LONGENECKER and ASSOCIATES. Ronald E. Matthews

Similar documents
DAVID J. HOLLER DETAILED EXPERIENCE

NQA-1 Graded Approach, 55-Gallon Drum Summary

Quality Management Manual Revision 19

OCRWM Title: Quality Assurance Requirements and Description DOE/RW-0333P, Revision 19 Page: 2 of 149

Quality Assurance - Supplier Qualification

Supplier Evaluation Program Doosan QA Team / Jeong Sun Kim

Sargent & Lundy LLC April 8, 2014

Training Catalog

Conformity Assessment. Section III Nuclear Requirements Buenos Aires, Argentina May 2017

EFCOG Best Practice #118 (02/12/12)

NRC INSPECTION MANUAL INSPECTION PROCEDURE 35065

U. S. Department of Energy. Consolidated Audit Program Treatment, Storage and Disposal Facilities. Checklist 1 Quality Assurance Management Systems

NRC INSPECTION MANUAL

RANCHO SECO TRANSITION TO FULL DECOMMISSIONING. Dennis E. Gardiner, Decommissioning Project Manager, SMUD John M. Newey, CHP, President, NewRad, Inc.

DISPOSITION OF ORNL S SPENT NUCLEAR FUEL*

NRC INSPECTION MANUAL

Greg Galletti & Richard McIntyre Quality Electrical Vendor Branch Quality Mechanical Vendor Branch Office of New Reactors U.S. NRC

Applicability of EPRI Decommissioning Pre-Planning Manual to International Decommissioning Projects

Page 1 / 11. Version 0 June 2014

Reactor Vessel Removal: Improving Performance Big Rock Point Lessons Learned

NR CHECKLIST Rev. 1. QAM IMP References NBIC Part 3, 1.8 Y N Y N a. Organization. Company Name/Certificate Number: Page 1 of 26

DOE Graded Approach. IAEA January 23-27, 2012 Meeting

REQUIREMENTS FOR SAFETY RELATED (ASME AND NON-ASME) ITEMS OR SERVICES

ASME NQA-1 Certification. Matthew Vazquez September 4, 2017

CYNTHIA (CINDY) D. JOHNSON

Łańcuch dostaw i procedury zapewnienia jakości w realizacji elektrowni jądrowej budowanej w oparciu o technologię amerykańską.

Definitions contained in the above mentioned document and industry regulations are applicable herein.

Project Procedures 1.0 PURPOSE 2.0 SCOPE 3.0 REFERENCES. No.: P /21/2012 PAGE 1 OF 13 BASIS OF OPERATION

BHG Operational Awareness Program May 8, 1998 Performance Assessment Guide ENA 7.1 Revision 0 Engineering Program Page 1 of 10 ENGINEERING PROGRAM

Desk Audit of. Based on Federal Transit Administration (FTA) Quality Assurance and Quality Control Guidelines FTA-IT

SAN FRANCISCO PUBLIC UTILITIES COMMISSION INFRASTRUCTURE CONSTRUCTION MANAGEMENT PROCEDURES

RESUME of SCOTT ATWATER

Quality Assurance / Quality Control Plan

NDT AUDIT Z LLC. An EnergySoluitons Company. Audit Status. Interviewed 3 Finalist. Close to Awarding the Audit

Accepting Supplier ISO 9000 Quality Programs

Zion Project Overview S. Chris Baker VP EH&S

INS QA Programme Requirements

Contract Quality Requirements Manual SLM Issue 3

DISCRETE RADIOACTIVE PARTICLE ISSUES ASSOCIATED WITH A FUEL POOL CLEANOUT. RICHARD L. DOTY and RICHARD C. KESSLER PPL SUSQUEHANNA, LLC 1

Frazier Reliability Solutions

Association of American Railroads Quality Assurance System Evaluation (QASE) Checklist Rev. 1/12/2017

ON-SITE WASTE DISPOSAL FACILITY (OSWDF) PROJECT QUALITY ASSURANCE PLAN PIKETON, OHIO

CQR-1. CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES Revision Date: 6/8/2015

NRC INSPECTION MANUAL

GENERAL REQUIREMENTS FOR ENGINEERING AND DESIGN

Human Performance and Lessons Learned from TRUPACT-III Fabrication. Tara Neider President & CEO AREVA Federal Services

ASME As a Help to Export! Our Topic today: Nuclear Quality Assurance ASME NQA 1

Division of Spent Fuel Management Interim Staff Guidance 2, Revision 2. Fuel Retrievability in Spent Fuel Storage Applications

IAEA activities related to construction and risk management

NUCLEAR QUALITY ASSURANCE MANUAL

NRC INSPECTION MANUAL

SUBCONTRACTING CHALLENGES OF THE DOE OAK RIDGE ENVIROMENTAL MANAGEMENT CONTRACT

Two Approaches to Reactor Decommissioning: 10 CFR Part 50 License Termination and License Amendment, Lessons Learned from the Regulatory Perspective

REFERENCES Overview Quality Assurance Engineering Program...5

THE AMERICAN REINVESTMENT AND RECOVERY ACT: U.S. DEPARTMENT OF ENERGY ENVIRONMENTAL CLEANUP OPERATIONS

Successful Nuclear Construction A Regulator s Perspective

STATEMENT OF QUALIFICATIONS

US REGULATORY OVERSIGHT OF COMMERCIAL-GRADE DEDICATION

Janitorial Essentials QA/QC Plan Sample

Power Reactor Decommissioning: U.S. Perspective on Regulatory Insights and Challenges

ITER Quality Assurance

Corrective Action Plan. For

Activities of the NRC s Division of Spent Fuel Management: An Overview

Sensor Scientific, Inc.

MANUAL QUALITY CONTROL & QUALITY ASSURANCE

TROJAN DECOMMISSIONING STATUS. OPUC Meeting March 8, 2005 (draft)

Considerations for Disposition of Dry Cask Storage System Materials at End of Storage System Life

QUALITY ASSURANCE / QUALITY CONTROL POLICY

Role of NDE in Regulatory Oversight of Nuclear Power Plants

QUALITY ASSURANCE AND QUALITY CONTROL MANUAL

METHODOLOGY FOR ENSURING THE INTEGRATION OF ALARA INTO THE DESIGN OF

AERO GEAR, INC. SUPPLIER QUALITY MANUAL

I. Development, Submittal, and Acceptance of a Quality Management System

Did You Know? Brian L. Mervak South Carolina Electric & Gas

Safety Considerations in the Transition from Operation to Decommissioning of Research Reactors

Fire Protection Contractor QA/QC Plan Sample

Janitorial Essentials QA/QC Plan Sample

Overview of EFCOG s Critical Few

Watts Bar Nuclear Plant Unit 2 Completion Project

Technical Support Organization (TSO) at Chashma Nuclear Power Generating Station (CNPGS) Saeed

Implementing Procedure. DEDICATION OF COMMERCIAL GRADE ITEMS Approved/Date President & COO /vji!"l~:l

EPRI QUALITY PROGRAM MANUAL

Historical Perspectives on Nuclear Procurement in North America

WOODS CONTRACTING QUALITY ASSURANCE QUALITY CONTROL QA/QC MANUAL VERSION: REV.2

REAFFIRMED. mobile low-level radioactive waste processing systems. June 30, 2016 ANSI/ANS ; R2016 ANSI/ANS

Quality Assurance Policy and Procedures

Division of Spent Fuel Management Overview

Nuclear Quality Standard Association

Assessment of the Implementation of the TJNAF Contractor Assurance System FINAL REPORT

SPECIAL ITEM NO Consulting Services SPECIAL ITEM NO RC Consulting Services, Recovery Purchase

QA/QC Program Overview. November, 2015

Quality Assurance Project Plan for the Chestnut Ridge Fly Ash Pond Stabilization Project at the Oak Ridge Y-12 Plant, Oak Ridge, Tennessee

Guidance Document For Selecting Applicable Quality Assurance Requirements For Department of Transportation Packaging

Quality Manual DRAFT. Quality Management Plan Version A1 Date: <22/01/11> Page 1 of 17

Dominion North Anna Power Station Restart Readiness

Remedies for Supply Chain Headaches: Innovating Critical Process Manufacturing Oversight. March 23, 2016

Communications Contractor QA/QC Plan Sample

20 September 2017 Document No. QM-ISO revision T ASTRONAUTICS CORPORATION OF AMERICA S. AS 9100 and FAA QUALITY MANUAL. Proprietary Notice

SQAR-1. SUPPLIER QUALITY ASSURANCE REQUIREMENTS for DESIGN AND PROCUREMENT SERVICES Revision Date: 2/1/2018

Transcription:

DETAILED EXPERIENCE MARCH 2006 to Present LONGENECKER and ASSOCIATES ARGONNE NATIONAL LABORARY CHICAGO, IL (SERVICES CONTRACTED THROUGH SERVICE SOURCE, INC AND NAVARRO RESEARCH AND ENGINEERING, INC.) POSITION HELD: QUALITY ASSURANCE SPECIALIST/MANAGEMENT ASSESSMENT COORDINAR Support the integration of self-assessment and Contractor Assurance processes; development, training, and implementation support for the Management Assessment process at the Laboratory; develop and implement the process for review and grading management assessment reports for mentoring/feedback and for measuring continuous improvement of the assessment process; assist in the planning, performance and reporting of management assessment; support improvements in issues management and corrective action processes. Perform Management and Independent Assessments of Laboratory ESH and QA program adequacy and implementation. Develop and implement Surveillance program to provide limited focus, real time, independent assessment of experimental and non-experimental work activities to provide timely feedback and support continuous improvement initiatives. QA Policy and Program development, implementation and assessment experience responsive to 10 CFR 830 Subpart A, DOE Order 414.1C, and DOE Order 226.1. JANUARY 2006 Envirocare/Energy Solutions/BNG America Oak Ridge, TN (Direct Services Contract with BNFL) Position Held: Contract Quality Assurance Consultant Reviewed Nuclear utility Request For Proposal and associated SAR, Technical Specifications, Quality Assurance Program and Administrative controls to develop the Envirocare/Energy Solutions/BNG America Team quality assurance portion of the bid proposal for removal of the Fermi reactor vessel and internals, intermediate heat exchangers, and primary sodium pumps. 2004 OCBER 2005 BNFL Inc/BNG America (ETTP) Oak Ridge, TN (Direct Personal Services Contract with BNFL) POSITION HELD: Contract Quality Assurance Consultant Project QA Manager, Issues Management Specialist BNFL/ETTP (Oak Ridge, TN) Provide staff augmentation as Issues Management Specialist (ISM) for the Compliance Support Organization. Interact with other ETTP project organization to manage and resolve issues identified on the project. Led and performed considerable Root and Apparent Cause Analysis of events and adverse trends. Assisted in the development of the updated Issues Management System (Integrated Nonconformance and Corrective 5052 Pensier Street, Las Vegas, NV 89135 702-493-5363 info@longenecker-associates.com

Action Programs). Developed Cause Analysis Procedure and Cause Analysis Guide for the conduct of Apparent and Root Cause Analyses; reviewed and revised procedures interfacing with the Issues Management System [Price- Anderson Reporting (PAAA), Incident Investigations, Occurrence Reporting (ORPS) and Lessons Learned]. Developed Corrective Action Plans (CAP) to respond to DOE OA findings and Type B investigations and served as CAP Manager to interface with the DOE and manage the CAP actions through completion and verification. Served as point of contact for DOE verification activities associated with CAP implementation. Perform QA review (QA SME) of Enhanced Work Plans. Perform Material Requisition/Purchase Order review for QA Requirements. Participate in subcontract planning to ensure quality requirements including Work Smart Standards are flowed down to subcontractors. Performed QA Receiving Inspection. QA Program implementation experience responsive to 10 CFR 830 Subpart A and ISO 9001. Led and conducted Independent and Management Assessments of D&D operations to verify compliance and effective implementation of DOE contract requirements and ETTP policies/procedures, Work Smart Standards, QAPP and ISMS requirements. Filled the position of Project QA Manager from December 2004 to October 2005 providing liaison with the ETTP organization for services provided by the QA organization, interface with external organizations including DOE. Managed project closeout activities including final record scanning/indexing and turnover to DOE.. NQA-1 Lead Auditor is current. Completed ISO 9000 Auditor Training. Hold DOE L clearance. Completed Rad Worker and Hazwoper Training. Current Medical/Respirator Fit Certificate. MAY 2003 2004 Quality Waste Solutions, LLC 5885 Lakeside Drive, Lenoir City, TN 37772 Position Held: Contract Quality Assurance Consultant Issues Management Specialist Details of Position: Essentially same as listed above FEB. 2001 MAY 2003 Sargent & Lundy 55 EAST MONROE STREET, CHICAGO, IL 60603 POSITION HELD: Contract Quality Assurance Consultant BNFL/ETTP (Oak Ridge, TN) November 2002 to May 2003 Issues Management Specialist (ISM) for the Compliance Support Organization. Interact with other ETTP project organization to manage and resolve issues identified on the project. Performed Root and Apparent Cause Analysis. Assisted in the development of the updated Issues Management System (Integrated Nonconformance and Corrective Action Programs); developed Cause Analysis Procedure and Cause Analysis Guide for the conduct of Apparent and Root Cause Analysis. Reviewed and revised procedures [Price- Anderson Reporting/Incident and Occurrence Reporting (ORPS)] interfacing

with the Issues Management System. QA Program implementation responsive to 10 CFR 830 Subpart A and ISO 9001. BNFL/BFS (Scotts Valley, CA) - Performed Internal Quality Assurance audits of Dry Fuel Storage Contractor; developed corrective action validation process (effectiveness review) and performed approximately 20 corrective action effectiveness reviews; developed audit checklists for all the 10 CFR 71/72 Quality Assurance audits to be conducted by BNFL in 2002. DEC. 1999 JAN. 2000 JANUARY 2006 SERVICE SOURCE, INC. P.O. BOX 15, NANTICOKE, PA 18634-0015 POSITION HELD: Quality Assurance Consultant Ionics, Inc. (Bridgeville, PA) Reviewed and updated procedures and work packages related to the fabrication of nuclear spent fuel dry storage components for compliance with design drawings, design specifications, contract requirements and government regulations (10 CFR 71/72). Envirocare/Energy Solutions/BNG America Oak Ridge, TN (Direct Services Contract with BNFL) Position Held: Contract Quality Assurance Consultant Reviewed Nuclear utility Request For Proposal and associated SAR, Technical Specifications, Quality Assurance Program and Administrative controls to develop the Envirocare/Energy Solutions/BNG America Team quality assurance portion of the bid proposal for removal of the Fermi reactor vessel and internals, intermediate heat exchangers, and primary sodium pumps. 2004 October 2005 BNFL Inc/BNG America ETTP Oak Ridge, TN (Direct Personal Services Contract with BNFL) Position Held Contract Quality Assurance Consultant Project QA Manager, Issues Management Specialist BNFL/ETTP (Oak Ridge, TN) Provide staff augmentation as Issues Management Specialist (ISM) for the Compliance Support Organization. Interact with other ETTP project organization to manage and resolve issues identified on the project. Led and performed considerable Root and Apparent Cause Analysis of events and adverse trends. Assisted in the development of the updated Issues Management System (Integrated Nonconformance and Corrective Action Programs). Developed Cause Analysis Procedure and Cause Analysis Guide for the conduct of Apparent and Root Cause Analyses; reviewed and revised procedures interfacing with the Issues Management System [Price- Anderson Reporting (PAAA), Incident Investigations, Occurrence Reporting (ORPS) and Lessons Learned]. Developed Corrective Action Plans (CAP) to respond to DOE OA findings and Type B investigations and served as CAP

Manager to interface with the DOE and manage the CAP actions through completion and verification. Served as point of contact for DOE verification activities associated with CAP implementation. Perform QA review (QA SME) of Enhanced Work Plans. Perform Material Requisition/Purchase Order review for QA Requirements. Participate in subcontract planning to ensure quality requirements including Work Smart Standards are flowed down to subcontractors. Performed QA Receiving Inspection. QA Program implementation experience responsive to 10 CFR 830 Subpart A and ISO 9001. Led and conducted Independent and Management Assessments of D&D operations to verify compliance and effective implementation of DOE contract requirements and ETTP policies/procedures, Work Smart Standards, QAPP and ISMS requirements. Filled the position of Project QA Manager from December 2004 to October 2005 providing liaison with the ETTP organization for services provided by the QA organization, interface with external organizations including DOE. Managed project closeout activities including final record scanning/indexing and turnover to DOE.. NQA-1 Lead Auditor is current. Completed ISO 9000 Auditor Training. Hold DOE L clearance. Completed Rad Worker and Hazwoper Training. Current Medical/Respirator Fit Certificate. MAY 2003 2004 Quality Waste Solutions, LLC 5885 Lakeside Drive Lenoir City, TN 37772 Position Held: Contract Quality Assurance Consultant Issues Management Specialist Details of Position: Essentially same as listed above FEB. 2001 MAY 2003 Sargent & Lundy 55 EAST MONROE STREET CHICAGO, IL 60603 POSITION HELD: February 2001 to May 2003 Contract Quality Assurance Consultant BNFL/ETTP (Oak Ridge, TN) November 2002 to May 2003 Issues Management Specialist (ISM) for the Compliance Support Organization. Interact with other ETTP project organization to manage and resolve issues identified on the project. Performed Root and Apparent Cause Analysis. Assisted in the development of the updated Issues Management System (Integrated Nonconformance and Corrective Action Programs); developed Cause Analysis Procedure and Cause Analysis Guide for the conduct of Apparent and Root Cause Analysis. Reviewed and revised procedures [Price- Anderson Reporting/Incident and Occurrence Reporting (ORPS)] interfacing with the Issues Management System. QA Program implementation responsive

to 10 CFR 830 Subpart A and ISO 9001. BNFL/BFS (Scotts Valley, CA) - Performed Internal Quality Assurance audits of Dry Fuel Storage Contractor; developed corrective action validation process (effectiveness review) and performed approximately 20 corrective action effectiveness reviews; developed audit checklists for all the 10 CFR 71/72 Quality Assurance audits to be conducted by BNFL in 2002. DEC. 1999 JAN. 2000 1974 2002 SERVICE SOURCE, INC. P.O. BOX 15 NANTICOKE, PA 18634-0015 POSITION HELD: Quality Assurance Consultant Ionics, Inc. (Bridgeville, PA) Reviewed and updated procedures and work packages related to the fabrication of nuclear spent fuel dry storage components for compliance with design drawings, design specifications, contract requirements and government regulations (10 CFR 71/72). Pennsylvania Power and Light Co. SUSQUEHANNA STEAM ELECTRIC STATION PO BOX 467, BERWICK, PA. 18603 POSITIONS HELD: April 1981 to July 2002 - Sr. Analyst, Nuclear Quality Assurance October 1978 to September 1980 - Supervisor, Nuclear Records December 1974 to October 1978 - Analyst, Nuclear Quality Assurance DETAILS OF POSITIONS: Analyst/Sr. Analyst, Nuclear Quality Assurance Up to the early 1980s was responsible for construction and start-up testing oversight of a two-unit nuclear power plant. Oversight was multi-disciplined and included civil, mechanical, electrical and I&C construction activities. Operating power plant oversight experience included a variety of multi-disciplined internal audits, assessments and surveillances related to the operation and maintenance of a nuclear power station. Completed utility Engineering Technical Support Certification. Conduct procurement evaluations, QA program plan and manual reviews, audits and source verifications associated with procurement of material/hardware/ components and maintaining multi-disciplined vendors and contractors on the Approved Suppliers List. Responsible for development of the PPL QA program and Source Verification Plans for fabrication of the Horizontal Storage Modules, Dry Shielded Canisters, Transfer Cask and Reactor Crane Hook/Yoke assembly related to the nuclear power station independent spent fuel storage installation (ISFSI). Reviewed contractor project specific plans for the performance of component manufacturing and fabrication. Performed readiness reviews/ assessments and in-process audits and source verification activities related to the fabrication of above ISFS components at multiple manufacturing and fabrication suppliers. Acted as liaison with NRC at the onset and during ISFSI QA program/plan review by the NRC including presentations to the NRC Staff at NRC

headquarters. Development of Quality Assurance Plans for other projects in the nuclear station. These plans provided the programmatic controls including vendor interface for a Fuel Pool Clean-out Project and a Chemical Decontamination Project of the plant Recirculating Water System. Served as Supervisor-Nuclear Records for two years. Other long-term project assignments included: Program/process development related to the issuance of the N3 Code Data Report for Susquehanna Units 1 and 2 and implementation of the program for Unit 1. Identification and resolution of inspection and documentation anomalies related to the Susquehanna E-Diesel construction project. Extensive field experience in the nuclear power plant and at manufacturing/ fabrication facilities including radiologically controlled environments. 1973 1974 Bechtel Power Corporation MILLSNE POINT UNIT # 2, NIANTIC, CT POSITION HELD: Quality Assurance Technician Primary responsibilities were Civil discipline related; however, due to personnel shortages, became multi-discipline and conducted 24 plant construction quality assurance audits in a 12 month period. Audits were in the electrical, mechanical, piping, instrumentation and control and civil/structural/concrete areas. NOV. 1973 NOV. 1974 BECHTEL POWER CORPORATION CALVERT CLIFFS UNITS #1 AND #2, LUSBY, MD POSITION HELD: Small Pipe Designer Responsible for the design and routing of 2 and under piping during construction of these nuclear units. BECHTEL POWER CORPORATION FARLEY NUCLEAR PROJECT, GAITHERSBURG, MD POSITION HELD: Design Draftsman Responsible for the development of piping isometric drawings showing entire plant systems to assist in the construction of those systems. Pennsylvania Power and Light Co. SUSQUEHANNA STEAM ELECTRIC STATION PO BOX 467, BERWICK, PA. 18603

2002 POSITIONS HELD: April 1981 to July 2002 - Sr. Analyst, Nuclear Quality Assurance October 1978 to September 1980 - Supervisor, Nuclear Records December 1974 to October 1978 - Analyst, Nuclear Quality Assurance DETAILS OF POSITIONS: Analyst/Sr. Analyst, Nuclear Quality Assurance Up to the early 1980s was responsible for construction and start-up testing oversight of a two-unit nuclear power plant. Oversight was multi-disciplined and included civil, mechanical, electrical and I&C construction activities. Operating power plant oversight experience included a variety of multi-disciplined internal audits, assessments and surveillances related to the operation and maintenance of a nuclear power station. Completed utility Engineering Technical Support Certification. Conduct procurement evaluations, QA program plan and manual reviews, audits and source verifications associated with procurement of material/hardware/ components and maintaining multi-disciplined vendors and contractors on the Approved Suppliers List. Responsible for development of the PPL QA program and Source Verification Plans for fabrication of the Horizontal Storage Modules, Dry Shielded Canisters, Transfer Cask and Reactor Crane Hook/Yoke assembly related to the nuclear power station independent spent fuel storage installation (ISFSI). Reviewed contractor project specific plans for the performance of component manufacturing and fabrication. Performed readiness reviews/ assessments and in-process audits and source verification activities related to the fabrication of above ISFS components at multiple manufacturing and fabrication suppliers. Acted as liaison with NRC at the onset and during ISFSI QA program/ plan review by the NRC including presentations to the NRC Staff at NRC headquarters. Development of Quality Assurance Plans for other projects in the nuclear station. These plans provided the programmatic controls including vendor interface for a Fuel Pool Clean-out Project and a Chemical Decontamination Project of the plant Recirculating Water System. Served as Supervisor-Nuclear Records for two years. Other long-term project assignments included: Program/process development related to the issuance of the N3 Code Data Report for Susquehanna Units 1 and 2 and implementation of the program for Unit 1. Identification and resolution of inspection and documentation anomalies related to the Susquehanna E-Diesel construction project. 1973 1974 Extensive field experience in the nuclear power plant and at manufacturing/fabrication facilities including radiologically controlled environments. Bechtel Power Corporation MILLSNE POINT UNIT # 2, NIANTIC, CT POSITION HELD: Quality Assurance Technician Primary responsibilities were Civil discipline related; however, due to personnel shortages, became multi-discipline and conducted 24 plant construction quality assurance audits in a 12 month period. Audits were in the electrical, mechanical, piping, instrumentation and control and civil/structural/

concrete areas. NOV. 1973 NOV. BECHTEL POWER CORPORATION CALVERT CLIFFS UNITS #1 AND #2, LUSBY, MD POSITION HELD: Small Pipe Designer Responsible for the design and routing of 2 and under piping during construction of these nuclear units. BECHTEL POWER CORPORATION FARLEY NUCLEAR PROJECT, GAITHERSBURG, MD POSITION HELD: Design Draftsman Responsible for the development of piping isometric drawings showing entire plant systems to assist in the construction of those systems. EDUCATION 1969 Penn State University (Wilkes-Barre Campus) LEHMAN WNSHIP, PA 1 Yr. Certification - Drafting and Design Technician (1970) Associate Degree - Mechanical Engineering Technology ()