPWATER WEST AFRICA FIELD

Introduction. FLNG: Costs and Cost Drivers. What is FLNG (and what isn t) FLNG Project Costs

Floating Wind Power in Deep Water Competitive with Shallow-water Wind Farms?

W.R. (BERT) ULBRICHT, P.E.

Table of contents TEMPORARY WORKS DESIGN BV 1

Monitoring for underground constructions

LOUISIANA FABRICATION FACILITIES AND SERVICES

DANIEL (DAN) J. TURNER, P.E. SENIOR STAFF CONSULTANT

On Board Regasification for LNG Ships. 22 nd World Gas Conference WS 3-2 Tokyo 2003 Wayne Perry

The Technical & Practical challenges of FLNG


Good afternoon ladies and gentlemen, my name is Desmond Greene. I m a Simulation Designer and Project Manager with GRI Simulations Inc.

Swivel and Marine Systems. Swivel stack and fluid transfer systems for multiple applications

FIRST JACK-UP RIG LOAD-OUT IN VIET NAM

The floatover forecast

CRANES WINCHES WINDLASSES CAPSTANS

A New Contender Shuttle Tankers, Contractor Owner, Service as Needed

National Maritime Center

Benefits of a cylindrically shaped floater for an FPSO application in cyclone exposed environments

offshoremonitoring INNOVATIVE MONITORING & CONTROL SYSTEMS Strainstall

Design Concept and Features of the Mitsubishi LNG-FPSO (Floating Production, Storage and Offloading Unit)

Storage Tank Explosion Frequencies on FPSOs

INVENTIVE SOLUTIONS for an Evolving Industry

INTEGRATED TERMINAL MANAGEMENT SYSTEMS

API Shuttle Vessel Task Force: It s Work and Findings

Caspian Energy Group. an EPCI contractor in the Caspian Sea

BISSO MARINE ADVANCED BURIAL & BACKFILL PLOUGH

The Future of Rigging Safety - Synthetics June 16-17, 2016 NMSA 2016 Seattle, WA Kris Volpenhein

Online Monitoring of sub-structure

Life Extension Technology for Mature Offshore Pipelines & New Cathodic Protection Performance Monitoring Strategies

STANDARD FOR CLASSIFICATION OF WIND TURBINE INSTALLATION UNITS

OFFSHORE STRUCTURES. Analysis and Design

Lars Odeskaug - TORP CEO

International Journal of Scientific & Engineering Research, Volume 7, Issue 10, October ISSN

SUBSEA CATHODIC PROTECTION SURVEYS HALF THE COST AND 10x THE DATA MPM S PROVEN CPSS

FPSO. installation and offloading

Flexible Pipe Technology for Deepwater and Gas Riser Systems

SENSE - Self Erecting Nacelle and Service System Estimated Cost Savings

Post-tensioned Structures Solutions for Repair and Protection

Offshore Support Vessels. Confidence in your position and attitude.

Mireille FRANCO DEV/TEC/STR FPSO LIFE EXTENSION TOTAL APPROACH

North American LNG 2006

/ Production.

Floating offshore gas units

RESOLUTION A.863(20) adopted on 27 November 1997 CODE OF SAFE PRACTICE FOR THE CARRIAGE OF CARGOES AND PERSONS BY OFFSHORE SUPPLY VESSELS (OSV CODE)

FOUNDATIONS FOR OFFSHORE STRUCTURES

INNOVATION & EXPERTISE

The Shades Valley Transfer Line (SVT) in Jefferson County, Ala., is only 24 years

NTEGRITY & NSPECTION

CASTORO SEI OFFSHORE

PIPELINE AND WELL INTEGRITY MANAGEMENT

Industrial IoT: From Concept to Business Reality. Improving O&G Operations with IoT. Progressing through the 5 Stages of IoT

FLOATING WINDMILLS. Department of Mechanical Engineering (MECH) Andhra University College of Engineering, Visakhapatnam, (INDIA)

THE TRENCHLESS TREND. Traditionally, pipeline shore crossings have integrated the by shallow waters, which are typically subject

Learn more at

API RP 2A - Recommended Practice for Planning, Designing, and Constructing Fixed Offshore Platforms Working Stress Design

Enabling safe and reliable offshore LNG transfer operations By Vincent Lagarrigue, Marketing & Project Manager within Trelleborg Industrial Solutions

SAFETY BENEFITS 18. Tide-independence 18 Rapid ballasting 19 Integrated hydraulic Ro-Ro ramps 20 Safety features, the future and engineering 22

CONVERSION OF SELF-ELEVATING UNITS TO OFFSHORE INSTALLATIONS

World Marine of Mississippi, LLC

FOFFSHORE WIND POWER HEADING FOR DEEPER WATERS BY JOHN KOSOWATZ

A Leader In Maritime Technology

Summary of Improvements Materials: New materials Since 1980s e.g., composites, synthetics Higher Strength More reliable Lower cost

Brochure Cable transport. Engineering. Cable handling & storage. Equipment

THE NEXT FRONTIER: OFFSHORE HYDRAULIC FRACTURING

OSNA -10 Copper-Nickel Sheathing on Boatlandings

Life Extension Services. Life Cycle Services

International MetalFusion Corporation

About Cortland in Australia

Innovations for the Global LNG Industry Bringing Continents of Energy Together Marine Technology Society March 22, 2007

Cathodic protection of harbour installations

Edit this text for your title

Structural Monitoring of Subsea Pipelines and Role in Reducing Mitigation Costs

Brochure. Cable transport. Cable handling & storage. Deck Spread. Equipment

Transcription:

MONITORING, MAINTENANCE OF MOORING SYSTEMS Help To Extend Design Life of Production Facilities William Furlow, Society of Petroleum Engineers The Zafiro Producer, a floating production, storage, and offloading vessel operated by ExxonMobil offshore Equatorial Guinea, began production in 1996. Replacement work was done on the mooring system as part of a broader refurbishment program to extend the platform's service life. Photo courtesy of InterMoor.

It would be an oversimplification to say that during the initial push to deep water in the mid-1990s, no one knew how long these fields would produce. Armed with 20 years worth of hindsight and steadily advancing technology, it is clear that many of these early discoveries will produce beyond their anticipated design life. This is especially true in a low-priced oil market. It makes sense to keep a known producer producing, as opposed to taking on the cost and risk associated with new exploration and development. The key to extending the life of floating production units (FPUs), as with anything production-related, is to accomplish what needs to be done safely, economically, and without shutting in the wells. Fortunately, as reservoir and development technologies have advanced, so have intervention methods. As an added bonus, a better understanding of materials interaction and improved monitoring tools allow newly installed systems the capability to outlive original equipment. Although deepwater mooring systems are designed with redundancies in place, it is not unheard of for one, or even two, lines in a system to part without the operator s knowledge, said Rizwan Sheikh, senior metocean engineer at BMT Scientific Marine Services. With the loss of one mooring line, an FPU on an overdesigned mooring system may simply drift over to a new equilibrium. As long as this new location is within the station-keeping parameters of the vessel, the failure may go undiagnosed. Many top-moored systems can still hold an FPU on station with multiple line failures. The problem is that if these lines fail without the operator s knowledge, then any subsequent failure could lead to an unzipping, or total failure, of the system. Bull's Eye Positioning Strain gauges and other sensors are designed to monitor line tension and would report a parting of a mooring line as a sudden drop in tension; however, these gauges are prone to failure over time and can be difficult to access for maintenance and repair. Also, since many of the older, firstgeneration FPUs did not have monitoring systems installed, the production vessels rely on their watch circle to ensure that they are remaining on station. The watch circle, a sort of bull's eye, uses GPS readings to tell the FPU how close it is to the optimum position for its riser system. There are excursion limits for these systems and, beyond that, what is considered the design limit. If the vessel strays outside the design offset of the system, it may be necessary to shut in some or all of the wells. It also indicates a problem with the mooring system. However, Sheikh said the watch circle gives the operator too little information, too late. By the time a vessel drifts out of its watch circle, there is already a serious problem with the mooring system. Because of the redundant design and the generous size of the watch circle, a vessel can be operating with one or two failed mooring lines and still be well within its design offset. TLP Tendon-Based Mooring Intecsea s floating systems business unit focuses much of its brownfield and life extension work on FPUs. Jim Yu, global subject matter expert of tendons and risers at Intecsea, said the company is working with several oil companies on tension leg platforms (TLPs) and semisubmersibles in the US Gulf of Mexico, although most of the FPUs have not yet reached their design life. TLPs are unique among deepwater platforms because they rely on rigid steel tendons to keep them on station. These tendons have a protective coating and are equipped with anodes to protect them from the corrosive environment. The tendons are also outfitted with fairings or strakes to resist vortex-induced vibration (VIV) during the installation stage. Although one of the TLPs has a number of years left on its design life, the operator plans to use the structure as a hub facility for many more years. To ensure the integrity of the FPU, the operator brought in Intecsea to evaluate the condition of the platform and provide a prediction of its remaining service life. The inspection and refurbish plan for the tendons and the top-tension riser was then developed. Bill Greiner, manager of the naval architecture department at Intecsea, said that while it makes economic sense to perform this type of maintenance on a TLP, the tendons are not designed to be changed out, except in a case of failure. Replacing any of the tendons would be uneconomical, which emphasizes the importance of regular inspection and maintenance of these facilities. Regulatory Oversight As with other FPU mooring systems, the process begins with contacting the contractor that built and installed the tendon system. This makes available the original engineering and design plans to Intecsea. In some projects, the company is the original engineering firm that designed the FPU. This type of life extension program requires regulatory approval, although there are no clear-cut regulations in place for such work. Instead, the company performs the engineering work and assists the operators in preparing and presenting operation plans to the appropriate regulatory body for approval based on the specifics of the platform. Typically, the US Bureau of Safety and Environmental Enforcement (BSEE) has oversight. The US Coast Guard (USCG) is also involved in the review process of the FPU. A third party verification analysis is typically included in the operator s plan. As part of the plan submitted to BSEE and USCG, Intecsea prepares an inspection plan for the tendons and riser to identify any weak links in the system. As with conventional mooring systems, some of the TLP tendon August 2015 Oil and Gas Facilities 21

Photo courtesy of InterMoor Two Stevpris Mk6 anchors on the Zafiro Producer were replaced with updated models. components present a challenge to visual inspection. In other cases, more advanced technology is required in addition to visual inspection. Yu said the use of acoustic and ultrasonic equipment is required for identifying possible cracks, corrosion, or other damage to the tendons. Also, it is important to detect problems with the coating and cathodic protection. Mooring Repair Plans The permanent mooring lines are commonly in need of updating and replacement on older FPUs. The assessment, repair, and/or replacement of these lines can be costly if not properly planned. Kent Longridge, a chief engineer at InterMoor, said cost is one of the reasons why contractors emphasize the importance of a mooring repair plan (MRP) to their customers. If the mooring contractor is involved with the planning process early, then the savings can be substantial. To create an MRP, companies that supply mooring and installation technology such as InterMoor first look at the as-built mooring configuration to determine which components make up the mooring system and to identify which equipment is available on the FPU for the repairs. Based on the as-built specifications, the contractors design an MRP that includes procedures for offshore operations and the identification of long lead-time mooring components and installation aids. A working knowledge of regional ports and harbors and the installation vessels in the area enables the identification of installation vessels with the capabilities to do the work. The contractor also identifies bases of operation (i.e., for equipment storage, maintenance, staging, and mobilization) and estimates cost and scheduling. Understanding the as-built configuration and the operational functionality of the on-vessel mooring equipment is essential. For example, most production facilities include mooring winches that are installed on the topsides. Winches that were originally used to wind up or pay out the mooring lines during installation may be useful in completing repairs and replacements. However, in cases in which the winch may have been set 20 years earlier, the equipment may no longer be operational. Making use of onboard mooring equipment is just one way of streamlining the replacement operation. Access to installation vessels and equipment is another key component of an MRP. Typically, anchor handling vessels can be used for this work and are more cost-effective than contracting a dedicated installation vessel with more capacity and capability. 22 Oil and Gas Facilities August 2015

The Unexpected Challenges in an FPSO Mooring Project Delmar Systems was contracted to perform maintenance on the nine-leg, external turret mooring system of the FPSO Serpentina, a floating production, storage, and offloading (FPSO) vessel operating offshore Equatorial Guinea. The vessel is also the single point of export for the Jade and the Zafiro Producer facilities. Robert Garrity, a chief engineer at Delmar Systems, explained that the FPSO Serpentina had been in production for about 10 years, so the mooring system was within its 15-year design life. The original plan was to change out the top chain, wire rope, and ground chain segments that were worn or damaged by corrosion. He said a remotely operated vehicle inspection showed broken wire strands on four of the nine lines. In addition, there had been some chafing of the top chain segment of three lines, where the chain had rubbed against the vessel s hull. The damage to the spiral strand wire rope was attributed to corrosion. The damaged segments would be replaced with sheathed rope to extend its life. Other than that, the plan was to exchange likeper-like. In all, five of the lines would be replaced. At that point, it seemed to be a routine project. But then, the ROV discovered something that was not routine. There was evidence of significant trenching around the system s suction pile anchors. The trenching was present in varying extents around all the nine pilings. A sonar sweep revealed variations in the trenching ranging from 4 m to 7 m in depth, and from 25 m to 40 m in length. Six of the mooring lines had trenches that were within 3 m of the piles. The trenching was believed to be caused by high amplitude motion of the ground chain. According to OTC paper 25449, the Photo courtesy of Delmar Systems. chains interaction with the seabed was observed by the ROV. Considering that the piles were connected to the ground chain at a depth of 9 m, the observed trenching significantly reduced the holding capacity of the system. The discovery dramatically changed the scope of the work. Instead of a like-per-like change out of five lines, Delmar would be redesigning and replacing the entire mooring system, including the anchors, while the FPU remained on station and on production. Working with multiple contractors, the mooring system was replaced with off-the-shelf components in only 6 months. Locating and securing equipment storage and maintenance space for spare mooring components saves time, especially in remote regions. Dedicated storage facilities allow the operator to preorder the necessary materials and house them in one location. This avoids the cost and delays of acquiring and importing long lead-time parts and equipment. A viable base of operations should be identified. In selecting a location, the depth of the channel and adequate space for staging of equipment are key factors. It is also important to have adequate crane capacity for handling the mooring systems and components, and local transport vessels or barges for mobilization to form a contingency plan. Mooring systems are designed with built-in redundancy and should outlast the design life of the production facilities. This feature makes it relatively easy to manage the timing of a refurbishment program to maximize savings and minimize disruption on the platform. Mooring Inspections An area of growing interest among operators is mooring integrity management. Visual in-place inspection of offvessel mooring components using a remotely operated vehicle (ROV) is an aspect of integrity management. The expertise required in examining and assessing the condition of the mooring components is also critical. The accurate documentation and record keeping of videos, pictures, and results is essential for the comparisons of results from previous and future inspections. A potential issue with in-situ inspections of mooring systems is the possibility that the inspection itself may affect August 2015 Oil and Gas Facilities 23

the condition of the components. For example, an ROV is dispatched to photograph mooring lines in the water column, but many of the critical components on the seabed have become covered with silt and mud. The only way to expose the buried section is to tension the mooring line, which may increase its fatigue. Likewise, mooring components situated near the oxygenated waters of the splash zone may become covered in rust or marine growth such as barnacles. The splash zone is the area immediately above and below the mean water level in which the platform is installed. Tides cause the water level to rise and fall, alternately wetting and drying the exposed metal of legs and risers. The soft and hard marine growth can be blasted off with high-pressure water jets mounted on an ROV; however, this action exposes fresh steel to the corrosive seawater, possibly inducing more corrosion. Vortex-Induced Vibration TLP tendons have their own challenges. Marine growth buildup may interfere with the view and inspection of tendons, and the performance of fairings or strakes which protect against VIV also may be affected by the buildup. Historically, industry has not done a good job of maintaining VIV equipment, Yu said. If the marine growth is soft, it can be removed by an ROV using high-pressure water jets. Hard growths, such as barnacles, may develop over time and are more difficult to remove. In this case, it is often necessary to replace the fairings or strakes to meet the platform's extended service life. Most of this maintenance can be conducted using an offshore service vessel and an ROV. If a top-tensioned riser needs to be pulled, a workover rig is required. Generally, a life extension project lasts from 1 to 2 years. Although these facilities are typically designed for a life of 20 years, often the original design carries certain design margins that potentially allow the service life to be extended from an additional 7 to 15 years with an inspection and maintenance program. While inspection programs can identify damage and extend the life of an FPU, Alaa Mansour, a marine engineering manager at Intecsea, said the collection and analysis of the platform s field history may identify existing fatigue damage and thus predict the most likely areas for failures. Something as simple as a tension monitoring system can be used to log fatigue events throughout the life of the facility. Even during a single extreme event, much of the fatigue life in these systems can be spent, Mansour said. Still, many FPUs either do not have such a system, or do not collect data on a reliable basis. Reaching out to operators and reviewing this data in advance of the design life of a facility can save money and help avoid the shutting in of operations for maintenance. Response Learning System Another solution that is just coming on the market relies on a mathematical model to evaluate the condition of a mooring system. Companies such as BMT use metocean data, the vessel s GPS location, motions, heading, and draft to predict FPU movement. Deviation of the FPU s actual movement from its predicted location indicates a problem. Sheikh of BMT said the topside-based response learning system concept is simple, but the math behind it is complex. To begin with, a baseline inspection is conducted to ensure that the station-keeping systems are working properly. It requires several months to train the model's algorithms to the actual motion of a given vessel. But, given time, Sheikh said the system can predict where the vessel should be within a few meters. Even a slight deviation from the predicted location may indicate a problem with the mooring system. The key to the predictive algorithm is how the vessel responds to the sea states. The more field data available to the model, the more accurate the resulting prediction. Sheikh compared the vessel s response to sea states to that of a buoy. If the sea state is known and the vessel s response is observed, it is possible to predict its response in other situations. Although not yet applied in the field, these observations may shorten the lead time required to get such a model in place and provide a detailed history of how the FPU reacts to changing weather and seas. While it may work by itself for older vessels, the modeling program may also complement a mooring management system that includes physical sensors such as strain gauges. Sheikh explained that the software provides an overall picture of where the vessel should be positioned, and the strain gauges and other monitoring equipment describe the condition of individual mooring lines. The Bottom Line If the on- and off-vessel mooring components are properly maintained, monitored, and inspected, it is possible to qualitatively evaluate a mooring system s remaining service life and plan accordingly. Mooring repair plans enable a cost-effective solution for the repair and replacement of mooring components. This approach enables operators to realize the value in establishing a maintenance program as part of a broader, life extension effort for their aging FPUs. Such was the case with ExxonMobil s Zafiro Producer, for which InterMoor did the mooring replacement work. The Zafiro Producer is a floating, production, storage, and offloading vessel that began production in the Zafiro field offshore Equatorial Guinea in 1996. A converted oil tanker, the vessel has a 12-point mooring system made up of chain and jacketed, spiral-strand wire rope. Longridge said InterMoor used the existing equipment to remove and inspect each of the mooring lines one at a time. After inspection, it was found that nine lines needed 24 Oil and Gas Facilities August 2015

replacement. Also, two of the Stevpris Mk6 anchors were replaced with updated models. The whole project, part of a broader refurbishment, took only 4 weeks to complete and was accomplished without interruption of production operations on the vessel. The work was conducted using vessels already on site, and there were no accidents or injuries. OGF For Further Reading OTC 25449 Serpentina FPSO Mooring Integrity Issues and System Replacement: Unique Fast Track Approach by S. Bhattacharjee, ExxonMobil Production Co.; S.M. Majhi, Granherne-KBR; D. Smith, ExxonMobil Upstream Research Co.; and R. Garrity, Delmar Systems William Furlow is the senior manager of business development at SPE. He may be reached at bfurlow@spe.org.