File No Supplemental November Geotechnical and Environmental Consulting Engineers

Similar documents
1.02 RELATED WORK: Refer to the following sections for related work: Section 4000-Concrete Materials and Methods

EXCAVATION, TRENCHING & BACKFILLING..1 The section refers to excavation, trenching, backfilling and all Work pertaining thereto.

2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

City of Brandon Division 2 Standard Construction Specifications Section January 2007(Revision 1) Page 1 of 8 ROADWAY EXCAVATION AND GRADING

TECHNOLOGY CENTER WAREHOUSE ADDITION ADMINISTRATIVE SERVICE CENTER MOORE PUBLIC SCHOOLS 1500 S.E. 4 th Street Moore, Oklahoma

SECTION TRENCHING

378 - POND NATURAL RESOURCES CONSERVATION SERVICE CONSERVATION PRACTICE SPECIFICATION I. SCOPE

DIVISION 4100 SITEWORK

SECTION EXCAVATION, BACKFILLING AND COMPACTING

SECTION SOILS REPORT

5.0 SITE CONDITIONS. 5.1 Surface Conditions

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 6 SANFORD, FLORIDA

SECTION UNCLASSIFIED EXCAVATION AND GRADING

SECTION TRENCHING, BACKFILLING, COMPACTION AND GENERAL GRADING

GRADING, FILL, EXCAVATION AND LANDSCAPING 2012 EDITION

SECTION SITE GRADING. Part 1 - General Work Included Related Requirements Reference Standards...

CW 3170 EARTHWORK AND GRADING TABLE OF CONTENTS

SECTION TRENCHING & BACKFILLING

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES. Granular Backfill (Wingwalls) (Set Price)

SECTION EXCAVATION AND EMBANKMENT. B. Subbase Grading A samples for gradation analysis.

B. Borrow: Satisfactory soil imported from off-site for use as fill or backfill.

SECTION 1100 GRADING 1102 MATERIALS AND DEFINITIONS.

Appendix D General Earthwork and Grading Specifications for Rough Grading

ORLANDO SANFORD INTERNATIONAL AIRPORT OUTPARCEL 1 SANFORD, FLORIDA

SECTION EARTHWORK; EXCAVATION, FILLING AND GRADING. A. Excavating soil and other material for surface improvements.

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

SECTION GENERAL EXCAVATION

SECTION UTILITY BACKFILL MATERIALS

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

Union County Vocational - Technical Schools Scotch Plains, New Jersey

DESIGN & CONSTRUCTION GUIDELINES

SECTION EARTHWORK

Date: December 7, 2017 Project No.:

SECTION 10 - TRENCHING AND BACKFILLING

SECTION MECHANICALLY STABILIZED EARTH RETAINING WALLS

Geotechnical Investigation Long Timber Brewing Building Highway 99 and Kelly Street Monroe, Oregon TABLE OF CONTENTS

The Six-Inch Layer Compaction Method

SECTION EXCAVATION AND FILL

4.8. Subsurface Infiltration

Section SITE CLEARING. B. Description of Work: 1. The extent of site clearing is shown on the drawings.

B. Base Course: Aggregate layer placed between the subbase course and hot-mix asphalt paving.

204 - EXCAVATION AND BACKFILL FOR STRUCTURES SECTION 204 EXCAVATION AND BACKFILL FOR STRUCTURES

STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION CITY OF WEST BEND, WISCONSIN SECTION 300 EARTHWORK, GRADING, AND GRAVELING

SECTION RIPRAP, BOULDERS, AND BEDDING

SIGN AND ATTACH A COPY OF THIS ADDENDUM COVER TO YOUR BID

SECTION EARTHWORK. B. Removal of subsoil and excavating all classes of material encountered.

SECTION STRUCTURAL EXCAVATION FOR STRUCTURES

REPORT OF GEOTECHNICAL EXPLORATION WEST MARJORY AVENUE TAMPA, FLORIDA

mtec REPORT OF GEOTECHNICAL EXPLORATION FTFA Construct Bin Wall at HERD Eglin AFB, Florida

Report of Exploratory Test Pits

SUB WATER DEPARTMENT STANDARD CONSTRUCTION SPECIFICATIONS TABLE OF CONTENTS SECTION EXCAVATION AND BACKFILL, GENERAL

SECTION SITE PREPARATION. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

COWLITZ COUNTY DEPARTMENT OF BUILDING AND PLANNING

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 9/17/18)

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

TRENCH EXCAVATION AND BACKFILL

MEMORANDUM. TO: STUART OLSON DOMINION CONSTRUCTION LTD. DATE: JANUARY 31, 14 ATTENTION: MR. Dave Bauder, Construction Manager KENNY K. C.KO, P.ENG.

SECTION BUILDING EARTHWORK

Geotechnical Engineering Report

SECTION EXCAVATION AND FILL

For. Report of Geotechnical Exploration. St. Johns Parkway Race Track Road to Espada Lane 8-inch Reclaimed Water Main St.

1.0 BACKGROUND 2.0 DIAGRAMS. The attached diagrams illustrate a typical NDDS system. 3.0 CDPHE OWTS REGULATION #43

4.8. Subsurface Infiltration

LANDSCAPE RETAINING WALLS

SECTION EXCAVATION AND BACKFILL FOR UTILITIES AND STRUCTURES

GRADING GUIDELINES. Kern County Engineering, Surveying & Permit Services Department Floodplain Management Section January 1, 2011

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

SECTION 2831 ITEM F-162 CHAIN-LINK FENCES

PRELIMINARY GEOTECHNICAL INVESTIGATION UCCS ACADEMIC OFFICE BUILDING COLORADO SPRINGS, COLORADO

Bidders shall acknowledge receipt of this Addendum in writing on his Proposal Form.

C. Foundation stabilization for pipe and utility structures.

This specification supplements the requirements of the Occupational Health and Safety Act, and its Regulations and the Ontario Building code.

SECTION STRUCTURE EXCAVATION AND EARTHWORK

Geotechnical Investigation Report

Section Fill Placement Tender No. [ ] Page 1

SECTION EXCAVATION, TRENCHING AND BACKFILL

Mi l l er Pac i fic E N G I N E ERI NG GR O UP 504 Redwood B l vd. Suite 220 Novato, Ca l i f o rnia 94947

SECTION 32 EXCAVATION, BACKFILL, COMPACTION AND GRADING

SECTION / ENGINEERED AGGREGATE PIERS (SOIL REINFORCEMENT AND FOUNDATION SYSTEM)

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

SECTION 14 EMBANKMENT

SPECIFICATIONS - DETAILED PROVISIONS Section Site Grading C O N T E N T S

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

Construction Specification for General Excavation

Lantz-Boggio Architects, P.C LBA Project No

SECTION EMBANKMENT

TOWN OF MANCHESTER GENERAL SERVICES DEPARTMENT 494 MAIN STREET P.O. BOX 191 MANCHESTER, CONNECTICUT

SECTION EXCAVATING, BACKFILLING AND COMPACTING

Section Excavation Tender No. [ ] Page 1

SECTION TRENCH EXCAVATION AND BACKFILL

EXCAVATION & BACKFILL SPECIFICATION

Date: September 27, 2018 Project No.:

CONCRETE SEGMENTAL RETAINING WALL SYSTEM

CONSTRUCTION SPECIFICATION FOR PRECAST REINFORCED CONCRETE BOX CULVERTS IN OPEN CUT

GEOTECHNICAL INVESTIGATION ADDENDUM Pavement Improvements for Imperial Avenue, Wake Avenue, and Danenberg Drive, El Centro, California

SECTION FINISH GRADING

Transcription:

Supplemental Information & Geotechnical Recommendations Proposed New Solar Valley Location B (East of Building No. 7) Cañada Community College 4200 Farm Hill Boulevard Submitted to: Mr. Peter Hempel Construction Project Manager l Swinerton Management & Consulting Construction Managers for San Mateo County Community College District 3401 CSM Drive San Mateo, California 94402 File No. 10569-Supplemental November 2013 Geotechnical and Environmental Consulting Engineers

ADVANCE SOIL TECHNOLOGY, INC. Engineers, Geologists & Environmental Consultants 343 Baywood Avenue - San Jose, California 95128 Office: (408)-261-1155 Fax: (408)-261-1588 File No. 10569-Supplemental November 12, 2013 Mr. Peter Hempel Construction Project Manager Swinerton Management & Consulting Construction Managers for San Mateo County Community College District 3401 CSM Drive San Mateo, CA 94402 Subject: Proposed New Solar Valley (East of Building No. 7 & South of Parking Lot 6) Cañada Community College 4200 Farm Hill Boulevard Supplemental Information for Cañada College Solar Photovoltaic System Project (Location B East of Building No. 7 & South of Parking Lot 6) Dear Mr. Hempel - Pursuant to your request and authorization, Advance Soil Technology, Inc. is pleased to present herein supplemental recommendation for the grading aspect of the project specifically related to Solar Valley Location B (East of Building No. 7 and South of Parking Lot 6) to be associated with the Proposed Solar Photovoltaic System Project at Cañada College located at 4200 Farm Hill Boulevard in. Based on the review of the conceptual drawings and the information received, it is our understanding that the above-mentioned area will be improved for usage as part of the Solar Photovoltaic System Project. Henceforth, in order to evaluate the site of proposed improvements, additional geotechnical borings were drilled to determine the subsurface soil conditions and provide recommendations for grading and foundation design aspect of the project. In the proceeding sections of this report, enclosed please find the recommendations for the grading aspect of the project to be used in conjunction with the original geotechnical report prepared for the Solar Valley Project (Location A Vacant Parcel, East of Athletic Fields) Titled Geotechnical Engineering Investigation & Geological Hazard Evaluation File No. 10569-S Dated May 2011. Review of these above-mentioned report(s), results of these subsurface exploration, and laboratory testing and analysis, formed the basis of our conclusions and recommendations related to the geotechnical engineering aspects of this project. This supplemental report presents selected elements of our findings and recommendations only for the proposed improvements. It does not present all the details needed for the proper application of our findings and recommendations for the development of the project. Our findings and

Cañada College Solar Valley AST Project No. 10569-Supplemental Page 3 recommendations and application options can be related only through the full reading of the original geotechnical report(s) File No. 10569-S dated May 2011 and shall be used in conjunction with this supplemental report. Grading Recommendations - Geotechnical Feasibility - Based on the results of our subsurface exploration, the primary geotechnical concerns for the proposed project include the following: (a) Compressible near surface soils (mostly fill material underlain with bedrock) that are subjected to settlements; (b) potential for lateral movement; (c) moderate to high expansive surficial clayey soils and (e) Subsurface moisture seepage. Existing Debris and Buried Vegetation - The site of proposed improvements is underlain with fill material of variable thickness with interbedded layers of buried vegetation, pieces of concrete, unsuitable fill with high organic content and other miscellaneous debris extending to a depth of (10)-feet below the existing elevated ground surface at the overflow parking area and tapering towards south along the property / fence at the top of slope. Any areas to be graded should initially be cleared of all obstructions, including any existing subsurface structures (if any), underground utility pipes, drainage fields, drain lines, landscape debris, brush, trees not designated to remain, debris, stumps, root balls, rubble and debris at the location of proposed improvements should be removed and hauled offsite. All active or inactive utilities within the construction area should be protected, relocated or abandoned. Any pipes abandoned in place should be filled with sand cement slurry (pressure grout). Holes / excavated areas resulting from the removal of underground obstructions below the proposed grades should be cleared for engineered fill given below. The contractor should separate all the miscellaneous debris to minimize the organic content (less than 3% by volume) in the soil to be utilized as engineered fill material. Earthwork Clearing & Site Preparation - After clearing, the site shall be stripped to a sufficient depth to remove all the surface vegetation and organically rich topsoil. This material should not be used as engineered fill material; however, it may be stockpiled on-site to be used in the landscape areas or hauled off to a disposal facility. After the removal of the debris and the stripping operation, all stockpile materials shall be re-located outside the area of proposed improvement to be utilized as a part of the engineered fill material if deemed acceptable by the geotechnical engineer, provided the organic content of less than 3% by volume. The entire site of proposed improvements and (50)-feet beyond the limits of proposed improvements on the north, east and west shall be excavated to a depth of (10)-feet below Inc. Geotechnical / Environmental Consulting Engineers

Cañada College Solar Valley AST Project No. 10569-Supplemental Page 4 the existing ground surface or/ to an elevation (12) to (18)-inches below the existing ground surface at the location of the fence along the freeway on the south side. During the excavation, at no time a vertical face shall be maintained along the parking lot / overflow parking side or any other side. The sides of the excavation shall be sloped to a minimum of 2:1 (Horizontal to Vertical). Depending upon the subsurface conditions of the fill material, excavation could extend further inward, if additional fill materials and buried debris are observed during the excavation. After achieving the desired limits of excavation, the bottom and (10)-feet beyond the limits shall be scarified to a depth of (12)-inches below the excavated bottom; moisture conditioned (2% over optimum) and compacted to a minimum of 95% relative compaction as per ASTM D1557, prior to placement of any additional fill material. Since the fill is being placed on an existing slope area, to provide slope stability, any required cut and fill slopes at the site shall have a gradient no steeper than 2.5:1 (horizontal to vertical). The fill placed on the slopes with the gradients greater than 5:1 shall be keyed and benched into the supportive material. The cut and fill areas shall be scarified and compacted to a minimum of 95% relative compaction, prior to any fill placement or grading at the site. Prior to placement of any fill material, a base key and subsurface drainage shall be provided along the length of the slope. The base key and subsurface drainage shall be provided at the toe of the slope. The base key shall be a minimum of 15-0 wide and shall be placed a minimum of (-3-0 ) below the proposed toe of slope and shall be sloped towards the existing slope with a minimum 2% slope. The subsurface drainage at the interlocking slopes shall consist of a rigid heavy duty four-inch perforated pipe (preferably schedule 80) embedded in clean washed drain rock wrapped in a filter fabric (Mirafi 140N). The perforated pipe shall have a minimum of two-inches of gravel at the bottom and a minimum of (18)-inches on the top of the pipe. The base key and the engineered fill material (8-inch lifts) shall be moisture conditioned and compacted to a minimum of 95% relative compaction. The location of the major and the minor keys will be determined during the grading operation. The fill material shall be placed in uniform lifts and each lift shall be compacted to 95% relative compaction as per ASTM D1557. However, if the above mentioned slope criteria could not be achieved a retaining structure shall be installed to retain the soil mass. The retaining structure shall be designed to hold the soil mass in conformance to the recommendation established the proceeding sections of this report. The excavation into the underlying bedrock will be required to achieve the desired grades. In our opinion, closed spaced fracturing pattern and the degree of weathering, the bedrock (if encountered) should be excavated with heavy duty excavating equipment. The contractor should anticipate excavations into the bedrock may be uneven and would require additional concrete due to over breaking of rocks. In addition to the above, excavated Inc. Geotechnical / Environmental Consulting Engineers

Cañada College Solar Valley AST Project No. 10569-Supplemental Page 5 material may contain oversized rock fragments, which may require special handling and processing / or breaking into pieces for off-haul from the site. Fill Materials - All fill materials under concrete slab-on-construction and behind the walls shall be primarily granular material with low plasticity and expansion potential and shall comply with the following: Resistance R-Value Not less than 25 Plasticity Index 12 or less Liquid Limit 30% or less Expansion Index 20% or less % Passing Sieve #200 between 10 and 20% Maximum rock size (3)-inches or less All material shall be approved by the Project Soil Engineer, prior to hauling it to the site. All grading work shall be observed and approved by the Soil Engineer. Temporary Slopes and Trench Excavations - The contractor should be responsible for all temporary excavations, slopes and trenches excavated at the site and the design of any required shoring system. Shoring, bracing and benching shall be performed by the contractor in accordance with the strict governing safety standards. Temporary shoring is usually considered as a construction issue (means and methods) and has to be addressed by the contractor. Shoring and bracing should be provided in accordance with all applicable local, state and federal safety regulations, including but not limited to the current OSHA excavation and trench safety standards. We are pleased to be of service to you in this matter. If you have any questions or require additional information, please feel free to contact us at your convenience. Very truly yours, ADVANCE SOIL TECHNOLOGY, INC. Almirza Alexkassai Al Mirza Alex A. Kassai PE/REA Project Engineer Principal Engineer Am/aak/am/cj PE #34882 Cc: File Copies: Enclosed Inc. Geotechnical / Environmental Consulting Engineers

Site Plan with Solar Valley Locations Advance Soil Technology, Inc. Geological, Geotechnical, Environmental Consulting & Construction Services Geotechnical Investigation & Geological Hazard Evaluation Proposed Solar Valley Cañada College 343 So. Baywood Avenue - San Jose, California 4200 Farm Hill Boulevard - AST File No. 10569-Supplemental Date: November 2013 Plate No. 1