Analysis of Improper Material Management Affecting Cost in Construction Projects

Similar documents
Study of Material Management Techniques on Construction Project

Analysis of the Cost Effective Construction Waste Management Plan

FACTORS AFFECTING LABOUR PRODUCTIVITY IN ROAD CONSTRUCTION

Assessment of Factors Causing Delay on Building Construction Projects in Enugu, Nigeria

Identification of Critical Construction Delay Factors

EVALUATION AND MANAGEMENT OF CONSTRUCTION MATERIAL AND TIME WASTE BY PARETO ANALYSIS METHOD

Critical Factors Influencing Construction Productivity in Thailand

AN OVERVIEW OF THE CONCEPT OF LEAN CONSTRUCTION AND THE BARRIERS IN ITS IMPLEMENTATION Radhika R *1, S.Sukumar 2

EVALUATION OF CONSTRUCTION COST AND TIME ATTRIBUTES

S. A. Santhosh 1, Dr. G. Chitra 2 1 PG Scholar, 2 Associate Professor, Department of Civil Engineering. IJRASET: All Rights are Reserved

AFRICAN JOURNAL OF APPLIED RESEARCH (AJAR) Vol.1, No.1 ISSN January 2015

NATURE OF THE CRITICAL RISK FACTORS AFFECTING PROJECT PERFORMANCE IN INDONESIAN BUILDING CONTRACTS

Causes of Delay in Construction of Bridge Girders

International Journal of Advance Engineering and Research Development

Assessment of Extension of Time Claims in Hydropower Projects of Pakistan

A Study Of Inventory Management System In Construction Industry

CAUSE OF DELAY IN CONSTRUCTION PROJECTS IN

Case Study on Inventory Management System Followed by Major Builders in Chennai Region and Proposing Recommendations to Improve the System

Project Management for Construction Projects: Improving Project Performance

COST AND TIME CONTROL FACTORS FOR HIGH RISE RESIDENTIAL CONSTRUCTION PROJECTS

CONSTRUCTION PROFESSIONALS PERCEPTION ON THE CAUSES AND EFFECTS OF PROJECT DELAY IN LUSAKA, ZAMBIA

Improving Effective Material Management by Identifying common Factors in Building Construction Project

Study Of Factors Causing Cost Overrun In Construction Industry Using AHP Technique

FACTORS AFFECTING LABOR PRODUCTIVITY ON CONSTRUCTION PROJECT

Factors Affecting Material Management on Construction Site

Factors Affecting Construction Labor Productivity In Peshawar Khyber Pakhtunkhwa (KPK) Pakistan

CHAPTER 5 TO IDENTIFY AND EVALUATE FACTORS AFFECTING COST ESCALATION IN INDIAN BUILDING CONSTRUCTION PROJECTS

A Brief Study on Residential Construction Projects from View of Delay Causes Ranking

Factors Affecting Material Management in Construction Industry of Khyber Pakhtunkhwa Pakistan

Investigation of Significant Factors Influencing Time and Cost Overruns in Indian Construction Projects

Namakkal, Tamilnadu, India

ANALYSIS OF SAFETY MANAGEMENT IN CONSTRUCTION INDUSTRY USING SPSS AND RII

Construction Waste Minimization and Reuse Management

Attitudes and perceptions of construction workforce on construction waste in Sri Lanka

Critical Factors behind Construction Delay in Petrochemical Projects in Saudi Arabia

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: April, 2016

CAUSAL ATTRIBUTES OF COST OVERRUN IN CONSTRUCTION PROJECTS OF PAKISTAN

DELAY IN LARGE MARA CONSTRUCTION PROJECTS BASED ON PROJECT MANAGEMENT CONSULTANT PERSPECTIVE.

AN ASSESSMENT OF ROLE OF MATERIAL MANAGEMENT IN CONSTRUCTION PROJECTS

Construction Experts Perception on the Causes and Effects of Cost Overruns in Johannesburg, Gauteng Province, South Africa

Controlling Of Variation Orders in Highway Projects in Jordan

EVALUATING REASONS FOR COST OVERRUN IN A LOW COST CONSTRUCTION PROJECT

Impact of Cost and Time Overrun on Building Construction Projects

Investigation of Factors Influencing Cost Overrun in High-Rise Building Constructions

CONTRACTOR PERSPECTIVE ON TIME OVERRUN FACTORS IN MALAYSIAN CONSTRUCTION PROJECTS

CHAPTER 1 INTRODUCTION

[Ganesh S* et al., 5(7): July, 2016] ISSN: IC Value: 3.00 Impact Factor: 4.116

CONSTRUCTION DELAY FACTORS IN GENERAL AND ESPECIALLY IN DEVELOPED COUNTRIES

IJRET: International Journal of Research in Engineering and Technology eissn: pissn:

Performance evaluation of major risk factors affecting construction projects

Factors Affecting Construction Cost in the Pakistani Construction Industry

FACTORS AFFECTING RELATIONSHIP BETWEEN CONTRACTOR AND SUBCONTRACTORS

The Impact of Variation Orders on Public Building Projects

CHAPTER 5 FACTOR ANALYSIS AND MULTIPLE REGRESSION MODEL

Evaluating the factors affecting Quality of Residential projects in Construction Industry

STUDY ON QUALITY ASSURANCE AND QUALITY MANAGEMENT IN HIGHRISE BUILDING CONSTRUCTION PROJECTS

Assistant Professor, Department of Civil Engineering, Knowledge Institute of Technology, Salem. 2

ASSESSMENT OF PLANNING, SCHEDULING AND RESOURCE MANAGEMENT TECHNIQUE FOR RESIDENTIAL PROJECTS IN AHMEDABAD

A Study on Critical Risk Factors involved Life Cycle of construction Projects

INVESTIGATING THE CAUSES OF DELAY WITHIN OIL AND GAS PROJECTS IN THE U.A.E.

Issues and Challenges of E- Technology Services in The Modern Commercial Banks

The Influence of Project Documents on the Outcome of Construction Projects Procured by Traditional Contracts in Nigeria. Godwin Iroroakpo Idoro 1

Analysis and Identification of Critical Factors of Delay in Construction Projects

Construction Resources Management System for Gaza Strip Building Contractors

Ranking of Delay Factors for Makkah s Construction Industry

ASIAN JOURNAL OF MANAGEMENT RESEARCH Online Open Access publishing platform for Management Research

NOVATEUR PUBLICATIONS INTERNATIONAL JOURNAL OF INNOVATIONS IN ENGINEERING RESEARCH AND TECHNOLOGY [IJIERT] ISSN: VOLUME 4, ISSUE

Problems Faced by Handloom Industry - A Study with Handloom Weavers Co-operative Societies in Erode District

ISSN: (Online) Volume 3, Issue 6, June 2015 International Journal of Advance Research in Computer Science and Management Studies

International Journal of Engineering Research and General Science Volume 4, Issue 4, July-August, 2016 ISSN

International Journal of Engineering and Innovative Technology (IJEIT) Volume 2, Issue 1, July 2012

A Various Factors Affecting Labour Productivity and Method to Improve It

A study of the causes of cost overrun in construction industry in Afghanistan

Factors Affecting Construction Labour Productivity for Floor Finishing Works

Effective Utilization of Lean Management in Construction Industry A.Chandrasekar, M.Logesh Kumar

THE DYNAMIC CONSTRUCTION WASTE GENERATION BEHAVIOR AMONG SUBCONTRACTORS IN SINGAPORE

Performance Evaluation of Road Over Bridge Using Primavera

Understanding Key Bidding Factors Considered by Top Jordanian Contractors

Analysis Of Critical Causes Of Delays In Indian Infrastructure Projects

An Analysis of Lean Construction Practices in Tamilnadu Construction Industry

To Study Effects of Cost Overrun on High-Rise Building Projects - A Case Study

Simulating The Impact Of The Material Flow In The Jordanian Construction Supply Chain And Its Impact On Project Performance

Factors affecting construction cost performance in project management projects: Case of MARA large projects

Study and Assessment of Causes and Effects of Delay in Large Public Construction Projects in Jordan

A Development of a Web-Based Mobile Daily Logistics Management Application for Construction Project

An Introduction to Inventory Management with reference to Bokaro Steel Plant

THE CAUSE FACTORS OF LARGE PROJECT S COST OVERRUN: A SURVEY IN THE SOUTHERN PART OF PENINSULAR MALAYSIA

THE STUDY ON THE EFFECTS OF INVENTORY MANAGEMENT ON OPERATIONS OF BUSINESS

CAUSES OF THE TIME DELAY IN CONSTRUCTION HOUSING PROJECTS IN GWALIOR DIVISION

Critical Factors Influencing Quality Performance in Construction Projects

Assessment of Cost Escalation and Overrun in Construction Projects

Effective Resources Management in Construction Industries for Success

TIME AND COST OPTIMISATION IN PROJECT EXECUTION

Causes and Effects of Construction Project Delays in Nigerian Construction Industry

Study on Value Engineering in Construction Projects

Advanced Engineering Projects Management

International Journal of Modern Trends in Engineering and Research e-issn No.: , Date: 2-4 July, 2015

Perceptions of Skilled Labour Attributes on Delays in Construction Projects in India

Analysis of Critical Success Factors for High Rise Buildings

THE SELECTION OF SUBCONTRACTORS: IS PRICE THE MAJOR FACTOR?

Transcription:

Analysis of Improper Material Management Affecting Cost in Construction Projects P.Lenin *, L.Krishnaraj *, D.Narendra Prasad *, V.R Prasath Kumar *, Assistant Professor, Civil Engineering Department, Periyar Maniammai University *, Assistant Professor, Civil Engineering Department, SRM University Abstract The paper aims to fill a void created by the absence of proper materials management on construction sites. Research has shown that construction materials accounts for 5-6% of the total cost in construction projects. For a productive and cost efficiency, material management is very essential. Material mismanagement decrease the contractor s profit leading to huge losses, and leaving the project in big troubles, therefore the proper management of this single largest component can improve the productivity and cost efficiency of a project and help ensure its timely completion. The existing construction material management practices of contracting companies are investigated in this paper. The study was exclusively assessed through questionnaire survey, interviews, field visits and discussion with the concerned authorities. 6 factors were selected for the proper assessment of most critical factors. The factors are ranked according to the degree of significance as assessed by the respondents. The results obtained from the ranking factors shows that the top five major s causes of cost overruns are: design issues, market condition, store issues, contractor issues and external issues. Recommendations are given for reducing the material mismanagement in the construction industry. Keywords material management, questionnaire, SPSS, mismanagement I. INTRODUCTION Materials management is the system for planning and controlling all of the efforts necessary to ensure that the correct quality and quantity of materials are properly specified in a timely manner, are obtained at a reasonable cost and most importantly are available at the point of use when required. Thus materials management is an important element in project management. The materials on a project can represent anything from 5% to 6% of the cost of the work, so minimizing procurement costs improves opportunities for reducing the overall project costs. Poor materials management can result in increased costs during construction. Efficient management of materials can result in substantial savings in project costs. If materials are purchased too early, capital may be held up and interest charges incurred on the excess inventory of materials. Materials may deteriorate during storage or get stolen unless special care is taken. Delays and extras expenses may be incurred if materials required for particular activities are unavailable. Ensuring a timely flow of materials is an important concern of material management. II. OBJECTIVE AND SCOPE OF THE STUDY The objective of the study is to identify the variables influencing material procurement and inventory which affects the construction time and causes cost overruns. The paper also aims at identifying the relative importance of the factors and to rank the factors according to their significance. The study provides recommendations for quality project delivery within stipulated time with proper material management system which helps timely project completion and cost savings. III. METHODOLOGY In order to identify the most frequent categories affecting performance of construction projects and investigate the causes of material waste in construction projects the following methodology is adopted. Flow chart of the methodology is given below in Fig.. A proper background study is done for the identification of critical factors which causes material Page 86

mismanagement. A questionnaire is designed based on the data collected form literature. Labour and equipment related issues: Obsolete or unsuitable construction equipment, improper handling of materials at site. Background study Identification of critical factors Questionnaire design Data collection Store related issues: Improper procurement policy, improper inventory control, problem on logistics of materials. External issues: Problem with neighbours, weather condition. Market condition: Scarcity of materials in market, fluctuation of price of raw materials. Fig. Methodology of the study IV. MAJOR CATEGORIES IDENTIFIED RELATED TO MATERIAL MISMANAGEMENT The factors that cause the cost overruns in building project are classified into 8 categories based on following issues: Data analysis Conclusion/ recommendations Design related issues: Improper study on material availability study and its source, inflated specification of item over specified codes, inadequate preconstruction survey on material. V. DESIGN OF QUESTIONNAIRE The questionnaire was developed to identify the significance impact level of the factors that causes cost overruns in building construction projects from the specialist and experts in the construction industry. A preplanned survey was conducted through the questionnaire. The questionnaire was divided into two parts. The first part requested background information about the respondents. The second part of the questionnaire focused on causes of material mismanagement. Twenty six numbers of issues were selected initially for the proper assessment of most critical factors. The scale method of designing questionnaires was adopted that is five point scale which includes strongly disagree, disagree, agree, moderately agree, and strongly agree. Client related issues: Poor cooperation of owner towards purchase, delay in supplier s payment and claim. Contractor related issues: Improper supervision at site and control, insufficient material handling instructions, engaging inadequate skill on labour, improper construction methods, improper planning and errors during construction, fraudulent activities of subcontractors. Site related issues: Waste control during material usage, lack of site storage space, operation limitation within site, stealing on site, unforeseen site condition, existence of unnecessary material. VI. RESULTS AND DISCUSSIONS After collection of sample, data analysis was conducted with research instruments such as the Statistical Package for Social Science (SPSS) software. The data from the questionnaires was fed into SPSS software version, and the results were analyzed to determine the major factors. The mean scores were calculated to rank mismanagement issues. The steps undergone for this analysis are given below Step : Statistical analysis done for each attribute. Step : Bar graph showing mean values were found out. Step : Based on high mean, the ranking of issues found out. A. Design Related Factors Page 87

It is important to understand that projects are never completed without alterations to the starting documentation. More changes mean more expenses, especially as the project progresses. These problems will eventually cause construction cost overruns. The Fig. shows the response of companies towards design factors. respondents moderately agree the payment delay to suppliers factor is responsible for cost overrun in construction project and disagree the poor cooperation of owner factor increases the cost, the result of ranking factors indicate that payment delay to suppliers has the highest in the ranking of client related factor analysis......9.8.7 material availability study Fig. Design factors strongly agree the improper material availability study and its source responsible for cost overrun in construction projects and moderately agree the remaining factors increases the cost, the result of ranking factors indicate that improper study on material availability and its source has the highest in the ranking of design related factor analysis, inflated specification of item ranked the second among the factors outline above, inadequate preconstruction survey that occupied third position in the above ranking material mismanagement factors of the cost overrun in construction projects. B. Client Related Factors Inflated specification Preconstruction material survey According to the contractors surveyed, delayed progress payments would affect their project s cash flow as a result of delayed income. For example postponing payment to subcontractors & suppliers, delay in supply of materials, etc., These multiple problems will eventually cause construction delays and cost overruns. The Fig. shows the response of companies towards client factors. agreed that payment delay to suppliers factor will significantly increase the cost and the results indicates most of the.5 C. Contractor Related Factors Fig. Client related factors According to the project managers interviewed, defective works were caused by unskilled labour, lack of supervision, incorrect construction methods and unordered sequences of work. These defective works required extra budgets to complete or repair them. Clearly, this factor would cause construction cost overrun. The Fig. shows the response of companies towards contractor related factors. 5.5..5..5..5..5 delay in contractor's payment poor cooperation of owner Fig. Contractor related factors Page 88

moderately agree that all contractor related factors will significantly increase the cost, and the result of ranking factors indicate that improper supervision has the highest in the ranking of contractor related factor analysis, insufficient handling instruction ranked the second among the factors outline above, improper planning and fraudulent activities of subcontractor both are occupied third position, construction method and inadequate labour skill both are stands at fourth rank respectively. D. Site Related Factors A major risk in civil engineering project is that the construction may encounter physical conditions on the project site which were unexpected and unforeseeable at the time of making the decision to build the project and which may delay work or cause increased cost. Building construction industry reflects various problems ranging from delays in project execution/delivery, to cost and time overrun as a result of wastages on sites, theft and displacement of materials on sites. The Fig. 5 shows the response of companies towards site related factors. site related factor analysis, waste control ranked the second among the issues outline above, existence of unnecessary material that occupied third position, operation limitation within the site and pilferage both are occupied fourth position, lack of storage space lie at fifth position. E. Labor and Equipment Related Factors Unsuitable construction equipment affects the productivity which causes delay in project and resulting in cost overrun. The Fig.6 shows the response of companies towards labour and equipment factors. moderately agree that these two labour and equipment factors are responsible for cost overrun in building construction projects, the result of ranking factors indicate that obsolete or unsuitable equipment has the highest in the ranking of labour and equipment related factor analysis, improper material handling ranked the second the above ranking material mismanagement factors of the cost overrun in construction projects......9.8.7.6.5.5 price fluctuation materials scarcity Fig. 5 Site related factors moderately agree that all site factors except lack of site storage space is responsible for cost overrun in building construction projects., the result of ranking factors indicate that unforeseen site condition has the highest in the ranking of F. Store Related Factors Fig. 6 Labour and equipment related factors Material stock control practice by construction firms on construction sites becomes imperative so that projects can be executed and completed within planned time, cost and to the required quality standard, thereby ensuring value for money Page 89

for the client. Contractor should give careful consideration to the procurement method and proper inventory control to be adopted on the project as this can cause cost increase. The Fig. 7 shows the response of companies towards store factors..7.6...5.5. design client. procurement policy inventory control logistics of material Fig. 8 External factors Fig. 7 Store related factors moderately agree the above said store related factors are responsible for cost overrun in building construction projects, the result of ranking factors indicate that improper procurement policy has the highest in the ranking of store related factor analysis, improper inventory control ranked the second among the factors outline above, problem on logistics of materials that occupied third position in the above ranking material mismanagement factors of the cost overrun in construction projects. G. External Factors Most of the projects surveyed were in the early stages and this means that the works being undertaken were foundation work or construction of the building structure. Such activities would undoubtedly be affected by rain. Project managers whose buildings included basements said that their basements were flooded and they needed extra time and equipment to dewater them. Most of the concreting works for the structures were also affected by heavy rain and occasionally, concreting was postponed. Another impact of weather was that rivers with sand quarries were flooded and affecting the availability of sand. The Fig. 8 shows the response of companies towards external issues. agreed that above said two external factors will significantly increase the cost and the results indicates most of the respondents moderately agree that these two external factors are responsible for cost overrun in building construction projects, the result of ranking factors indicate that problem with neighbours has the highest in the ranking of external factor analysis, weather condition ranked the second the above ranking material mismanagement factors of the cost overrun in construction projects. H. Market Condition Factors Increased price was recognized as the top critical risk factor affecting both project time and cost. On the projects surveyed, the prices of steel, cement and timber had increased dramatically over a few years. As indicated, most of the activities were affected by these unwelcome effects. The Fig. 9 shows the response of companies towards market condition factors. Page 9

.5.5 price fluctuation Fig. 9 Market condition factors materials scarcity strongly agree price fluctuation of materials is responsible for cost overrun in construction projects at the same time they moderately agree that scarcity of materials in market increases the cost., the result of ranking factors indicate that price fluctuation of materials has the highest in the ranking of market condition related factor analysis, scarcity of materials in market ranked the second the above ranking material mismanagement factors of the cost overrun in construction projects. I. Overall Material Mismanagement Factors Many researchers have discovered reasons for the disparity between the tender sum and the final cost of construction cost. The following were identified as the factors that influence cost overruns. Such as design related factors, client related factors, contractor related factors, site related factors, labour and equipment related factors, store related factors, external factors, market condition related factors. The Fig. shows the response of companies towards overall material mismanagement issues. strongly agree the design related factor is responsible for cost overrun in building construction projects at the same time they moderately agree that remaining factors increases the cost, the result of ranking factors indicate that design related factors has the highest in the ranking of factor analysis, market condition related factors ranked the second among the factors outline above, store related factors that occupied third position, contractor related factors that occupied fourth position, external factors occupied fifth position labour and equipment related factors occupied sixth position, site related factors occupied seventh position, client related factors are lie at eighth rank in the above ranking material mismanagement issues of the cost overrun in construction projects..5.5 VII. Fig. 9 Overall Factors CONCLUSION Based on the analysis, obtained conclusions are given below Identifying variables influencing construction time and cost overruns shows that, design issues, client issues, contractor issues, site issues, labour and equipment issues, store issues, external issues, market condition issues are responsible for cost overrun of building construction projects are described. Rank of the top factors of each scenario is listed by means of questionnaire survey. The results obtained from the ranking analysis shows that the followings, design issues, market condition issues as the major significant factors that causes the cost overruns in construction projects in India. Page 9

REFERENCES [] Abdul-Rahman, H. and Alidrisyi, M. N. (99) A Perspective of Material Management Practices in a Fast Developing Economy: the case of Malaysia. Journal of Construction Management and Economics.. pp.-. [] Akintoye, A (995) Just-in-time application and implementation for building material management Journal of Construction Management and Economics., pp.5-. [] Andel,T.(99) Automatic Data Identification: For your own good. Transportation and Distribution. (). pp.76-88. [] Bell, L C. and Stukhart, G. (986) Attributes of materials management systems. Journal of building industry: Main causes and prevention. Journal of Construction Engineering and Management. (),pp.-. [5] Dey, P. K. (), Re-engineering materials management: A case study on an Indian refinery. Business Process Management Journal. 7,pp. 9-8. [6] Faniran, O.O. and Oluwoye, O.O. and Lenard, D. (99) Effective construction planning Construction Management and Economics,, pp.85-99. [7] Navon, R and Berkovich, O (6) An automated model for materials management and control Journal of Construction Management and Economics,, pp.65-66. [8] Ofori, G () Greening the construction supply chain in Singapore European Journal of Purchasing and Supply Management, 6, pp.95-6. [9] Prabu, V. and Baker, M. (986) Materials Management. UK: McGraw-Hill, Journal of Construction Management and Economics. 9(7), pp.7-75. [] Tan, K () A framework of supply chain management literature, European Journal of Purchasing and Supply Management, 7, pp.9-8. [] Wong, E T T and Norman, G (997) Economic evaluation of materials planning systems for construction Journal of Construction Management and Economics, 5, pp.9-7. [] Zakeri, M, Olomolaiye, P, Holt, G D and Harris, F C (996) A survey of constraints on Iranian construction operatives' productivity. Construction Management and Economics,, pp.7-6. Page 9