Just-In-Time (JIT) Manufacturing. Overview

Similar documents
Just-in-Time System. Dr S G Deshmukh

Chapter 11. In-Time and Lean Production

Outline. Push-Pull Systems Global Company Profile: Toyota Motor Corporation Just-in-Time, the Toyota Production System, and Lean Operations

Lecture 9 MBF2213 Operations Management Prepared by Dr Khairul Anuar. L9: Lean synchronization

Ch 26 Just-In-Time and Lean Production. What is Lean Production? Structure of Lean Production System. Activities in Manufacturing.

JIT and Lean Operations. JIT/Lean Operations

PLUS VALUE STREAM MAPPING

Operations Management

Improving Scrum with. Lean Thinking Nuno Rafael SGMUN 2016

Historical Phases of Production

LEAN PRODUCTION FACILITY LAYOUT.

Finished goods available to meet Takt time when variations in customer demand exist.

Lean Flow Enterprise Elements

Five Tips to Achieve a Lean Manufacturing Business

Business Process Management Introduction. Marek Zborowski PhD.

Lean Principles in Facility Management

APICS PRINCIPLES OF OPERATIONS MANAGEMENT TOPIC OUTLINE CONCEPTS AND APPLICATIONS

"Value Stream Mapping How does Reliability play a role in making Lean Manufacturing a Success " Presented by Larry Akre May 17, 2007

World Class Manufacturing SMED. Single-Minute Exchange of Die

Eliminate Waste and. Increase Value

Optimizing Inplant Supply Chain in Steel Plants by Integrating Lean Manufacturing and Theory of Constrains through Dynamic Simulation

JUST IN TIME (JIT), LEAN, AND TOYOTA PRODUCTION SYSTEM (TPS)

The entire presentation kit is having 2 main directories as below. Just in Time. 01 Introduction

LEAN MANUFACTURING & TPM.

Lean manufacturing concept: the main factor in improving manufacturing performance a case study

Chapter 5 Productivity Improvement Techniques

CHAPTER 1 INTRODUCTION

Pull Systems: Overview, Challenges and Success Factors

Optimizing Inventory Control at PT. Total Pack Indonesia by Using Kanban System

Lean Gold Certification Blueprint

Lean Project Delivery Operating System

Mechanical Engineering 101

Understanding Manufacturing Execution Systems (MES)

Copyright 2000 Society of Manufacturing Engineers MANUFACTURING INSIGHTS. An Introduction to Lean Manufacturing

Lean Means Speed. Alessandro Anzalone, Ph.D Hillsborough Community College, Brandon Campus

c. Op welke manieren kan Pull production verspilling verminderen?

LeadingAge Maine & New Hampshire 2014 Annual Conference

Lean Manufacturing Implementation in Small and Medium Industry

LEAN ADMINISTRATION.

Introduction to Lean CAPTURE AND LEVERAGE THE LEAN ADVANTAGE. Introduction to Lean. Learning Objectives

Online Course Manual By Craig Pence. Module 12

Key Steps in Implementing a Kaizen Event

LEAN SIX SIGMA GLOSSARY OF TERMS

Kitting Trolley for TCF Line

ABSTRACT I. INTRODUCTION LITERATURE REVIEW

LEAN CERTIFICATION BODY OF KNOWLEDGE RUBRIC VERSION 3.0

Set Up Change Time Optimization Using Single Minute Exchange of Die (SMED) Methodology

End-to-End Printing Workflow. PressWise is the lights out workflow solution you need to scale your business, without scaling your workforce.

SUPPLIER QUALITY ASSURANCE IN SUPPLY CHAIN MANAGEMENT (SCM) THROUGH QUALITY TOOLS AND TECHNIQUES

Lean Production and Modern Socio- Technology (MST) Design principles compared: MST as the science of lean?

Managing for Daily Improvement

Value Stream Mapping Train the Trainer

COLUMBUS McKINNON CORPORATION MIDLAND FORGE DIVISION. 6S Training Overview

Lean Thinking - Doing More With Less

Applying 5S Lean Technology: An Infrastructure for Continuous Process Improvement

Presented by Renaldo de Jager 11-1

LEARNING TO SEE an introduction to lean thinking

It s Not Easy Being Lean. C G Clark Consulting Group

reasons to invest in a CMMS

Subject: Apparel Production Management. Unit 3: Manufacturing Systems. Quadrant 1 e-text. Describe the various types of production systems.

5S METHOD IN LEAN MANUFACTURING

Introduction to the Toyota Production System (TPS)

A Kaizen Based Approach for Cellular Manufacturing System Design: A Case Study Joseph C. Chen, John Dugger, and Bob Hammer

Value Stream Mapping

The Role of Physical Simulation in the Re-Design of Existing Manufacturing Systems

ProcessModel Simulation to Show Benefits of Kanban/Pull System

ANALYSIS OF AN HYBRID PRODUCTION CONTROL SYSTEM FOR MANUFACTURING MANAGEMENT

Training Within Industry (TWI) The Missing Link To Continuous Improvement

WHY LEAN PLASTIC INJECTION MOLDING COMPANIES ARE BETTER SUPPLIERS

Lean Thinking: Examples and Applications in the Wood Products Industry

The Book of Value Stream Maps II

Cover-Time Planning, An alternative to Material Requirements Planning; with customer order production abilities and restricted Work-In-Process *

Lean Distribution. Mark Kushner, COO Lloyed Lobo, Director Business Development

LEAN-MOD: AN APPROACH TO MODULAR CONSTRUCTION MANUFACTURING PRODUCTION EFFICIENCY IMPROVEMENT

Toyota Kaizen Patterns & Basic Stability:

Fundamental Productivity Improvement Tools and Techniques for SME

Implementing VMI to Reduce Direct and Indirect Cost

SEVEN (7) PRINCIPLES FOR IMPROVING WORKFLOW

Financial Transfer Guide DBA Software Inc.

JIT in Auto Industry A Boon or Ban?

The Future of ERP and Manufacturing Management

Lean Manufacturing. Overview and Perspectives on Lean Methods and Tools. WIW at WERC

TABLE OF CONTENTS DOCUMENT HISTORY 3

Sugar factory automation and optimization. Control. Visualize. Optimize.

Lean Enterprise Portfolio Management

Agile & Lean / Kanban

Wonderware MES/Operations

Drum Buffer-Rope. Skorkovský. Based on : R. Holt, Ph.D., PE

Lean Operations and Supply Chains. Explain why it is so difficult to make global supply chains lean. 3

Productivity Improvement

Politecnico di Torino. Porto Institutional Repository

CUWIP: A modified CONWIP approach to controlling WIP

- Rev 4 Date

LEAN WAREHOUSE OPERATIONS.

The Conversion Cycle. chapter. Learning Objectives

Journal of Business & Economics Research May 2008 Volume 6, Number 5 ABSTRACT

Application of Lean Manufacturing methodologies to improve productivity: Fedima Tyres case study

From KAIZEN to LEAN to GREEN. Kaizen Institute Masaaki Imai

Reduction of bottleneck operations in Just-In-Time manufacturing

Lean Checklist Self-Assessment

Transcription:

Just-In-Time (JIT) Manufacturing Overview The Just-in-Time (JIT) Manufacturing Philosophy Prerequisites for JIT Manufacturing Elements of JIT Manufacturing Benefits of JIT Manufacturing Success and JIT Manufacturing Wrap-Up: What World-Class Producers Do 1

APICS Definition of JIT A philosophy of manufacturing based on planned elimination of waste and continuous improvement of productivity.... APICS Definition of JIT The primary elements of Just-in-Time are to: have only the required inventory when needed, improve quality to zero defects, reduce lead times by reducing setup times, queue lengths, and lot sizes, incrementally revise the operations themselves, and accomplish these things at minimum cost. 2

JIT Synonyms IBM - Continuous Flow Manufacturing HP - Stockless Production Repetitive Manufacturing System GE - Management by Sight Boeing - Lean Manufacturing Motorola - Short Cycle Manufacturing Japanese - The Toyota System Time-Based Competition It is not enough for firms to be high-quality and low-cost producers. Today, they must also be first in getting products and services to the customer fast. To compete in this new environment, the order-to-deliverycycle must be drastically reduced. JIT is the weapon of choice today to reduce the elapsed time of this cycle. 3

Traditional View of Manufacturing Key objective was to fully utilize capacity so that more products were produced by fewer workers and machines. How? With large queues of in-process inventory waiting at work centers. Workers and machines never had to wait for product to work on, so capacity utilization was high and production costs were low. Result: Products spent most of their time in manufacturing just waiting, an arrangement that is unacceptable in today s time-based competition. JIT Manufacturing Philosophy The main objective of JIT manufacturing is to reduce manufacturing lead times. This is primarily achieved by drastic reductions in work-in-process (WIP). The result is a smooth, uninterrupted flow of small lots of products throughout production. 4

Successful JIT Applications Most successful JIT applications have been in repetitive manufacturing, where batches of standard products are produced at high speeds and in high volumes. Successful use of JIT is rare in large, highly complex job shops where production planning and control is extremely complicated. Smaller, less complex job shops have used JIT, but operations have been changed so that they behave somewhat like repetitive manufacturing. Changes Required for JIT JIT requires certain changes to the factory and the way it is managed: Stabilize production schedules Make the factories more focused Increase work center capacities Improve product quality Cross-train workers Reduce equipment breakdowns Develop long-term supplier relations 5

Elements of JIT Manufacturing Eliminating waste Enforced problem solving and continuous improvement People make JIT work Total Quality Management (TQM) Parallel processing Kanban production control JIT purchasing Reducing inventories Working toward repetitive manufacturing Eliminating Waste in Manufacturing Make only what is needed now. Reduce waiting by coordinating flows and balancing loads. Reduce or eliminate material handling and shipping. Eliminate all unneeded production steps. Reduce setup times and increase production rates. Eliminate unnecessary human motions. Eliminate defects and inspection. 6

Problem Solving and Continuous Improvement JIT is a system of enforced problem solving. One approach is to lower inventory gradually to expose problems and force their solution. With no buffer inventories to offset production interruptions, problems are highly visible and cannot be ignored. The job of eliminating production problems is never finished. Continuous improvement --or kaizen--is central to the philosophy of JIT. Uncovering Production Problems We must lower the water level! Machine Breakdowns Production Problems In-Process Inventory Worker Absenteeism Workload Imbalances Material Shortages Out-of-Spec Materials Quality Problems 7

People Make JIT Work JIT has a strong element of training and involvement of workers. A culture of mutual trust and teamwork must be developed. An attitude of loyalty to the team and selfdiscipline must be developed. Another crucial element of JIT is empowerment of workers, giving them the authority to solve production problems. TQM and JIT Long-term relationships with suppliers Certified suppliers eliminate incoming inspection Share design process for new products Simplify design/processes Poka-yoke Process capable of meeting tolerances Operators responsible for quality of own work 8

Parallel Processing Operations performed in series: Cycle Time for Each Operation = 1 Hour Total Product Cycle Time = 1 x 8 =8 Hours Op 1 Op 2 Op 3 Op 4 Op 5 Op 6 Op 7 Op 8 Operations performed in parallel: Op 2 Cycle Time for Each Operation = 1 Hour Total Product Cycle Time = 1 x 5 =5 Hours Op 1 Op 3 Op 6 Op 7 Op 8 Op 5 Op 4 Operations 2 and 4 start the same time as Operation 1 JIT: A Pull System In a push system, such as an MRP system, we look at the schedule to determine what to produce next. In a pull system, such as JIT, we look only at the next stage of production and determine what is needed there, and then we produce only that. As Robert Hall states, You don t never make nothin and send it no place. Somebody has got to come and get it. 9

Kanban Production Control At the core of JIT manufacturing at Toyota is Kanban, an amazingly simple system of planning and controlling production. Kanban, in Japanese, means card or marquee. Kanban is the means of signaling to the upstream workstation that the downstream workstation is ready for the upstream workstation to produce another batch of parts. Kanbans and Other Signals There are two types of Kanban cards: a conveyance card (C-Kanban) a production card (P-Kanban) Signals come in many forms other than cards, including: an empty crate an empty designated location on the floor 10

Conveyance Kanban Conveyance Kanban Card Part number to produce: M471-36 Part description: Valve Housing Lot size needed: 40 Container type: RED Crate Card number: 2 of 5 Retrieval storage location: NW53D From work center: 22 To work center: 35 Production Kanban Production Kanban Card Part number to produce: M471-36 Part description: Valve Housing Lot size needed: 40 Container type: RED crate Card number: 4 of 5 Completed storage location: NW53D From work center: 22 To work center: 35 Materials required: Material no. 744B Storage location: NW48C Part no. B238-5 Storage location: NW47B 11

How Kanban Operates When a worker at downstream Work Center #2 needs a container of parts, she does the following: She takes the C-Kanban from the container she just emptied. She finds a full container of the needed part in storage. She places the C-Kanban in the full container and removes the P-Kanban from the full container and places it on a post at Work Center #1. She takes the full container of parts with its C-Kanban back to Work Center #2. Containers in a Kanban System Kanban is based on the simple idea of replacement of containers of parts, one at a time. Containers are reserved for specific parts, are purposely kept small, and always contain the same standard number of parts for each part number. At Toyota the containers must not hold more than about 10% of a day s requirements. There is a minimum of two containers for each part number, one at the upstream producing work center and one at the downstream using work center. 12

Calculating the Number of Containers between Work Centers N UT ( 1 + = P ) C N = Total number of containers between 2 stations U = Usage rate of downstream operation T = Average elapsed time for container to make entire cycle P = Policy variable indicating efficiency... 0-1 C = Capacity (number of parts) of standard container Example: Number of Containers There are two adjacent work centers, one of which is fed parts from the other. The production rate of the using work center is 165 parts per hour. Each standard Kanban container holds 24 parts. It takes an average of 0.6 hour for a container to make the entire cycle from the time it leaves the upstream center until it is returned, filled with parts, and leaves again. The efficiency of the system is observed to be 0.2. How many containers are needed? 13

Example: Number of Containers Number of Containers, N N = UT(1 + P) / C = 165(0.6)(1 + 0.2) / 24 = 99(1.2) / 24 = 118.8 / 24 = 4.95 or 5 containers Essential Elements of JIT Purchasing Cooperative and long-term relationship between customer and supplier. Supplier selection based not only on price, but also delivery schedules, product quality, and mutual trust. Suppliers are usually located near the buyer s factory. Shipments are delivered directly to the customer s production line. Parts are delivered in small, standard-size containers with a minimum of paperwork and in exact quantities. Delivered material is of near-perfect quality. 14

Working Toward Repetitive Manufacturing Reduce setup times and lot sizes to reduce inventories Change factory layout to allow streamlined flows Convert process-focused layout to cellular manufacturing (CM) centers Install flexible manufacturing systems (FMS)..more Working Toward Repetitive Manufacturing Standardize parts designs Train workers for several jobs Implement preventive maintenance (PM) programs Install effective quality control programs Develop an effective subcontractor network 15

Benefits of JIT Inventory levels are drastically reduced: frees up working capital for other projects less space is needed customer responsiveness increases Total product cycle time drops Product quality is improved Scrap and rework costs go down Forces managers to fix problems and eliminate waste... or it won t work! 16