Kent Morrisey, Business Development Manager Bailey Systems Evolution Planning Considerations. ABB Group March 26, 2012 Slide 1

Similar documents
Automation Sentinel Life Cycle Management Program for Control Systems

Distributed Control Systems for Industrial Automation ABB. Product PDF Presented by DCScenter.com. For Product Needs:

Awesome lvl1 picture

Value Driven Control System Migration

The Power of Integration

T51 - Maximizing the Efficiency of OEM Skid Equipment in The Connected Enterprise

2012 Honeywell Users Group Americas Sustain.Ability. Ben Comtois Marjorie Ochsner 3rd Party Migration to Experion Sustainable and Flexible Solutions

SIMATIC IT Maintenance Program. An innovative software maintenance concept

GE s Control System Lifecycle Management Offerings

Ovation GE LM6000 Control System Retrofit

Successful Migration of a Legacy Control System At Marathon Petroleum Company LLC

Unified control system in power plant TCE approach for implementation in Indian context

Life Cycle Management Sesam

Emerson s Flexible Approach to Control System Migration. Executive Overview End Users are Facing a Migration Crunch... 4

2013 Honeywell Users Group Asia Pacific. Andrew Stuart Harness the Power of Experion PKS with Modernization Solutions for TPS

T91 - How to Select the Right Machinery Safety Logic System

Bürkert Academy Reduce Process Control Costs Technical Article.

Intelligent Process & Equipment Surveillance. Anand Vishnubhotla

Avaya Product Lifecycle Policy

Freelance 800F The compact control system

Guardian Support for AMS Device Manager

SIMATIC PCS 7 Lifecycle Services

ABB ServicePro 4.0 Service Management System

Deliver your next project on time and within budget. Integrated Projects

IBM ICE (Innovation Centre for Education) Welcome to: Unit 1 Overview of delivery models in Cloud Computing. Copyright IBM Corporation

Totally Integrated Automation. Efficiency driving productivity

Advanced Automation and Digitalization for the Automotive Industry

System 800xA with AC 870P We like it large

Energy Advisor. Introduction. Energy Advisor. Product Data Sheet October 2014

A Paradigm Shift for Dispatch Consoles From hardware consoles to a licensed, evergreen software platform

CEMAT based on process control system SIMATIC PCS 7. cemat

Integrated engineering with COMOS and SIMATIC PCS 7

Trusted by more than 150 CSPs worldwide.

Proficy * Plant Applications. GE Intelligent Platforms. Plant Performance Analysis and Execution Software

Vijeo Citect roadmap and how to get more from your investment. Darren Fraser General Manager SCADA Adam Barnes Product Manager Vijeo Citect

Agenda. 1. Check Weighing 2. Business Needs 3. Solution & Case Study

Advanced Support for Server Infrastructure Refresh

Wonderware System Platform 2017 Real-time Operations Control Platform for Supervisory, HMI, SCADA and IIoT

Title: HP OpenView Configuration Management Overview Session #: 87 Speaker: Loic Avenel Company: HP

Vimal Kapur. President, Honeywell Process Solutions Industry Perspective

Open Architecture Machinery Control Systems

SOFTWARE VALIDATION CASE STUDY

The Connected Chemical Plant

Symphony Plus Total plant automation for the power and water industries

DCS Conversions to Wonderware FactorySuite. Marty Bince, ISSWonderware Rick Arnott, Ready Engineering

Not For General Distribution. For Committee Ballot 3849 Use Only. Process Control Systems

On Demand Systems Management

Symphony Plus / Melody Total plant automation for the power and water industries

Program Guide. Server and Cloud Enrollment (SCE)

Discussion on Long-Term Test System Management and Sustainment

Factory Information Integration and Utilization

1 Building an Identity Management Business Case. 2 Agenda. 3 Business Challenges

CONTENTS. Industrial IT Certification Procedure for Hardware. ABB Automation Technologies AB 2PAA en - 1

VOITH PAPER S PILOT PLANT AUTOMATION PERMITS REMOTE CUSTOMER MONITORING

Be open and independent

Increase Productivity While Reducing Costs:

Innovating for the Road Ahead. Oracle Utilities Customer Solution

HP PrintOS. Reinvent print production

BMC - Business Service Management Platform

SIMATIC PCS 7. TELEPERM M process control system. Migration to SIMATIC PCS 7. Brochure July

Wonderware MES, Thommy Djupenström Invensys. All Rights Reserved.

ITIL Asset and Configuration Management in the Cloud. January 2017

Enterprise APM version 4.2 FAQ


Cisco Connected Asset Manager for IoT Intelligence

System and Software Engineering. Ian Sommerville 2004 Software Engineering, 7th edition. Chapter 1 Slide 1

Integration and Connection Strategies to Maximize the Benefits from Your MES System

VZ09 SCADA Ready: Using Rockwell Software Products to Realize Specific Requirements of a Supervisory Control and Data Acquisition System

Highest efficiency across the line. Optimized Packaging Line. siemens.com/packaging

Server and Cloud Enrollment Frequently Asked Licensing Questions

Automation and Drives OSEA Totally Integrated Automation SIMATIC. Process Automation. Exceeding requirements of a DCS

> EXCELLENCE MADE IN ITALY

Dynamics 365 for Finance & Operations

Windows Server 2003 migration: Your three-phase action plan to reach the finish line

Physical Changes. Updates

VALMATIC. Integrated Automation System. Exceeding expectations...

Introducing FUJITSU Software Systemwalker Centric Manager V15.0

Using historical data for asset management decision making Craig Knox, ISE Solution Engineering. October 10, 2017

CT308: Gilead s Greenfield API Pilot Lab Process Control System Uses PlantPAx For Life Sciences

imvision System Manager Infrastructure Management Software

IBM Tivoli Workload Automation View, Control and Automate Composite Workloads

Design, Install and Manage System Center 2012 Operations Manager

Adobe Value Incentive Plan (VIP) Channel FAQ

Optimizing the PC Lifecycle. Dell PC as a Service

Central Management Server (CMS) for SMA

1 Building an Identity Management Business Case. 2 Agenda. 3 Business Challenges

Symphony Plus S+ Operations

What s New with the PlantPAx Distributed Control System

Asset Management. Visit us at: or call SCAN

JD Edwards EnterpriseOne Mobile Solution Strategy

Eurotherm. Temperature Control, Measurement and Data Recording Solutions. Product Selection guide

Oracle Cloud Blueprint and Roadmap Service. 1 Copyright 2012, Oracle and/or its affiliates. All rights reserved.

Market System Evaluation. June 2017

Tough Math for Desktop TCO

C2-304 INTEGRATED INFORMATION SYSTEM FOR THE SIEPAC REGIONAL ELECTRICITY MARKET

This topic focuses on how to prepare a customer for support, and how to use the SAP support processes to solve your customer s problems.

Application Overview. System 800xA Application Libraries ProBase Library

Reference report Oil & Gas

HP Quality Center 10 Overview

copyright Value Chain Group all rights reserved

Transcription:

Kent Morrisey, Business Development Manager Bailey Systems Planning Considerations March 26, 2012 Slide 1

Region March 26, 2012 Slide 2

How to Maintain an aging automation system.. Objectives $ Improve Benefit $ Current Value Lower Costs TCO Yr1 Yr2 Yr3 Yr4 Yr n Extend Life March 26, 2012 Slide 3

Strategy Without Obsolescence Maximum Value Minimum Risk Flawless Execution Automation solutions that sustain and extend your control system to meet today s business challenges Investment Protection Intellectual Property Capital Equipment Incremental, stepwise execution Realized in ABB s policies, programs, processes and tools March 26, 2012 Slide 4

without Obsolescence Life Cycle Management Overview Underlying products are sustained by defined life cycle phases Active until functional equivalent Defines minimum 10 years of support after removal from Active sales Life cycle changes documented 12-18 months in advance Active actively sold Classic manufactured and maintained Limited serviced Obsolete normal support not available Active Classic >10 years Limited Obsolete >12 months >6 months Released for Sale Obsolete Notice Manufacturing End Last Buy March 26, 2012 Slide 5

Automation Sentinel Delivering on the Lifecycle Policy Software support to match customers system lifecycle needs March 26, 2012 Slide 6 System Software Support Software license updates for new releases Access to System 800xA and S+ Operations Software Software performance improvements and anomaly fixes on current releases On-line access (24x365) Software downloads User documentation Release notes and workarounds Status of MS security patch validation Validated PC hardware for 800xA software versions Technical phone support Auto-notifications Subscription renewal notices Software Version release notices

Automation Sentinel Enabler Provides the evolution path to System 800xA or Symphony Plus software Delivers functional equivalent at 100% license discount Significant Savings (> 50%) vs Purchase of New Software Includes Controller Software Licenses All ABB systems, all generations Consoles Historians Batch Engineering Control System 800xA ABB OCS Systems March 26, 2012 Slide 7

Planning from ABB On-going collaborative process planning requires continuous re-evaluation of business needs and solutions March 26, 2012 Slide 8 ABC, Inc. Harmony System Overview Installed system description: INFI 90 Controller type: Controllers (MFP) Lifecycle Status Limited Support Status OK I/O type: Rack I/O Active OK System Communications: Cabinet Power Supplies: Engineering Tools: Operator Workstations: Network 90 I/O Limited OK INFINET Active OK INFI 90 Power System (MPS1) WinTools OIS 20 Series LAN 90 PCView Limited Limited Limited Classic Recommended Recommended Recommended Recommended Comments MFP02 & 03 controller pairs can be readily replaced with BRC300 or BRC400 pairs. While some installed INFI90 Rack I/O modules are in Limited phase, Active-phase directreplacement modules are available. Active-phase direct-replacement modules are available. Active-phase replacements are available for all installed comm. equipment - slight difference in architecture (i.e.: MPI no longer required.). Most MPS1 components are no longer manufactured. Upgrades to MPSIII are strongly recommended. Support for WinTools software effectively ended in 2006. Users are strongly encouraged to move all WinTools-based configurations to Composer. OIS 20 was removed from sale in 1999. Recommend evolution to 800xA Process Portal. Software will be in classic phase through 2010. Recommend maintaining software at latest revision, stocking sufficient hardware spares and planning for evolution to 800xA Process Portal. An ongoing, collaborative process between ABB and our system owners Identifies customer s business needs, goals, and priorities Results in short and long term roadmap for system enhancement and maintenance Continuous re-evaluation: business needs and solutions Customer Benefits: Insight into process/system risk areas Identification of new system functionality and solutions to extend the value of the system to meet customer s business goals Known timing for evolution action (2-5 years); assist budgeting process

System Support Considerations Typical Operator Software Engineering Software Controllers Power Supplies System Communication I/O Spare Parts March 26, 2012 Slide 9

System Support Considerations Priorities are Dependent Are Parts available only on a Repair basis? Are Spare parts needs met? Are >10 year old Power supplies in Service? Especially Net 90 Supplies Is the Operator Station OS still supported by Mfc? Is the Operator Station HW still current? Are Communications Infinet? Controlway? Not Plant Loop nor Super Loop Is Controller Utilization >80%? Is Software at latest version? Do IO modules draw high current? March 26, 2012 Slide 10

System Support Considerations Best Practices Assess Evaluate Plan Justify Execute Periodically Monitor / Update / Revise March 26, 2012 Slide 11

Kent Morrisey, Business Development Manager Bailey Systems Case Study March 26, 2012 Slide 12

Case Study Agenda System Lifecycle Status - 2008 Recommendations Actions to Date Future Plans March 26, 2012 Slide 13

Harmony System Overview Installed system description: Lifecycle Status Support Status Comments Operator Workstations: Conductor NT Active OK Recommend maintaining software at latest revision or evolution to 800xA Process Portal for additional functionality. Cabinet Power Supplies: INFI 90 Power System (MPS1) Limited Recommended Most MPS1 components are no longer manufactured. Upgrades to MPSIII are strongly recommended. Cabinet Power Supplies: Symphony Modular Power System (MPSIII) Active OK Recommend continuing evolution of MPSI to MPSIII System Communications: INFINET Active OK Active-phase replacements are available for all installed comm. equipment - slight difference in architecture (i.e.: MPI no longer req d.). Controllers: Network 90 Controllers Limited Recommended MFC controller pairs can be readily replaced with BRC300 or BRC400 pairs. March 26, 2012 Slide 14

Controllers: INFI 90 Controllers (MFP) Limited Recommended MFP controller pairs can be readily replaced with BRC300 or BRC400 pairs. Controllers: Bridge Controllers (BRC) Active OK The BRC family of controllers will be active until at least the year 2015. I/O: INFI90/ Symphony Rack I/O Active OK While some installed INFI90 Rack I/O modules are in Limited phase, Active-phase direct-replacement modules are available. I/O: Infi90 Termination Units Active OK Engineering Tools: Composer Active OK Composer will be active until at least 2015. March 26, 2012 Slide 15

DCS Component Qty. Existing Support Status Path Comments Power 9 IEPAS01 Power 23 IEPAS02 Recommended Recommended MPSIII MPSIII All MPSI components are in Limited status. Recommend upgrades to MPSIII. Note: IEPAS02 is currently available. Power 2 MPSIII OK N/A Human System Interface Engineering Tools 3/6 Conductor NT OK System 800xA 1 Composer OK N/A Controllers 8 BRC100 OK BRC300 BRC100 is in limited status due to component availability. Recommend planned evolution to BRC300 (in pairs). Controllers 10 IMMFP01/11 Recommended BRC300/400 Replace (in pairs) with BRC300 or 400 as failures occur. Controllers 1 IMMFC02 Controllers 5 IMMFC05 Recommended BRC300/400 Evolve to BRC300/400. MFC's are in supported on a repair only basis. Multiple MFC's may be consolidated into one BRC. March 26, 2012 Slide 16

March 26, 2012 Slide 17 DCS Component Control Network Control Network Control Network Control Network Control Network Qty. Existing Support Status Path 13 INNIS01/11 OK INNIS21 9 INNPM01/11 OK INNPM12 4 INICT03A OK INICT13A 4 IMMPI01 OK INICT13A 1 NSPM01 Recommended INCPM02 Rack I/O 3 IMASI02 OK IMFEC12 Rack I/O 15 IMASI03/13 OK IMASI23 Rack I/O 24 IMASI23 OK N/A Rack I/O 69 IMCIS02 OK IMCIS22 Rack I/O 77 IMCIS22 OK N/A Rack I/O 1 IMDSM04 OK N/A Rack I/O 31 IEMMU21 OK N/A Comments Replace as Failures occur Replace as Failures occur INICT13 does not require MPI but INNIS21 is required in ICT13-based ICI03 INICT13 does not require MPI recommended only if this functionality is still required. FEC12 is a functional replacement for the ASI02 ASI23 is a functional replacement for the ASI03 (assuming ASI03 is used for thermocouple or RTD inputs - if not, the ASI can be replaced with the FEC12) CIS22 is a functional replacement for the CSI02

Plan Recommendations Immediate Assure Conductor NT software is covered by the ABB Automation Sentinel software maintenance and evolution program. Begin a managed, pair-by-pair evolution program for the MFC controllers to BRC300/400 controllers. 1-3 Years Plan to evolve MPS1 Power Systems to MPS3. Begin a managed, pair-by-pair evolution program for the MFP controllers to BRC300/400 controllers. 3-5 Years Begin or continue planning the evolution of Conductor NT software to System 800xA Process Portal or S+ Operations 5-10 Years Continue yearly evolution planning paying particular attention to new technologies and features as they are introduced in the ABB Symphony/Harmony and System 800xA product lines. March 26, 2012 Slide 18

Plan Actions to Date Immediate Assure Conductor NT software is covered by the ABB Automation Sentinel software maintenance and evolution program. Subscribed to Sentinel and upgraded CNT to latest version Begin a managed, pair-by-pair evolution program for the MFC controllers to BRC300/400 controllers. Budgeted for 2010 turnaround. 1-3 Years Plan to evolve MPS1 Power Systems to MPS3. All (8) Cabinets upgraded to MPS 3 in 2010. Begin a managed, pair-by-pair evolution program for the MFP controllers to BRC300/400 controllers. 9 BRC pairs installed in 2010. 3-5 Years Begin or continue planning the evolution of Conductor NT software to System 800xA Process Portal. Proposed upgrade to 800xA. 5-10 Years Continue yearly evolution planning paying particular attention to new technologies and features as they are introduced in the ABB Symphony/Harmony and System 800xA product lines. March 26, 2012 Slide 19

Plan Actions to Date (cont.) Safety System Application Purchased in 2009 SIL Rated AC800M Controllers S800 I/O System 800xA HMI Potential Future interface into Plant wide System 800xA Operator Station Implemented HPG Connection between AC800M and Harmony 2009 Implemented HPG to Compressor PLC Upgraded NPM firmware under Sentinel Added Rack PCU Cabinet and PC Cabinet March 26, 2012 Slide 20

Plan Future Plans Upgrade CNT to System 800xA HMI Continue with Sentinel March 26, 2012 Slide 21

Value Proposition Controllers -> BRC 1 Faster, more powerful controller processor will lower utilization and allow for logic expansion. 2 Faster, more powerful processor provides faster control execution rate that can result in increased process production depending on the application. 3 Ability to utilize low cost, flexible S800 I/O for expansions. 4 Like in kind replacement with little or no Re-engineering required. (Intellectual investment is maintained 100%) 5 Ability to consolidate logic from Multiple Processors into new BRC reduces upgrade cost and maintenance. 6 BRC 400 offers 30000 function block capacity; 3 times the capacity for 15% greater price. MPS I -> MPS III Power Supplies 1 Extends power supply life another 7-10 years 2 Reduced footprint may provide additional cabinet space 3 Increases system reliability 4 Cost effective solution vs investment in existing supplies March 26, 2012 Slide 22

Value Proposition Sentinel Program 1 Can be applied to the existing system to provide software upgrades to System 800xA 2 Ongoing software updates including the 800xA Process Portal and Composer software 3 Firmware updates and chips 4 Supportline for assistance in loading software 5 Solutionsbank subscription for access to patches and online documentation Operator Console -> 800xA Process Portal 1 Opportunity to review current graphics utilization and presentation and reduce/consolidate. Leads to reduced cost/effort to maintain and improved operations. 2 Personalized workplaces to meet the needs of Operations, Engineering, Maintenance and Management. 3 PC based hardware and software continues effective use of maintenance investment 4 Graphics conversion maintains years of prior intellectual investment. 5 Utilize Asset Optimization reduces annual maintenance costs. (Predictive/preventive.v. reactive maintenance) 6 Capability to interface to Business systems can dramatically improve enterprise automation 7 Provides Standardization to one common Workplace over all ABB plant control systems. 8 With PLC Connect can provide one common Workplace over all plant control systems. March 26, 2012 Slide 23