Asbestos Management Plan. Program originated: 02/2000 Last updated: 6/2015. Wendel Reece University Safety Manager

Similar documents
BRIGHAM YOUNG UNIVERSITY IDAHO ENVIRONMENTAL, HEALTH & SAFETY SAFETY DEPARTMENT ASBESTOS MANAGEMENT PROGRAM EH-006-R02

UI Procedures for Asbestos Management

Asbestos Management Program April 27, 2017

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

DUQUESNE UNIVERSITY ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Washington University Asbestos Operations and Maintenance Plan

AUBURN UNIVERSITY RISK MANAGEMENT & SAFETY

VERTEX Corporate Headquarters 400 Libbey Parkway Weymouth, MA p: f:

Asbestos Consulting Radon Measurements Lead Assessments Indoor Air Quality Testing Mold Investigations. Project Number: Page 1 of 22

ASBESTOS AWARENESS. Supplement to Standard Training Module

Asbestos Management Plan (Operations and Maintenance Plan) Office of Environmental Health & Safety

Asbestos Awareness Program

"ASBESTOS AWARENESS IN THE WORKPLACE"

1.1 SUMMARY.1 Comply with requirements of this Section when performing the following work:

ASBESTOS OPERATIONS & MAINTENANCE PROGRAM

Asbestos / Lead Paint Management Plan

Asbestos Management Program and Procedures

INTRODUCTION TO THE PROGRAM

NAVSEA STANDARD ITEM. 1.1 Title: Asbestos-Containing Material (ACM); control

Project Monitoring & Air Sampling

ASBESTOS MANAGEMENT PROGRAM

Thames Valley District School Board. The Board has assigned the following responsibilities to ensure compliance with the above Policy and Legislation.

OLM Environmental, LLC PHONE: (919) LOCKWOOD FOLLY LANE; RALEIGH, NC CELLPHONE: (919)

Asbestos is the generic name that refers to six unique minerals: Chrysotile Amosite Crocidolite Anthophyllite Tremolite Actinolite PPT-SM-A 2018

Limited Asbestos Demolition Survey

ASBESTOS PROGRAM. C. Asbestos Containing Materials (ACM) are defined as any material or product which contains more than 1% (by weight) asbestos.

ASBESTOS ASSESSMENT Cartier Court Memorial University of Newfoundland St. John s, NL

ADDENDUM NO.: 1 TO THE CONTRACT DOCUMENTS For SCC SWING SPACE FOR MOHR HALL MODERNIZATION (Existing Temps)

September 30, Ted Sherman Saint Paul Public Schools 1930 Como Avenue Saint Paul, MN Dear Ted,

DP ASBESTOS MANAGEMENT

(Reprinted from the Electronic Code of Federal Regulations, Subparts A D [Reserved]

Asbestos in the Home

HOW TO SAFELY REMOVE ASBESTOS

(1) Adequately wet asbestos-containing waste material as follows by doing all of the following:

Asbestos. Asbestos is a naturally occurring fibrous mineral that is mined from the earth and

REMOVAL AND DISPOSAL OF MATERIALS CONTAINING LEAD. A. General provisions of the Contract, including General and Supplementary Conditions.

DIVISION 02 SELECTIVE DEMOLITION

Abatement Scope of Work and Project Requirements for Library Painting Project Bay Shore Library Bret Harte Library Dana Library Long Beach, California

APPROACH FOR IMPLEMENTION OF HUD S LEAD SAFE HOUSING RULE REGULATIONS (24 CFR Part 35, Subpart H, )

ASBESTOS BUILDING INSPECTION

JULY 10, 2013 INTRODUCTION

UNIFIED FACILITIES GUIDE SPECIFICATIONS

HERRON Enterprises USA, Inc.

PIER 26 and 28 BULKHEAD LIMITED ASBESTOS and LEAD SURVEY NTE Project No.: NT-3278

UNIVERSITY COLLEGE LONDON STANDARD ASBESTOS MANAGEMENT PLAN

START WORK NOTIFICATION

If the address on this form is different than the address of the building, submit a written explanation.

ST. LUKE CATHOLIC ELEMENTARY SCHOOL

Respirable Silica Exposure Control Program

Negative Exposure Assessment Study Using the Wonder Makers Asbestos Bulk Sampler

DIVISION 02 EXISTING CONDITIONS FACILITY REMEDIATION ASBESTOS ABATEMENT

A/55/135. General Assembly. United Nations

What is Asbestos? Asbestos was also used in household items, such as: oven gloves ironing board pads simmer mats for stoves fire blankets.

Tim Nelson, Facilities Management's Asbestos Coordinator, 400 Donhowe Building Dan Allen, Associate Director, Recreation Sports, 108 Cooke Hall

RECYCLING CONSTRUCTION AND DEMOLITION MATERIAL

Lead-Safe Weatherization Updates & RRP Similarities/Differences

Enfield Magistrates Court Re-inspection Survey Asbestos Report

Health, Safety and Fire Specialists Ltd

University of Massachusetts Procurement Department 140 Hicks Way 407 Goodell Building Amherst MA November 6, 2015

SECTION REMOVAL AND DISPOSAL OF ASBESTOS CONTAINING MATERIALS

SSPC. QP2 Audit Evaluation Checklist. Contractor: Location: Date: Type of Audit: Auditor:

N.J.A.C. 5: New Jersey Register, Vol. 49 No. 11, June 5, 2017

Environmental, Health and Safety Policy for Contractors

Explain in writing if the address of the building is different than the address on this form:

Personal Protective Equipment (PPE) Safety Program

Lead Management Program

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Asbestos Elevator Industry Workshop November 25, 2015

Asbestos-Containing Material and Hazardous Material Survey Summary Report

Standard Operating Procedure PCB Fluorescent Light Ballast Management

OSHA s Enforcement of Asbestos Standards in the Construction Industry

Asbestos Survey. Site: Prepared for: Edmundson Elementary School Grayland Avenue, Norwalk, CA 90650

Asbestos Abatement for Business Owners: Identifying a Least-Cost Approach. Nathan Biasotti. Oregon State University

Office of Design & Construction State University Plaza Albany, New York

TABLE OF CONTENTS 1.0 SUMMARY SCOPE REGULATIONS AND POLICIES DEFINITIONS RESPONSIBILITIES... 2

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

Hazard Communication Program. Program originated: 07/2002 Last Updated: 06/2016. Gordon Krueger Environmental Safety Specialist

ASBESTOS SURVEY & LEAD-BASED PAINT INSPECTION REPORT GARFIELD ELEMENTARY SCHOOL BUILDING "A" & CLASSROOM A "B" STREET SELMA, CALIFORNIA

Learn Charter School Excel Campus

Asbestos Management Procedure

TSI SAMPLE. Asbestos Producing Countries. Asbestos Uses. Asbestos Consuming Countries. Asbestos Uses. Training Services International, Inc


ASBESTOS MANAGEMENT PLAN

General Specifications for HVAC System Cleaning

UC Irvine Environmental Health & Safety SECTION: TITLE: Lead Compliance Program

SECTION REMOVAL AND DISPOSAL OF ASBESTOS-CONTAINING MATERIALS

Common Household Contaminants: The Hazards and the Laws

29 CFR Asbestos in General Industry

Lead Management Program for Building Maintenance and Construction Projects. Office of Environmental Health and Safety University of Toronto

ASBESTOS ABATEMENT SPECIFICATION

Lead in Construction Guidance

Abu Dhabi Occupational Safety and Health System Framework (OSHAD-SF) OSHAD-SF Technical Guideline

Education Infrastructure Service. Asbestos Management Process

If the address on this form is different than the address of the building, submit a written explanation.

Photographic Processing Facility Sector Control Policy

Determination of Clearance Criteria Following Mercury Decontamination Projects

Lockout Tagout Program

CONSTRUCTION SAFETY GUIDE

TABLE OF CONTENTS 4. PREPARATION, COMMUNICATIONS, AND CONTROLS

Oklahoma State University Policy and Procedures

Transcription:

Asbestos Management Plan Program originated: 02/2000 Last updated: 6/2015 Wendel Reece University Safety Manager

TABLE OF CONTENTS I. Introduction II. Purpose III. Operations and Maintenance Asbestos Related Activities IV. Applicability V. Regulatory Reference VI. Definitions VII. UNI Environmental Health and Safety Office Duties VIII. Recordkeeping IX. Asbestos Coordinator Duties X. Manager and Supervisor Duties XI. Certified Asbestos Consultants XII. General Contractors Involved in Asbestos-Related Work XIII. Asbestos Abatement Contractors XIV. Storage/Disposal/Transportation of Waste Material XV. Prohibited Asbestos-Related Work XVI. Periodic Reassessment of ACM XVII. Procedure for Addressing PACM on Campus XVIII. Procedure for Accidental Release of Asbestos XIX. Procedures for Accidental Contact with PACM Appendices Appendix A: Asbestos Testing And/Or Removal Form

I. Introduction The University of Northern Iowa Asbestos Management Plan is established for the protection of all UNI employees. The Plan addresses any operation, including maintenance activities, involving potential or actual disturbance of materials that contain asbestos. The University of Northern Iowa Asbestos Management Plan complies with State/Federal regulations (IOSHA, OSHA, and EPA) and is an effort to streamline these compliance documents into one logical and efficient plan. All University contractors/subcontractors who conduct asbestos-related work located on university property must adhere to all requirements set forth in the University of Northern Iowa Asbestos Management Plan. II. Purpose UNI has established the Asbestos Management Plan to address a variety of issues regarding asbestos-related work. The goals of the Asbestos Management Plan are to: 1. Minimize exposure of employees, faculty, students, and visitors to airborne asbestos. 2. Comply with all pertinent, regulatory, and University requirements related to asbestos-containing materials (ACM). The UNI recognizes and will comply with all applicable Federal, State, and local governing regulatory agency regulations/guidelines pertaining to asbestos-containing materials. 3. Establish procedures for the identification, evaluation, control, maintenance, disturbance, abatement, and waste storage/disposal of asbestos-containing materials (ACM) at the University of Northern Iowa. 4. Remove, enclose, encapsulate, or repair hazardous asbestos-containing material as required by government or University regulations and as needed to protect human health. 5. Provide asbestos awareness training. 6. Appoint an Asbestos Coordinator to evaluate potential asbestos-related hazards, coordinate the sampling of suspect materials and oversee asbestos-abatement projects. 7. Eliminate the installation of new asbestos-containing material whenever possible. 8. Ensure that UNI asbestos-related contracted/subcontracted work is properly planned, reviewed and conducted. III. Operations and Maintenance Asbestos Related Activities The principal objective of an operations and maintenance asbestos program is to minimize potential exposure of airborne asbestos fibers to all building occupants and maintenance personnel. Individuals involved in an operations and maintenance program are employees who are in casual and non-intentional contact with asbestos because of the nature of their work or mere presence in a building.

To accomplish this objective, an operations and maintenance program shall include work practices to: 1. Remove Presumed Asbestos Containing Material (PACM) where needed. 2. Prevent further release of asbestos fibers. 3. Monitor the condition of ACM and PACM. 4. This program includes the following components: o Training of affected employees in asbestos awareness for ACM and PACM. o Regular documentation of ACM and PACM s. o A permit system to control activities that might disturb ACM and PACM. o Procedures for accidental release of asbestos. o Procedures for keeping records that pertain to asbestos activities. IV. Applicability The University of Northern Iowa Asbestos Management Plan is applicable to all University employees and to all work conducted under the directions of the University of Northern Iowa. V. Regulatory Reference UNI adheres to and enforces this policy and all applicable Federal, State and local governing regulatory agency laws/guidelines pertaining to asbestos-containing materials and asbestos-related work, including: 1. Iowa Department of Labor, Occupational Safety & Health Administration (IOSHA) 29 CFR Part 1910.1001 (Asbestos Regulations) 29 CFR Part 1910.134 (Respirator Regulations) 29 CFR Part 1926.1101 (Construction Asbestos Regulations) 2. Environmental Protections Agency (EPA) Guidance Documents Asbestos-Containing Materials in School Buildings, parts 1 and 2 Guidance for Controlling Asbestos-Containing Materials in Buildings Managing Asbestos in Place A Building Owner s Guide for Operations and Maintenance Programs for Asbestos-Containing Materials. VI. Definitions 1. Abatement: Any operation that is designed to permanently remove asbestoscontaining materials. 2. Asbestos: Includes chrysotile, amosite, crodicolite, tremolite asbestos, anthophyllite asbestos, actinolite asbestos and any minerals that have been chemically treated and/or altered. 3. Asbestos-Containing Material (ACM): Any material that contains more than 1 % asbestos.

4. Asbestos-Related Work: Any work that involves asbestos-containing material and may result in the release of any quantity of asbestos fibers into the air. 5. Certified Asbestos Consultant: Any person who contracts to provide professional health and safety services that relate to asbestos-containing construction material. The activities of an asbestos consultant include building inspection, abatement project design, contract administration sample collection, preparation of asbestos management plans, clearance monitoring and supervision of site surveillance technicians. 6. Disturbance: Contact with any material that contains ACM or PACM that causes release of fibers. This term includes activities that disrupt the matrix of ACM or PACM or generate visible debris. Disturbance includes cutting away small amounts of ACM and PACM. 7. Fiber: A particulate form of asbestos, 5 micrometers or longer, with a length-todiameter ration of at least 3-to-1. 8. Intact: ACM that has not crumbled, been pulverized, or otherwise deteriorated so that it is no longer likely to be bound with its matrix. 9. Presumed Asbestos-Containing Material (PACM): Materials that may contain asbestos but have not yet been tested. 10. Removal: All operations where ACM and/or PACM is taken out or stripped from structures or substrates, including demolition operations. 11. Renovation: Any operation that involves altering a facility or one or more facility components in any way. VII. UNI Environmental Health and Safety Office Duties 1. Oversee development and implementation of the UNI Asbestos Management Plan. 2. Review and evaluate the impact of regulatory changes on the University 3. Oversee and maintain records of asbestos awareness training given to University employees. 4. Participate in determining the need for baseline air monitoring in occupied buildings. 5. Maintain a central location for all asbestos management documentation. VIII. Recordkeeping All building asbestos management documents are located in the University of Northern Iowa Environmental Health and Safety Office. Some of the documents at the location include. 1. Air sampling data from abatement and University projects located in the UNI Safety Office. 2. Laboratory results from area/final clearance sampling and personnel monitoring located in the Asbestos Coordinator s office 3. Results from bulk sampling analysis located in the Asbestos Coordinator s office

4. Medical Surveillance Records (all medical surveillance records of University employees will be located in the Human Resource Office). 5. Proof of medical surveillance and successful completion of an asbestos physical located in the UNI Safety Office. IX. Asbestos Coordinator Duties The Asbestos Coordinator will see that the PACM will be tested or removed and disposed in compliance with applicable governing regulatory agency regulations/guidelines pertaining to ACM. The Asbestos Coordinator will use licensed asbestos contractors (Advanced Environmental and Abatement., Iowa Illinois Taylor Insulation, etc.) with the proper license and permits to remove, store and dispose of ACM. The approved removal contractor will hire the proper testing lab as required for clearance. X. Manager & Supervisor Duties All University personnel who manage construction or maintenance projects will report PACM to the Asbestos Coordinator. The manager/supervisor will inform the Asbestos Coordinator by use of the Asbestos Removal/Insulation form (Appendix A). XI. Certified Asbestos Consultants A certified asbestos consultant will be called upon by the Asbestos Coordinator when required. The certified consultant will supervise the asbestos contractor when required by forming a scope of work, supervising containment set up, testing and daily sight visits. All results and reports will be sent to the Asbestos Coordinator. XII. General Contractors Involved in Asbestos-Related Work Any contractor or UNI employee that discovers any PACM on a project controlled by the University will through their supervisor, inform the Asbestos Coordinator who will make all arrangements to address same. XIII. Asbestos Abatement Contractors Any contractor and their employees used for asbestos related work shall be licensed and trained in the proper and safe removal of asbestos and will show their license to the Asbestos Coordinator before starting the project. Asbestos contractor will inform Asbestos Coordinator before beginning a project so that the proper parties can be notified of the project and at the conclusion of project to make a final inspection of area. All labs used for UNI asbestos work will be licensed for asbestos related testing.

XIV. Storage/Disposal/Transportation of Waste Material All ACM will be transported, stored and disposed of by the removing contractor. XV. Prohibited Asbestos-Related Work No University employee shall engage in any of the following activities involving PACM. 1. Sweeping up of any PACM 2. Removing any PACM 3. Taking samples of PACM 4. Grinding of any PACM 5. Power wire brushing of any PACM. 6. Disturbing any PACM. XVI. Periodic Reassessment of ACM Conditions, accessibility, use factors, etc. are likely to change over time. Therefore, ACM s require periodic reassessment to determine if changes have occurred that warrant reassessment to a different hazard class. XVII. Procedures for addressing PACM on campus When suspected asbestos containing material (PACM) is found and must be disturbed to effect needed repairs: Employee will request that his manager/supervisor have the material tested. Employee will provide the following information to his supervisor: 1. Location 2. Amount that needs to be addressed 3. Type of ACM it is (pipe, floor, tile, plaster, sprayed). 4. Relative urgency of access Unit manager/supervisor will fill out Asbestos Testing and/or Removal Request Sheet (See Appendix A). Requisition will contain the following data: 1. Contact person (person requesting) 2. Maintenance group 3. Building 4. Room 5. Exact location of test or removal and how many feet

6. Is the material covering a steam or water pipe? 7. Is it an emergency 8. Required completion date This form will be turned into the Asbestos Coordinator. At this time it will be decided if there is a need to have a test sample taken or if it is to be handled as ACM. This will be based on location or quantity. The Asbestos Coordinator will call the contract labor asbestos contractor or send request for quotes if large project and set up the schedule for the project. A. If a walk through is required the Asbestos Coordinator will show the areas that need to be inspected. The original contact person may be asked to assist. B. If the project is large enough to require containment, the Asbestos Coordinator will show prospective asbestos removal contractors the area. The original contact person may be asked to assist. C. The Asbestos Coordinator will send out the request for quotes and the requisition for the PO#. Once the project date has arrived the Unit Manager/supervisor will A. Coordinate the shutting off of all affected utilities for the contractor to do his job safely (proper Lock Out/Tag Out). B. Notification of effected parties (Asbestos Coordinator will assist with this). After contractor has received final clearance to release the area, all systems will be returned to normal. XVIII. Procedures for Accidental Release of Asbestos The following procedures must be followed if asbestos is accidentally released: 1. Immediately isolate the area by closing doors and/or erecting temporary barriers to restrict air movement as well as access to the site. 2. Notify Asbestos Coordinator. 3. If asbestos fibers are suspected to have entered the heating, ventilation and air conditioning (HVAC) system (or may do so), the HVAC system must be shut down and sealed off. 4. Through an asbestos contractor, employ thorough cleanup procedures to properly control the ACM, by using wet methods, HEPA vacuums, respiratory protection, etc. 5. Asbestos Coordinator will inspect the area before clearance is given. Arrange for the collection of at least one air sample for a final clearance level of no more than 70 structures per square millimeter (strm/mm 2 ) using the Transmission Electron Microscope (TEM) method or not more than.01 fibers per cubic centimeter (f/cc) if using the Phase Contract Microscopy (PCM) method.

XIX. Procedures for Accidental contact with PACM The following procedures must be followed if PACM is accidentally contacted: MINOR CONTACT (i.e. brushing up against PACM with small amount of fiber sticking to clothes.) 1. DO NOT brush of or blow off PACM. 2. Remove PACM with wet rag or wet paper towel. 3. Wrap wet rag or wet paper towel contain PACM in another layer of wet rag or wet paper towel. 4. Dispose of rags and/or paper towels in a sealed plastic bag. MAJOR CONTACT 1. Take measures to terminate contact with PACM. 2. Notify Asbestos Coordinator. 3. Initiate testing procedure for PACM material contacted. 4. Change clothes and shower. 5. Clothing may be bagged and remain sealed until testing procedure determines if ACM is present.

Appendix A ASBESTOS TESTING AND/OR REMOVAL Requesting Individual Complete This Section: Contact Person: Building: Maintenance Group Room: Describe the EXACT location of test or removal and how many feet: MARK AREA WITH X IF THE PACM WILL NOT BE DISTURBED Is the material covering a steam pipe or hot water pipe YES- NO- Emergency: YES- NO- Required Completion Date: EH&S Office Area located and identified Asbestos contractor contacted Testing Scheduled ACM Yes No Removal Scheduled ACM Removed Contractor Contact Person Notified