Effective June, Eaton-Durham Model # UTRS223ACH. Siemens, Model # SUAS877-PG. (or Landis & Gyr # UAS877-PG) Milbank. Model # U1980-O.

Similar documents
(Condensed from National Electric Code)

ELECTRICAL SERVICE UPGRADE RESIDENTIAL AND COMMERCIAL QUICK INFORMATION REFERENCE

UNDERGROUND SERVICES SECONDARY

Basic Service. This Section provides information regarding a. Introduction

Section 2: Underground

Underground Residential Distribution (Specifications for Installation) PES March 2008 Spec 11

Electric Service Standards

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

SERVICE ENTRANCE SPECIFICATIONS FOR RESIDENTIAL AND COMMERCIAL

Large Basic Service. This Section applies to members requiring new. Introduction. Service Types

Electric Service Handbook

TEMPORARY METER POLE INSTALLATION

PRIMARY LINE EXTENSION

STREET LIGHTING. Springville City Power standard street lights will be installed in accordance with Springville City Power's Line Extension Policy.

COMMERCIAL CONDUIT RULES AND REGULATIONS

Specifications for Electrical Underground Residential Distribution Systems

ELECTRIC METERING GENERAL

DOWNTOWN UNDERGROUND NETWORK SECONDARY SERVICES GUIDELINES

Underground Service Requirements and Instructions

Section 4 Underground Service

WIRING RULES AND REGULATIONS OF TOMBIGBEE ELECTRIC POWER ASSOCIATION

NORTHWESTERN UNIVERSITY PROJECT NAME JOB # ISSUED: 03/29/2017

METER INSTALLATION SPECIFICATIONS HANDBOOK

SECTION GROUNDING AND BONDING

This product specification is written according to the Construction Specifications Institute MasterFormat, 2014 Update.

Welcome to Douglas County PUD

Energy Delivery Service Guide

Title: YALE OFFICE OF FACILITIES PROCEDURE MANUAL Chapter: 01 - Yale Design Standard Division: Electrical Standards

PAYSON CITY POWER AND LIGHT. Electrical Construction Standard Specifications

St. Clair County Electrical Code Regulations

WIRING METHODS CHAPTER 38

CHAPTER 11 CONDUITS AND FITTINGS

Revisions for the 2011 National Electrical Code - Part 2

SECTION 4 - SECONDARY CONSTRUCTION OVERHEAD TABLE OF CONTENTS

2008 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

INSTALLATION INSTRUCTIONS FOR ELECTRICAL CONTRACTORS

CONDUITS AND FITTINGS

Basic Requirements for Residential Electrical Installations

Douglas County Traffic Signal Installation Guidelines (January 2013)

DIVISION 1100 TRAFFIC

REQUIREMENTS for ELECTRIC SERVICE and METER INSTALLATIONS. Florida Service Area. REVISED 2012 Amended (7/2013)

A. Product Data shall be provided for each type of product indicated.

ITEM L-119 AIRPORT OBSTRUCTION LIGHTS DESCRIPTION

Foundation Manual. Part Number: Version: Updated: July 5, S. Meadows Pkwy. A-9, #329 Reno, NV

ComEd Customer Requirements for Proper Installation of Metering Equipment Residential and Commercial Customers

B. Provide a complete conduit system with associated couplings, connectors, and fittings.

SECTION CHAIN-LINK FENCES AND GATES 02821/1

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

Article 300: Wiring Methods And Materials

CONSOLIDATED EDISON COMPANY OF NEW YORK, INC Van Dam Street Long Island City, NY ELECTRIC METER SHOP DEPARTMENT

SECTION 16496A MTS MANUAL TRANSFER SWITCH (MANUAL CONTROL ONLY) Note to Spec Writer: { } Denotes EATON Feature reference number

Southern California Edison Revised Cal. PUC Sheet No E Rosemead, California (U 338-E) Cancelling Revised Cal. PUC Sheet No.

2015 Code Rollout Meeting Q & A

YOUR SPLASH PAD RESOURCE

Revision 1 RAM ELEVATORS. Elevator Electrical Planning Guide. RAM Manufacturing Ltd

SECTION PACKAGE BOOSTER PUMP STATIONS

Type FLX Freezer Floor Frost Heave Protection DESIGN GUIDE

NOVA SCOTIA POWER INC. UTILITY SERVICE REQUIREMENTS

TESTING PTE EARTHING

Temporary Wiring Practices And Guidelines For NECA. National Electrical Contractors Association Omaha, Nebraska

Trench Duct Class Catalog 5230CT9601R10/08

ELECTRICAL SAFETY FOLLOW UP INSPECTION REPORT (4th)

SECTION 3 SERVICE ENTRANCE SECTION UNDERGROUND

BUSWAY LOW VOLTAGE (POW-R-WAY III) SECTION SECTION 16466

Customer Requirements Customer-owned Transformer Vault Room

Article 324: Flat Conductor Cable (FCC) 1.! Type FCC (flat conductor cable) cable wiring system is designed for installations under.

ELECTRICAL SAFETY INSPECTION REPORT

Pre-Delivery Instructions

PATHWAYS FOR COMMUNICATIONS SYSTEMS

For the 2008 Code, the minimum clear distances were revised to reflect an accurate metric conversion (also known as a soft conversion).

Natural Gas Service Installation and Meter Clearance Requirements

Materials Carbon Steel and Malleable Iron are used in the manufacture of concrete inserts. Stainless Steel and other materials are available.

1. Hangers and supports for electrical equipment and systems. 2. Construction requirements for concrete bases.

BUILDER S CONSTRUCTION SUPPLIES (Temporary in permanent position) REQUIREMENTS. March 2014

Applying For New or Revised Electric Service. ComEd is happy to assist you in initiating new or revised electric service to your location.

Communications Page 1 of 9

CHAPTER 5 METERING REQUIREMENTS

FREQUENTLY ASKED QUESTIONS

Telecommunication Spaces

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

PV Mounting System 2703 SERIES 200 UL GROUND MOUNT SYSTEM. SnapNrack Residential PV Mounting Systems Code Compliant Installation Manual

The Equipotential Plane in New Livestock Facilities

Evaluation of Aluminum Cable Presentation for IEEE OCS September 14, 2011 Breck Booker, Southwire

All service lines shall conform to the following requirements:

Specifications and Installation Requirements for Underground Service for Residential Developments

ELECTRICAL BULLETIN

TYPICAL INSTALLATION INSTRUCTIONS

The Canadian Electrical Code (Saskatchewan Amendments) Regulations, 1999

2. A preconstruction meeting with the TWA s staff is required prior to initiating construction.

C. ASSE 1013 Performance Requirements for Reduced Pressure Principle Backflow Preventers.

SECTION LOW-VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES (24 Volt AC/DC or Less)

nbn Lead-in Trenching Requirements

SPECIFICATION FOR ELECTRICAL INSTALLATION

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

Solar Powered TS1000 Installation Pictures. (Trench and Fill Method) City of Vallejo, CA

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

TCC/SHORE TRANSIT BUS MAINTENANCE FACILITY - PHASE II

UNIFIED FACILITIES GUIDE SPECIFICATIONS

B. Accept materials on site in original factory packaging, labeled with manufacturer s identification.

Document No Issue Date: May 15, 2012

Transcription:

Siemens, Model # SUAS877-PG (or Landis & Gyr # UAS877-PG) Eaton-Durham Model # UTRS223ACH Milbank Midwest Model # U980-O UTRS223AMEP These are some examples of the single meter sockets we require for underground service. Our cable comes in on the bottom and goes straight into the terminal lugs. No Wire Bending Required. Socket/Breaker combination panels with this design are also acceptable and shown on our web-page under Meters. Effective June, 2008 Revised April, 203

SOURCE 20V 240V STUD (PER NEC) TO LOAD A teaser wire is required from the neutral lug to a 5th terminal mounted on the left side of the meter block between the line and load terminals. SOURCE STUD TO LOAD (PER NEC) 20V TYPE S 3 WIRE SINGLE PHASE 20/240 VOLTS TYPE S 3 WIRE SINGLE PHASE 20/208 WYE VOLTS SOURCE NO. THREE PHASE 4 WIRE DELTA 20 / 240 VOLTS LINE Note: Install conduit under meter socket on opposite side of switch ABCN Ungrounded Conductor with the Higher Voltage to Ground (Phase marked C) must be marked orange (NEC 0.5 & 230.56) CONDUIT PLACEMENT Meter socket shall be designed for underground service (installed and maintained by customer) Left Side (PER NEC) OR REVISION Right Side TO LOAD ABCN Note: Install conduit under meter socket on opposite side of switch SOURCE BY: THREE PHASE 4 WIRE WYE 20 / 208 or 277/480 VOLTS. All diagrams on this drawing show connections when the switch is installed on the right side (see Right Side below) of the meter socket. If the switch is installed on the left side of the meter socket you will need to mirror this diagram (see Left Side below). 2. All sockets, except residential single phase less than 320 Amps, shall have a manual mechanical gang operated bypass switch. 3. Load and supply wires shall not cross in the meter socket. 0/3 REVISION OF DRAWING SS.8-2 EJH APPR: LINE ABCN (PER NEC) WIRING DIAGRAM CONNECTIONS FOR UNDER SELF CONTAINED METERS JRH SCALE: = D9-3 TO LOAD Caution: For 480 volt service, see drawing D9-5. 0/0/203 NONE ABCN For 277/480 volt service, Customer shall furnish and install a Company approved, Company lockable, non fused disconnect switch on the supply side of the meter base and a separate load side disconnect with overcurrent protection within 2 ft. of the meter. Company shall control the supply side disconnect. It shall be labeled "Utility Disconnect" see s.5 Labels and Disconnects and it shall be available to Company 24 hours a day without notice. 2 OF 2

UNDER CLEARANCE FOR SWIMMING POOL UNDER REQUIREMENTS FOR PAVED AREAS See note 2 POOL 5' Existing Company Facility NEIGHBORS POOL ROAD Electrical lines under paved areas shall be in conduit. Existing Company Facility HOME OR BUILDING Connection point 5' Underground electrical service Property Line Electrical facilities and lines can never be within 5' of a pool Connection point HOME OR BUILDING ROAD ROAD UNDER FACILITIES CLEARANCES From shrubs, trees, buildings, fences, decks etc. DO NOT BLOCK ACCESS TO ELECTRICAL FACILITIES 3' Proposed Driveway 3' URD box (See note 2) 2' (lock side) 3' HOME Do not plant, pave, or build around electrical URD boxes, transformers, or cables not in conduit. SERVICE CABLE IS NOT ALLOWED BELOW A BUILDING. Minimum Customer Wiring Size - Residence Single Phase ** METER SIZE 00 Amp 200 Amp 320 Amp 0/2 CONDUIT SIZE 2" #4 #2 2.5" * 3" Current carrying & neutral wire size (per NEC) COPPER ALUMINUM CALL 8 TWO BUSINESS DAYS BEFORE YOU DIG REVISION OF DRAWING SS8.6-6. WIRE SIZE In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities..the Customer is responsible for clearing and maintaining all right of way. 2. NEVER build anything under or over existing electrical lines or facilities. Check with the Company for clearances. 3. Contact Company for clearances prior to pool construction. 4. Connection point shall be pre-approved by the Company. 5. Transformers must meet requirements of drawing D0-. NO. REVISION BY: APPR: #6 2/0 4/0 #4 350 500 #2 * Arkansas locations only allows 2" ** For 3Ø, consult the Company, Commercial/Industrial wire sizes are typically larger. 6. The Customer shall bear the cost of conduit and its installation. 7. Underground service/conduit should be installed separated by not less 24" of well tamped earth from other utilities. 8. Conduit color shall be electrical gray or black with red stripes (for continuous below ground conduit). Conduits above the ground and transition elbow or conduit from underground to above ground, shall be schedule 80 PVC or equivalent. Generally, non-metallic conduit installed totally below grade shall be at least Schedule 40 PVC or equivalent. In certain cases, concrete encasement may be required according to Drawings D8-2 and D8-7. All conduits, elbows, fittings, etc. shall be UL approved with an U. L. label. METER CLEARANCES & LOCATION CAUTION: No gas meters within a 3' radius of meter enclosure. 5" HOUSE Meter Socket 3' UNDER SERVICE INSTALLATION DETAILS & CLEARANCES JRH 5" No gas meter, fences or anything else For residential service, the meter is to be located on the outside of the building on the side of the residence within three feet of the front wall and outside of the fences on the side most economical to reach the company's facilities. SCALE: = 0/24/202 None D8- OF

CONDUIT PLACEMENT Meter socket shall be designed for underground service installed and maintained by Customer. Main breaker should be within 2'-0" of the meter. Outside wall recommended. Shall meet requirements of drawings D8-, D8-2 and D9-3. OR Note: Install conduit under meter socket on opposite side of switch Note: Install conduit under meter socket on opposite side of switch SEE DRAWING D9-3 WIRING DIAGRAM CONNECTIONS FOR UNDER SELF CONTAINED METERS Threaded coupling, adapter, or sleeve as appropriate. 6'-6" working clearance 3' working clearance 5'-0" -6'-0" max. (required) When installing conduit system, Customer shall extend conduit to pole (Drawing D8-5) or to Pedestal (Drawing D8-4). 6" max. CALL 8 TWO BUSINESS In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. NOTES:. Customer facilities shall comply with Company Standards, the National Electrical Code, and authorities having jurisdiction. 2. Meter socket shall be installed and maintained by the customer. 3. The customer shall install 80lb test non-metallic (manila or grass) pull line in the conduit. Conductor normally supplied by Company. 4. Bends and turns in the conduit to fit the contour of the wall or slab are not permitted. Cable binding may occur in bent conduit, causing failures. Any turns or bends shall have a minimum radius of 3'-0". 5. Spacing material, such as treated wood or metal, to be rigidly and securely attached to structure at a sufficient thickness to keep the conduit to the meter free of bends. 6. Concrete encasing on elbow is required where soil subsidence is possible, consult with Company. 7. Conduit color shall be electrical gray or black with red stripes (for continuous below ground conduit). Conduits above the ground and transition elbow or conduit from underground to above ground, shall be schedule 80 PVC or equivalent. Generally, non-metallic conduit installed totally below grade shall be at least Schedule 40 PVC or equivalent. In certain cases, concrete encasement may be required according to Drawings D8-2 and D8-7. All conduits, elbows, fittings, etc. shall be UL approved with an U. L. label. 8. Conduit shall be flush with wall. The foundation may be required to have blocked out area for conduit in order for conduit to be flush with wall when installed. Conduit is not allowed behind the wall. 9. Upper end of ground rod to be flush with or below grade. 0. Conduit required in restricted access or paved areas. (See section 8.0). Main breaker should be within 2'-0" of the meter. Outside wall recommended. 2. Consult a Company Representative for required system in your area. 0/2 REVISION OF DRAWING SS8.6-4 NO. REVISION BY: APPR: 2'-6" See note 9 IN CONDUIT SYSTEM (See note 2) DETAILS FOR TYPICAL UNDER SERVICE AT HOUSE OR BUILDING DIRECT BURIED SYSTEM (See note 2) JRH /06/202 SCALE: NONE = 5/8" X 2" steel dowels required when concrete encased. D8-3 See note 6 5/8" X 8'-0" copper clad ground rod and clamp. 36" radius factory bend (If PVC, schedule 80 required). OF

Shall meet requirements of drawing D0-. Pad mount transformer or (furnished and installed by Company). 2'-0" Could also be a permanent pole. Provided by the Company The Customer will find the red flagging tape and tie into the conduit system that is provided by the Company located with 2'-0" of of the transformer pad or secondary pedestal. 2'-6" 36" radius factory bend (If PVC, Sched. 80 required). IN CONDUIT SYSTEM 5/8" x 8'-0" copper clad ground rod and clamp. Upper end of ground rod to be flush with or below ground level. TOP VIEW Pedestal DIRECT BURIED SYSTEM See Note Street Side Bring cable or conduit to one foot from the center of the pedestal buried at 30" below the ground. Pulling tape or capped secondary cable at least 5 ft. longer than conduit. Ground Pedestal Conduit or cable For direct buried, cable must be long enough to reach the connectors in the pedestal (at least 5 extra feet). For Customer installed and supplied conduit, pulling tape must be long enough to reach pedestal (at least 5 extra feet) and the elbow to enter the pedestal is supplied by the Customer and installed by the Company. CALL 8 TWO BUSINESS In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. PADMOUNT TRANSFORMER OR SECONDARY PEDESTAL SERVING A CUSTOMER. Contact Company for local area requirements. 0/2 REVISION OF DRAWING SS8.6-2 NO. REVISION BY: APPR: JRH /06/202 SCALE: 3/8"='-0" D8-4 = OF

TYPICAL PULL BOX PEDESTAL See note 2 Conduit run as specified Ground Level Ground Level Company facility Exact Meter locations to be determined by Company STANDARD SERVICE INSTALLATION FRONT OF HOUSE R O A D DRIVEWAY Conduit run as specified Company facility Pedestal (See pull box detail and notes and 2) STANDARD SERVICE INSTALLATION WITH PEDESTAL POLE PEDESTAL REQUIRED IF: CONDUIT LONGER THAN 200 FT. OR CONDUIT HAS MORE THAN 3 BENDS INCLUDING RISER BENDS. CALL 8 TWO BUSINESS In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities.. Customer shall consult with Company for location and type of pedestal. 2. The Customer shall bear the cost of conduit and its installation. NO. 0/2 REVISION OF DRAWING SS8.6- REVISION BY: APPR: TYPICAL CONDUIT SYSTEM REQUIREMENTS FOR SECONDARY PHASE CUSTOMER UNDER SERVICE JRH SCALE: 0/3/202 NONE D8-2 = OF

See note 2 If pedestal present, see drawing D8-4. 2'-6' 6" Pole Ground 7" See note 2 IN CONDUIT SYSTEM (See note 3) Could also be meter on pole. DIRECT BURIED SYSTEM (See note 3). If one conduit installation is already on the pole, Contact the Company to (at its option) install a pedestal at the base of the pole. 2. Customer shall install the conduit to 7" from the pole. The Company will install the Customer supplied riser material up the pole. The Customer shall supply enough conduit to extend up the pole to a point 50" above the Telephone Co.'s and/or cable. When these minimum conditions cannot be satisfied, the Customer shall consult the Company. The Customer shall secure the riser material at the meter entrance for installation by the Company. (EXCEPTION: In Arkansas and Mississippi the conduit for the riser is supplied by the Company) 3. Contact Company for local area requirements. 0/2 NO. REVISION OF DRAWING SS8.6-3 REVISION BY: APPR: CALL 8 TWO BUSINESS In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. TYPICAL UNDER SERVICE FROM OVERHEAD SOURCE JRH /06/202 SCALE: NONE = D8-5 OF

4" minimum of RED concrete Tie wires Conduit 2 steel rod reinforcing may be eliminated and concrete cover reduced in some cases. Consult Company for details. Tie wires 2 steel rods: 2 upper, 2 lower 4" Conduit 4" Concrete END VIEW SECTION VIEW CALL 8 TWO BUSINESS In locations with underground facilities, the Customer shall notify One Call and shall have One Call locate all underground facilities before digging. It shall be the responsibility of the Customer to stay clear of all underground facilities. 0/3 REVISION OF DRAWING SS8.6-5 NO. REVISION BY: APPR: TYPICAL DETAIL OF METAL CONDUIT ENCASED IN CONCRETE JRH 0/0/203 SCALE: /2"='-0" = D8-7 OF