Loss of 7 Billion Units power generation due to raw water shortage at coal based thermal power stations in India from June 2016 to April 2017

Similar documents
GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE LOK SABHA UNSTARRED QUESTION NO.2282 TO BE ANSWERED ON

PARCHED POWER: WATER DEMANDS, RISKS, AND OPPORTUNITIES FOR INDIA S POWER SECTOR

Accenture Services Private Limited Corporate Social Responsibility (CSR) Policy

GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE. LOK SABHA STARRED QUESTION No. 334 TO BE ANSWERED ON

India. India Grain Voluntary Update - October 2017

Confederation of Indian Industry. Opportunities in. Fisheries. Sector in India. Ministry of Food Processing Industries. Government of India

Status of Poverty in India A State wise Analysis

INVESTOR BRIEFING. Water shortages threaten coal company revenues

Details of Retirement / Replacement of more than 25 years old Coal based Thermal Power Plants (as on )

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.164 ANSWERED ON SHORTAGE OF WATER IN THERMAL PLANTS

Cellulosic Ethanol Emerging Opportunities in India Feb 2015

GUIDE FOR VAT, SALES TAX & OTHER LEVIES ( Updated On 31st -Jan-17)

Regional Pattern of Agricultural Growth and Rural Employment in India: Have Small Farmers Benefitted?

India s Water Minister: Linking of Rivers Is Top Priority

National Vegetable Initiative for Urban Clusters. Value chain integration, technology dissemination and accessing investments and markets

India Solar Market Update Q Executive Summary.

Facts of PAT Cycle 1 & 2. A Bicon Consultants Report. Bicon Report 12/30/16 Energy Knowledge Hub

RCMC RENEWAL. i) For RCMC renewal without any amendments i.e. change of address / partner / Directors / Category:

The Need for Institutional Capacity Building for Developing Solar Rooftop Markets: Experience of the USAID PACE-D TA Program in India

SCENARIO OF GOAT SECTOR: MAHARASHTRA STATE (INDIA)

OWNER S ENGINEERING SERVICES

Production and Market Arrivals Pattern of Paddy in APMC Bangarpet Karnataka: A Trend Analysis

Output and Employment Growth in Registered Manufacturing Industries in India: Testing Kaldor s Hypothesis


CH2356 Energy Engineering Wind Power. Dr. M. Subramanian

Rural Livelihoods Approach and Health and Nutrition

Farmer Suicides in India: Levels and Trends across Major States,

SMALL HYDRO PROGRAMME IN INDIA

Economic implications of land degradation on sustainability and food security in India

Progress and Potential of Horticulture in India

Short-term Inter-State Transactions of Electricity by Trading Licensees (RTC*) Purchased From

Water and Climate Resilience Programme (WACREP) South Asia - India

Directions issued by Hon ble vide order dated PBMC submitted Action Plan and Bye laws, 2016 which covers the action points.

Diversified geological history right form pre-cambrian to recent. At present 89 minerals including fuel minerals, atomic. minor minerals are mined.

GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.76 TO BE ANSWERED ON PROJECTS UNDERTAKEN BY NTPC

Overview, Strengths, Service, Key Projects & Clients

Upcoming Biotech Parks

FOOD PROCESSING REDUCES THE DISTANCE BETWEEN FARM AND FORK SHRI NARENDRA MODI HONOURABLE PRIME MINISTER OF INDIA


Indian Poultry Market Update

Commercial Buildings. Ministry of Power Government of India

Quality of Water and Water Related Diseases in Urban Areas

THE GREEN BOND IMPACT REPORT

CORPORATE SOCIAL RESPONSIBILITY POLICY

1 What are three cropping seasons of India? Explain any one in brief. 2 Discuss three main impacts of globalization on Indian agriculture.

Government of India s Perspective and Initiatives on Integration of Future Smart Food in Rice-Fallows

Hydro & Small Hydro Outlook in India 2017

Chapter: 4. Role of NTPC Ltd. in country s power sector and its activity profile.

Trends and Patterns of Urbanization in India: A State Level Analysis

CDM Developments in India & Challenges Ahead. Pamposh Bhat Head, GTZ CDM - India Indo German Energy Programme Bureau of Energy Efficiency

A Balance Sheet of Performance of Large dams in India The case of irrigation and flood control

JICA s Support to India (Forestry Sector)

Agflation and the PDS: Some Issues

Responding to information needs of the citizens through e-government portals and online services in India

INDIA PROJECTS IN. ODA Loans Grant Aid Projects Technical Cooperation Projects, Development Studies and others JICA Partnership Program (JPP) Projects

NABARD Consultancy Services Private Limited (An ISO 9001:2008 Company) A Wholly owned subsidiary of NABARD

Mineral and Power Resources

Second largest Cement market. Dominated by private players. Higher share of large plants. Large concentration in South and West

Government of India. Ministry of Communication and Information Technology

RENEWABLE ENERGY INTEGRATION IN TAMILNADU

River Basin Management. with Emphasis on Inter-linking of. Rivers in India

FUTURE SCADA SYSTEM WITH SMARTER GRID A SMART VISION FOR INDIA

Concept Note on Cost Recovery in Indian Water Sector 1

CHRONIC POVERTY AND SOCIALLY DISADVANTAGED GROUPS: ANALYSIS OF CAUSES AND REMEDIES. Sukhadeo Thorat Motilal Mahamallik

Impact of Awareness Programmes and Capacity Building in Farmers Plant Variety Registration under the PPV&FR Act

A Brief on National Agricultural Market

Sanitation beyond toilets: the challenge of new thinking and innovative technologies for water and sanitation

BENEFITS OF MICRO IRRIGATION SYSTEM SUGAR RECOVERY & PRODUCTIVITY AMIT BHARDWAJ DY. HEAD - INDIAN SUGAR MILLS ASSOCIATION 8 TH OCT, 2013

Scenario of Small Hydro Power Projects in India and Its Environmental Aspect

RIVER BASIN MANAGEMENT-II

Page 1 of 6. Agriculture. I. Answer the Following

Environmental Sustainability Index (ESI) is a comparative analysis of environmental achievements, challenges

6. LAND RESOURCES : AGRICULTURE

Renewable Energy policies and challenges -Developers perspective

CDM and NAMA in India

SAGARIKA RATH PhD candidate ACADEMIC BACKGROUND. PhD Candidate, Agricultural and Biological Engineering Dept. (2016-Continuing)

The Impact of India s Cotton Yield on U.S. and World Cotton Markets

Fastest Growing Electric Utility in Asia for 3 rd successive year. An S&P BSE SENSEX Company Q2 FY Press Meet New Delhi November 9, 2016

Short-term Inter-State Transactions of Electricity by Trading Licensees (RTC*) Purchased From

m«f~fpllf~ ( \lr(l m<iir Cf» ~)

Climate Change and Variability: Mapping Vulnerability of Agriculture using Geospatial Technologies

BOARD QUESTION PAPER : JULY 2017 GEOGRPAHY AND ECONOMIC

Open Access Regulations & Operationalization

INTERLINKING INDIAN RIVERS MERITS, DEMERITS AND DIFFICULTIES IN IMPLEMENTATION


IMPO P RT R AN A C N E C E O F G RO R UN U D N W

State of Indian Farmers: A Report

GOVERNMENT OF INDIA MINISTRY OF POWER LOK SABHA STARRED QUESTION NO.465 ANSWERED ON USE OF TRANSFERRED COAL

Farm Power and Machinery Availability on Indian Farms

E-way bill - basic provisions

GOVERNMENT OF INDIA DEPARTMENT OF ATOMIC ENERGY RAJYA SABHA UNSTARRED QUESTION NO : 740 TO BE ANSWERED ON 04/03/2010 SHARE IN ATOMIC ENERGY PRODUCTION

SWACHH BHARAT MISSION (GRAMIN)

MAPPING MONSOON ON SUGARCANE PLANTING (SEASON )

Indian Minerals Yearbook 2015

NTPC LIMITED (A Govt. of India Undertaking)

PERIODICAL OCTOBER 2004-MARCH 2005

Module 3. Irrigation Engineering Principles. Version 2 CE IIT, Kharagpur

State Service Delivery Gateway (SSDG), e-forms, State Portal (SP): An Approach to Access the Services by Citizens under a Single Interface Mechanism

Presentation for the Press Conference

Transcription:

Loss of 7 Billion Units power generation due to raw water shortage at coal based thermal power stations in India from June 2016 to April 2017 Coal based thermal power generation needs huge amounts of water. Water shortages have been affecting power generation at such plants on a regular basis. Manthan is monitoring such loss in generation on an ongoing basis. This brief note documents the loss in power generation at coal based power plants due to shortage of water. This is based on the daily generation reports of the Central Electricity Authority, which also lists reasons for a power station not generating at the level indicated for the day. Loss of power generation from 16 st June 2016 to 25 th April 2017 A total of 13 coal based thermal power facilities in India faced loss of power generation due to raw water problems (this is how CEA lists the problems with regards shortage of water). Out of 13coals based thermal power stations 11 are inland plants, and two are coastal. In total 24 units with installed capacity of9483 MW were affected due to raw water shortage related problems. The total loss due to closure of these units due to water shortages during the time period 15 th June 2016 to 25 th April 2017 was 7151.51 MU (at 80% PLF). It should be noted that several of these units also faced closure for additional days in this time period due to other reasons. However, we have not taken into consideration the loss in generation due to closure for reasons other than water shortage. The details are given in the following table. Table 1: Coal based thermal power stations / units and the loss of generation in hours and Million Units (MU) during 1 st July 2016 to 25 th April 2017 1 Hours of Closure due to Raw water problem Loss power generation in MU at 80% PLF Sr. No. Plant Name Unit State Owner Capacity (MW) 1 OP JINDAL TPS 4 Chhattisgarh Jindal Power Limited 250 247.08 49.42 2 RATIJA TPS 1 Chhattisgarh ACB(India)Limited 50 523.73 20.95 3 SVPL TPP 1 Chhattisgarh ACB(India)Limited 63 714.12 35.99 4 PARLI TPS 3 Maharashtra MAHAGENCO 210 6936.00 1165.25 5 PARLI TPS 4 Maharashtra MAHAGENCO 210 4176.00 701.57 6 PARLI TPS 5 Maharashtra MAHAGENCO 210 4176.00 701.57 7 PARLI TPS 6 Maharashtra MAHAGENCO 250 2565.85 513.17 8 PARLI TPS 7 Maharashtra MAHAGENCO 250 2352.00 470.40 9 PARLI TPS 8 Maharashtra MAHAGENCO 250 2130.25 426.05 10 Tirora TPS 1 Maharashtra Adani Power 660 354.18 187.01 11 Tirora TPS 2 Maharashtra Adani Power 660 337.98 178.46 12 Tirora TPS 5 Maharashtra Adani Power 660 360.00 190.08 13 RAICHUR TPS 7 Karnataka KPCL 210 858.63 144.25 14 SALAYA TPP 1 Gujarat Essar Energy Limited 600 224.48 107.75 1 Compiled from Daily Generation Reports of power facilities in India by Central Electricity Authority.

15 SALAYA TPP 1 Gujarat Essar Energy Limited 600 84.78 40.70 16 STERLITE TPP 2 Odisha Sterlite Energy Limited 600 2007.43 963.57 17 STERLITE TPP 1 Odisha Sterlite Energy Limited 600 47.72 22.90 18 BELLARY TPS 2 Karnataka KPCL 500 155.82 62.33 19 BELLARY TPS 1 Karnataka KPCL 500 804.68 321.87 TALWANDI SABO Punjab Talwandi Sabo Power 20 21 TPP 1 TALWANDI SABO TPP 3 Punjab Limited 660 806.97 426.08 Talwandi Sabo Power Limited 660 202.60 106.97 22 SIMHAPURI TPS 2 Andhra Pradesh Simhapuri Energy Private Limited 150 2688.00 322.56 23 TUTICORIN TPS 1 TamilNadu TANGENCO 210 783.47 131.62 24 TUTICORIN TPS 2 TamilNadu TANGENCO 210 1080.00 181.44 25 TORANGALLU TPS(SBU-I) 1 Karnataka Jindal Power 260 72.05 14.99 Total 9483 Total 7486.94 Note: Where the outages due to water shortage are not in one continuous period but have been at multiple times, with the plant coming online and then going offline again, separate entries have been made for each such outage period. In some cases, a unit closed down due to water shortages, and then remained closed, but the reason for the closure changed from raw water shortage to something else like reserve shut down, low schedule, maintenance issues etc. In such cases, we suspect that the unit continued to be affected by water shortages (in some cases this has been corroborated by other reports), but for the table above, we have considered only the period where outages have been attributed to raw water shortage. Parli TPP (except unit 8) is an example of this. Thus, our estimate of loss in generation due to water shortages is a conservative estimate. Status of major reservoir and river basins as on 25 th April 2017. According to the status of 91 major reservoirs in India given by Central Water Commission (CWC), as on 25 th April 2017, 46.02 BCM water was available in these reservoirs which have a total of 157.79 BCM live capacity. This accounts to 29.16% of the total live storage. However, there are 20 major projects where water availability is less than 10% of their live storage. Out of these 20 major projects 16 are from Karnataka, Kerala, Tamil Nadu, Telangana and Andhra Pradesh. Almost all the major projects in middle and lower Krishna (Except Narayanpur reservoir in middle Krishna), Tungabhadra sub basin, Cauvery and Periyar river basins have less than 10% of live storage water. The southern states of Karnataka, Kerala, and Tamil Nadu have announced drought situation in several parts of the states For more details about water available in major 91 reservoir of India please refer Table 2 in the Annexure. Thermal power stations which are likely to suffer due to raw water shortage during May-June 2017 Given this situation of various river basins, coal based thermal power stations in Karnataka including Kudagi thermal power station (800MW) of NTPC, Raichur thermal power station (1470MW),Yermarus thermal power station (800MW) of Karnataka Power Corporation Ltd are likely to get affected due to water shortages in the coming period. These thermal power stations are dependent on Almatti and Narayanpur reservoirs on river Krishna where water availability is0% of live storage in Almatti and 14.72% of live storage in Narayanpur. This water has to meet multiple needs, not just of the thermal power plants.

The Dr. N. Tata Rao thermal power station (1760MW) of Andhra Pradesh Generation Corporation Limited downstream of NagarjunaSagar in Krishna river basin of Andhra Pradesh may also get affect with raw water shortages. Water availability at NagarjunaSagar is 0 % of live storage. The Mettur thermal power station (1440MW) of Tamil Nadu Generation and Distribution Corporation Limited which is dependent on Mettur Stanley reservoir in Cauvery river basin of Tamil Nadu could also face raw water shortages. The Mettur Stanley reservoir has water only to 6.01% of live storage water. Statement of Power Minister in Parliament related to raw water shortage and coal based thermal power stations In response to an Unstarred question 2 in Lok Sabha on 16 th March 2017 in relation to shortage of water in thermal power station, Shri Piyush Goyal, Minister of Power, Government of India, provided the following details about the number of units which had to undergo shutdown during certain periods due to non-availability of water and generation loss thereof. Year Number of Units Loss of generation in MU 2013-14 16 5253 2014-15 9 1258 2015-16 15 4989 2016-up to Feb 2017 21 5870 Conclusion Despite a good monsoon in northern and central part of India there are a number of power facilities which have faced raw water shortages. Given that several basins are facing an acute water shortage even today and that there are still a few weeks to go before the onset of the monsoon, it is likely that we will see more loss of generation at coal based power plants due to water shortages. Shripad Dharmadhikary, Jinda Sandbhor, Manthan Adhyayan Kendra, Pune 18 th May 2017 www.manthan-india.org 2 Unstarred question no 2419 asked by Dr. Satyapal Singh, Shri Sanjay Dhotre, Shri Rahul Shewale in Lok Sabha of Indian parliament was answered by Minster of Power on 16 th March 2017. Web link : http://164.100.47.190/loksabhaquestions/annex/11/au2419.pdfaccessed on 27th April 2017

Annexure Table no. 1 List of 91 CWC monitored reservoirs in India with their live storage water availability as on 20 th April 2017 3. Sl. No Name State Live Capacity (BCM) Current live storage (BCM) % of of reservoir filled out of Live capacity 1 NAGARJUNA SAGAR A.P & TG 6.841 0 0.00 2 ALMATTI KARNATAKA 3.105 0 0.00 3 SHOLAYAR TAMIL NADU 0.143 0 0.00 4 DANTIWADA GUJARAT 0.399 0.004 1.00 5 KABINI(Sancherla Tank) KARNATAKA 0.444 0.005 1.13 6 TUNGABHADRA KARNATAKA 3.276 0.051 1.56 7 VANIVILAS SAGAR KARNATAKA 0.802 0.021 2.62 8 BHADAR GUJARAT 0.188 0.005 2.66 9 VAIGAI TAMIL NADU 0.172 0.005 2.91 10 MALAPRABHA(RENUKA) KARNATAKA 0.972 0.042 4.32 11 PARAMBIKULAM TAMIL NADU 0.38 0.017 4.47 12 HEMAVATHY KARNATAKA 0.927 0.047 5.07 13 METTUR(STANLEY) TAMIL NADU 2.647 0.159 6.01 14 PERIYAR KERALA 0.173 0.012 6.94 15 MANIKDOH (KUKADI) MAHARASHTRA 0.288 0.02 6.94 16 BHADRA KARNATAKA 1.785 0.149 8.35 17 LOWER BHAWANI TAMIL NADU 0.792 0.069 8.71 18 YELDARI MAHARASHTRA 0.809 0.072 8.90 19 SRISAILAM A.P & TG 8.288 0.738 8.90 20 KRISHNARAJA SAGRA KARNATAKA 1.163 0.112 9.63 21 GHATAPRABHA KARNATAKA 1.391 0.155 11.14 22 MALAPMUZHA KERALA 0.224 0.025 11.16 23 PENCH (TOTALADOH) MAHARASHTRA 1.091 0.127 11.64 24 TEHRI UTTRAKHAND 2.615 0.317 12.12 25 BHIMA(UJJANI) MAHARASHTRA 1.517 0.191 12.59 26 SOMASILA ANDHRA PRADESH 1.994 0.272 13.64 27 LINGANAMAKKI KARNATAKA 4.294 0.595 13.86 28 NARAYANPUR KARNATAKA 0.863 0.127 14.72 29 HARANGI KARNATAKA 0.22 0.034 15.45 30 GOBIND SAGAR(BHAKRA) HIMACHAL PRADESH 6.229 0.98 15.73 31 RAMGANGA UTTRAKHAND 2.196 0.351 15.98 32 SHETRUNJI GUJARAT 0.3 0.052 17.33 33 PONG DAM HIMACHAL PRADESH 6.157 1.077 17.49 3 Compiled from weekly status report of 91 reservoir published at Central Water Commission of India.

34 ISAPUR MAHARASHTRA 0.965 0.176 18.24 35 SRIRAMSAGAR TELANGANA 2.3 0.444 19.30 36 KALLADA(PARAPPAR) KERALA 0.507 0.098 19.33 37 IDUKKI KERALA 1.46 0.292 20.00 38 ALIYAR TAMIL NADU 0.095 0.02 21.05 39 MAYURAKSHI WEST BENGAL 0.48 0.113 23.54 40 TAWA MADHYA PRADESH 1.944 0.466 23.97 41 LOWER MANAIR TELANGANA 0.621 0.154 24.80 42 KOYANA MAHARASHTRA 2.652 0.682 25.72 43 TILAIYA JHARKHAND 0.142 0.04 28.17 44 KAKKI KERALA 0.447 0.127 28.41 45 JHAKAM RAJASTHAN 0.132 0.038 28.79 46 KONAR JHARKHAND 0.176 0.051 28.98 47 RANA PRATAP SAGAR RAJASTHAN 1.436 0.42 29.25 48 IDAMALAYAR KERALA 1.018 0.299 29.37 49 SALANADI ODISHA 0.558 0.164 29.39 50 SABARMATI(DHAROI) GUJARAT 0.735 0.217 29.52 51 DAMANAGANGA GUJARAT 0.502 0.151 30.08 52 MACHKUND(JALPUT) ODISHA 0.893 0.274 30.68 53 BARNA MADHYA PRADESH 0.456 0.141 30.92 54 KANGSABATI WEST BENGAL 0.914 0.283 30.96 55 INDIRA SAGAR MADHYA PRADESH 9.745 3.052 31.32 56 DHOM MAHARASHTRA 0.331 0.109 32.93 57 MULA MAHARASHTRA 0.609 0.201 33.00 58 JAYAKWADI(PAITHON) MAHARASHTRA 2.171 0.722 33.26 59 GIRNA MAHARASHTRA 0.524 0.176 33.59 60 SUPA KARNATAKA 4.12 1.423 34.54 61 MAHI BAJAJ SAGAR RAJASTHAN 1.711 0.594 34.72 62 DUDHGANGA MAHARASHTRA 0.664 0.238 35.84 63 BARGI MADHYA PRADESH 3.18 1.164 36.60 64 KARJAN GUJARAT 0.523 0.194 37.09 65 MATATILA UTTAR PRADESH 0.707 0.263 37.20 66 PANAM GUJARAT 0.697 0.261 37.45 67 UPPER TAPI MAHARASHTRA 0.255 0.096 37.65 68 GUMTI TRIPURA 0.312 0.125 40.06 69 HIRAKUD ODISHA 5.378 2.161 40.18 70 BALIMELA ODISHA 2.676 1.106 41.33 71 UPPER WARDHA MAHARASHTRA 0.564 0.234 41.49 72 BHANDARDARA MAHARASHTRA 0.304 0.128 42.11 73 MAHANADI CHHATTIS GARH 0.767 0.325 42.37 74 RIHAND UTTAR PRADESH 5.649 2.396 42.41 75 UPPER INDRAVATI ODISHA 1.456 0.623 42.79 76 UPPER VAITARNA MAHARASHTRA 0.331 0.144 43.50

77 TENUGHAT JHARKHAND 0.821 0.376 45.80 78 UPPER KOLAB ODISHA 0.935 0.447 47.81 79 BHATSA MAHARASHTRA 0.942 0.455 48.30 80 UKAI GUJARAT 6.615 3.215 48.60 81 KADANA GUJARAT 1.472 0.822 55.84 82 PANCHET HILL JHARKHAND 0.184 0.103 55.98 83 GANDHI SAGAR MADHYA PRADESH 6.827 3.968 58.12 84 THEIN PUNJAB 2.344 1.386 59.13 85 BANSAGAR MADHYA PRADESH 5.166 3.092 59.85 86 MINIMATA BANGOI CHHATTIS GARH 3.046 1.894 62.18 87 SARDAR SAROVAR GUJARAT 1.566 1.069 68.26 88 MAITHON JHARKHAND 0.471 0.331 70.28 89 RENGALI ODISHA 3.432 2.48 72.26 90 GERUSOPPA KARNATAKA 0.13 0.113 86.92 91 KHADAKVASLA MAHARASHTRA 0.056 0.053 94.64 Total 157.799 46.02 29.16