RS24-10 Single-Section Skylight System

Similar documents
238T and 138T Panel and Accessories Price List 9/29/2017 (price good for shipments through 11/31/2017) Customer Job Date Sales Rep 238T PANEL ITEM #

INSTALLATION INSTRUCTIONS for MP-RC1 TWO PIECE CONSTRUCTION TO BE INSTALLED ON COMPLETED ROOF DECK

YCW 250 I-Beam Curtain Wall System Installation Manual

Pella 250 Series. Wood Frame Construction with Vinyl Siding... V250-ID-888 Wood Frame Construction with Brick Veneer...

Roof Accessories. Division Roof Hatches Roof Safety Rails Safety Posts. Division Smoke Vents

KS SERIES - VERTICAL INSTALLATION

ARCHITECTURAL TESTING, Inc. Code Compliance Research Report #0774 CCRR-0131

Kingspan Day-Lite Klick

ATI Evaluation Service A Division of Architectural Testing Certification Services

Assembly Instruction wedi Fundo Floor element

SWING DOOR SPECIFICATION

Canopy Assembly Instructions: Post-Supported Super Lumideck (2 3/4" Interlocking deck, 6" Fascia)

Roof Replacement. Notes: T-1 (Title Sheet) Roof Key Plan Russell House Student Union 1400 Greene Street Columbia, South Carolina 29208

200 / 300 SERIES PANELS COLD STORAGE

Planning and installation instructions

SECTION SLOPED TRANSLUCENT METAL SKYLIGHT SYSTEM

TEST REPORT. Rendered to: ALL WEATHER ARCHITECTURAL ALUMINUM Vacaville, California. SERIES/MODEL: 6000 PRODUCT TYPE: Aluminum Awning Window

Metal Roof Panels

Casement Windows Montecito New Construction Window

Architectural Single-Hung Aluminum Window Series L701T SH-AW130 GUIDE SPECIFICATION

CEILING & WALL SYSTEMS

B. Polyethylene samples shall be submitted for Owner approval of color and quality.

Smarter. Safer. Leaner.

Assembly Instruction. wedi Fundo Primo Shower System

NUCOR VR 16 II STANDING SEAM ROOF SYSTEM TABLE OF CONTENTS

VELUX America Inc. SPECIFICATION FOR MODEL FS NO LEAK FIXED SKYLIGHT SECTION UNIT SKYLIGHTS

7520 Casement Windows

Picture/Radius Windows Montecito New Construction Window

General. 2. Design. 3. Anchor Bolts And Foundations. 4. Drawings. 5. Structural Framing. 6. Roof Covering Nucor Classic Roof Panel

MAKE ROOFS LAST LONGER

PROVEN SOLUTIONS FOR RE-ROOFING METAL ROOFS ROOF HUGGER

Lithia Dodge East 5500 L St. Omaha, NE

Awning Windows Montecito New Construction Window

Prior to ordering and installing materials, all dimensions should be verified by field measurements.

INSULATED PANEL OVERVIEW

AXIOM Indirect Light Coves

ROOF MOUNT KIT OWNERS MANUAL

ELEVATION FOR DETAIL REFERENCE ONLY

How do you install yours?

TMS 114 XT TECHNICAL MANUAL

Standard Model Coolers, Freezers and Combination Cooler/Freezers In Stock for SAME DAY SHIPMENT

YES SSG TU Vent Window System

Louis Armstrong New Orleans International Airport NOAB Project # North Terminal Development Program Phase 1

SECTION DIRECTORIES

Senergy Platinum CI Stucco Typical details for an impact resistant cement plaster stucco system featuring Neopor GPS Plus Rigid Insulation Board

Assembly Instruction. wedi Fundo Primo Steam Shower System

VELUX America Inc. SPECIFICATION FOR MODEL VS and VSE NO LEAK VENTILATING SKYLIGHT SECTION UNIT SKYLIGHTS

PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

SECTION MANUFACTURED ROOF EXPANSION JOINTS

ASTM C 1363 Thermal Performance Test Report

Thin Brick Façade. Façades Installation Guide

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

PROJECT LOCATION SECTION COPPER METAL PLATE WALL PANELS

Roof Accessories. Division Roof Hatches Roof Safety Rails Safety Posts. Division Smoke Vents.

PRODUCT SPECIFICATION SERIES 9000 WINDOW WALL THERMALLY BROKEN ALUMINUM CASEMENT / AWNING / FIXED WINDOW

PRE-ENGINEERED METAL BUILDINGS

Liner Replacement Instructions:

Duracast Pressure Plate Installation Instructions

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

SECTION TURBINE VENTILATORS

Guardian-Lok. Standing Seam Roof System THIS MANUAL APPLIES TO GUARDIAN-LOK SYSTEMS. GUARDIAN-LOK REQUIRES PANEL SIDELAPS TO BE MECHANICALLY SEAMED.

MASTERSPEC - SHORT FORM. B. See Division 5 Section "Metal Stairs" for steel tube railings associated with metal stairs.

3275 & 3275U, 3285 & 3285U Vertical Sliding, Double-Hung Windows

Maximum thermal performance ISOLEREN INSULATED METAL PANELS INSTALLATION GUIDE

Lexan* Thermopanel Sheet LTP30B4RS36. Property Profile Value Test Method. Lexan*

Skylights & Tube Skylight Systems. Let the Sunshine in...

WARRANTY PROVIDER ACCEPTED A REFERENCE GUIDE OF TYPICAL RAINSCREEN WALL AND WINDOW DETAILS

Trench Duct Class Catalog 5230CT9601R10/08

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

5. AMCA 301 Method of Publishing Sound Ratings for Air Moving Devices. 6. AMCA 500 Test Methods for Louver, Dampers, and Shutters

HIGH PERFORMANCE PRISMATIC SKYLIGHTS. Nucor Daylighting

DIVISION: SPECIALTIES SECTION: DEMOUNTABLE PARTITIONS REPORT HOLDER: KRUEGER INTERNATIONAL, INC.

Steelway Building Systems. Product Specifications Guide

Alply CLASSIC WALL Architectural Insulated Panel Wall System

Single Layer Wall Install Instructions

City of Port Orange Adult Activity Center Remodeling SSA Project No Volusia County, Florida October 8, 2009

MIAMI-DADE COUNTY PRODUCT CONTROL SECTION DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER)

Axiom Building Perimeter System

NCMA TEK TEK 19-5A FLASHING DETAILS FOR CONCRETE MASONRY WALLS

/BUT BuyLine BUtler roof systems ROOF SYSTEMS DESIGN AND SELECTION GUIDE

This program is intended to be used by the following professionals:

GroundTrac. Installation Manual

Section Sliding Aluminum Framed Glass Doors (2500 Model Specifications)

ACCESSORIES TABLE OF CONTENTS

BENCHMARK Evolution Axis

Sheet Metal Connectors, Inc.

Shower & Spa System Solutions. Innovation. System. Quality.

Product Data Sheet. Product: Benchmark Wall Liner System

OmniFlex 300 Plus Installation Instructions

FC /2 Hour Curtain Fire Dampers

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

KNIGHT WALL SYSTEMS GUIDE DETAILS:

Modular CABANA Kit 16 x 16 (6x6) Lumber: Western Red CEDAR #1 (Cabinet) Shingles: 5X / 16" long / 1/2" thick or 16 oz. copper

TMS 152 / 152T / 152XT TECHNICAL MANUAL

Cladding Attachment Solutions for Exterior Insulated Commercial Walls

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Page 1 of 5

Transcription:

INSTALLATION INSTRUCTIONS RS24-10 VERSION 1.100316 DATED: 10/03/16 RS24-10 Single-Section Skylight System under/over seam clip double diverter US Patent D750,282 www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981

SKYLIGHT - ACRYLIC skyline series 24 trapezoidal standing seam roof RS24-10 FIGURE 1: CROSS SECTION Clear Impact Modified Acrylic Prismatic Outer Dome 0.070 Extruded Aluminum Condensate Gutter Neoprene Gaskets 10 x 3/4 Fastener White Impact Modified Acrylic Prismatic Inner Dome Poured & De-bridged Thermal Break 12 x 1-1/4 Fastener Shim One Piece Aluminum Curb Standing Seam Roof Panel Bright White Liner Optional Fall Protection Screen Standing Seam Remains in Tact for Rigidity 14 x 7/8 Fastener FIGURE 2: RS24 KIT Double Dome Prismatic Glaze Clear over White Downslope Backer Plate Optional Fall Protection Screen (Meets OSHA Guidelines) Upslope Edge of Flange Slides Under Roof Panel for an Under / Over Flashing Condition CONSTRUCTION 0.080 Aluminum Under/Over Fully Welded & Assembled Base 0.070 Extruded Aluminum Thermally Broken Skylight Frame 2 Rigid Vertical Insulation with Bright White Metal Liner 1/8 x 1 Neoprene Gasket Seals Skylight Frame Clear, 100% Impact Modified Acrylic Prismatic 0.177 Outer Dome White, 100% Impact Modified Acrylic Prismatic 0.118 Inner Dome 2-1/2 Triple Bead Mastic Tape, Polyurethane Sealant #5 Tek Shoulder Screws Long-Life Self Drillers w/ Washers: 12-14 x 1-1/4 & 14 x 7/8 Long-Life Self Drillers w/o Washers: 12 x 1-1/4 & 10 x 3/4 Expansion Joint Covers with 1/4 Flanged Shoulder Spacers Upslope Diverter Backer Plate PERFORMANCE 70% Visible Light Transmittance with 100% Haze Factor 0.50 Solar Heat Gain Coefficient 0.65 U Factor or 1.54 R Value AAMA/WDMA/CSA 101/I.S.2/A440-08 OPTIONS 4 x 4 x 3/16 galvanized steel fall protection screen RS24 Custom Length Increments of 5 : Panel Offset Height: 3/8, 1-3/8, Custom Liner Height: 5-7/8, Custom Liner Base: 3, Custom Customer Date Model Quantity Project Name Roof Panel Panel Offset Height 3/8 1-3/8 www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981

SKYLIGHT - POLYCARBONATE skyline series 24 trapezoidal standing seam roof RS24-10 FIGURE 1: CROSS SECTION Clear Smooth Polycarbonate Outer Dome 0.070 Extruded Aluminum Condensate Gutter Neoprene Gaskets White Smooth Polycarbonate Inner Dome 12 x 1-1/4 Fastener 10 x 3/4 Fastener Poured & De-bridged Thermal Break Shim One Piece Aluminum Curb Optional Fall Protection Screen 14 x 7/8 Fastener Bright White Metal Liner Standing Seam Remains in Tact for Rigidity FIGURE 2: RS24 KIT Double Dome Glaze Clear over White Downslope Backer Plate Optional Fall Protection Screen (Meets OSHA Guidelines) Upslope Edge of Flange Slides Under Roof Panel for an Under / Over Flashing Condition Upslope Diverter Backer Plate CONSTRUCTION 0.080 Aluminum Under/Over Fully Welded & Assembled Base 0.070 Extruded Aluminum Thermally Broken Skylight Frame 2 Rigid Vertical Insulation with Bright White Metal Liner 1/8 x 1 Neoprene Gasket Seals Skylight Frame Clear Smooth Polycarbonate 0.118 Outer Dome White Smooth Polycarbonate 0.118 Inner Dome 2-1/2 Triple Bead Mastic Tape, Polyurethane Sealant #5 Tek Shoulder Screws Long-Life Self Drillers w/ Washers: 12-14 x 1-1/4 & 14 x 7/8 Long-Life Self Drillers w/o Washers: 12 x 1-1/4 & 10 x 3/4 Expansion Joint Covers with 1/4 Flanged Shoulder Spacers PERFORMANCE 60% Visible Light Transmittance with 98% Haze Factor 0.26 Solar Heat Gain Coefficient 0.70 U Factor or 1.43 R Value AAMA/WDMA/CSA 101/I.S.2/A440-08 OPTIONS 4 x 4 x 3/16 galvanized steel fall protection screen RS24 Custom Length Increments of 5 Panel Offset Height: 3/8, 1-3/8, Custom Liner Height: 5-7/8, Custom Liner Base: 3, Custom Miami-Dade County Control Approved Customer Date Model Quantity Project Name Roof Panel Panel Offset Height 3/8 1-3/8 www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981

Parts List RS24-10 SKYLIGHT DOMES & SCREENS SLYLIGHT CURB 10 Normal Frame 10 Safety Screen 10 Complete Curb CURB INSULATION & LINERS BACKER CHANNELS Upslope Backer Channel 10 Insulation Set 10 Curb Liner Set Downslope Backer Channel FASTENERS #5 1/4-14x1-1/4 #12 14x1-1/4 TEK #14 x 7/8 TEK #12 x 1-1/4 TEK #10 x 3/4 TEK Safety Screen Clip Shoulder TEK 2 Longlife Hex Head Longlife Hex Head Longlife Hex Head Longlife Hex Head Spaced 12 o/c 5/16 Hex Head w/ Integral Washer w/ Integral Washer w/ Integral Washer w/ Integral Washer SEALANTS 2-1/2 Triple Bead Tape Mastic Polyurethane Sealant 10 OZ Cartridge www.rnssales.com sales@rnssales.com 805.375.3980 Fax 805.375.3981

RS24 Skylight System IMPORTANT: The RS24 Skylight System is designed to be installed after the roof has been put in place. The skylight system includes components required to allow the units to expand and contract with the roof sheeting. 1 The curb upslope flange is located near the upslope purlin. Reference the center line of the purlin top web for center of the opening. Remove 8 of the roof panel where the skylight will be installed. PURLIN 2 Remove 116-1/2 of roof sheeting as shown below. Do not remove roof clips when crossing purlins. Clean the sheeting area and remove metal shavings. IMPORTANT: Do not remove roof clips where skylights cross purlins. RS10 116-1/2

RS24 Skylight System 3 Place the steel upslope backer channel, with the 1 notch facing into the opening as shown below, under the roof sheeting and onto the purlin. Fasten the channel with six #5 shoulder tek screws to allow for roof movement. UPSLOPE DIVERTER CRICKET 3 3 7 7 BACKER CHANNEL ALLOWS FOR ROOF MOVEMENT WHEN US- ING #5 SHOULDER TEK SCREWS IN SLOTS #5 SHOULDER TEK SCREW DOWNSLOPE BACKER CHANNEL ALLOWS FOR ROOF MOVEMENT WHEN USING #5 SHOULDER TEK SCREWS IN SLOTS

RS24 Skylight System 4 Secure the upslope curb, and sides in place. Mark a line matching the outline of the curb. DOWNSLOPE UPSLOPE CURB ASSEMBLY UNDER ROOF PANEL UPSLOPE

RS24 Skylight System 5 Remove curb and clean the sealing surfaces. Place 2-1/2 of butyl sealant over the panel within the outline drawn in step 4. Place 2-1/2 of butyl sealant over the leading edge of the curb. Run a 3/8 bead of polyurethane over all mastic surfaces. Prepare the seam clips and expansion joint face with mastic and polyurethane sealants and as shown below. DOWNSLOPE UPSLOPE POLYURETHANE 2-1/2 MASTIC

RS24 Skylight System 6 Install the curb with the leading edge under the roof panel and with the sides and downslope over the panel. Locate the downslope backer channel under the roof panel and downslope flange. The downslope mounting location must be within 12 of a purlin. Upslope and downslope flanges are secured with #12-14 1-1/4 long life integrated washered head self drilling fasteners at 4 centers so that the sealing washer is flat on the outside surface. Secure sufficiently so a small amount of sealant is exposed along the sides. Attach the seam clips and side rails with #14 7/8 long life integrated washered head self drilling fasteners, 6 on center on both sides of the seam clips. DOWNSLOPE BACKER CHANNEL #12-14 1-1/4 HWHSD FASTEN IN PANEL SHOULDERS UPSLOPE

RS24 Skylight System 7 Remove the fiberglass insulation on the inside area, leaving a 2-3 perimeter The facing remains in place. Cut the insulation facing as shown below. INSULATION CUT LINE INSULATION FACING 8 Terminate the exposed facing in any of the following ways. Tape the exposed facing if necessary.

RS24 Skylight System 9 Install the side wall insulation and liner panels as shown. The insulation is notched to surround the remaining roof panel. The liner panel is placed over the insulation and fastened with self-drilling screws in the pre-punched holes. If safety screen is included, position as shown in step 10, and use the self drilling fasteners to secure the liner and safety screen assembly at the same time using the same pre-punched holes. GASKET #10 x 3/4 FASTENER SAFETY SAFETY SCREEN CLIP LINER PANEL INSULATION FACTORY NOTCHED 10 If the safety screen option is included, align the screen over the opening as shown. Using the clips, gasket, and fasteners provided, fasten a clip every 12 around the perimeter. See detailed clip positioning above. UPSLOPE 11 Install the RS24 skylight so it is centered on the curb and so it compresses the foam rubber gasket to the curb. Secure the skylight frame to the curb in pre-drilled holes with #12 1-1/4 self-drilling fasteners, shimming to avoid excessive stress on the skylight frame. Do not over tighten the fasteners.