Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

PART 1 GENERAL REQUIREMENTS

WYOMING DEPARTMENT OF TRANSPORTATION. Pollution Controls and Best Management Practices for Storm Water During Construction FIELD GUIDE

Storm Drain Inlet Protection

Straw Bale Barrier. - Along the face and at grade breaks of exposed and erodible slopes to shorten slope length and spread runoff as sheet flow

Straw Bale Barrier. Parallel to a roadway to keep sediment off paved areas

City of Bozeman. Construction Site Management Program

C. This project shall be designed to meet LEED Silver design criteria. Construction activity pollution prevention is a mandatory requirement.

Module 4 Regulatory requirements for Land Disturbing Activities

Town of Essex, Vermont January, 2017 Standard Specifications For Construction CHAPTER 3 EROSION AND SEDIMENT CONTROL

EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR PROJECT TITLE

901 - TEMPORARY EROSION AND POLLUTION CONTROL SECTION 901 TEMPORARY EROSION AND POLLUTION CONTROL

Nevada Contractors Field Guide for Construction Site BMPs

11 Ways to Avoid Storm Water Fines. No Exceptions!

KDOT TEMPORARY EROSION - CONTROL MANUAL

Erosion & Sedimentation Control Policy

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Richland County Department of Public Works Engineering (Land Development) Division

28 February 2017 ATTENTION: MR HENNIE WOOD AND MS MAGGIE VON RONGE NORTHAM BOOYSENDAL CC: AMANDA PYPER AMEC FOSTER WHEELER NOTE FOR THE RECORD

U.S. ARMY CORPS OF ENGINEERS. Little Rock District

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

CCI107 ONLINE PROGRAM. Stormwater Management. Stormwater Management for Construction Activities Alberta. Market Type: Construction Level: 1

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Chapter 12 Erosion and Sediment Control

Stormwater Construction Inspection Guide

SACHSE EROSION CONTROL GUIDELINES

Erosion Control for Home Builders

CONSTRUCTION EROSION AND SEDIMENT CONTROL PLAN APPLICANT PACKAGE

Filter Tube Barriers (Instream)

Storm Drain Inlet Protection for Construction Sites (1060)

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices

Parking Area Maintenance

Concrete Waste Management

Construction Field Manual

Appendix A. Best Management Practice Toolbox

BMP #: Infiltration Basin

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

The Clean Water Act: Phase I

C. Foundation stabilization for pipe and utility structures.

JEFFERSON COUNTY STORM WATER MANAGEMENT

Sediment Basin. Fe= (Depends on soil type)

Builder s enviro guide

Temporary Watercourse Crossing: Culverts

Elements of the Storm Water Management Plan. Storm Water Pollution Prevention Plan (SWPPP)

UMD Storm Water Program Construction Requirements. Greg Archer, MBA Environmental Compliance Specialist

Stormwater Local Design Manual For Houston County, Georgia

Stormwater Pollution Prevention Plan for:

MODEL Stormwater Local Design Manual. City of Centerville

Constructing a Better Future for Kentucky s Environment AND SEDIMENT CONTROL EROSION PREVENTION KENTUCKY. Field Guide

Recommended Resources: The following resources may be useful in teaching this lesson:

Teton County, WY. Storm Water Pollution Prevention Plan (SWPPP) Guide

SMALL SITE Stormwater Pollution Prevention Plan For:

STORMWATER POLLUTION PREVENTION PLAN

CHAPTER 2 EROSION CONTROL

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

SOIL EROSION CONTROL PERMIT APPLICATION

1.1.2 NOI & NOT Notice of Intent and Notice of Termination for TPDES permits TPDES Texas Pollutant Discharge Elimination System

Applying landforming to reclamation: A case study in Central Appalachia

EROSION & SEDIMENT CONTROL FIELD GUIDE. Northeast Wisconsin Stormwater Consortium

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Stormwater Management and Sediment and Erosion Control Plan Review Checklist For Design Professionals

STORMWATER POLLUTION PREVENTION PLAN

Site EMP Kit- Guidance Notes

Review of State and Federal Stormwater Regulations November 2007

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

Design Specifications & Requirements Manual

E. STORMWATER MANAGEMENT

CITY STANDARD DETAILS FOR CITY OF JACKSONVILLE FLORIDA DEPARTMENT OF PUBLIC WORKS

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Block or Log forms of PAM and PAM blends are manufactured for specific use in drainage waterways to remove suspended particulates from runoff.

SECTION TRENCHING & BACKFILLING

Erosion and Sediment Control Plan for a Timber Harvesting Operation

Lump Sum L.S. (15") EA

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

QSD/QSP Training Module 9 SWPPP Preparation

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

At least 2 feet above the seasonal high water table Overflow path or structure provided

ENGINEERED DRAINAGE PLANS COMMERCIAL, RESIDENTIAL AND LAND DIVISIONS FEE DETERMINATION WORKSHEET

Item Name Description Unit of Measure Mobilization Per WSDOT Lump Sum

Construction Best Management Practices Plan (CBMPP) Instructions

Municipal Stormwater Ordinances Summary Table

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Infiltration Guidelines

[Rev - 1] 06/

ITEM 506 Temporary Erosion Control

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

23.0 Storm Water Management

Constructed Wetland Pond T-8

CITY OF TROY CONSTRUCTION SPECIFICATIONS PREPARED BY: F-7587

Hazardous Waste Management

CHAPTER 7: TREE PROTECTION DURING CONSTRUCTION 7.1 TREE PROTECTION AREAS

Section SNOW DISPOSAL SITE DESIGN CRITERIA

Attachment D-1: Civil/Structural Scope of Work

Pahiatua Waste Water Treatment Plant Wetland Erosion and Sediment Control Plan (ESCP)

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

Transcription:

Overview The Good, The Bad, and The Ugly Stormwater Regulations for the Construction Industry Seminar March 20, 2012 Wendy Terlizzi Arizona Department of Transportation Office of Environmental Services Water Quality Group Statewide Program Manager Best Management Practices (BMPs)-Control Measures Erosion and Sediment Control BMPs Examples Gathered form previous seminars Bad and good examples The term Best Management Practices seems to be in the process of being phased out by the regulators and replaced by the term control measures. 1 2

Best Management Practices (BMPs) Erosion vs Sediment Control BMPs means schedules of activities, prohibitions of practices, operation and maintenance procedures, and other management practices used to prevent or reduce pollution to waters of the U.S. BMPs also include treatment requirements, operating procedures, and practices to control plant site runoff, spillage or leaks, sludge or waste disposal, or drainage from raw material storage. Erosion Control, 1 st line of defense Purpose is to keep soil in place, minimizing suspension and transport. Primary means of preventing stormwater pollution, implemented at beginning of construction and during construction as needed. Used at the end of construction to permanently stabilize. Runoff & Sediment Control, 2 nd line of defense Purpose is to trap sediment. Use in conjunction with properly designed and installed Erosion Control BMPs. Non-structural Structural Included this slide in to provide the definition of best management practices. Some people forget that BMPs include non structural practices and procedures and BMPs are a large part of how a permittee complies with permit conditions. BMPs can be structural or nonstructural. Examples of Nonstructural are: Good Housekeeping phasing and minimizing disturbance Spill Control and Response Training Preventative Maintenance Inspections Examples of Structural are anything that needs to be installed: Wattles Rip rap Stabilized entrances and exits 3 4

Erosion Control Runoff and Sediment Control Minimize disturbed area and protect natural features and soil (e.g. Preserve Existing Vegetation) Phase construction activity (e.g. Construction Sequencing) Control stormwater flowing onto and through the project (e.g. Earth Dikes/Drainage Swales and Lined Ditches) Stabilize soils promptly (e.g. Seeding, Mulch Cover, Soil Binders) Protect slopes (e.g. Geotextiles, Crown Ditch, Slope Drains) Protect storm drain inlets (e.g.. Storm Drain Inlet Protection) Establish perimeter controls (e.g.. Silt Fence, Sediment Logs) Retain sediment on-site and control dewatering practices (e.g.. Sediment Trap/Basin, Dewatering Operations) Establish stabilized construction exits (e.g.. Stabilized Construction Entrance/Exit) Inspect and maintain controls (e.g.. Inspection and Maintenance) As stated in the previous slide erosion control is the first line of defense on a construction project and its purpose is to keep soil in place, minimizing suspension and transport. Runoff and sediment control are a last resort sediment leaving for a project. Runoff and sediment control BMPs should be used in conjunction with erosion controls to effectively control sediment on a project. 5 6

Vegetation left in-place Erosion Control One of the most effective BMPs to employ is not removing vegetation. This used in conjunction with scheduling, phasing, and maintenance are probably the cheapest BMPs out there. 7 8

Slope Protection Temporary Stabilization (Soil Protection) Slope protection is critical to install as soon as practicable to ensure that the erosional processes are limited and can consist of a variety of methods I will cover in the next few slides. Temporary stabilization can take many forms. It can be mulch cover, or soil binders. Should be initiated within 14 days in portions of the site where construction activities have ceased temporarily or permanently. 9 10

Crown Ditch Earthen dikes / Drainage swales A crown ditch is designed to intercept, divert and convey surface run on, usually sheet flow over slopes, to prevent erosion. The picture to the right shows how these structures can be constructed so that it blends with the natural background. As with the crown ditch, the purpose of these structures are to intercept, divert and covey surface runoff, usually sheet flow, to a desired location. 11 12

Erosion Control Mats/Blankets Mini Benching Erosion control mats/blankets can be a natural or synthetic material installed to reduce the soil erosion by wind or water. Proper soil preparation is needed prior to installing the matting or blankets. Roughened soil slows runoff, increases infiltration, traps sediment, and improves seed germination. Photo on the bottom right shows a slope that was both mini benched and not. As you can see the area that had the benches installed is performing much better. 13 14

Improperly Installed Wattles/Logs Runoff and Sediment Control Wattles should be placed along the contour of the slopes, be trenched in to prevent undermining, overlapped to make sure there are no gaps, and staked in place. Their main purpose is to intercept runoff, drop sediment out, reduce flow velocities and promote infiltration. Note that the stakes on the bottom right photos are not pounded in far enough and could cause a safety issue. 15 16

Improperly Installed Wattles/Logs Poorly Maintained Wattles/Logs Wattles/logs should not cross washes unless they are temporary and called out in the required 404 permit issued by the Army Corp of Engineers. BMPs lose their functionality if they are not properly maintained or replaced. 17 18

Poorly Maintained Wattles/Logs Proper Installation of Wattles/Logs The wattles should not be placed in an area where traffic will drive over them. The area circled shows evidence of traffic over the wattles. These wattles/logs are placed along the contour of the slope and used in conjunction with other erosion control BMPs to help attain proper stabilization. 19 20

Proper Installation of Wattles/Logs Protect Storm Drain Inlets The logs (left photo) are used as velocity dissipation devices. The bottom right photo show sediment wattles installed in conjunction with soil track walking. Storm drains need to be protected during construction to ensure that sediment or other pollutants are not allowed to enter. Can be done in many ways, either temporarily with logs or wattles or permanently with rock mulch. This is a last line of defense to protect sediment and debris from entering the storm drain. 21 22

Protect Storm Drains/Dry Wells Curb Inlet Protection Should be marked Need to be protected and maintained A temporary filtering device placed in the flow line of completed curb inlets to protect until final stabilization is reached. Fill sand bags with rocks instead of sand Can handle a faster water flow than sediment logs or wattles Allows sediment to settle from runoff before water leaves the site 23 24

Perimeter Control Track-out Control The most common form of perimeter control that I see is silt fence. Silt fence is a temporary sediment barrier consisting of a filter fabric that is entrenched into the soil, stretched between and attached to posts and wire fence for support. Track out is required not just for stormwater quality, but also for air quality. There are many ways of going about this, but one of the easiest is the installation of gravel. The purpose of these BMPs is to: Remove mud and sediment from construction vehicle tires. Minimize amount of mud and sediment leaving the area on vehicle tires. Stabilize entry/exit area to prevent tire rutting. 25 26

Track-out Control Desilting Basin As with all other BMPs this needs maintenance to ensure that it properly functions throughout the life of the project and that sediment is not tracked out onto the roadway. A desilting basin is a small impoundment formed by excavation and/or constructing an embankment so that sediment laden runoff is temporarily detained. Simplify stormwater management on a construction site by trapping small amounts of sediment at multiple spots. 27 28

Check Dam Rock Outlet Protection Good protection Inadequate protection A small dam constructed across a roadside ditch or channel. The purpose of these are to: Reduce the velocity of concentrated water flows. Reduce channel erosion. Allow sediment to settle. This BMP by definition would also be considered a post construction BMP (permanent) since it is left in place after construction is complete. The outlet protection helps to prevent scour and reduce velocity of concentrated stormwater flows. Photo on left should have some riprap around the top of the culvert as well to protect from run on. 29 30

Portable Toilets Good Housekeeping Portable toilets should be placed on a level surface where they can be secured from tipping over and away from traffic. They should never be placed in a wash. Above photos show what not to do. 31 32

Portable Toilets Material Storage Staking portable toilets Ripped and uncovered bags of material Covered The toilets have areas where stakes can be inserted to secure them to the ground. Material storage should be off the ground, under cover and protected from the elements. If not, and this is especially important here in the desert, the plastic can degrade and tear, thus releasing the material to the ground s surface. 33 34

Stockpile Management Stockpile Management No down slope protection Whether it is sweeper waste or stockpiles of other loose material, stockpiles should have BMPs implemented around them. These are procedures and practices to reduce or eliminate stormwater contact with all piled construction site material including: soil, sand and paving materials such as concrete rubble, asphalt concrete, asphalt concrete rubble, aggregate subbase or premixed aggregate, and asphalt binder ( cold mix asphalt). Need to have perimeter control installed. Ideally there would be some freeboard left between the wattle and the pile to allow the pile to settle without overtopping the control measure with silt. If a berm of material is used as a control measure then it needs to be compacted to ensure that sediment will not be leaving from the berm or the stockpile. It should be noted that if other functional site perimeter controls are maintained, control measures around temporary or active stockpiles may be redundant. The upper left photo does not have any perimeter control, and more importantly it does not have any down slope BMPs installed. So if there was a discharge, it would go directly onto the roadway. The photos on the right show spillage outside of the BMPs. 35 36

Concrete Washout Concrete Washout In Arizona, under the groundwater program, APP General Permit 1.12, concrete washout is required to comply with some general conditions. It is only required to be lined (30mls thick) if it is within 20 feet of groundwater. The impoundment is located at least 50 feet from any storm drain inlet, open drainage facility, or watercourse and 100 feet from any water supply well. These are good examples of concrete washout. For the top right photo noticed that it is signed and roped off to protect it from interfering activities. The vegetation at the soil base of the impoundment is cleared, grubbed, and compacted to uniform density not less than 95%. If the impoundment is located above grade then the berms or dikes needs to be compacted to a uniform density of not less than 95%. The washout should also be signed. Although the photo on the bottom shows the sign, there is evidence of the concrete washout material not being contained. 37 38

Secondary Containment Secondary Containment Gap in liner Tear in liner Secondary containment is required not just under the stormwater permit, but also under the Spill Prevention Control and Countermeasure (SPCC) regulation. This is to ensure that if that container where to rupture, the fluid inside would be contained and not run off of the site. Lining of fueling areas is considered under Good Housekeeping. By providing lined secondary containment, the operator is preventing the pollution of storm drains or watercourses from spills Good examples of secondary containment. Both of these liners need maintenance. They have lost their intended function. 39 40

Secondary Containment Laying on bare ground Proper storage of liquid or any other material helps to reduce the risk of discharge from leaks and spills at the construction site. The above photos are example of what not to do. Does not have to be complicated. This is a wattle with a sheet of plastic wrapped around it to create an impervious layer. Simple and cheap. 41 42

Spills and Prevention Spills and Prevention Spill kits on site Oily residue on ground Leaks happen, but there needs to be some sort of response plan to deal with even the smallest of spills. Here it would be appropriate to have some sort of container to store the oily soil in while it is waiting to be disposed of. Need to have spill kits and proper BMPs on site to address spills if they happen. 43 44

Straw bales Questions For More Information Wendy Terlizzi Water Quality Manager Not allowed on ADOT projects Office of Environmental Services 602-712-8353 wterlizzi@azdot.gov Straw bales as BMPs are not allowed on most municipal protects; ADOT will not allow their use. They have the tendency to fall apart and cause more problems (introduction of new pollutants) than they are trying to solve. Seeds in bales may introduce undesirable non native plants to the area. Bales are heavy & hard to move around (especially when water logged). 45 46