ATTACHMENT C Design Analysis for Erosion Protection Cover for Piñon Ridge Tailing Cells

Similar documents
Prepared for Urban Drainage and Flood Control District

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

HYDROLOGIC MODELING CONSISTENCY AND SENSITIVITY TO WATERSHED SIZE

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

Engineering Hydrology Class 3

DIVISION 5 STORM DRAINAGE CRITERIA

Appendix B. Storm Drain System Data

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Culvert Sizing procedures for the 100-Year Peak Flow

Inflow Design Flood Control System Plan

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY

North Carolina Sedimentation Control Law

APPENDIX G HYDRAULIC GRADE LINE

Applying landforming to reclamation: A case study in Central Appalachia

Table of Contents. Overview... 1

APPENDIX IV. APPROVED METHODS FOR QUANTIFYING HYDROLOGIC CONDITIONS OF CONCERN (NORTH ORANGE COUNTY)

CEE3430 Engineering Hydrology

Constructed Wetland Channel T-9

TECHNICAL BULLETIN. Synthetic Turf Athletic Field Drainage Design Assistance

Section 500 Rainfall Table of Contents

SAN GORGONIO PASS CAMPUS - PHASE I

ENVIRONMENTAL ENGINEERING LAND SURVEYING

Updated Rainfall Coefficients for Texas The EBDLKUP-NEW.XLS Tool

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

Project Drainage Report

Learning objectives. Upon successful completion of this lecture, the participants will be able to:

Summary of Detention Pond Calculation Canyon Estates American Canyon, California

UNIT HYDROGRAPH AND EFFECTIVE RAINFALL S INFLUENCE OVER THE STORM RUNOFF HYDROGRAPH

Stream Reaches and Hydrologic Units

E. STORMWATER MANAGEMENT

2C-12 Detention Basin Outlet Structures

Run-On and Run-Off Control System Plan Neal North Energy Center Monofill

Recommended Resources: The following resources may be useful in teaching this lesson:

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

Unit E: Basic Principles of Soil Science. Lesson 7: Understanding Soil Erosion and Management Practices

The Islamic University of Gaza- Civil Engineering Department Sanitary Engineering- ECIV 4325 L5. Storm water Management

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

BRADLEY UNIVERSITY. The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

2

Runoff Processes. Daene C. McKinney

Runoff Hydrographs. The Unit Hydrograph Approach

DRAINAGE PLAN OF NAU S EASTBURN EDUCATION AND GAMMAGE BUILDINGS FINAL PROPOSAL

Chapter 7 Ditches and Channels

Impact of Climatic Changes on Downstream Hydraulic Geometry and its Influence on Flood Hydrograph Routing Applied to the Bluestone Dam Watershed

Pennsylvania Stormwater Best Management Practices Manual. Chapter 3. Stormwater Management Principles and Recommended Control Guidelines

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

10.0 Storm Sewer Systems

Chapter 9 Hydraulic Structures

Hydrology and Water Management. Dr. Mujahid Khan, UET Peshawar

Understanding Soil Erosion and Management Practices

STORMWATER RUN-ON AND RUN-OFF CONTROL PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL

Sediment Basin. Fe= (Depends on soil type)

DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF

Uncertainty in Hydrologic Modelling for PMF Estimation

Gwinnett County Stormwater System Assessment Program

6.0 Runoff. 6.1 Introduction. 6.2 Flood Control Design Runoff

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

Urban Drainage Introduction. A.Ramachandra Rao. C.B. Burke. T.T. Burke, Jr.

Rhode Island Stormwater Design and Installations Standards Manual

Hancor, Inc. Drainage Handbook Hydraulics 3-1

Pennsylvania Stormwater Best Management Practices Manual. Section 3 Stormwater Management Principles, Goals, and a Management Model

Section 600 Runoff Table of Contents

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

ANALYSIS OF HYDRAULIC FLOOD CONTROL STRUCTURE AT PUTAT BORO RIVER

Highway Engineering. 3 _ 2/2 Lecture/Laboratory Hours

DRAINAGE DESIGN AND RUTTING PERFORMANACE GUIDELINES FOR PERMEABLE PAVEMENT

STONE OAK DAM: TO BREACH OR NOT TO BREACH, THAT IS THE QUESTION. TFMA Spring Conference 2013

CLARK COUNTY REGIONAL FLOOD CONTROL DISTRICT HYDROLOGIC CRITERIA AND DRAINAGE DESIGN MANUAL

INITIAL RUN-ON AND RUN-OFF CONTROLS PLAN NORTH VALMY GENERATING STATION (ASH LANDFILL) HUMBOLDT COUNTY, NEVADA OCTOBER 2016 PROJECT NO

Re-plumbing Roadside Ditch Networks

FINDINGS: Olsson used a three-step analysis strategy to develop a benefit cost ratio that would indicate the relative feasibility of this project.

1. Stream Network. The most common approach to quantitatively describing stream networks was postulated by Strahler (1952).

NRCS Hydrology methodology review Minnesota NRCS recommendation MnDOT recommendation Using Atlas 14 with HydroCAD

Stormwater Local Design Manual For Houston County, Georgia

Chapter 12 Storage. Contents. Overview... 1

Index. Page numbers followed by f indicate figures.

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

TECHNICAL MEMORANDUM. SUBJECT: Determination of watershed historic peak flow rates as the basis for detention basin design

Appendix F Preliminary Flood Hazard Assessments

Drainage of Highway Pavements

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

MODEL Stormwater Local Design Manual. City of Centerville

SURFACE DRAINAGE FACILITIES FOR AIRFIELDS AND HELlPORTS

BUILDING A WATERSHED MODEL

Preview of LEAME Computer Software

Stormwater Best Management Practice Handbook Portal: Construction

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

BROWARD GROUNDWATER ELEVATION MAPS - PREDICTED CHANGES AND PLANNED UPDATES

Estimating Future Floods to Manage Flood Risk

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

History of Model Development at Temple, Texas. J. R. Williams and J. G. Arnold

I(n)Kn. A Qp = (PRF) --- (8) tp Where A is the watershed area in square miles and PRF is the unit hydrograph peak rate factor.

Transcription:

ATTACHMENT C Design Analysis for Erosion Protection Cover for Piñon Ridge Tailing Cells TAILING CELL CLOSURE DESIGN REPORT ENERGY FUELS RESOURCE CORPORATION PIÑON RIDGE PROJECT

Summary The primary purpose of the tailing cell erosion cover is to protect the tailing cell cover from erosion by runoff of precipitation and by wind. Of these two, runoff presents the greater hazard. As suggested in NUREG-1620 (USNRC, 2003), the tailing cell erosion cover is designed to withstand the Probable Maximum Flood (PMF) resulting from the Probable Maximum Precipitation (PMP). The methods used for determining the PMF, top and side slope cover design, and tailing cell toe protection follow guidelines suggested by the Nuclear Regulatory Commission in NUREG-1623, Design of Erosion Protection for Long-Term Stabilization (USNRC, 2002). The following discusses the basic approach, methodology, and key parameters used in the tailing cell cover erosion design. Full calculations (Kleinfelder document DEN8R197, December 9, 2008) are included following this summary. PMP and PMF Calculations The PMP was calculated using procedures outlined in Hydrometeorological Report No. 49 (HMR 49). Each tailing cell has an approximate footprint of 0.05 square miles so no areal reduction was applied to the rainfall depth calculation. A 6-hr Local Storm depth was calculated and applied to the appropriate HMR-49 storm distribution. The maximum 1-hour rainfall depth increment for the 6-hr Local Storm distribution was determined to be 7.6 inches. NOAA Atlas 2 Volume III (Miller et al., 1973) was followed to create an intensityduration curve for tailing cell drainages shown below in Table 1. Table 1 Intensity-Duration Values for Piñon Ridge Mill Site, Montrose County, Colorado Duration (min) 1 = 0 5 10 15 30 60 Intensity (in/hr) = 26.4 26.4 20.5 17.3 12.0 7.6 11 Miller et al, 1973 The times of concentration for the tailing cell drainages were calculated using Kirpich s method, Equation (1) (Barfield et al., 1981) T c L 0.0078 S 0.77 0.385 (1) where T c is time of concentration in minutes, L is the maximum length of flow in feet, and S is the slope of the drainage in feet/foot. 2

The Rational Method (Barfield et al., 1981) was used to calculate the PMF for each drainage on the tailing cell configuration. Based on the magnitude of the design event and anticipated soil and vegetation conditions, a conservative runoff coefficient value of 0.8 was chosen. A flow concentration factor of 3.0 was selected for top and side slope cover designs to account for concentrated sheet flow conditions. The Rational Method is given below in Equation (2) Q FCiA (2) where Q is the maximum discharge in cubic feet per second (cfs), F is a flow concentration factor (only used for sheet flow conditions), C is a runoff coefficient, i is rainfall intensity in inches/hour, and A is the drainage area in acres. A unit discharge rate was used in designing the top and side covers while a conventional peak discharge for a given area was calculated for the riprap channel rundowns. Top and Side Slope Covers PMF unit discharges were used in the Safety Factor method (Barfield et al., 1981) to determine an appropriate rock size for the tailing cell top cover. The Maximum Permissible Velocity (MPV) method (Chow, 1959) was used to design a stable vegetated soil/rock mulch cover. PMF unit discharges were also used in the Stephenson Method to design a rock cover for the steeper tailing cell outslopes. The Safety Factors method was used for slopes less than 10% while the Stephenson Method was used for slopes of 10% or greater (NUREG-1623, 2002). The Safety Factors method is given in Equation (3) cos( ) tan( ) SFb sin( ) b tan( ) 21 b ( SG 1) D c 21dS D 50 ( SG 1) 50 (3) where SF b is the safety factor, θ is the slope angle in degrees, φ is the materials friction angle in degrees, η b is a stability parameter, τ is applied tractive force in psf, τ c is the critical tractive force in psf, γ is the specific weight of water in pcf, SG is the specific gravity of the cover material, d is flow depth in feet, S is longitudinal slope in feet/foot, and D 50 is the representative material size in feet. 3

A safety factor of 1.0 indicates the moment of incipient motion for a representative cover particle; therefore, a safety factor of 1.1 was used in the design to maintain stable conditions (i.e. no particle movement). The MPV method was used to design a stable vegetated top cover with an approximate slope of 2%. Assuming a cover composed of a grass mixture, a 2% average slope, and easily erodible soils an MPV of 4.0 fps was chosen from Table 7-6 in Chow s Open Channel Hydraulics (Chow, 1959). PMF unit discharges were used with Manning s equation to determine maximum expected flow depths and velocities. In compliance with recommendations outlined in NUREG-1623, a correction factor was applied to the MPV to accurately represent sheet flow conditions and reduced it to 2.0 fps. A low vegetal retardance factor was chosen to represent a fair stand with average grass lengths of two to six inches on the tailing cell covers. A Manning s n value was subsequently computed using Chow s experimental curves. An iterative approach was taken until a maximum expected PMF velocity was determined. If the expected MPV was less than the permissible MPV of 2.0 fps, the design was considered acceptable. The Stephenson Method was used to design a rock cover for the tailing cell side slopes. The Stephenson Method is given in Equation (4) D 50 Cg 1 2 q tan( ) 6 n 1 n SG 1 cos( ) tan( ) tan( ) p 7 2 3 p (4) 5 3 where D 50 is the representative particle size in feet, q is maximum unit discharge in cfs/ft, θ is the slope angle in degrees, φ is the material friction angle in degrees, n p is the cover material porosity, C is the Stephenson coefficient, g is the acceleration of gravity in ft/s 2, and SG is the specific gravity of the cover material. Drainage Features The overall erosion cover was designed to minimize concentrating flow in channels that require large sizes of riprap. This was done to minimize costs, future maintenance efforts, and to reduce areas of high volume, high velocity flows. However, runoff will unavoidably be concentrated in the grading intersections between Tailing Cells A and B and Cells B and C. Runoff collected in these areas will be directed to riprap lined channels flowing down the groin area between the tailing cells. The channels are designed to route the PMF away from the tailing cells, eventually discharging into natural drainages at the site. Riprap for the rundown channels was designed using experimental curves developed by Bathurst (1979) published in the Surface Mining Water Diversion 4

Design Manual (1982). It is important to note that the areas receiving concentrated flow are constructed over natural fill embankments and not tailings. Erosion protection at the toe of the tailing cells was designed using the Abt et al. (1998) method, Equation (5) D C 0. 56 f q 50 10. 46 S 0.43 (5) d where D 50 is the representative particle size in feet, S is the longitudinal slope in feet/foot, C f is the flow concentration factor, and q d is the maximum unit discharge in cfs/ft. All rock material used for the erosion cover will meet the criteria for durability outlined in NUREG-1623, Appendix D. The tailing cell configuration is generally located on northward sloping terrain with several natural drainages (arroyos) directing flow away from the centerline of the cells toward the northwest and northeast ends of the site. The natural drainage network and overall slope of the site help to direct runoff away from the tailing cells, protecting them from long-term erosion. A riprap-lined diversion berm, designed for the PMF, will be constructed south of Tailing Cell A to redirect runoff from the tailing cell area to natural drainages that will eventually flow offsite. The design of the diversion berm will be consistent with the methods used for the riprap rundown channels. 5

References Abt, S.R., Johnson, T.L., Thornton, C.I., and Trabant, S.C., 1998, Riprap Sizing at the Toe of Embankment Slopes. J. of Hydr. Engr., ASCE, 1998. Barfield, B. J., R. C. Warner, and C. T. Hahn, 1981, Applied Hydrology and Sedimentology for Disturbed Areas. Oklahoma Technical Press, Stillwater, Oklahoma, 1981. Bathurst, J.C., R.M. Li, D.B. Simons, 1979, Hydraulics of Mountain Rivers. Civil Engineering Department, Colorado State University, CER78-79JCB-RML- DBS55, 1979. Chow, V.T., 1959, Open Channel Hydraulics. McGraw-Hill Book Company, Inc., New York, NY, 1959. Hansen, E., Schwartz, F., Riedel, J., 1984, Probable Maximum Precipitation Estimates, Colorado River and Great Basin Drainages. Hydrometeorological Report No. 49, 1984. Miller, J.F., R.H. Frederick, R.J. Tracey, 1973, "Precipitation-Frequency Atlas of the Western United States," NOAA Atlas 2 Volume III--Colorado, National Oceanic and Atmospheric Administration, National Weather Service, U.S. Department of Commerce, Silver Spring, MD, 1973. U.S. Nuclear Regulatory Commission (USNRC), 2002, Design of Erosion Protection for Long-Term Stabilization. NUREG-1623, 2002. U.S. Nuclear Regulatory Commission (USNRC), 2003, Standard Review Plan for the Review of a Reclamation Plan for Mill Tailing Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978. NUREG-1620, Rev. 1, 2003. U.S. Dept. of the Interior: Office of Surface Mining, 1982, Surface Mining Water Diversion Design Manual, U.S. Government Printing Office, Washington D.C., 1982. 6