DSC BUILDING 1200 ALTERATIONS OCTOBER 2011 SECTION DUCT INSULATION

A. ASTM E84 Standard Test Method for Surface Burning Characteristics of Building Materials

Design & Construction Standards, Revised January

D. Provide UL-approved assemblies for pipes and ducts passing through fire-rated floors, walls, or partitions as required.

FIRE STATION 55 June 14, 2010

A. Section Fire Procection, HVAC & Plumbing Penetration Firestopping. B. Section Interior Painting: Painting insulation jacket.

SECTION MECHANICAL INSULATION. A. Types of insulation specified in this section include the following:

SECTION HVAC INSULATION

A. ASTM E 84 - Standard Test Method for Surface Burning Characteristics of Building Materials

A. Product Data: Identify thermal conductivity, thickness, and jackets (both factory and field applied, if any), for each type of product indicated.

A. This Section includes duct and plenum insulation; accessories and attachments; and sealing compounds.

State of Alaska Section State Office Building HVAC Fan Replacement MECHANICAL INSULATION

University of Delaware

PROJ. NO SECTION HVAC DUCT INSULATION

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

1. Division 23 Section "Hangers and Supports for HVAC Piping and Equipment" for pipe insulation shields and protection saddles.

SECTION MECHANICAL INSULATION

This Design guideline contained herein includes the requirements for mechanical insulation at The University of Texas at Austin

B. Refer to Section : Air Distribution for lined ductwork requirements.

SECTION (15081) - HVAC INSULATION

SECTION PIPING INSULATION

Addendum to Specifications

SECTION PLUMBING INSULATION

PRESTON HEALTH SERVICES ARCHITECT S NO. 2700

SECTION HVAC INSULATION

A. Deliver material to job site in original, nonbroken, factory packaging, labeled with manufacturer's density and thickness.

UBC Technical Guidelines Section Edition Thermal Insulation for Piping Page 1 of 5

BuildingName The Description of the Project P DOCUMENTS

MECHANICAL INSULATION

SECTION MECHANICAL INSULATION

University of Houston Master Construction Specifications Insert Project Name

INSULATION SECTION 15250

DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION HVAC INSULATION

UBC Technical Guidelines Section Edition Insulation of Tanks, Steam and Condensate Piping Page 1 of 6

SECTION IDENTIFICATION FOR PLUMBING PIPING AND EQUIPMENT

HVAC INSULATION

NORTH HARRIS COUNTY REGIONAL WATER AUTHORITY. Section PIPE AND EQUIPMENT INSULATION

SECTION MECHANICAL SYSTEMS INSULATION

Division 15 INSULATION Section 15100

HVAC INSULATION. A. General Requirements for Flexible Elastomeric Insulation: 3. Use pre-molded roll on pipe sizes 3.5" and below.

SECTION DUCT INSULATION

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

INSTALLATION GUIDELINE FOR TRYMER INSULATION ITW INSULATION SYSTEMS

This specification describes the minimum requirements for industrial thermal insulation.

SECTION DUCTWORK INSULATION

Addendum 1 Section THERMAL INSULATION FOR PIPING Burrow Avenue Pumping Station Upgrades Page 1 of 5

SECTION HVAC PIPING INSULATION

A. ASTM C203: Standard Test Methods for Breaking Load and Flexural Properties of Block-Type Thermal Insulation

SECTION THERMAL INSULATION GENERAL THERMAL INSULATION PART RELATED DOCUMENTS

.1 The following is a list of standards which may be referenced in this Section:

Recommended Design Considerations. and. Guide Specifications For. Commercial Building Insulation

GUIDE SPECIFICATION: DUCT LINER

HVAC Piping Insulation FIBERGLAS Insulation. General Specification Guide SECTION

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SECTION HVAC DUCTS AND CASINGS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for CHILLED WATER SYSTEMS

GOWANDA, NEW YORK SEPTEMBER 18, 2008 ARCH PROJECT NO

Mechanical Insulation for Refrigeration Systems

GUIDE SPECIFICATION: MECHANICAL SYSTEMS

Friendly Feel Duct Wrap with KwikStretch Markings. Knauf Data Sheet AH-DS

ACOUSTICAL INSULATION (LAGGING) FOR PIPING AND EQUIPMENT

A. Source Limitations: Obtain each type of building insulation through one source.

Knauf Data Sheet AH-DS-5E Friendly Feel. Duct Wrap. with ECOSE Technology

ITW INSULATION SYSTEMS

EcoTouch Insulation with PureFiber Technology

HVAC Piping Insulation- FIBERGLAS Insulation

ITW INSULATION SYSTEMS

.1 Thermal insulation for insulated piping and piping accessories affected by construction and new pipe sections as indicated on drawings.

SPECIFICATION GUIDELINES FOR THE USE OF CRYOGEL Z ON COLD PIPING AND EQUIPMENT

SECTION PLUMBING INSULATION

PERMATHERM PIPE INSULATION PRODUCTS

TENOCHCA HALL - PROJECT NO FAN COIL UNITS, RESTROOM AND FINISH RENOVATION

SECTION PROJECTED SCHEDULE

Construction Standards PAGE

INSTALLATION GUIDELINES FOR CHILL WATER PIPE INSULATION

Master Insulation Guide Specification for Mechanical Systems

SECTION PRE-ENGINEERED BUILDING INSULATION

SECTION PLUMBING PIPING SYSTEM

10.1 APPLICATION 1 A. HOT PIPING 1 B. ANTI SWEAT PIPING 1 C. COLD PIPING FINISHES 2

ITW INSULATION SYSTEMS

SECTION DUCTS PART 1 GENERAL 1.01 SUMMARY

INSTALLATION GUIDELINE FOR TRYMER INSULATION

PERMATHERM, INC. SPECIFICATION FOR CHILLED WATER PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

PERMATHERM, INC. SPECIFICATION FOR COLD/CRYO PIPE INSULATION

INSTALLATION GUIDELINES for ISO-C1 POLYISOCYANURATE MECHANICAL INSULATION for LIQUEFIED NATURAL GAS (LNG) CRYOGENIC REFRIGERATION CHILLED WATER

SPECIFICATION FOR COLD INSULATION

Redi-Klad 1000 Pipe Insulation

NCCER Progress Blvd, Alachua, Florida Tel: (888)

B C M T e c h n i c a l, L L C A v o n I n d u s t r i a l D r. R o c h e s t e r H i l l s, M I P h o n e : T o l

ROOFING EPDM ELASTOMERIC SHEET ROOFING FULLY ADHERED- CONVENTIONAL

SECTION AIR DISTRIBUTION

INSTALLATION GUIDELINES FOR COLD/CRYOGENIC PIPE INSULATION

A. This section is intended to provide design guidelines for Utility Direct Buried Piping and Conduit Systems.

079 Quick Installation Guide

SECTION HVAC PIPING INSULATION Updated 8/2018

SECTION THERMAL INSULATION PART 1 - GENERAL 1.1 RELATED DOCUMENTS

Transcription:

15180 MECHANICAL SYSTEMS INSULATION ************************************************************************************************************* SPECIFIER: CSI MasterFormat 2004 number: 23 07 16 ************************************************************************************************************* PART 1 GENERAL 1.1 SUMMARY A. Related Sections: 1. 15510 - Piping (HVAC). 2. 15410 - Piping (Plumbing). 3. 15515 - Valves, Hangers, and Specialties. 4. 15540 - Pumping Equipment (HVAC). 5. 15890 - Ductwork. 1.2 REFERENCES A. Current applicable edition of standards of: American Society for Testing and Materials (ASTM): 1. C534-94 Specification for Preformed Flexible Elastomeric Cellular Thermal Insulation in Sheet and Tubular Form. 2. C547-95 Specification for Mineral Fiber Pipe Insulation. 3. C552-91 Specification for Cellular Glass Thermal Insulation. 4. C553-92 Specification for Mineral Fiber Blanket Thermal Insulation for Commercial and Industrial Applications. 5. C585-90 Practice for Inner and Outer Diameters of Rigid Thermal Insulation for Nominal Sizes of Pipe and Tubing (NPS System). 6. C612-93 Specification for Mineral Fiber Block and Board Thermal Insulation. 7. D1056-91 Specification for Flexible Cellular Materials-Sponge or Expanded Rubber. 8. D1668-95 Specification for Glass Fabrics (Woven and Treated) for Roofing and Waterproofing. 9. E84-96a Test Method for Surface Burning characteristics of Building Materials. 10. E96-95 Test Methods for Water Vapor Transmission of Materials. B. National Bureau of Standards (NBS). C. National Fire Protection Institute: NFPA 90A. D. Underwriters Laboratories (UL) - 723. E. Insulation Contractor s Association of South Florida Inc. 1.3 SUBMITTALS Project No. SPECIFICATION GUIDELINES 15180-1

A. Submit properly identified manufacturer's catalog cuts, performance curves, and procedures before starting work. 1.4 DELIVERY AND STORAGE A. Protect materials from the weather during storage and installation. 1.5 QUALITY ASSURANCE A. Materials shall be labeled, listed, or have certified test reports submitted from testing laboratory accepted by M-DCPS. B. Comply with the most stringent requirements between the Insulation Contractors Association of South Florida Inc. and as specified. C. There shall be no fiberglass in contact with the HVAC airstream anywhere in the system whether protected by encapsulation or not. D. Foam plastic insulation shall be certified, by an independent third-party national recognized laboratory, that the product emits less than 1 part per million formaldehyde out gassing after 24 hours. E. All adhesives and sealants used on the construction of mechanical insulation shall comply with the South Coast Air Quality Management District (SCAQMD) Rule #1168; VOC limits shall comply with the limits indicated in Table 1 of LEED Version 2.2, Indoor Environmental Quality Section, Credit EQ-4.1. F. All coatings and mastics for mechanical insulation used on the building s interior shall comply with the VOC limits set forth by Green Seal GS-11 and comply with the South Coast Air Quality Management District (SCAQMD) Rule #1113; VOC limits shall comply with the limits indicated in Table 1 of LEED Version 2.2, Indoor Environmental Quality Section, Credit EQ-4.1. G. Fiberglass Adhesives and Vapor Barrier Coatings shall meet California Department of Public Health (CDPH) Standard Method Ver. 1.1, 2010 Small Scale Environmental Chamber Test for VOCs, CA Specification 01350 and LEED for Schools EQ-4.1 (adhesives) or 4.2 (coatings) 1.6 FIRE HAZARD RATING A. Fire hazard rated materials shall be UL labeled or a certified test report by a Board accepted testing laboratory shall be submitted indicating product s compliance with specified fire hazard requirements. B. Insulation (including adhesives) shall be fire retardant or self-extinguishing. Finishing jackets, insulation, and adhesives shall have composite fire and smoke ratings complying with ASTM E84, NFPA 255, and UL 723, as plain or on a composite basis. C. When insulation, vapor barrier covering, wrapping materials, and adhesives are applied separately in field, each item shall be tested individually. Project No. SPECIFICATION GUIDELINES 15180-2

D. When insulation, vapor barrier covering, wrapping materials, and adhesives are factory composite systems, they shall be tested as an assembly. E. Insulation materials, adhesives, coatings, and other accessories shall have a fire hazard rating not more than 25 for flame developed and not more than 50 for fuel contributed and smoke developed, except as follows: 1. Flexible unicellular insulation. 2. Nylon anchors for securing insulation to ducts or equipment. 3. Factory pre-molded 1 piece fittings and valve covers F. Flame resistance treatments subject to deterioration due to effects of moisture or high humidity are not acceptable. PART 2 PRODUCTS 2.1 MANUFACTURERS A. Insulation: 1. Armaflex. 2. Armstrong. 3. Certain-Teed. 4. Foamglas. 5. Manville. 6. Owens-Corning. 7. Pittsburgh Corning. B. Insulating Cement Mastics, adhesives and coatings as manufactured and recommended by: 1. Keene Powerhouse. 2. Fibrex FBX fast set. 2.2 MATERIALS A. Insulation: Type and thickness as specified. 1. Provide fire retardant or self-extinguishing insulation, including adhesives. 2. Finishing jackets, insulation, and adhesives shall have composite fire and smoke ratings per ASTM E84, NFPA 255, and UL 723. B. Tape: As recommended by the insulation manufacturer or 3M adhesive EC-1329. C. Insulating Cement: All-purpose mineral wool cement. D. Glass Cloth Jacket: Factory sized white, standard weight, with 1-1/2" minimum longitudinal pressure sealing lap and seal strips for butt joints. E. Vapor Barrier Jacket: Project No. SPECIFICATION GUIDELINES 15180-3

1. Flame resistant glass fiber adhered to outside of a 1 mil aluminum foil sheet with longitudinal pressure sealing lap and seal strips for butt joints. 2. End cement perm rating shall not exceed 0.05. F. Weatherproof Metal Jacket (Exterior Above Ground Only): 1. Damage and corrosion resistant, longitudinal seam closure, joint construction capable of locking insulation and jacket securely in place. 2. Seal and weatherproof butt joints with factory supplied 2 inch wide "snap-straps" lined with plastic sealing compound secured with outer holding band. 3. Jacket Material: 0.016 aluminum. G. Molded Fiberglass Pipe Insulation: 1. Rigid molded sectional pipe covering with integral factory jacket. 2. Comply with ASTM C547. 3. Maximum Thermal Conductivity: 0.23K factor at 75 degrees F. mean temperature. 4. Alkalinity: Less than 0.6 percent. H. Foamed Plastic Insulation: 1. Closed cell. 2. Comply with ASTM C534. 3. Maximum Thermal Conductivity: 0.27K factor at 75 degrees F. mean temperature. 4. Water Vapor Permeability: 0.1 perms. I. Cellular Glass Insulation: 1. Comply with ASTM C552 2. Maximum Thermal Conductivity: 0.33 K factor at 75 degrees F. 3. Water Vapor Permeability: 0.00 perm-in. J. Flexible Fiberglass Ductwrap Blanket Insulation: 1. 2.2/2.3 inches thick, 3/4 pounds per cubic foot density fiberglass blanket with UL approved aluminum foil vapor seal facing reinforced with fiberglass scrim, laminated to 30 lb. kraft paper, R = 6.5. 2. Comply with ASTM C553, TYPE I, Class B-4. 3. Maximum Thermal Conductivity: 0.24K factor at 75 degrees F. K. Rigid Fiberglass Ductboard Insulation: 1. Comply with ASTM C612. 2. Maximum Thermal Conductivity: 0.24K factor at 75 degrees F. 3. Provide scrim foil facing having a minimum 3 pounds per cubic foot density, 2 inches thick. L. Accessories: 1. The following accessories shall be used in the application of thermal insulation: a. PVC fittings cover and PVC jacketing: Project No. SPECIFICATION GUIDELINES 15180-4

1) Certain-Teed "Snap Form". 2) Manville Corp. "Zeston". 3) Proto. b. Vapor Barrier Mastic: 1) Foster 30-65. 2) Childers CP-34. 3) Vimasco 749. c. Lagging Adhesive: 1) Foster 81-42W or 30-36. 2) Childers CP-50 AMV1. 3) Vimasco 713. d. Weather Barrier Breather Mastic: 1) Foster 45-00 or 46-50. 2) Childers CP-10 or CP-11. 3) Vimasco WC-5. e. Insulation Bonding Adhesive (to metal): 1) Foster 85-60. 2) Childers CP-127. 3) Duro Dyne SSG. f. Insulating and Finishing Cement: 1) Fibrex Inc. FBX Super Blend Cement. 2) Manville Corp. No.375 Insulating and Finishing Cement. 3) Keene Corp. Super Powerhouse. g. Insulation Joint Sealants: Foster 95-50, Childers CP-76, Pittsburgh Corning PC444 or accepted equivalent. h. Metal Jacketing Sealant: Foster 95-44, Childers CP-76, Pittsburgh Corning 727 or accepted equivalent. i. Staples: Type 304 or 316 stainless steel outward clinching type. j. Wire: 16 gage, copper weld wire. k. Bands: 3/4 by 0.015" thick galvanized steel. l. Glass or Polyester Reinforcing Mesh : 1) 10 strands by 10 strands per square inch or 9 strands by 9 strands per square inch. 2) Childers Chil Glas #10. 3) Foster Mast a Fab. 4) Pittsburgh Corning PC 79. m. Insulation Jackets: Project No. SPECIFICATION GUIDELINES 15180-5

1) Jackets inside building shall comply with fire hazard classifications as specified. Insulation jackets shall not support mold growth. 2) Vapor Barrier Jackets: a) For Cold Pipelines (-30 degrees F. to 60 degrees F.): Perm rating shall bot exceed 0.05, ASTM E96 Procedure A. Puncture resistance shall not be less than 50 beach units. b) For Air-conditioning Ducts: Perm rating not more than 0.05, ASTM E96, Procedure A. Puncture resistance shall not be less than 25 beach units. 2.3 SYSTEMS INSULATION BY SERVICE TYPE A. Chilled Water Supply and Return Piping Insulation: 1. 1" diameter and smaller - copper, aboveground: a. Foamed Plastic Pipe Insulation: 1 inch thick. b. Provide vapor barrier mastic on all seams, elbows and fittings. 2. 1-1/2" to 4" diameter - aboveground: a. Cellular Glass Insulation. b. Thicknesses as follows: 1) 2 inches thick for interior ceilings. 2) 2-1/2 inches thick for areas such as exterior or perimeter corridors and walkways, whether exposed of concealed, or in ceilings or breezeways. 3) Provide insulation joint sealant on all longitudinal and butt joints. 4) Provide vapor barrier mastic and reinforcing mesh on all elbows, fittings and valves. Omit this finish at exterior aboveground piping as specified in paragraph 3.2.C of this section. 3. 5" to 10" diameter - aboveground: a. Cellular Glass Insulation. b. Thicknesses as follows: 1) 2-1/2 inches thick for interior ceilings. 2) 3 inches thick for areas such as exterior or perimeter corridors and walkways, whether exposed of concealed, or in ceilings or breezeways. 3) Provide insulation joint sealant on all longitudinal and butt joints. 4) Provide vapor barrier mastic and reinforcing mesh on all elbows, fittings and valves. Omit this finish at exterior aboveground piping as specified in paragraph 3.2.C of this section. 4. Underground, all sizes. a. Cellular Glass Insulation: 2-1/2 inches thick with factory applied jacket. Project No. SPECIFICATION GUIDELINES 15180-6

B. Hydronic and Domestic Hot Water Supply, Return and Recirculation Piping and Fittings Insulation: 1. 1 inch thick molded fiberglass insulation with pre-sized factory applied FRJ jacket of glass cloth with longitudinal lap and butt joint strips with self-sealing adhesive. 2. Insulation may be 1/2" insulation for vertical branches to individual fixtures. 3. Minimum density of 7-1/4 pounds per cubic foot, maximum thermal conductivity factor of 0.26K at 75 degrees F. mean temperature, and alkalinity of 0.696. 4. Flame Spread: 25 or less. 5. Smoke Developed: 50 or less. 6. Accessories: Adhesives, mastics, cements, tapes for fittings, and related materials shall have the same composite ratings as listed above. C. Solar Collector Piping and fittings Insulation: 1. Same as specified for Hot Water Piping except with weatherproof jacket. D. AHU Drainage Piping, Drinking Fountain, and Electric Water Cooler Drain Piping; refrigerant suction piping, insulation: 1. Elastomeric (foam plastic) thermal insulation 1 inch thick with built-in vapor barrier rated self-extinguishing ASTM D1056. 2. Maximum thermal conductivity factor of 0.26K at 70 degrees F. mean temperature, density of 5-6 pounds per cubic foot, and a water vapor transmission of 0.1 perms. E. Engine Exhaust and Gas Boiler Flue Insulation: 1. 3 inches thick hydrous calcium silicate on pipe, fittings, and muffler. 2. 3 inches thick Temp Matt on flexible connections. 3. Fasteners: 14 gage galvanized iron wire on 9 inch centers. 4. Fittings: Fabricated from pipe insulation. 5. Finish: 1200 degree F. glass cloth. 6. Maximum thermal conductivity factor of 0.5 K at 500 degrees F. mean temperature and a density of 11 pounds per cubic foot. F. Hot Water Storage Tank Insulation: 1. 3 inch thick block insulation with V-grooves. 2. Secure with 24 gage galvanized wire or 1/2" wide galvanized bands on 12 inch centers. 3. Finish with exposed smooth coat of insulating cement and when dry apply Foster GPM mastic with glass cloth reinforcing. G. Interior Concealed Ductwork Insulation: 1. Flexible fiberglass Ductwrap Blanket Insulation: a. 2.2 inches thick, 3/4 pounds per cubic foot density, R=6.5.. b. 2.0 inches thick, 1-1/2 pounds per cubic foot density, R=6.3. H. Interior or Exterior Exposed Ductwork Insulation: Project No. SPECIFICATION GUIDELINES 15180-7

1. Rigid Fiberglass Ductboard Insulation: 2 inches thick, 3 pounds per cubic foot density, with factory applied FSK jacket. I. At contractor s option, where specified and approved by M-DCPS on per project basis preinsulated, underground exterior piping may be used. 1. Pre-insulated underground piping system shall consist of integral sealed units insulated with rigid polyurethane foam sealed with outer jacket and compression fitted rubber end seals: 2. Pipe: All sizes: Pipe shall be as specified in Section 15510. 3. Insulation: All sizes: Rigid 90 to 95 percent closed cell polyurethane with 1.9 to 3.0 lbs./cu.ft. density and a thermal conductivity (K) of 0.13 to 0.17 BTU/sq.ft./ F./inch at 73 degrees F, 2 1/2" minimum thickness. 4. Jacket: All sizes: Type I, Grade 1 PVC or HDPE with a minimum wall thickness of 0.060 inches. 5. Fittings: Fittings shall be coated in the field (Ricwil "Rip Coat or equivalent). 6. Manufacturers: a. Energy Task Force, Apopka, FL. b. Insul-Tek, Mulberry, FL. c. Steel-Gard by Ricwil. d. Insul-8 by Rovanco Corp. e. Heat Tite by Thermal Pipe Systems Inc. f. Thermacor Process, Inc. 1) Ferro-Therm (Welded) 2) Ferro-Therm D.I. (Gasketed) 3) Copper-Therm (Brazed). g. U.I.P. by Urecon, Melbourne, FL. PART 3 EXECUTION 3.1 INSTALLATION A. Install insulation according to applicable codes and regulations. B. Except as specified, install materials according to manufacturer's recommendations and specifications for obtaining conformance to construction documents. C. Packages or standard containers of insulation, jacket material, cements, adhesives, and coatings delivered for use and samples required for acceptance shall have manufacturer's stamp or label attached listing manufacturer, brand name, and a description of material. D. Provide allowances for expansion/contraction, and wall and manhole penetrations. E. Run continuous through wall, floor, and ceiling penetrations. F. Insulation materials shall not be applied until: Project No. SPECIFICATION GUIDELINES 15180-8

1. Test results specified in other sections of these specifications are completed and accepted. 2. Rust, scale, dirt, and any other foreign material have been removed. 3. Ductwork or piping material are clean, dry, joints firmly butted together, and tightly sealed at all joints, seams, and fittings. G. Wrap butt joints with a 3 inch wide strip of the same material as the jacket. H. Insulation shall be kept clean and dry at all times. I. Insulation on exposed piping penetrating floors in locations subject to water damage, such as kitchens and custodial spaces, shall be protected with aluminum jacketing as specified herein. Apply jacketing over the insulation for a minimum height of three feet above the finish floor. J. Duct Materials: 1. Fiber glass duct lining is not allowed. 2. Duct materials exposed to the airflow shall be noncombustible metal. 3. Duct insulation for thermal purposes shall be separated from airflows by solid metal. 4. Provide natural noise attenuation procedures, as recommended in ASHRAE, Sheet Metal and Air Conditioning Contractors' National Association (SMACNA), and industry s good engineering practices. 5. Fiberglass ducts or ductboards shall not be used to convey air. K. Protection Shield: Where pipe or tubing insulation pass through hangers, provide: 1. For Piping 4 inches and smaller: A protection shield, 180 degree arc, 16 gage galvanized sheet metal covering, minimum 12 inches long. 2. For Piping Larger than 4 inch diameter: A protection shield, 180 degree arc, 16 gage galvanized sheet metal covering, minimum 18 inches long. 3. Hangers not exceeding maximum spacing distances recommended by insulation manufacturer to prevent crushing or compressing insulation. L. Flanges, Fittings, and Valves on Insulated Piping: 1. Provide pre-molded glass fiber fittings wired or taped on and adhered with canvas jacket and mold resistant lagging adhesive. 2. Terminate insulation and jacket neatly and finish with insulating cement troweled to a bevel and of the same thickness as adjoining insulation. 3. Vapor seal insulation on cold systems with vapor barrier mastic. M. Vapor Barriers: 1. Intact and continuous. 2. Apply over staples. N. Omit Pipe Insulation From the Following: 1. Screwed unions, except at "cold drains" and air- conditioning wastes. Terminate insulation neatly at both sides of unions with insulation cement. 2. Discharge lines from safety and relief valves. Project No. SPECIFICATION GUIDELINES 15180-9

3. Nickel or chrome plated piping. O. All ductwork shall be insulated, except as noted below: 1. Exhaust air ductwork. 2. Where indicated on plans: supply air ductwork, exposed in air-conditioned spaces. (Note: Ceiling plenums, and mechanical equipment rooms are not to be considered air-conditioned spaces.) P. Ceiling supply air registers located on perimeter rooms and corridors shall be field insulated with flexible fiberglass duct wrap insulation as specified. Insulation shall cover the upper body and installation flanges. Q. All appurtenances subject to condensation shall be protected as necessary and covered with vapor seal mastic. 3.2 APPLICATIONS A. Molded Fiberglass Pipe Insulation Installation (Hot Water Piping): 1. Tightly butt together sections of insulation on pipe runs sealing longitudinal seams of jacket with self- sealing laps. Position longitudinal seam so seam is on bottom to prevent dirt and moisture infiltration. Seal end joints with 3 inch wide straps of vapor barrier tape. Seal ends of insulation with vapor seal mastic at valves, fittings and flanges. 2. Cover valves, fittings, and flanges with insulation similar to adjacent pipe covering, or one piece PVC cover sections as specified. B. Foamed Plastic Insulation Installation (Return Suction Piping, Interior Condensate Drains, and Electric Water Cooler Drains): 1. Insulation shall be slipped on pipe without slitting. Butt joints shall be sealed with the manufacturer s recommended adhesive. 2. Where slip-on techniques are not possible, the insulation shall be carefully slit and applied to the pipe. Seal joints with the manufacturer s recommended adhesive. 3. Insulate valves and fittings with fabricated foamed plastic insulation, or one piece PVC cover sections as specified. 4. Provide vapor barrier mastic for chilled water service insulation for all areas. C. Cellular Glass Insulation Installation (Chilled Water Supply/Return): 1. Interior aboveground. a. Each length of insulation shall be secured with two wires. Insulation shall be applied with all joints fitted to eliminate voids. Voids shall be eliminated by refitting or replacing insulation. Do not fill voids with joint sealer. b. Seal longitudinal and butt joints with insulation joint sealant. c. On any straight run over 40 feet, install an expansion joint consisting of a 2 inch wide section of foamed plastic. Finish over this section with reinforcing mesh and vapor barrier mastic. d. Finish concealed piping with factory installed white all purpose jacket, all joints and seams sealed with fire rated adhesive. Finish elbows and fittings with vapor Project No. SPECIFICATION GUIDELINES 15180-10

barrier mastic reinforced with white open weave membrane with maximum mesh opening of 10 x 10 per inch. e. For exposed piping in machine rooms and similar spaces, finish with vapor barrier mastic reinforced with white open weave membrane with maximum mesh opening of 10 x 10 per inch. Then apply second coat of vapor barrier mastic and brush lightly with a wet brush to a smooth finish. 2. Exterior Aboveground: a. Same as interior aboveground, except finish specified above for elbows and fittings shall be omitted. b. Finish straight runs with 0.016" aluminum jacket secured with 1/2" aluminum bands and seals, aluminum screws, or pop rivets on 9 inches on center. Elbows, valves, and fittings shall be finished with preformed aluminum fitting covers. Seam shall be placed at bottom. Caulk all joints to prevent water intrusion with 1/8 inch bead of metal jacketing sealant to prevent water intrusion. 3. Exterior Underground: a. Same as interior aboveground. b. Finish with factory applied jacket, self-sealing, nonmetallic consisting of special bituminous resin, reinforced with an aluminized Mylar film and a release paper. Finish jacket shall be not less than 70 mils thick and weigh not less than 39 lbs. per 100 sq.ft. c. Provide a minimum of 6 inches of clean sand all around underground insulated piping. Provide one foot above the 6 inches of sand cover with rock free backfill. D. Flexible Fiberglass Ductwrap Blanket Insulation Installation: 1. Apply insulation to duct with joints tightly butted. Prepare stretch-out dimensions and cut out insulation so a 2 inch minimum overlap is created that will overlap the facing and insulation at the other end, and the adjoining seam. Install so insulation is not excessively compressed at duct edges. Foil face shall be on outside. Seams shall be stapled approximately at 6 inches on center with outward clinching staples. 2. On ductwork having a 24 inch or larger dimension, insulation shall be secured to the bottom of the duct with mechanical fasteners spaced at not more than 18 inches on center and held in place with washers or clips. Cut off protruding pin after clips are secured. 3. Seal all insulation joints, pinheads, tears, punctures, washers, clips, and staples with 2 coats of a vapor barrier mastic type sealant, reinforced with 1 layer of 4 inch woven glass fabric. E. Rigid Fiberglass Ductboard Insulation Installation: 1. Apply insulation tightly and smoothly to duct. 2. Secure insulation on the sides and bottom of duct by impaling insulation over pins or anchors located not more than 18 inches apart and held in place with washers or clips. 3. Cut off protruding pins after clips are secured and seal with vapor barrier mastic. 4. Apply insulation with joints tightly butted. 5. Seal ductwork joints, punctures, and pin heads with a vapor barrier mastic. Project No. SPECIFICATION GUIDELINES 15180-11

6. Insulation shall be continuous through walls and floors except at fire dampers and at combination smoke/fire dampers. F. Equipment: 1. Chilled Water Pump Casings: a. Insulate with not less than 2 inches of cellular glass block insulation finished with a 1/2" thick coat of insulating cement reinforced with 1 inch hexagonal mesh wire cloth, followed by a 1/2" thick coat of hard finish insulating cement. b. Apply casing insulation in 2 removable sections to ease pump maintenance. G. Electric Duct Heaters: 1. Insulate all sides of electric duct heaters (except control panel side) installed in supply air ducts, as specified for supply air ductwork. END OF SECTION Project No. SPECIFICATION GUIDELINES 15180-12