Product Manual Release 05/17

Similar documents
ArmorZone TL-2 Barrier

ArmorZone TL-2 Barrier and End Treatment

Installation Manual. Orion. TL-3 Steel Barrier. VHD (v2)

TL-2 Plastic Water Filled Barrier

INSTALLATION MANUAL ORION BARRIER. NCHRP 350 TL-3 Portable Steel Longitudinal Barrier

Universal Armorwire Terminal End

ArmorWire Cable Barrier

Nu-Guard 31. Roadside and Median Guardrail System. MASH TL-3 & NCHRP TL-4 Product & Installation Manual

Universal TAU-II Redirective, Non-Gating, Crash Cushion

T-39 Thriebeam. Product Manual. NCHRP 350 Test Level 3 & 4 Compliant Barrier. Release 01/11

Sentryline II Cable Barrier

BarrierGuard 800 Gate

BarrierGuard 800 Gate

Sentry Water-Cable Barrier Installation, Maintenance, and Repair Manual

TRACC. Crash Attenuation Cushion. Product Manual

TRACC. Crash Attenuation Cushion. Product Manual

TRACC. Product Manual. Crash attenuation cushion. Release 10/14

DESIGN GUIDE. Advancing Safety Through Innovation. TCC-DG01 07/18/02 Page 1

Technical Memorandum: Road Safety Hardware Series. technical memorandum

In-Ground Removable Bollard PRODUCT MANUAL. Installation Operation Maintenance

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - EXTRUDER TERMINAL SYSTEM

Assembly, Installation & Watering Guide 6 PLANTER TRAY KIT. Product Version. Gro-Wall SLIM PRO. Document ID

Sentryline Terminal End III Non-Release Terminal End. Anchoring for 4 cable barrier system. Training and Product Installation Manual

RAMSHIELD. New Zealand Edition. Product & Installation Manual. MASH TL3 Compliant W-Beam Barrier. Ref: PM 023/0

February 9, In Reply Refer To: HSST/CC-114

SLED End Treatment System Manual

Specification for Road Safety Hardware Systems

Speedlock Pallet Racking

LOCATION AND DESIGN DIVISION

Safeguard Gate. Safety Barrier. Product Manual. Safeguard Gate Safety Barrier: Product Manual

MDS TL5 Minimum Deflection Systems

PN Revision D January SoftStop. System. End Terminal. Product Manual

DOUBLE SLIDE RAIL INSTALLATION METHOD. Double Slide Rail August

ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE. SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - STEEL BEAM ENERGY ATTENUATING TERMINAL SYSTEMS

Product Specification ArmorGuard Barrier System

ADA-COMPLIANT SAFETY DEVICES PRODUCT GUIDE. SafetyRail TM Barricade SafetyWall TM Barricade BoardWalk Temporary RAMP

LOCATION AND DESIGN DIVISION

Flexbeam Guardrail Roadside Safety Barrier

MDS TL4 Minimum Deflection Systems

SPECIFICATION FOR THE RUBBER SPEED HUMPS

CONSTRUCTION SPECIFICATION FOR GUIDE RAIL END TREATMENT - ECCENTRIC LOADER TERMINAL SYSTEM

TRACC-Family System Manual

Safence. Wire Rope Safety Barrier. Product Manual

Aluminum Headache Rack

BarrierGuard (02) GROUP. a new era in road safety

KEEP FOR FUTURE REFERENCE MRT FORKLIFT ADAPTER READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Product Manual REACT 350 (36") (3 foot [915 mm] wide Systems) Reusable Energy Absorbing Crash Terminal

MICHIGAN DEPARTMENT OF TRANSPORTATION SPECIAL PROVISION FOR MOVABLE CONCRETE TRAFFIC BARRIER

QuadGuard System. General Specifications. CEN General Specifications

AS THE EFFECT ON BRIDGE BARRIERS

Instructions for the use of the Link 4 Pallet Rack Lifter (PRL) model 5000

MagnumStone Specifications Gravity

SMART CUSHION INNOVATIONS SCI100GM General Specifications

Chapter 4 Bridge Program Drawings

TEMPORARY EDGE PROTECTION SYSTEM DESCRIPTION CTS. Combisafe International AB

DuraComp Composite Decking Installation Guide. Hidden Plastic Clip Fixing

ROADSIDE SAFETY BARRIER ELEMENTS Module 3

Qualified Products Policy #49 Page 1 of 8

Installation and Repair Manual

U-MAD Trailer TMA. Installation and Maintenance Manual. NCHRP 350 TL-2 and TL-3 Trailer Truck Mounted Attenuator

CONSTRUCTION SPECIFICATION FOR CONCRETE BARRIERS

SKATEWHEEL FLOW RACK

R-126-I PLACEMENT OF TEMPORARY CONCRETE BARRIER AND TEMPORARY STEEL BARRIER DETA IL 2 MICHIGAN DEPARTMENT OF TRANSPORTATION ** LATERAL OFFSET

Construction Overview. Section 5 Construction Considerations. Curb Ramp Construction. Curb Ramp Construction. Overview.

Reinforced Earth wall Construction Manual

NOTES ON THE SPECIFICATION FOR ROAD SAFETY BARRIER SYSTEMS

Instructions. Slim temporary safety barriers SB 50 Installation and Maintenance Manual. Documentation for license partners

CONSTRUCTION SPECIFICATION FOR ENERGY ATTENUATORS

ENGINEERED SOLUTIONS SAFETY INSTRUCTIONS FOR STRUCTURAL PLATE PRODUCTS

KEEP FOR FUTURE REFERENCE FORKLIFT ADAPTER FOR MRTA6 AND MRTA8 LIFTERS READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

Dock shelter and dock seal Full choice of dock shelters and dock seals can be included, refer to Stertil Stokvis brochure.

User Manual For Clamp H- Beam

MODEL 185R Kontrol-Karrier Operator s Manual for Morse Kontrol-Karrier

Edge Support Trench Lining System

Alberta Transportation Roadside Design Guide February 2012 APPENDIX E GUIDELINES FOR THE SELECTION AND DESIGN OF HIGH TENSION CABLE BARRIER SYSTEMS

2200-Lb. Semi-Electric Stacker OWNER S MANUAL

Miller Collective Safety at Height Solutions EPIC ULTRA Barrier System EPIC Post-N-Barrier System EPIC Basic Barrier System

Design and Testing of an Easy to Use Pinned-down Temporary Concrete Barrier with Limited Deflections

Precast Concrete Trench Drain Systems INSTALLATION INSTRUCTIONS

BarrierGuard 800. Temporary Steel Safety Barrier NCHRP 350 TL-3 & TL-4. Product and Installation manual

Alberta Transportation Roadside Design Guide November 2016 APPENDIX E GUIDELINES FOR THE SELECTION AND DESIGN OF HIGH TENSION CABLE BARRIER SYSTEMS

7 2 i n. x 9 i n. Tr i - Fo l d R a m p s OWNER S MANUAL

DO NOT INSTALL, OPERATE OR SERVICE PRODUCT WITHOUT HAVING READ AND FULLY UNDERSTAND ALL SAFETY PROCEDURES, WARNINGS, INSTALLATION AND OPERATING

High Performance. Cost Effective. Easy Installation.

Road Safety. Zoneguard MASS. Column Mounted Floor Mounted Flexible Rigid

Special Provision No. 799S15 December 2016

MODULO GEOBENT Installation Guidelines

Strengthened Soil Wall Construction Manual

Product Manual: ABSORB 350 Crash Cushion ABSORB 350. Crash Cushion. Product Manual. Ph or visit

freestone eco Prestige & quality DIY vertical wall Large blocks - 10/m 2 Smooth surface finish No concrete footings

PACIFIC SHORING, LLC ALUMINUM SHORING PRODUCTS ALUMINUM S-PANEL SHIELDS. TABULATED DATA Effective April 01, 2014

Delta Level 1000 Hinged Lip Pit Mounted & Suspended Frame Dock Leveller

ITEM 461 STRUCTURAL PLATE STRUCTURES. Galvanized steel plates shall conform to AASHTO M167 and aluminum plates shall conform to AASHTO M219.

San Antonio Water System Standard Specifications for Construction ITEM NO. 812 WATER MAIN INSTALLATION

Mounting systems for solar technology

San Antonio Water System Standard Specifications for Construction ITEM NO. 813 WATER SERVICE FOR FIRELINES

Ministry of Forests & Range

Transcription:

Temporary Safety Barrier (TL-2 MASH) Product Manual VHD (v3) www.valmonthighway.com

Table of Contents 1.0 ArmorZone Introduction... 3 2.0 Before Installation... 3 3.0 Limitations & Warnings... 3 4.0 System Design & Design Considerations... 4 5.0 Parts Identification... 6 6.0 Bill of Materials... 6 7.0 Installation Preparation... 6 8.0 Installation Instructions... 7 9.0 Installation Examples... 11 10.0 Installation Checklists... 12 11.0 Repair Guide... 13 APPENDIX Technical Drawings 12.0 ArmorZone Barrier... 14 12.1 ArmorZone End Treatment... 15 ArmorZone, Armorflex and Valmont Highway are trademarks of Valmont Industries. 2

1.0 Introduction ArmorZone is a TL-2 barrier made up of plastic units that when joined together using a steel pin and filled with water provides positive work zone barrier protection to temporary construction sites and other miscellaneous roadside activities. The unique ArmorZone polyethylene composition, profile design and steel pin allow the barrier to be installed straight or down to a minimum radius of 92 (28m) if required. If required the ArmorZone TL-2 barrier connects directly to the ArmorZone TL-2 end treatment which negates the need to shield or flare the ends of the barrier. ArmorZone barrier has been designed and tested to meet the evaluation criteria of MASH Test Level 2 (TL-2) for longitudinal barriers and the end treatment to NCHRP 350 Test Level 2 (TL-2) for crash cushions. 2.0 Before Installation Placement of ArmorZone shall be in accordance with the design as provided for the temporary work zone. Installation shall be in accordance with the installation instructions supplied for this product. Depending on the circumstances at the site, installation including the filling of a unit (using a truck mounted water tanker) should take no more than 1 minute for each 6-7 (2.0m) unit. ArmorZone is a highly engineered safety device made up of a relatively small number of parts. Before starting installation ensure that one is familiar with the make up of the system. 3.0 Limitations and Warnings ArmorZone TL-2 barrier and end treatment have been rigorously tested and evaluated per the evaluation criteria in the MASH guidelines for longitudinal barrier and NCHRP 350 guidelines for crash cushions. The impact conditions recommended are intended to address typical in-service collisions. When properly installed and maintained ArmorZone TL-2 barrier and end treatment allows an impacting vehicle to be stopped, contained or re-directed in a safe and predictable manner under the MASH and NCHRP 350 impact conditions. Vehicle impacts that vary from the MASH and NCHRP 350 impact conditions described for longitudinal barriers and crash cushions may result in significantly different results than those experienced in testing. Vehicle impact characteristics different than, or in excess of, those encountered in compliance testing (weight, speed and angle) may result in system performance that may not meet the evaluation criteria. The ArmorZone barrier can be installed with the ArmorZone end treatment. If this treatment is not used the end of the barrier must be shielded or flared as per Road Controlling Authority requirements. 3

4.0 System Design & Design Considerations 4.1 Slopes A maximum slope of 10:1 is preferable. On slopes greater than this, follow the Road Controlling Authority s guidelines. 4.2 Curbs ArmorZone has been designed and tested so the centre of gravity of the impacting vehicle is a constant height in relation to the barrier. For this reason, it is preferred that curbs or channels are not in front or behind the barrier as they will result in altering the height of the vehicle at impact. If there is no option but to install ArmorZone near a curb, consult Road Controlling Authority s guidelines. 4.3 Undulating ground conditions Site specific grading may be necessary to ensure that there are no humps or hollows that may significantly alter the impacting vehicles stability or substantially alter the barrier height in relation to the ground. 4.4 Median and Roadside Applications ArmorZone can be used in both roadside and median applications. 4.5 Length of Need The Length of Need (LoN) of ArmorZone is 46 (14m). Ensure that when installing the barrier that it is of sufficient length. For further details consult the Road Controlling Authority s guidelines. If an ArmorZone end treatment is connected the LoN increase to 52 (16m). 4.6 End Treatment ArmorZone end treatment is a free standing special end unit that can be fitted to the ArmorZone barrier in a tangent position if an end treatment is required. If an end treatment is not used it may be required to flare or shield the barrier as per Road Controlling Authority s guidelines. 4.7 Soil Conditions ArmorZone is installed above ground so soil conditions on site are not applicable. However it is recommended ArmorZone systems are installed on a compacted surface. 4

4.8 Deflection Test 2-11 (MASH TL-2) 2270kg pickup truck, 25 degree angle at 70kph (43mph) Dynamic Deflection Permanent Deflection 13-6.5 (4.10m) 6-10.5 (2.10m) Test 2-10 (NCHRP 350 TL-2) 820kg car, 20 degree angle at 70kph (43mph) Dynamic Deflection Permanent Deflection 3-5.5 (1.05m) 3-5.5 (1.05m) Note: Results are from actual crash testing and the test article length was 164 (50m). Results from Test 2-11 (MASH) are the published TL-2 Deflection. 161 1/2 (4100) Deflection Zone *Calculated 5.0 Parts Identification ArmorZone MASH TL2 Dynamic Deflections 2.5 Tonne Pick-Up Truck @ 43.5mph (2-11 Test) Deployment Length 164ft (including LON) Angle of Impact Dynamic Deflection (ft) 25 degrees 13.5 20 degrees 8.9* 15 degrees 5.3* 10 degrees 2.3* Standard Unit (HDPE) End Treatment Unit (HDPE) Connector (Hot Dipped Galvanised) 6.0 bill of Materials For every 6-7 (2.0m) (linear) of temporary barrier the following components are required: 6-7 (2.0m) ArmorZone Standard Unit... 1 required Steel Pin... 1 required Water... 116 gal required (440L) 6-7 (2.0m) ArmorZone End Treatment Unit & Pin... Optional (water is not required) 5

7.0 Installation Preparation 7.1 Getting Started It is essential that ArmorZone barrier and ArmorZone end treatment are installed correctly. Please carefully read and understand the following instructions before installing system. Note: These instructions relate only to the installation of ArmorZone and are for standard installations only. ArmorZone is designed so that it has exactly the same components and barrier setup whether in a roadside or median application. For all installations, commence placement of the units at one end and connect the units together until the correct barrier length and position is achieved. Please ensure that the checklists for both barrier and end treatment are completed for every installation. 7.2 Preparation Before installing ArmorZone, ensure that all components required for the system are on site and have been identified. ArmorZone is a highly engineered safety device made up of a relatively small number of parts. Before starting installation ensure that one is familiar with the make up of the system. Refer to the Parts Identification and Bill of Materials section in this manual for more information. Ensure that the area where ArmorZone is to be installed is flat enough (max slope 10:1) and compacted, so that the ground conditions will not significantly alter the height of the vehicle in relation to the height of the barrier. Minor site grading may be required. 7.3 Tools Required There are no tools required to install the components of ArmorZone. The units can be manually lifted and positioned by 2 personnel and the steel pin used to connect the units is simply dropped into position. Each unit requires approx 116 gal (440L) of water and it is recommended that a large truck mounted tanker with large fill hose is sourced for fast barrier construction. The diameter of the fill hole is 5 (125mm). 6

8.0 Installation Instructions 8.1 Step 1 Site Preparation It is preferred that ArmorZone barrier is installed on compacted flat, level ground. Ensure that sufficient width and traffic control is available before installing ArmorZone. Due to the bulky nature of the units, deployment will be from a flat deck truck or similar. Each unit requires 116 gal (440L) of water and it is recommended that a large truck mounted tanker is used. ArmorZone barrier should be installed in a tangent position to the direction of travel. ArmorZone units are dispatched in bundles of up to 15. (shown in Figure 1) To ensure safe unloading of the units, use a fork hoist or similar to lower each row to ground level. From there each unit can be manually moved into position. (shown in Figure 2). Safety Statements General Safety All required traffic safety precautions should be complied with. All workers should wear required safety clothing. (high visibility vests, steel capped footwear, gloves etc.) Gloves should be worn at all times. Only authorized trained personnel should operate any machinery. Where overhead machinery is used, care must be taken to avoid any overhead hazards. ArmorZone Safety Statements All installers must be well clear of the water tanker when the units are being filled. ArmorZone is a stand alone barrier and does not require at any stage during installation that the surrounding soil is dug or drilled in anyway. The empty units weigh 128 lbs (58kg) each and should be unloaded by 2 personnel. Do not attempt to lift a unit which contains water. Final positioning of the empty units and placement of the steel pin connectors should be done by 1 personnel so fingers are caught between the components. Figure 1: ArmorZone units are dispatched in bundles of up to 15. Figure 2: Use a fork hoist or similar to lower each row to ground level. 7

8.2 Step 2 Placement of the Barrier Units Unload the units and set out in a row along the intended barrier position. Make sure the configuration of the ends will fit together where they join (shown in Figure 3). Lifting the units is a 2 person job; they weigh 128lbs (58kg) each when empty. Slide the units into position (shown in Figure 4). The units must fit flush together so that the vertical holes on each unit line up (shown in Figure 5 & 6). Note: If the drainage bung is on the workzone side of the barrier when assembled, it will allow for safe access when decommissioning the barrier. Note: None of the units are fixed to the ground in any way. Drainage Bung Bung Spanner Figure 3: When setting out, ensure the configuration of the ends will fit together. Figure 4: Sliding the units into position. Figure 5: Units are pushed together to align the vertical holes Figure 6: The units must fit flush together so that the vertical holes on each unit line up. 8

8.3 Connecting the Barrier Units Once the units are flush fit aligned, the steel pin can be positioned down the 2 vertical alignment holes (shown in Figure 7 & 8). The steel pin sits in the vertical holes under its own weight only and is not connected to the barrier units in any other way. Note: If slight curvature of the barrier is required, position as required at this point. 8.4 Step 4 Filling the Barrier Units Lifting the flap on the top of the unit will allow access to the 5 (125mm) diameter water fill hole (shown in Figure 9). Using a truck mounted tanker fill each unit to the top with water (shown in Figure 10). Check that there are no leaks before filling the next unit. If there is a leak the unit must be replaced. It may be possible to fix at a later stage depending on the damage. Figure 7: Once the units are aligned, the steel pin can be dropped into the alignment holes. Figure 8: Check the steel pin has gone through the alignment holes. Figure 9: Lif the flap on the top of the unit to allow access to the water fill hole. Figure 10: Using a truck mounted tanker fill each unit to the top with water. Note: The ArmorZone end treatment unit is never filled with water. Through design it is not possible to hold water through error or weather conditions. 9

8.5 Step 5 Connecting the End Treatment Unit (Optional) If protection is required for the end of the barrier, the ArmorZone end treatment can be connected to the barrier in a tangent position. Position the end treatment unit so that the lugs line up with the end barrier unit. Slide the unit into position so that the vertical holes line up (shown in Figure 11 & 12). Once the units are flush fit aligned, the twin pin connector can be positioned down the 2 vertical alignment holes (shown in Figure 13 & 14). Note: The end treatment unit is not and can not be filled with water. The connector sits in the vertical holes under its own weight only and is not connected to the barrier units in any other way. Note: The end treatment unit is NOT fixed to the ground in any way and must NOT have the twin pin connector inserted at the exposed end of the unit. 8.6 Step 6 Delineation (Optional) Depending on location, delineation may be required as per the Road Controlling Authority Guidelines. For further details contact your ArmorZone distributor. Figure 11: Position the end treatment unit so that the lugs line up with the end barrier unit. Figure 12: Slide the unit into position so that the vertical holes line up. Figure 13: Once the units are aligned, the steel pin can be dropped into the alignment holes. Figure 14: Ensure the steel pin has gone through the alignment holes. 10

9.0 Installation Examples Note: A minimum 92 (28m) radius curvature can be achieved when the flush fit connection is made between ArmorZone units. It is recommended that this positioning should be completed before the units are filled with water. Straight Installation Curved Installation Installed End Treatment Installed End Treatment 11

10.0 ArmorZone Barrier & End Treatment Location: Installed By: Date: Signed: Inspected By: Date: Signed: Barrier The units are positioned on level ground Yes No The set-out of the barrier is as per the design instructions Yes No The lugs of each unit have a flush fit with each other and the steel pin is positioned through both vertical holes in the lugs of each unit Yes No The lid and bung are attached to each unit correctly so as to ensure the units will remain full of water as intended Yes No Each unit is filled to the top with water. (approx 116 gal (440L)) Check for leaks Yes No The barrier is not fixed to the ground or any other device in any way Yes No Attach delineation as required by the Road Controlling Authority Guidelines Yes No End Treatment Yes No The ArmorZone end treatment unit is connected to the ArmorZone barrier using the twin pin steel connector through both vertical holes in the lugs of each unit Yes No The end treatment unit is not and can not be filled with water Yes No Do not install a twin pin connector at the upstream end of the end treatment unit Yes No The end treatment unit is not fixed to the ground or any other device in any way Yes No Attach delineation as required by the Road Controlling Authority Guidelines Yes No Disclaimer: Important Note: The conformity of the installation is the responsibility of the installation contractor, and Valmont Highway accepts no liability for or in connection with any installation that is outside of the specifications of this manual or the Road Controlling Authority. For more information, please refer to our Standard Terms and Conditions of Sale available on our website: www.ingalcivil.com.au. 12

11.0 repair guide ArmorZone barriers can only be repaired if the damage sustained is in accordance with these guidelines. Not only is the size of repair important, but also the location. Repair is only to make the barrier water-tight again. Any barriers which have structural damage must be discarded (recycled), as they cannot be used a vehicle barrier. Maximum permissible size of a repair is 2 inch (50mm) x 0.5 inch (12mm). Damage must be located between the green area indicated on diagram (shown below). Repair must be carried out by suitably trained personnel. Only HDPE plastic wire supplied by Valmont Highway to be used. Damage must be located between the green area indicated above Welder & HDPE Plastic Wire 13

2160 85" 860 33-7/8" 2001 78-3/4" 450 17-3/4" The information heron is proprietary to Armorflex International Ltd.and shall not be disclosed,duplicated or used otherwise without the express written approval of Armorflex International Ltd. C 2010 Armorflex International Ltd. 42 1-5/8" 125 5" waterfill hole 9 2 3 4 5,6 8 7 Note: Steel Connector installed Empty weight 58kg Water volume 440 l Full weight 498kg ITEM NO. DESCRIPTION QTY. 1 Plastic Shell 1 2 Bung 1 3 Lid 1 Note: All dimensions are nominal only. This is a rotomolded 4 Lid Plate 1 product and is therefore subject to shrinkage after manufacture 5 Lid Rivet 2 so some variation in dimensions will occur. Further variances 6 Lid Washer 2 may be experienced depending on climatic conditions. 7 Reinforced Pin 1 8 Full Indicator 1 9 Steel Connector 1 SCALE: 1:20 Standard 57-65 Airds Road, DATE INIT. Tolerance Minto NSW 2566 DRAWN BY 20/12/2010 AD 1800 251 420 HIGHWAY info@valmonthighway.com APPR'D BY 20/12/2010 DJ SHEET DRAWING NUMBER REV. REV. CHANGES DATE 1 OF 1 P-AZ-A1S ArmorZone TM c/w steel 1 14

Note: No Steel Connector inside Wejght 50kg 2160 85" 860 33-7/8" 2000 78-3/4" The information heron is proprietary to Armorflex International Ltd.and shall not be disclosed,duplicated or used otherwise without the express written approval of Armorflex International Ltd. C 2010 Armorflex International Ltd. 450 17-3/4" 42 1-5/8" 125 5" Note: All dimensions are nominal only. This is a rotomolded product and is therefore subject to shrinkage after manufacture so some variation in dimensions will occur. Further variances may be experienced depending on climatic conditions. SCALE: 1:20 Standard 57-65 Airds Road, DATE INIT. Tolerance Minto NSW 2566 DRAWN BY 20/12/2010 AD 1800 251 420 HIGHWAY info@valmonthighway.com APPR'D BY 20/12/2010 DJ SHEET DRAWING NUMBER REV. REV. CHANGES DATE 1 OF 1 P-ET-A1 Armor Zone TM End Treatment 15

Design and Development of Highway Safety Innovations www.valmonthighway.com 57-65 Airds Road, Minto NSW 2566 1800 251 420 info@valmonthighway.com www.valmonthighway.com