Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade

Similar documents
TECH FACTS. Formulas for Success Innovative Ways to Reinforce Slabs-On-Ground

WWR For Structural Applications A Discussion of Current Product Knowledge and Practices

SAMPLE SPECIFICATION ONLY FOR INFORMATIONAL PURPOSES NOT INTENDED FOR DUPLICATION OR USE SECTION XX.XX WELDED WIRE REINFORCEMENT

SAMPLE SPECIFICATION ONLY FOR INFORMATIONAL PURPOSES NOT INTENDED FOR DUPLICATION OR USE SECTION XX.XX WELDED WIRE REINFORCEMENT

CONSTRUCTION SPECIFICATION FOR CONCRETE SIDEWALK AND CONCRETE RAISED MEDIAN INDEX TS SCOPE...3 TS DEFINITIONS...3

THE CUPOLEX SOLUTION EXPANSIVE SOILS. www. cupolex.ca

1 Exam Prep Placing Reinforcing Bars Tabs and Highlights

Slab on Grade. Introduction CHAPTER 10

A. Submittal Procedures: See Article 13 of the General Conditions.

SECTION 415 REINFORCING FOR CONCRETE

General Information for Joints

SECTION MISCELLANEOUS CAST-IN-PLACE CONCRETE

SPECIFICATIONS FOR BRIDGE CONSTRUCTION SECTION 5 REINFORCING STEEL. 5.1 General Certification Fabrication...

Concrete Framing: Slab on Grade

CONCRETE WORK CONCRETE WORK. Underground Electric Distribution Standards I. SCOPE APPLICABLE STANDARDS

Fundamentals of Jointing for Volume Change in Concrete

ITEM 431 PNEUMATICALLY PLACED CONCRETE. All material shall conform to the pertinent requirements of the following items:

SECTION CONCRETE PAVING PART 1 - GENERAL 1.1 REFERENCES

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

SECTION RIGID PAVEMENT. 1. Portland Cement Concrete (PCC) pavement. 2. Section Aggregate Base Course.

Concrete contractors are

A. Section includes cast-in-place concrete, including reinforcement, concrete materials, mixture design, placement procedures, and finishes.

1.02 RELATED WORK: Refer to the following sections for related work:

SECTION PORTLAND CEMENT CONCRETE

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

PROJECT CONTRIBUTORS

LITHOCRETE ARCHITECTURAL CONCRETE PAVING

SECTION CONCRETE CURBS, GUTTERS AND SIDEWALKS

6 The Paving Operation

SigmaJoint. The Ultimate Joint J. Armouring & Load Transfer Systems. Metallic Leave-In-Place Contraction & Day Joints for INDUSTRIAL CONCRETE FLOORS

Prescriptive Engineering Helix TM Above Grade Tables

Installation GUIDE STEEL DECKING SOLUTIONS FOR CONCRETE SLABS

CONSTRUCTION SPECIFICATION FOR CONCRETE ROAD BASE

1. Cast-in place structural concrete including footers, foundations, and other non-slab applications. 2. Formwork 3. Reinforcement

SECTION RIGID PAVEMENT

Lessons Learned on Concrete Pavement Patching Virginia Concrete Conference March 9, 2012

B. Reinforcing. Materials shall be as specified in Section 2000 Concrete or as indicated on the plans.

2. Determine Random Numbers: Determine random numbers for testing locations using the Probing, Coring, Texture and MIT-SCAN T2 Report.

SECTION CAST IN PLACE CONCRETE PART 1 GENERAL 1.01 RELATED DOCUMENTS

Control of Random Cracking in Concrete Residential Pavements

Pervious Pavement Placement

SECTION UNDERGROUND ELECTRICAL CONSTRUCTION

SECTION CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS

Chapter 1: INTRODUCTION

General: Exterior walks and paved areas constructed in conjunction with new building projects shall conform to the requirements of these guidelines.

VARIOUS TYPES OF SLABS

Design of Rigid Pavements

CONCRETE WALKS AND CURBS SECTION CONCRETE WALKS AND CURBS PART 1 - GENERAL

ITEM 432 RIPRAP. Dry Riprap is defined as Stone Riprap of the required type with voids filled only with spalls or small stones.

SECTION 1 TERMS, DEFINITIONS, ABBREVIATIONS, UNITS OF MEASURE, AND SYMBOLS 1-3 ABBREVIATIONS Common Usage.

TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

SECTION TRENCHING

CONSTRUCTION SPECIFICATION FOR CONCRETE PAVEMENT AND CONCRETE BASE

Concrete Slab-on-Ground

Construction Specification for Concrete Bus Pad

CONSTRUCTION SPECIFICATION FOR CONCRETE CURB AND GUTTER SYSTEMS

CITY OF FARGO SPECIFICATIONS CONCRETE SIDEWALKS AND DRIVEWAYS

Interior Hangers. Application

Concrete Industrial Pavements

KANSAS DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION TO THE STANDARD SPECIFICATIONS, 1990 EDITION

Construction Specification for Utility Adjustments

SECTION STAY-IN-PLACE INSULATED CONCRETE FORMING SYSTEM

Section REINFORCING STEEL

Installation Guidelines

Joint Free Slabs On Grade Website:

SECTION CONCRETE PAVING

Concrete Inspection. Code Officials Conference of Michigan

Concrete Framing Systems - Walls and Columns

SECTION TILT-UP PRECAST CONCRETE SANDWICH PANELS. A. Work includes, but is not limited to, the following:

UPRR INDUSTRIAL LEAD BRIDGE T-WALL RETAINING WALL SYSTEM 5.0 x 7.5 UNITS DESIGN UNIT 018 WORK PACKAGE 04

SECTION CONCRETE FORMWORK AND ACCESSORIES

SECTION 36 - CAST-IN-PLACE CONCRETE PIPE (CIPCP) TABLE OF CONTENTS

Concrete Overlays. ACPA Pennsylvania Chapter. ACPA Pennsylvania Chapter. Versatile & Sustainable Solutions. Reasons to Consider a Concrete Overlay

SECTION CONCRETE PAVING FOR PEDESTRIAN AREAS. A. This Section includes exterior cement concrete pavement for the following:

Page 1 of 1 ADDENDUM NO. 2 PROJECT: THE SALVATION ARMY, THIFT STORE 601 N. EUCLID AVE., BAY CITY, MI WILLIAM A. KIBBE & ASSOCIATES, INC.

Inspection of Concrete Part 2

3.4.2 DESIGN CONSIDERATIONS

Section 1 - Introduction 1.1 Introduction Welcome to Fox Blocks. You have made an excellent decision to use Fox Blocks Insulated Concrete Forms (ICFs)

SECTION SITE CONCRETE

CONCRETE TECHNOLOGY CORPORATION

Floor Preparation Recommendations. Best Practices to Prepare Concrete for Polishing

Steel Fiber Reinforcing

1.02 STANDARD REFERENCES: The following standard specifications shall apply to the Work of this Section as indicated:

DISTRESS PHENOMENA OFTEN MISTAKENLY ATTRIBUTED TO FOUNDATION MOVEMENT

A-ONE Insulated Forms Installation Manual

INSTEEL WIRE PRODUCTS. Product Catalog

Introduction to Pavement Overlays

Construction Specification for Concrete Curb and Concrete Curb and Gutter

SECTION 11 - REINFORCED AND PLAIN CONCRETE WORKS CONTENTS

Stanford University Facilities Design Guidelines SECTION Pervious Concrete Paving

T-WALL Retaining Wall System

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

SECTION ASPHALT INTERLAYER REINFORCEMENT SYSTEM. Display hidden notes to specifier by using Tools / Options / View / Hidden Text.

1. Manufacturer certified according to NRMCA's "Certification of Ready Mixed Concrete Production Facilities."

1. Cast-in-place concrete is specified in Section

ITEM 481 MONOLITHIC REINFORCED CONCRETE BOX SEWERS

INDUSTRY RECOMMENDATION EXTERIOR CONCRETE FLATWORK

Transcription:

TF 702-R-08 Low Maintenance Slabs Supports Are Needed for Long-Term Performance of Welded Wire Reinforcement In Slabs-On-Grade INTRODUCTION With its cost-efficiency and superior performance attributes, welded wire reinforcement (WWR) frequently is the reinforcing steel of choice for slabs-ongrade. However, WWR s full benefits in controlling cracking and reducing maintenance can only be realized when it is accurately positioned with properly installed supports. One of the primary causes for an under-performing slab-on-grade is the inadequate positioning or complete absence of supports. Yet, there is no justification for improper placement or inadequate support of WWR, particularly since the process is relatively easy and inexpensive to accomplish. This report, which is directed largely to architects, engineers and contractors, encourages the use of proper supports for WWR in slabs-on-grade, including industrial floors, light commercial floors, residential floors, parking lots, sidewalks and, in general, all concrete flat work. It supplements the Wire Reinforcement Institute s Tech Fact 705, Innovative Ways to Reinforce Slabs-On-Ground. WWR is used primarily to control cracking due to shrinkage, thermal stresses and other effects, and thus reduces future maintenance while helping to produce a higher quality slab. However, WWR also may be designed and used as structural reinforcement for the slab. The design of slabs-on-grade is less straightforward and less restricted by building codes than is the Tying WWR is very quick and easy simply tie at overlaps and a few ties may be required at supports. case for supported slabs. While these less prescriptive requirements have led to a variety of practices in the field, it has also allowed significant innovations by designers and constructors of slabs-on-grade. Whatever the case, however, reinforcement must be properly detailed on the project drawings, and then be accurately located and securely tied before and during concrete placement. It may be necessary with light WWR styles to place supports and properly position reinforcement as the concrete is being screeded. With heavier styles or wide wire spacings the supports could be placed before concrete placement. These steps are absolutely necessary for the reinforcement to perform its intended function. When WWR (deformed or plain wire) is specified, the combination of wire diameters and wire spacings should be selected to maintain the WWR s proper position during the construction process. Moreover, WWR always should be supported as described in this report. Welded wire reinforcement placed on welded wire supports. DESCRIPTION OF A SLAB-ON-GRADE A number of phrases are used to describe a slab-ongrade, including a grade slab, a floating slab and, simply, a slab. The key point is that such a concrete slab has continuous contact support with a prepared base or subgrade material. The report by ACI Committee 360 defines a slab-on-grade as a slab which is continuously supported by ground, may be of uniform Wire Reinforcement Institute, Inc. 2008

Page 2 TF 702-R-08 Welded wire reinforcement for highway paving and white topping is being specified more today properly supported WWR helps protect against damaging transverse and longitudinal cracking. POSITION OF REINFORCEMENT AND COVER The proper position for the steel reinforcement is a decision based on the design itself and is controlled by the intended function of the steel. When one layer of reinforcement is used, then it should be located at or above the mid-depth of the slab. Some architects/ engineers require that the single layer be placed 2 inches below the top surface of the slab. In thicker slabs, the reinforcement must be low enough so that it will not interfere with saw cutting. Others recommend that the layer be placed at one-third the depth below the top surface. Any of these locations can be the appropriate choice, depending on the design concept for example, whether the slab is reinforced for crack control, or is reinforced for structural reasons, or designed for shrinkage-compensating concrete. When one layer of reinforcement is used, it should not be allowed to be below mid-depth. In general, positioning at one-third the depth below the surface is sufficient. or variable thickness, and may also have stiffening elements such as ribs or grade beams. WHY SUPPORTS FOR REINFORCEMENT ARE NECESSARY The primary performance requirement for supports of welded wire is that the supports hold the reinforcement in the proper vertical position within the slab during placement of the concrete. Properly positioned welded wire will reduce future maintenance costs for the slab. It is not recommended that reinforcement be placed on the grade surface and then pulled up (so-called hooking ), nor is it recommended that the reinforcement be placed on the freshly placed concrete and depressed into the concrete (so-called walking-in ). Both of these practices are no longer used because the resulting location of the reinforcing steel is approximate and can not be inspected for actual placement. Project specifications should indicate the requirements for properly supporting the reinforcement. Here concrete blocks support the bottom layer of WWR and continuous wire chairs support the top layer. When two layers of reinforcement are used, the question of cover applies to both layers. The upper layer should be placed at least 1 inch below the top surface of the slab. However, it should not be positioned too close to the top surface due to the variation in flatness created when that surface is finished. The specified depth of any saw cut must also be considered and Various types of supports for WWR are commercially available. The types of supports include wire and welded wire supports, individual high chairs with plates, bolsters with plates, all-plastic supports, concrete blocks, and others. Individual high chairs or bolsters without plates may be used with a firm subbase or mud mat. See Figure 1 for some examples of supports. Wide spaced wires and wide support spacings are cost effective while maintaining proper positioning of reinforcement.

Page 3 TF 702-R-08 the upper layer placed below that saw cut. In the case of the lower layer, when the concrete slab is placed on a well-constructed base course (normally graded, compacted and porous), many who design floors consider 1 1 /2 of clear cover below the steel to be adequate. Additional cover should not be necessary unless the governing building code requires a bottom cover of up to 3 inches. Two-course slab construction is occasionally used in airport and paving work where the slab is thicker than normally encountered in industrial plants, commercial buildings, and residential buildings. The WWR is placed on the first course of low slump concrete and the remainder of the concrete is then placed. This two-course technique is not common in building construction; when it is used the resultant position of the reinforcing steel may not be as accurate as when supports are used. Highway reinforcement supported on continuous wire chairs. TYPES OF SUPPORTS Although this report concentrates on slabs-on-grade, supports are also used for foundation mats and supported slabs. Some are shown in Figure 1 but these and others are well described in support manufacturer s brochures. For a particular project, the supports should be selected taking into account the size and weight of the welded wire reinforcement, the stiffness and strength of the base or subgrade, the specified position of the reinforcing steel including the number of layers, and the construction process to be used for placement of the concrete. The supports selected must properly position the reinforcing steel so it remains in place during the construction process and until the concrete hardens. Supports must be compatible with the concrete and be positioned firmly on the top of the base surface or subgrade. It is not necessary to stagger supports. Generally, vibration of the concrete is specified to obtain adequate consolidation of the concrete materials and would be sufficient to encase the supports, thus preventing voids. The supports selected must properly position the welded wire reinforcement and provide adequate support until the concrete cures. WWR is placed on the first course of low slump concrete in this airport taxiway. INFLUENCE OF BASE CONDITIONS ON SELECTION OF SUPPORTS The condition of the upper portion and top surface of the subgrade is crucial to the proper selection of the support system. For example, soft base materials, such as loose sand, require supports with base plates or with appreciable contact areas. Stiffer and more stable base materials, such as a compacted granular base, should allow the use of wire and plastic supports without base plates or concrete blocks. In selecting the supports it is necessary to consider both the reinforcement to be supported and the base directly under the supports. Most manufacturer s brochures will indicate the base surfaces required for their products. The ACI Committee 360 report recommends a graded granular fill, appropriate for compaction and trimming, as the base material for slabs-on-grade. Gravel bases, when compacted, fit this description. Compacted granular fill allows a greater variety of supports for consideration due to the inherent strength and stability of gravel. The so-called sand cushion (a few inches of uniformly graded sand) is usually not stable or stiff, and thus demands the use of supports with base plates or concrete blocks. The supports must not penetrate the base (subgrade) during the construction process because the specified position of the reinforcing steel could be changed and its beneficial effect diminished. When polyethylene sheeting is used under a slab the selected supports must not puncture the sheeting. Other materials

Page 4 TF 702-R-08 may be required under a slab due to special circumstances or conditions. For example, the floors in cold storage or freezer warehouses are usually placed upon insulation boards. The selected supports must not penetrate the insulation board. reinforcement. There are several factors to consider before determining support spacings. These factors include the diameter and spacing of the reinforcement (larger wire diameters with wider support spacings will allow workers to step through rather than on the reinforcement); and general recognition of any construction loads that will be applied before and during concrete placement. The welded intersections of WWR provide a very rigid sheet of reinforcement. SPACINGS AND STRENGTH OF SUPPORTS After having determined the amount of reinforcement required, the next step is to determine its correct position within the slab. To accomplish the purpose of the reinforcement it is essential that it be placed on supports and these requirements should be stated in the project specifications. Many types and configurations of supports, as well as devices for special purposes not discussed in this report, are commercially available. Properly positioned steel below the saw cut control joint allows concrete to crack the full depth and adds load transfer capacity across the joint. Examples of some types of supports are shown in Figure 1. Generally these supports are spaced 2 to 6 (or more) feet apart, depending on the stiffness and weight of the WWR being supported. Between the supports, the reinforcement must not deflect or sag excessively. While there are no criteria for limiting this deflection, the reinforcement must not deflect beyond any required clearances. A variety of wire and plastic supports are available many are made especially for welded wire reinforcement. Adequate spacing of supports depends on the style and size of wires. Spacings of supports varies from 2-6 feet and more depending on wire sizes and spacings. There is limited information available on requirements for support spacings for welded wire

Page 5 TF 702-R-08 The suggested spacings of supports in Table 1 may be used for estimating and construction. However, the preceding factors should be considered. TABLE 1. SUGGESTED SPACINGS OF SUPPORTS Welded Wire Reinforcement Range Welded Wire Spacing Suggested Support Spacing W or D 9 or larger* 12 and greater 4-6 ft. W or D5 to W or D8 12 and greater 3-4 ft. W or D9 and larger Less than 12 3-4 ft. W or D4 to W or D8 Less than 12 2-3 ft. Less than W or D4** Less than 12 2-3 ft. or Less *Spacing of supports for WWR with wires larger than W or D9 could possibly be increased over the spacings shown depending on the construction loads applied. **Consider using additional rows of supports when large deflections or deformations occur also spacing of supports may be increased provided supports are placed and properly positioned as concrete is screeded. FIGURE 1 TYPES OF SUPPORTS Continuous support (used on firm subbase or mud mat) Slab bolster with base plate (one layer of reinforcement) All plastic high chair Wired block (generally used on sloping grade) Continuous support (two layers) High chair with base plate Plain concrete block This report is furnished as a guide to industry practice. The Wire Reinforcement Institute (WRI) and its members make no warranty of any kind regarding the use of this report for other than informational purposes. This report is intended for the use of professionals competent to evaluate the significance and limitations of its contents and who will accept the responsibility for the application of the material it contains. WRI provides the foregoing material as a matter of information and, therefore, disclaims any and all responsibility for application of the stated principles or the accuracy of the sources other than material developed by the Institute. High chair with base plate All plastic support (two layers)

Page 6 TF 702-R-08 As ready mix trucks leave after tailgating the concrete in strip pours, supports are placed to stay ahead of the laser screed on this project... For welded wire reinforcing sheets, spacings of the individual wires should be a consideration to avoid permanent displacement due to workers walking on the reinforcement. This spacing should be 12 inches or more (up to 18 inches may be specified). If the design requirements do not allow larger spacings, then the wire stiffness and the support strength and spacings must be adequate to carry all anticipated construction loads. The strength of the supports and their spacings required to carry construction loads, other equipment and workers must also be considered. There are no exact guidelines, but the requirement for strength and stability cannot be ignored. The applicability of the suggested spacings in Table 1 may best be confirmed by conducting on-site testing of the proposed arrangement of supports. Loadings caused by personnel and equipment can be checked with minimum expense before proceeding with construction of the slab.... laser screed rides easily over supported welded wire without excessive displacement or distortion. REFERENCES 1. Innovative Ways to Reinforce Slabs-On- Ground, Wire Reinforcement Institute Tech Fact TF 705, 1996. 2. Design of Slabs On Ground (ACI 360R-06), American Concrete Institute, 1992. 3. Manual of Standard Practice, 7th Edition, Wire Reinforcement Institute, 2006. 4. Structural Detailing Manual WWR, Wire Reinforcement Institute, updated 2007. 5. How to Specify, Order and Use Welded Wire in Light Construction, Tech Fact TF 202, Wire Reinforcement Institute, 2003. 6. Guide for Concrete Floor and Slab Construction (ACI 302.1R-04), American Concrete Institute, 2004. 7. Designing Floor Slabs on Grade, The Aberdeen Group, 1992, Authors - Boyd C. Ringo and Robert B. Anderson. 8. Kohl s Tech Fact, TF 294 Wire Reinforcement Institute, 1994. Based on a contribution by Boyd C. Ringo, P.E. More cost-effectiveness and ease in placing can be achieved with step-through styles of WWR (12x12 and larger). Pumping concrete is a sure way to maintain proper position of supported reinforcement.