Schedule Of Works. 35 Konkan Railway Corporation Limited Signature of Tenderer

Similar documents
Special Conditions Of Contract

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) (A Joint Venture of NTPC Ltd. And BSEB ) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

Schedule for construction of ROB Approaches no. 48, 54,55 of PKG-III (MGR) including temporary road diversion along ROB approach No 55.

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Road

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI BILL OF QUANTITIES IN THREE SCHEDULES

FOR SINGRAULI (M.P.) LIMITED. RITES LIMITED Enterprise) OFFICE, Tender. Name of Tenderer Address of Tendererr

NTPC Ltd. KORBA VOLUME-II (FINANACIAL BID) Consultants

- Earthwork Operations & Equipments

AN ISO 9001 & COMPANY TENDER DOCUMENT. TENDER No: EPI/WRO/CON/757/0119 FOR

SCHOOL OF OPEN LEARNING (CAMPUS OF OPEN LEARNING) UNIVERSITY OF DELHI DELHI-7. Ref: SOL/Gen/2017/

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

TENDER FOR EXPANSION OF ASH POND AT NALCO's ALUMINA REFINERY AT DAMANJODI

SCHEDULE OF RATES BIDDING DOCUMENT NO. 6907/106/OT/RITES-EIL/EXECUTION/PKG-I/ P a g e Signature of the bidder Under seal of the firm

SOR FOR PILE FOUNDATION WORKS FOR TANKAGE & ENGINEERING STORE

DIVISION 4100 SITEWORK

CONTRACT NO. : MTK 5/2018 REHABILITATION OF STEELPOORT ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

CONTRACT NO. : MTK11/2017 REHABILITATION OF MSAULI ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

Scanned by CamScanner

GOVERNMENT OF ODISHA PANCHAYTI RAJ DEPARTMENT. Construction of Culvert on Sunamudi Nalla (2 Span RCC slab)

CONTRACT NO. : MTK 11/2018 REHABILITATION OF UITKYK ASBESTOS MINE SCHEDULE OF QUANTITIES SECTION 1: PRELIMINARY AND GENERAL

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

Brahmaputra Cracker and Polymer Limited SCHEDULE OF RATES

1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

NATIONAL INSTITUTE OF TECHNOLOGY TIRUCHIRAPPALLI ESTATE MAINTENANCE DEPARTMENT

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

SECTION GENERAL EXCAVATION

SCHEDULE A BILL OF QUANTITIES Part - I : Construction of Bridge

GUJARAT ENERGY TRANSMISSION CORPORATION LIMITED SARDAR PATEL VIDYUT BHAVAN RACE COURSE, VADODARA

CONSTRUCTION SPECIFICATION FOR CLEARING, CLOSE CUT CLEARING, GRUBBING, AND REMOVAL OF SURFACE AND PILED BOULDERS

PRICED BILL OF QUANTITIES

COCHIN SHIPYARD LIMITED INFRA PROJECTS DEPARTMENT. Corrigendum No:III. No. INFRA/CIV/70/ Sept 2017

INDIRA GANDHI NATIONAL OPNE UNIVERSITY CONSTRUCTION & M AINTENANCE DIVISION MAIDAN GARHI NEW DELHI

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 2 BACKFILL. 2.1 General...2-1

S C H E D U L E - "B"

Excavate drilled shafts in accordance with Item 416, Drilled Shaft Foundations.

SECTION 201 ROADWAY AND DRAINAGE EXCAVATION

Tender ref no: SBIIMS/BHU/AO2/ / 57 Date: PRICE BID FOR CIVIL WORKS AT SBI UDALA BRANCH (A) RAIN WATER HARVESTING. Cum 15.

Contract Identification No. and Package 1. SUHEP-067/68-Lot No.1-AR: Package B 2. SUHEP-067/68-Lot No.1-AR: Package C

SCHEDULE OF QUANTITIES OF COMPOUND WALL WORK FOR PROPOSED CONSTRUCTION OF TEMPERATURE CONTROLLED WAREHOUSE AT PATALGANGA MIDC, DIST- RAIGARH, MUMBAI.

WATER RESOURCES DEPARTMENT CHAPTER- WRD: 3 SCHEDULE OF RATES CANAL AND ALLIED WORKS FOR THE YEAR : REFERENCE DATA

SPECIFICATIONS FOR STRUCTURAL EXCAVATION

SECTION A1 EXCAVATION AND BACKFILL GENERAL

General bids will be received at the Office of the Board of Selectmen/Town Manager, no later than 11:00 AM, Wednesday, October 12, 2011.

Special Provision Item P-152 Excavation and Embankment

TENDER NO- 02/2012/RAJ

Bihar State Power Generation Company Ltd. (BSPGCL)

CONSTRUCTION SPECIFICATION FOR EXCAVATING AND BACKFILLING - STRUCTURES

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE) PART 2 FINANCIAL BID SCHEDULE (BILL) OF QUANTITIES (PERCENTAGE RATE CONTRACT)

Sub Total for Demolishing

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR LOW-TENSION CABLE BARRIER. OPR:CT 1 of 5 APPR:JAR:DBP: FHWA:APPR:

RITES LIMITED (A GOVERNMENT OF INDIA ENTERPRISE)

Amendment -1. Date: NIT No. RECPDCL/CSR/CWC/ /3368 dt:

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

Estimate FOR THE SEPTIC TANK

Item No. Description Unit Quantity Rate (EUR) Amount (EUR) No 2

STANDARD GRADING AND SOIL EROSION & SEDIMENT CONTROL PLAN FOR SINGLE LOT SINGLE FAMILY RESIDENTIAL CONSTRUCTION AND MINOR EARTH DISTURBANCES

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

Construction Specification for General Excavation

SCHEDULE A BILL OF QUANTITIES Part - I : Road Work

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

NOTICE INVITING QUOTATION

RITES PROJECT OFFICE, KOLKATA 56 C R AVENUE, Kolkata

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS

TCN Ref: PSER:SCT:FKK-M717:TCN-01 Date:

205 - EXCAVATION AND EMBANKMENT FOR HIGHWAYS SECTION 205 EXCAVATION AND EMBANKMENT FOR HIGHWAYS. Common Excavation (Contractor-Furnished)

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

ITEM 706 PIPE SLOPE DRAIN

NATIONAL INSTITUTE OF ANIMAL BIOTECHNOLOGY (NIAB), HYDERABAD

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

CONSTRUCTION SPECIFICATION FOR GRADING

CONSTRUCTION SPECIFICATION FOR GRADING

KANPUR SMART CITY LIMITED

SECTION STRUCTURE EXCAVATION AND EARTHWORK

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

G&P GEOTECHNICS SDN BHD CHECKLIST FOR EARTHWORKS (ROCK EXCAVATION AND ROCK SLOPE STRENGTHENING WORKS) WORK INSTRUCTIONS FOR ENGINEERS KYW.

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

January 2008 No. 500 INDEX FOR SPECIFICATIONS FOR GRADING SCOPE...1

SECTION 18 - EARTHWORK TABLE OF CONTENTS

CONSTRUCTION SPECIFICATION

SECTION 18 - EARTHWORK TABLE OF CONTENTS

2.1 Backfill - General

Tender Schedule for the Work "Construction of Staff qtrs. at Tainda S/S (1no.)

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION

SECTION 203 EXCAVATION AND EMBANKMENT DESCRIPTION

TENDER FOR CIVIL WORK

Special Provision No. 599S22 March 2001

(Speed Post) Sir, Approx. Quantity 80 cu. m. S. No. Name of Works

SECTION TRENCHING, BACKFILLING AND COMPACTION. B. Provide necessary sheeting, shoring and bracing.

CITY OF LETHBRIDGE SECTION INFRASTRUCTURE SERVICES Page 1 of 7 GRANULAR BASE PREP

SECTION ASPHALT CONCRETE

Construction operations shall be conducted in a manner to provide DOT forces access to the Maintenance Yard on a continuous basis.

Riprap must be placed uniformly and carefully to eliminate any weak area where erosion can get a start.

SECTION 14 EMBANKMENT

CAUTIOUS BLASTING IN CRITICAL AREAS AT RAMAGUNDAM SUPER THERMAL POWER STATION

CITY OF AUBURN STANDARD SPECIFICATIONS SECTION 13 EXCAVATION AND BACKFILL

Appendix D General Earthwork and Grading Specifications for Rough Grading

Transcription:

Schedule Of Works 35 Konkan Railway Corporation Limited Signature of Tenderer

Schedule of Works (Package II, Chainage 5/400 to 7/800 = 2400 mtrs SCHEDULE - A (CUTTING) Name of work: Limited tender for Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 5/400 to 7/800 Package - II at NTPC In-plant yard for construction of new Railway siding for M/s. NTPC Limited between Gadag - Hotgi section of South Western Railway at Kudgi (Bijapur - District, Karnataka - State)". Sr. No. Description of Items 1 Earthwork in cutting (Classified) in formation, trolley refuges, side drains, level crossing approaches, bridge approaches, platforms, catch water drains, diversion of nallah, & finishing to required dimension and slopes to obtain a neat appearance to standard approved profile inclusive of all labour, machine and materials and removing & leading all cut spoils either to make spoil dumps beyond 10m. from cutting edge or for filling in embankment (in layers) with all leads, lifts, ascent, descent, loading, unloading, all taxes / royalty, clearance of site and all incidental charges, bailing & pumping out water if required, etc., complete as per directions of the Engineer-in- Charge. The work is to be executed as per latest / updated edition of "Guidelines for Earthwork in Railway Projects" (Guideline No. GE:G-1 including correction slip no. 1, July 2003) issued by RDSO, Lucknow and as per Tender document conditions. Cut trees, if any, shall be property of Corporation / NTPC and to be deposited in Corporation / NTPC location as directed by Engineer-in- Charge. [Chainage 6/200 to 6/600 = 400 mtrs & Chainage 6/950 to 7/300 = 350 mtrs, Total Cutting length = 750 mtrs approximately]. Unit Rate in ( ) Quantity Amount in ( ) a In all conditions and classifications of soil except soft / hard rock and including filling in embankment at nominated locations between 3/800 to 7/800 or dumping / stacking at other locations including beyond NTPC land boundary and at Contractor s own / private locations / land as directed by Engineer-in-Charge. Cum 161.02 17,300 27,85,646 36 Konkan Railway Corporation Limited Signature of Tenderer

b Soft rock not requiring blasting in all conditions and excavation done using breaker attachment or chiseling and including filling in embankment at nominated locations between km 3/800 to 7/800 or dumping / stacking at other locations including beyond NTPC land boundary and at Contractor s own / private locations / land c In hard rock excavation requiring blasting with explosives and blasting / drilling equipment Including all incidental works in all conditions. Rate includes cost of all explosive material. Cum 269.59 43,250 1,16,59,768 Cum 452.73 1,12,450 5,09,09,488 Note - (i) All usable earth arising from cut spoils shall be led into bank formation any where between km 3/800 to 5/400 or beyond this chainage upto km 7/800 where filling is required beyond km 5/400 and Unusable spoils shall be dumped / stacked with in NTPC land, if available. Otherwise contractor has to dump out side NTPC land boundary on private land and this dumping yard to be arranged by contractor on his own cost. (ii) All hard rock and boulders not fit for filling will be stacked by the contractor and will be the property of the NTPC. (iii) These items will be paid only after compaction of earth, if cutspoils are filled in embankment as per Schedule - 'C'. iv) No extra payment shall be made for filling (embankment) beyond km 5/400 upto 7/800 and rate includes all lead, lift, etc. (v) The Engineer-in-charge shall decide the classification based on strata conditions and shall instruct the contractor to execute the work under hard rock / soft rock items and payment under these items shall be made based on this prior instructions of Engineer-incharge only and the depth / level of the cutting quantity to be paid under these items shall be decided by Engineer-incharge (or higher authorities) which is final and binding. Proper and valid records / cross-sections are to be maintained by contractor as directed by Corporation. Total amount 6,53,54,902 37 Konkan Railway Corporation Limited Signature of Tenderer

I, we agree to carry out the works at (in figures) % (and in words ) at par / above / below the Scheduled rates of Schedule A. (Tick the applicable word / item and strike out which are not applicable). GM/Works 38 Konkan Railway Corporation Limited Signature of Tenderer

SCHEDULE - B (FILLING) Name of work: Limited tender for Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 5/400 to 7/800 Package - II at NTPC In-plant yard for construction of new Railway siding for M/s. NTPC Limited between Gadag - Hotgi section of South Western Railway at Kudgi (Bijapur - District, Karnataka - State)". Sr. No. Description of Items Unit Rate in Quantity Amount in 1 Earthwork in filling in embankment, through layers with specified thickness, guide bunds, around buried type abutments, bridge gaps, bridge approaches, trolley refuges, rain bunds if provided, platforms etc. as per RDSO's latest guidelines (Guideline No. GE:G-1 including correction slip no. 1, July 2003) and as per specifications / conditions of tender document including all leads, royalty, lifts, ascents, descents, crossing of nallahs or any other obstructions. The rates shall include all dressing of bank to final profile, demarcation and setting out of profile, site clearance, removing of shrubs, roots of vegetations growth, heavy grass, benching of existing slope of old bank, all handling / re-handling. taxes, octroi and royalty etc. as a complete job. Cut trees, if any, shall be property of NTPC and to be deposited in the NTPC godown / yard unless specified otherwise in the Special conditions of contract. [Chainage 5/400 to 6/200 = 800 mtrs, Chainage 6/600 to 6/950 = 350 mtrs & Chainage 7/300 to 7/800 = 500 mtrs, total length = 1650 mtrs] With Contractor s own earth Cum 112.10 22,39,550 25,10,53,555 Note: (i). The filling in embankment is mainly with NTPC / Corporation earth (cutspoils) of around 50,000 Cum and to be done in both tendered Chainage between 3/800 to 5/400 and beyond tendered Chainage between 5/400 to 7/800 (Package - II Chainage) within NTPC In-plant yard and payment will be made as per the rate in item schedule A and as per awarded rate on this schedule. The rate includes leading of cutspoils beyond Chainage 39 Konkan Railway Corporation Limited Signature of Tenderer

5/400 and up to 7/800 with all lead, lift, ascent, descent, transportation, labour etc. (ii). This own earth item shall be paid only after execution of Schedule - 'C'. Total amount 25,10,53,555 I, we agree to carry out the works at (in figures) % (and in words ) at par / above / below the Scheduled rates. (Tick the applicable word / item and strike out which are not applicable). GM/Works 40 Konkan Railway Corporation Limited Signature of Tenderer

SCHEDULE - C (MECHANICAL COMPACTION) Name of work: Limited tender for Earthwork in Cutting & Embankment (Filling), Bridge approaches, side drains, etc., from Chainage 5/400 to 7/800 Package - II at NTPC In-plant yard for construction of new Railway siding for M/s. NTPC Limited between Gadag - Hotgi section of South Western Railway at Kudgi (Bijapur - District, Karnataka - State)". Sr. No. Description of Items Unit Rate in Quantity Amount in 1 Mechanical compaction of earth / cum 11.37 23,25,450 2,64,40,367 blanketing material filled in embankment / cutting with dozing and contractor s rollers of suitable capacity, type and size to achieve specified density as per specification, taking core cutters on each layer as directed, testing as per IS codes including cost of water, Tools and Plants field lab equipments / instruments, consumable material and all labour as a complete job. The work including compaction is to be executed as per Latest edition of "Guidelines for Earthwork in Railway Projects" Guideline No. GE:G-1 including correction slip no. 1, July 2003, issued by RDSO, Lucknow and as per Tender document conditions. Total amount 2,64,40,367 I, we agree to carry out the works at (in figures) % in words (and in words ) at par / above / below the Scheduled rates. (Tick the applicable word / item and strike out which are not applicable). GM/Works 41 Konkan Railway Corporation Limited Signature of Tenderer