INTERMODAL TRANSPORTATION, USACE STYLE

Similar documents
Linde FUSRAP Site Tonawanda, New York

Site Closeout Report for the Ashland 1 (Including Seaway Area D), Ashland 2 and Rattlesnake Creek FUSRAP Sites. Tonawanda, New York

FUSRAP COST TO COMPLETE. Kate Peterson U.S. Army Corps of Engineers HTRW CX, Omaha District Omaha, NE 68144

Niagara Falls Storage Site Safety Measures During Remediation

IMPROVING BUSINESS PRACTICES TO INTEGRATE DOE TRANSPORTATION OF LOW-LEVEL AND LOW-LEVEL MIXED RADIOACTIVE WASTE

Refuse Collections Division Solid Waste Services Department Anchorage: Performance. Value. Results.

Oakland Global News, December 2013

Pharmaceutical and Biotechnology Services

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

Twin Rivers Technologies is committed to providing quality customer service to our valued customers.

RDEIR/SDEIS Traffic Forecasting Key Assumptions Update

Waterways 1 Water Transportation History

Transportation of Radioactive Materials

A Full Service Environmental Company

Manifest Information. Types of Manifests. Universal Hazardous Waste Manifest

The Point Intermodal River Port Facility at the Port of Huntington Project Benefit Cost Summary

AUDIT REPORT SOIL WASHING AT THE ASHTABULA ENVIRONMENTAL MANAGEMENT PROJECT DOE/IG-0542 JANUARY 2002

Metro-North s Response to Hurricane Irene. Chris Bennett, Vice President AECOM Toby Ritz, Chief Engineer MNR Capital Programs New York

THE 14TH R EFUELING outage at Diablo

Factors Affecting Transportation Decisions. Transportation in a Supply Chain. Transportation Modes. Road freight transport Europe

Section 6 - Loading/Unloading Rules, Regulations & Charges

Hudson River PCBs Superfund Site

A MODAL COMPARISON OF DOMESTIC FREIGHT TRANSPORTATION EFFECTS ON THE GENERAL PUBLIC EXECUTIVE SUMMARY. November 2007

CUSTOMER AUDIT HANDBOOK CORPORATE OVERVIEW

Recycling and Reclamation of Airfield Pavements

Partnerships in Capital Projects. AAPA Facilities Engineering Seminar and Expo

Lessons Learned from Shut-Down to Decommissioning Plan at the Army Pulse Radiation Facility

Taking Control: Improved Inventory Visibility Leads to Lean Success

Ch.9 Physical Distribution

Day 2 field sites 2012 WORKSHOP

Corporate Office Rosario Leo Building 2185 Main Road Newfield, NJ

NA Supplier Packaging Standards

Cross-Docking. in the Global Supply Chain Northbrook Drive, Suite 100, Trevose, PA

Sustainable Human Resource Development in Logistic Services for ASEAN Member States

ECNAMRFO ER P R FO ED EER IN G EN / S N TIO LU O S E G A R TO S

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

Eric Thomas Benchmark River and Rail Terminals

49 CFR PART 172. Subpart I Security Plans

THE NEW YORK, SUSQUEHANNA AND WESTERN RAILWAY

8 REASONS Why Your Inbound Trailers are Underutilized

Sustainability Strategies for Highway Construction: A Case Study of ADOT s Piestewa SR51 HOV Widening Project

A Short History of U.S. Freight Railroads

Container Transport Operator Access Terms & Conditions

Food Defense Supplier Guidelines

CFE Charge Schedule. Optional Services Catalog Customer Switching and Accessorial Services. Customer Switching.

The client. The challenge. CASE STUDY: From Supply Chain Insights to Value

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

A NATIONAL NETWORK OF LOCAL SHIPPING EXPERTS

Chapter 1 Introduction

SOIL CONTAMINATION REVIEW QUESTIONNAIRE

Waste Management, Transportation, and Disposal Plan Volume 2 Transportation and Disposal Plan

Stone Consulting, Inc. Industrial Railroad Projects

World Energy Use by Source

Morris County Freight Profile

National Protection and Programs Directorate Office of Cyber and Infrastructure Analysis

C.H. Robinson. Surface Transportation

nalcofabtech.com A Nalco Champion Company

Alaska LNG Concept Information. Alaska LNG. Overview. October

SUPPLEMENTAL SERVICES

Logistics Insight Corporation Romulus ODC Version 3.2 Procedure Manual Subject: Material Flow July 31, 2014

Jacksonville Port Authority Blount Island Marine Terminal Rail Improvements Jacksonville, Florida

Core Competencies. ESA South, Inc. is a CVE Verified Service Disabled Vet-

Multiple Benefits as a Result of Mine and Mine Waste Reclamation

APPENDIX A STATEMENT OF WORK SCRAP RUBBER/TIRE REMOVAL AND RECYCLING SERVICES

Best Practices for Transportation Management

FACTS DMS Dock Management System

Stakeholder Concerns An International Perspective

EP US RAIL SERVICE ISSUES - DATA COLLECTION

Analyst: Meilin C. Pierce Spring Recommendation: Hold Target Stock Price (12/31/2016): $120

Cross Dock. Cross Dock Methods. Cross Dock Criteria and Benefits. Vendor Requirements for Vendor Prepared Cross Dock

CERTIFIED WAREHOUSING AND STOREKEEPING COURSE

Work Instruction Pontiac LOC Version 1.0 WI-B402 Bulk Hi Lo Material Receiving / Stocking APRIL, 07

EARTH ENERGY RESOURCES INC. Western U.S. Oil Sands Conference. D. Glen Snarr, President & CFO September 21, 2006

The Des Moines Metropolitan Organization. Rail Market Analysis

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri

I know that you all understand the critical importance of the freight transportation system

Vendor Compliance. General Requirements

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Frequently Asked Questions

Federal Transportation Officer Training Program: Basic (Level 1)

CSX TRANSPORTATION GUIDELINES FOR THE DEVELOPMENT OF COAL UNIT TRAIN FASTLOAD ORIGINS

EOP / ESF - 03 ANNEX / APPENDIX 3-1 / TAB B EVENTS AND ASSUMPTIONS TAB B EVENTS AND ASSUMPTIONS

DISTRICT OF NORTH VANCOUVER GUIDELINES FOR THE DEVELOPMENT OF CONSTRUCTION TRAFFIC MANAGEMENT PLANS

NOTICE OF PREPARATION

REYHER FARM. Diverse Agricultural Business Located In Southeast Colorado For Sale. 7,000+/- ACRES OFFERED AT $19,500,000

Palm Beach County Fire Rescue

Sabbir Saiyed, PhD., P.Eng. Manager, Transportation System Planning

2016 Mid-Continent Transportation Research Symposium, October 24-25, Donna Brown-Martin, Director Bureau of Planning and Economic Development

Collection and safekeeping of TRIGA Spent Nuclear Fuel

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

The Cost Savings Potential of Sustainability Practices

Container Transport Operator Access Terms & Conditions

Safety & Security. Introduction. Chemical transportation. Chemical transportation risk management. Resources. Chemical Transportation

Company Introduction & Overview

NSK Steering Systems America

On the Road to Zero Waste

Manufacturing Functionlity in Microsoft Dynamics GP. Gain complete control over your inventory, production and orders.

SAP Supply Chain Management

Evaluation of Uranium Enrichment/Depletion and Recycled Uranium Residuals in Soils and Groundwater at the Harshaw FUSRAP Site

Transcription:

INTERMODAL TRANSPORTATION, USACE STYLE Author Kenneth M. Grumski MHF Logistical Solutions 129 McCarrell Lane Zelienople, Pennsylvania 16063 Co-author Peter W. Coutts The IT Group 175 East Park Drive, Building 31 Tonawanda, NY 14150 ABSTRACT The US Army Corps of Engineers (USACE) has developed project management techniques with a proven track record for safe and successful results for constructing large scale and massive projects such as improving our nations water transportation systems, flood control, bridges and dams. Applying many of these techniques to the Formerly Utilized Sites Remedial Action Program (FUSRAP) managed by USACE to remediate the environment is achieving the same safe and successful results as their construction projects. This paper examines the additional economics and improved safety results of using intermodal containers and a combination of rail and truck transportation conveyances to transport the contaminated soil and debris from the Linde FUSRAP site, located in Tonawanda, New York. To date, USACE, along with their contractor IT Corporation has been able to remediate and remove over 93,000 tons of contaminated soil and debris at the Linde FUSRAP site. Over 71,000 tons of FUSRAP material has been transported to Blanding, Utah and over 22,000 tons to Andrews, Texas from the Linde site. This task was done by Intermodal Transportation, USACE Style. Even though a large portion of the material was not direct rail served at the end destination, the project was still able to provide an economical method of transportation utilizing intermodal containers, and a combination of rail and truck transportation. The IT Corporation contracted MHF Logistical Solutions, Inc. to supply the transportation logistics and equipment to accomplish the task. The following paper will describe how the ideals of the USACE could be instilled into the transportation efforts of the Linde project. Such details as equipment descriptions, transportation management, intermodal transfer, and final trucking of the material will be described in the following presentation. In addition, the summary will provide lessons learned from the project that can be used for future campaigns such as this one. 1

PROJECT BACKGROUND FUSRAP Linde Site Remediation, Tonawanda, New York The IT Corporation has been contracted by the United States Army Corps of Engineers (USACE) to remediate the Linde Site located in Tonawanda, New York. This remedial effort is part of USACE s Formerly Utilized Sites Remedial Action Program (FUSRAP). The principal contaminants of concern at the Linde Site are uranium-238, thorium-230, and radium-226. During the 1940 s, the Linde Site was used by the Manhattan Engineering District (MED) to isolate uranium from ore. The Linde Site encompasses a 135-acre complex and is home to office buildings, fabrication facilities, and approximately 1,400 employees. The remediation efforts conducted by the IT Corporation at the Linde Site included: utility relocation; new utility construction; building demolition and restoration; soil characterization; excavation, water treatment, transportation and disposal; final status surveys and site restoration. Following the signing of the Record of Decision in March 2000, IT Corporation began remediation activities. In July 2000, IT Corporation began the demolition of the first of five buildings at the site. IT Corporation performed characterization sampling of the site to determine waste stream profiles and the extent of the contamination. Based on IT Corporation s investigation results, Argonne National Laboratory (ANL) revised the site volume estimate. Currently the revised estimate for contaminated material to be excavated at the Linde site is 120,600 tons. The current estimate is almost triple the original quantity estimate defined in the scope of work. Following the demolition and characterization activities, the excavation of soils began. IT Corporation contracted MHF Logistical Solutions to provide the containers, railcars and transportation logistics to transport the contaminated materials off site. The USACE and IT Corporation determined that the material would be reprocessed (reclaimed 1 ). The facility that is performing the reprocessing is International Uranium Corporation (IUC) located in Blanding, UT. In order to transport the material economically, rail transportation was chosen as the safest and most economical method. Because IUC was not rail served, a transportation logistics package had to be designed that utilized rail conveyance and truck transportation. In September 2000, the first shipment of MHF Intermodal Containers 2 (IMCs) was shipped off-site for recycling to IUC White Mesa Mill in Blanding, Utah. As of January 18, 2002 MHF has shipped 4525 IMCs, containing 93,000 tons of excavated material. An additional 900-tons of demolition material has been sent off-site for recycling or disposal. IT Corporation is currently estimating an 11 million dollar cost savings to the 2

US Government based on aggressive procurements, value engineering, proper classification of materials, operational enhancements and accelerated production rates. IT Corporation and MHF accelerated the project schedule by successfully doubling originally scoped on-site excavation and shipping production rates even through the winter months. The accelerated schedule put a strain on mobilizing equipment to the site. Over 650 containers had to be mobilized to the site, inspected, and prepared for loading. In order to meet the challenge of mobilizing this large amount of containers in less than three weeks for an aggressive shipping campaign; MHF was required to deliver an average of 34 containers a day, which equates to approximately 2 trucks every hour delivering empty containers to the site. The USACE also built in certain safety requirements into the containers. One safety requirement was the use of a flapper door closure system, which eliminated concerns of material exiting the rear doors of the intermodal during rail transport. All of the containers supplied to the project have the flapper closure system. When delivering the containers to the site each container had to be inspected and prepared for filling. A parking lot sized area was roped off to manage the incoming containers, and subsequently used for container preparation. The quality of the containers had to meet acceptance criteria or the containers would be rejected potentially causing delays in the accelerated schedules. After the task of mobilizing the containers was completed, they then had to be filled, manifested and placed onto MHF ABC rail cars 3. Because of the chosen destination of the material, the containers could only be loaded to 21 tons. Typically, an IMC can be loaded up to 31 tons if the IMC is transported by rail, but because of the weight limitations of trucking over the road, the IMC s from Linde had to be limited to 21 tons. In order for the material to be transported to the final destination, a 120-mile truck trip was required for the last leg. At the peak shipping times of the project, 120 containers a week were being shipped from the site. In order to manage that many containers at one time, 110 railcars were utilized for the project. The loaded railcars were shipped approximately 1800 miles from Tonawanda, New York to Cisco, Utah. Twenty trucks and trailers were utilized to perform the 120-mile trip from Cisco to the IUC Mill. Cisco is a sparsely populated cattle and mining town located 70 miles west of Grand Junction, Colorado. Cisco had no infrastructure to support the IMC transfer. MHF had to supply all of the necessary equipment and personnel to support the operation. Three local people were hired out of Green River, UT to provide truck administration, intermodal transfer and DOT paperwork management for the shipments. The operation needed to be self-supporting, so while electric and phone lines existed, everything else had to be brought in to provide support for the necessary operational tasks. Installing fax machines, computers (e-mail), a mechanical repair shop, and a container repair facility was something that the small town of a population of three had never seen. Once operational, the MHF Intermodal Facility was able to process twenty trucks per day. The main functions of the facility were to inspect incoming railcars and containers; 3

off load containers with a CH-70 side lifter; load the trucks; verify the shipping paperwork both inbound and out bound; load empty containers back onto the rail cars; perform minor repairs on tarps and containers; and perform routine maintenance on all transportation equipment including trucks and trailers. Once the containers arrived at IUC, they were detached from the truck and reconnected to a Bartlett Dumper. The Bartlett streamlined the container empting process at IUC because the container never needed to be unloaded from the trailer, thus eliminating the need for additional equipment for unloading. In order to remain cost effective, IT Corporation asked to have equipment brought in or taken off the project at peaks and valleys in remediation efforts. MHF had to manage the equipment and transportation so the project never had an excess or shortage of containers. In order to accomplish this, IT and MHF had to work as a team, continuing to refine schedules so that the equipment could be available when needed and did not impair efficient productivity. In order to provide accountability of moving equipment, the MHF Project Manager provided status and location reports to IT and the USACE on each railcar and truck. This provided the confidence that the material would not be misdirected or delayed. The incident rate on the transportation of the material is exceptional. To date there are no reportable DOT incidents on the Linde Project, nor are there any reportable injuries from the Cisco Site personnel or trucking personnel. The combined efforts and teamwork between vendor contractor (MHF and IT) demonstrated an unprecedented shipping campaign. The results of this effort were immense cost savings, accelerated schedules, and no safety incidents. A true demonstration of how the USACE and its contractors can work together, focus on the goals of the project, and execute the project efficiently and safely. Intermodal transportation, USACE style. 4

By The Numbers 0 Reportable Safety Incidents 3 MHF Personnel at Cisco, Utah 20 Trucks Per Day at Cisco, Utah 110 Railcars Utilized 120 Containers Per Week Shipped From The Linde Site, Tonawanda, New York 120 Mile Truck Route From Cisco, Utah to IUC, Utah 658 Intermodal Containers Utilized 1800 rail miles from Linde, New York to to Cisco, Utah 4525 Intermodal Containers Shipped 93,000 Tons of Materail Shipped Estimated $11,000,000 Cost Savings LESSONS-LEARNED Because of the contracting and budget allocation between IT and the USACE, the green light to begin mobilizing equipment was not given until the final hour of project start up. There was no buffer to allow for delivery of the containers to the project site. In the future, contracts need to have a window of mobilization that allows for the build up of equipment, before project start up. The accelerated schedule caused equipment to build up at the destination, MHF had to work very closely with the IT Project Manager to spread the equipment out so that there was enough equipment available for use at Linde. Initial problems with multiple lines of communication led to exclusive and direct communication between the IT PM and the MHF PM to prevent misinformation being passed. The Global Positioning System (GPS) tracking system was discontinued early in the Linde Project for the tracking of the railcars and containers. This was because it could be demonstrated that the MHF Tracking system was superior when all factors were taken into account, i.e. cost effectiveness, operational ease, reliability, and accuracy. 5

FOOTNOTES 1 Reclamation = Is a recycling process in which the material is reprocessed to remove the uranium raw product. 2 IMC s = Intermodal Containers have a 25.4 cubic yard capacity; they are 8x6x20 feet with tarp tops. 3 ABC = Articulating Bulk Commodity railcar that is capable of double stacking containers and has a capacity of 177 tons. 6