PRESCOTT FIRE PIT INSTALLATION GUIDE AND OWNER S MANUAL

Similar documents
SpaVault TM Installation Guide for Bullfrog Spas (7-10 x 7-10 x 38 )

Installation guide WALLS

SYNTHETIC GRASS INSTALLATION GUIDE SOFT AND HARD SURFACE

OUTDOOR FEATURES FIREPLACES, FIREPITS, PIZZA OVENS & GRILL ISLANDS. techo-bloc.com

LAYING IBSTOCK CLAY PAVERS FOR PERMEABLE PAVEMENTS

Installation guide WALLS

PE45 AMAZON MONKEY BARS OWNER'S MANUAL

HOW TO BUILD Garden Walls Frestanding & Landscape Walls

How To Install Your Cambridge Pavingstones System How To Install Your Cambridge Segmental Retaining Wall System

at home installation guide Manufactured by:

Tasman Retaining Wall System

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

HOW TO INSTALL PATIOS AND WALKWAYS STEP 2 STEP 1. For all Patios and Walkways. The base is the most important step in your patio and walkway projects.

Municipality of Waterville Public Sidewalk Repair Policy

PERMEABLE PAVERS PHYSICAL AND GEOMETRICAL CHARACTERISTICS - PAVERS DRIVEWAYS, PERMEABLE DRIVEWAYS & PATIOS CHARACTERISTICS CSA A231.

Steps And Stairs Installation Steps In Wall - Option 1 Steps In Front of Walls - Option 2 Steps In Wall; 10 (25cm) Tread - Option 3 Step Parallel to

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

LANDSCAPE RETAINING WALLS

Installation Information 2016

Retaining Walls. Made Easy

Windsor Fireplace Installation Instructions

City of Hughson Building Safety Division 7018 Pine Street Hughson, CA (209)

Steps And Stairs Installation Option 1 - Steps In Wall Option 2 - Steps With Plant Space Option 3 - Steps In Front of Walls Option 4 - Steps Along

PERMEABLE INTERLOCKING PAVERS

SEMPLICE OUTDOOR FIREPLACE KIT

Fiberstars Lighted Laminar Flow Fountains

Freedom One-Piece Barrier Free Showers Installation Instructions

MUTUAL MATERIALS TECH SHEET RomanStack. Coverage* 4.5 pcs / ft² (48.44 pcs / m²) 3,242 lb (1,470 kg) 4 x 8 Cap Unit. 1.6 pcs / ln ft (4.

RAUPEX SPEED SYSTEM Installation Guide

Single Post Anchor Part Number Spectrum Lane ~ Missoula MT ~

NORTHERN QLD LANDSCAPING COLLECTION RETAINING WALLS. style and function

DIVISION 31 EARTHWORK 2006 Edition, Published January 1, 2006; Division Revision Date: January 31, 2012

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

Installation Guide. PrivacyShield Outdoor Enclosure

Redi Rock Specification and Installation Manual

C. Foundation stabilization for pipe and utility structures.

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

MACHINE-LAY Installation Manual

CANTILEVER RACK SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

ISO ven A Personal Size Family Wood Fired Oven Quick Installation Guide - Graphic

4 EXTREME FOUNDATION PANELS

CHARACTERISTICS CSA A TECHO-BLOC Compressive strength psi [45 MPa] min.

Copyright 2010, Pinnacle Spas. All rights reserved. No portion of this manual may be reproduced in any manner without express written permission of

BASED ON DFD MASTER SPECIFICATION DATED 2/24/2014

LATRINE CONSTRUCTION SHELTER. Pour flush latrine 2. Pour flush micro septic tank 3. Initial investment, location, human resources 4.

Uwall UNIVERSAL CONSTRUCTION MANUAL

GUIDELINES FOR INSTALLATION OF ON-SITE SEWAGE SYSTEMS

15 lbs (6.8 kg) Approx. Weight. AB Junior. AB Jumbo. 35 lbs (16 kg) Approx. Weight

The Garden Wall Collection

PAVING SLABS ON A CONCRETE BASE

SECTION 1 BIO-INFILTRATION BUMP OUTS (BIBO)

COURSE BY COURSE INSTRUCTIONS

RETAINING WALLS.

Garage Construction. Permit Guide. Development Center. General Information. Zoning Ordinance Requirements. Building Code Requirements

TYPICAL INSTALLATION INSTRUCTIONS

How To Install Dry-Laid Flagstone

StormTech Construction Guide

Free standing Patio covers


Instructions for 12 IGT system

CHECKLIST Inspecting a Garage

AUGUST 2017 HASTINGS. retaining walls installation guide

Installation instruction

Assembly Instructions. Victorian Fire Ring

SITE SERVICES GUELPH TRANSIT OPERATIONS & MAINTENANCE SECTION WATSON ROAD FACILITY PAGE 1 OF 6 WATER RECLAMATION PROJECT JUNE 2013

Landscaping. Retaining Walls & Pavers. masonry. build in style

Contact Clark Public Utilities Construction Services department at (360) to initiate a request for service.

SECTION 19 - TRENCH EXCAVATION, BEDDING AND BACKFILL TABLE OF CONTENTS

YOUR SPLASH PAD RESOURCE

ROOF MOUNT KIT OWNERS MANUAL

How to Build a Dry Stone Wall

NextGel TM JOINTING SAND

StormwaterWise Landscapes: Pervious Surfaces Specifications

STANDARD SPECIFICATION FOR CRIBLOCK CONCRETE CRIBWALL

BIO-AQUIFER STORM SYSTEM

cambridgewallsupport.com cambridgepavers.com

h Installation Manual

BROWN S SIGNATURE COLLECTION

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

B-500 / B-600 SERIES

Rainwater Harvesting Tank

HOME DEVELOPMENT GUIDE

SAND INSTALLATION GUIDE

One and Two Family Additions

VERSAWALL RETAINING WALL SYSTEM

THE POTTING SHED PF-1D-1144 CONSTRUCTION DRAWINGS PROJECT PLAN INDEX FOUNDATION / FLOOR PLAN 2 ROOF PLAN 3

Paver and Ground lights - Anchor Plate

Fabrication and Installation Table of Contents

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Section 2: Underground

SECTION TRENCHING & BACKFILLING

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Anchor bolts ASTM F1554, Gr. 36 Wide flange beams ASTM A992, Fy = 50 ksi Misc. structural steel ASTM A36, Fy = 36 ksi

CRUSHED AGGREGATE BLENDED WITH GRANITECRETE ADMIXTURE SURFACING

ROSETTA BY BROWN S MADE STRONG WITH THE FINEST GRANITE AGGREGATE. PAVERS RETAINING WALLS STEPS FIRE PITS SLABS

GROUND THAWING & CONCRETE CURING REFERENCE GUIDE.

Tasman. Retaining Wall System. Available From. Choose the original Tasman block. Beware of imitations!

Transcription:

PRESCOTT FIRE PIT INSTALLATION GUIDE AND OWNER S MANUAL

TABLE OF CONTENTS COMPONENTS... 3 OVERALL DIMENSIONS.... 4 POSITIONING REFERENCE PER LAYER... 5 FOUNDATION PREPARATION PAVER SURFACE OR CONCRETE SLAB.... 5 COMPACTED GRAVEL BASE.... 5 INSTALLATION OF BLOCKS... 6 OPERATION AND MAINTENANCE... 7 WARRANTY... 8

GENERAL INFORMATION PLEASE SAVE THIS OWNER S MANUAL FOR FUTURE REFERENCE Check with your municipality for regulations on the installation and use of outdoor fire pits. We also recommend that you contact your home insurance company and advise them of the acquisition of your new Techo-Bloc fire pit. IMPORTANT This fire pit is for OUTDOOR USE ONLY. NEVER build a fire pit for use in a house, warehouse, gazebo, garage, or any other indoor setting. Check with your municipality for minimum clearance distances. Make sure that there is nothing directly above the fire pit area that can be a potential fire and/or injury hazard (e.g. tree branches, awnings, patio umbrellas, electrical wires, transformers, cantilevered roof structures, etc.). When selecting the location of your fire pit, make sure that it is located at least 20 feet away from any structure or building. IF YOU WISH TO CONVERT THIS INTO A GAS FIRE PIT, A GAS OR PROPANE INSERT & WIRING WILL BE REQUIRED. CONSULT YOUR LOCAL FIRE PLACE STORE TO PURCHASE THE INSERT & TO HIRE A CERTIFIED FIRE FEATURE TECHNICIAN FOR INSTALLATION. COMPONENTS A. Prescott 2.25" A (x7) B. Prescott 2.25" B (x18) C. Prescott 2.25" C (x7) D. Prescott 2.25" Corner (x16) E. Prescott 4.5" A (x3) F. Prescott 4.5" B (x6) G. Prescott 4.5" C (x3) H. Prescott 4.5" Corner (x6) I. Cap unit 25" (x4) J. Cap unit 27" (x2) K. Steel insert (x1) 3

OVERALL DIMENSIONS Below are the overall dimensions of the fire pit. The height shown is the total height (including buried portion). Unless installed directly on a paver surface or concrete slab, the fire pit should be buried about 2" or 3" below finished grade. 50 3 / 4" 1 289 mm 25 3 / 8" 645 mm 50 3 / 4" 1 289 mm 25 3 / 8" 645 mm TOP ELEVATION 11 3 / 4" 298 mm 27 1 / 4" 692 mm 11 3 / 4" 298 mm 48" 1 219 mm 1' - 6" 457 mm ELEVATION A ELEVATION B ELEVATION C ELEVATION D 4

POSITIONING REFERENCE PER LAYER FOUNDATION PREPARATION PAVER SURFACE OR CONCRETE SLAB If you are building the fire pit on an existing paver surface or concrete slab, drill through the pavement to provide a 2" diameter drain hole at the lowest point. This will allow the rainwater to infiltrate into the ground. Fill the drain hole with clean stone. Go to step Installation of Blocks. COMPACTED GRAVEL BASE Mark out the area of the fire pit and excavate to accommodate 6" of well compacted, dense-graded aggregate base, a 1" layer of sand setting bed, and about 2" or 3" of fire pit wall that will be buried below ground. The aggregate base should extend at least 6" on all the sides of the fire pit walls. It is recommended that a geotextile be laid on the top of the soil surface and up the sides of the excavated area. Place and uniformly compact the aggregate base. The aggregate base should be compacted, for best results, using a vibratory plate compactor, or hand tamper. Spread 1" concrete sand setting bed and level using two 1" diameter pipes and a straight edge (such as a 2" 4"). Keep in mind that the 1" setting bed will be reduced to 5 8" once the wall blocks will be set into the sand setting bed with a mallet. NOTE: if the fire pit is being installed along with a paver installation, the aggregate base course and setting bed of pavers can be extended to be used for the fire pit installation. 5

INSTALLATION OF BLOCKS LAYER 1 Place the first course of blocks with the narrower side of the block facing towards the center of the fire pit. Verify that no gaps are left at the outer face of the blocks. Once the first course has been aligned, use a soft-head mallet to set the blocks into the sand setting bed. Make sure that the blocks are leveled from front to back, side to side, and from block to block. LAYER 1 LAYER 2 TO 5 Install the next courses as shown on the drawings and using the steel insert as a template for each layer. Use a heat resistant concrete adhesive to glue every course to the blocks beneath it. All units should be dry and dust free before applying adhesives. Any alignment adjustments should be done quickly as the adhesive will set up in a short amount of time and the block will set in place. LAYER 2 LAYER 2-1 LAYER 3 LAYER 4 6

(x2) (x2) (x2) LAYER 5 LAYER 6 LAYER 6 Dry lay the cap units and place the steel insert in the center of the opening. Make sure that the insert flange rests evenly on top of the cap units and that the cap units overhang the fire pit wall in a uniform way. Take out the steel insert and lift up each cap unit individually leaving the others in place to act as a guide. Apply adhesive to glue every cap unit to the blocks beneath it. Put the insert back with the flange resting on top of the cap units. Fill the inside of the pit with 3 4" (20 mm) clean stone to a depth of 4" (100 mm). This will allow the filtration of any water that may evacuate through the walls of the fire pit following a rainstorm. Do not light a fire for at least 48 hours to allow any adhesive to cure properly and for potentially flammable fumes to dissipate. OPERATION AND MAINTENANCE The fire pit is not designed for large fires. Use only a small amount of dry and clean hardwood for burning. Allow the fire to burn out on its own unless it is an emergency case. Extinguishing an active fire with water or any other liquid may cause the metal components of the accessory kit to warp and will encourage the formation of rust. Do not burn charcoals, leaves, trash, paper, cardboard, and softwoods such as pine, cedar and plywood. Do not use lighter fluid, gasoline, or other fire accelerants to start or maintain fires. Never touch the steel insert and flange while a fire is lit. The steel insert and flange will become extremely hot and burn the skin on contact. Wear fire resistant gloves when maintaining the fire. The fire pit area must always be clear and free from any combustible materials such as gasoline, propane tanks and/or any other flammable vapors and/or liquids. Always have a fire extinguisher or garden hose nearby for any potential emergency. Avoid using the fire pit in windy conditions. At each use, before starting a fire, remove all accumulation of ashes, wood and debris from the fire bowl and inspect the overall fire pit and accessories to ensure that it is in safe operational condition. 7

Children and pets should NEVER be left unsupervised when the fire pit is in use. We highly recommend that good fire safety measures are practiced and that you and your guests maintain a minimum distance of 3 feet away from the fire pit to avoid potential injury. Do not sit, lean on or stand on the fire pit wall. Ensure that the fire pit area is always clear of toys, clothing, etc. Do not use the fire pit for cooking purposes. Never leave an active fire unattended. It is recommended to replace the clean stone at the bottom of the fire pit annually to maintain proper water filtration. WARRANTY For warranty details and exclusions on TECHO-BLOC PRODUCTS, please visit our website at: https://www.techo-bloc.com/contact-us/about-us/ REDEFINING LANDSCAPE PRODUCTS CANADA 5255, Albert-Millichamp street, St-Hubert, Québec J3Y 8Z8 USA 852 Pennsylvania ave, Pen Argyl, PA 18072 Toll free: 1-877-832-4625 Fax : 450-656-1120 www.techo-bloc.com 8