MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division. REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act)

Similar documents
The Afton TSF, situated approximately 12 km west of Kamloops, BC has been under care and maintenance since 1997.

Review of ML/ARD Geochemistry & Water Quality Predictions

Integrated Mine Waste Storage Concept, Krumovgrad Gold Project, Bulgaria

PROPOSED STOCK PILE YARD PHASE 1 SITE: MYRA FALLS MINE

Soil Treatment Facility Design and Operation for Bioremediation of Hydrocarbon Contaminated Soil. Version 1.0

MINE RECLAMATION COSTING AND SPREADSHEET

Teck Coal Ltd. Elkview Operations. Dam Safety Inspection Report Independent Third Party Review. November 2014 M09963A01.730

PROJECT SITE DOCUMENTATION BINDER CONTENTS

Inrushes and Subsidence

Mining, Tailings and Dam Safety: the Mt. Polley Disaster and Next Steps. Dr. Andrea Kennedy, Ph.D. Bridgeway Consulting for Adams Lake Indian Band

APPENDIX 4-D KSM MINE PLAN

Muskeg River Mine Dedicated Disposal Area (DDA) Plan for In-pit Cell 1

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

SEMINAR ON WATER SECURITY IN BULGARIA SOFIA, SEPTEMBER 18-19, 2017 DAM SAFETY IN ROMANIA

Reclamation and Closure Cost Planning and Estimation and the Mining Life Cycle. Presenter: Lois Boxill, P.Eng., P.E.

DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia DRAFT. Submitted to: Imperial Metals Corporation Hornby Street Vancouver, BC

Tailings Storage Facility Conceptual Closure Plan Alternatives Assessment

FINAL REPORT DAM SAFETY REVIEW. Mount Polley Mine Likely, British Columbia. Submitted to:

IN-PIT CRUSHING AND CONVEYING MINE PLANNING AND OPERATIONS Skillings Mining Review, June 1, 1985 by: Independent Mining Consultants, Inc.

I am a. Mining Engineer

Newmont Mining Corporation Tailing & Heap Leach Facility Management Standard

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Comparative Evaluation of Thickened versus Slurry Tailings Surface Disposal D. Johnson Golder Associates Ltd., Canada R. Moghaddam Golder Associates

File No Supplemental November Geotechnical and Environmental Consulting Engineers

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

2016 LANDFILL INSPECTION REPORT CARDINAL PLANT BRILLIANT, OHIO

Converting slurry tailings facilities to filtered dry stacks a case history. John Lupo Newmont Mining Corporation Marcelo Mussé - Consultant

8.0 CLOSURE AND DECOMMISSIONING

Swift River Pit No. 1500

CHAPTER 7. San Dieguito River Flooding Adaptation

KEY MAP - SCALE 1:1,500,000 NOTE 1. SLIDE FEATURES RECORDED USING A HAND HELD GPS. SLIDE MOVEMENT DIRECTION 2014 PH26 INSPECTION PLAN

Annual Inspection Report

BENEFITS RELATED TO THE APPLICATION OF MASS BLASTS IN OPEN CUT MINING

IDM Mining Updates Pre-Development Engineering and Optimization at Red Mountain Gold Project

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

Global Mining Solutions From concept through closure

Estimation of Open Cut Mining Recovery and Mining Dilution. Summary. Introduction. Estimation Techniques. AusIMM JORC Code Edition.

EVOLUTION OF RECLAMATION FOR WILDLIFE HABITAT AT SULPHIDE MINES IN BRITISH COLUMBIA, CANADA. Natalie Tashe November 9, 2012

DESIGN AND INSTALLATION OF THE SHORING AND DECKING FOR TTC YONGE STATION

Erosion & Sedimentation Control Policy

Some excerpts from the federal Surface Mining Control and Reclamation Act of 1977 (SMCRA), passed August 3, 1977

Tailings Facility Risk, Resilience, and Robustness

Environmental Management Plan (EMP)

LONG TERM ACID ROCK DRAINAGE (ARD) MANAGEMENT AT PT FREEPORT INDONESIA 1

SMART GYPSUM STACK MANAGEMENT FROM CONCEPT TO REALITY

Tailings Design and Operation Safety!

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

Preferred Elevated Tank Site

Coal Combustion Facility Assessment Report. October 20, 2010

CITY OF ORANGE MANUAL OF GRADING DEPARTMENT OF PUBLIC WORKS ENGINEERING DIVISION

B. Subsurface data is available from the Owner. Contractor is urged to carefully analyze the site conditions.

SepticDesign.ca Gunnell Engineering Ltd.

Preface. MNR # Queen s Printer for Ontario, 2012 ISBN (PRINT) ISBN (PDF)

Chapter 26: Canada s Mineral Wealth May 8, Monday, May 12, 14

Ajax Project Open Pit Review of Open Pit Design Parameters for Updated Hydrogeological Conditions

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

Tailings System Safety Review for the Quirke Tailings Management Area in Elliot Lake

INSTRUCTIONS FOR PREPARATION OF APPLICATION FORM FOR SURFACE MINING PERMIT AND/OR RECLAMATION PLAN

Tailings Review Task Force. Recommendations to Strengthen the Mining Association of Canada s Tailings Management Requirements and Guidance

Dam Safety Inspection Checklist

Base Metal and Iron Ore Mining

(this cover page left intentionally blank)

Design of the Eldorado Gold Efemçukuru Filtered Tailings Facility

In-pit tailings disposal at Langer Heinrich TSFs in a unique hydrogeological setting

NOTICE OF PREPARATION

URANIUM MINING IN MALAWI BY PATRICK MEDIUS NYIRENDA ENVIRONMENTAL AFFAIRS DEPARTMENT, MINISTRY OF NATURAL RESOURCES, ENERGY AND MINING, MALAWI

Request Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects

Strategic mine planning of surface mining projects incorporating sustainability concepts

Strategic mine planning of surface mining projects incorporating sustainability concepts

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N

P U B L I C H E A L T H P R O T E C T I O N. Ministry of Health and Ministry Responsible for Seniors

Incident Reporting Requirements

Division 02 - Site Work Section

Annual Report of the Chief Inspector of Mines 2014

CONSTRUCTION AND DEMOLITION DEBRIS DISPOSAL SITE GUIDELINES

SPECIFICATION FOR ENGINEERED FILLS

Photo Courtesy of Jason Pineau Photography MINING SERVICES

will be completed during the summer of 2013 along with the regrading of the grounds around the construction site and removal of construction

Location Item Date Completed

For personal use only

Filter Tube Barriers (Instream)

GP 30/5/1/3/2/10242 MP

Location Item Date Completed

ODOT Design & Construction Requirements for MSE Walls

Revision Nalcor Doc. No. MFA-SN-CD-0000-GT-DC C1 Date Page SLI Doc. No EC Dec-2013 ii DESIGN CRITERIA - GEOTECHNICAL

Application For Waste Regulation (Check all that apply)

The Relocation of Waste Trench #54 at the Port Granby Waste Management Facility, Municipality of Clarington, Ontario, Canada

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

Design, Construction and Operation of a Large Centerline Tailing Storage Facility with High Rate of Rise

Azurite Mine Overview

Enviable water recovery in a desert environment a case study

SLURRY WALLS FOR SEEPAGE CUTOFF IN LEVEE APPLICATIONS RECENT EXPERIENCE AND CONSTRUCTION CHALLENGES IN THE NORTHERN CENTRAL VALLEY OF CALIFORNIA

Surface Mining and Reclamation

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

HMA GROUP AUSTRALIA - NEW ZEALAND - INDONESIA - SOUTH AFRICA SINCE 1966

Transcription:

MINISTRY OF ENERGY AND MINES Mines and Mineral Resources Division REPORT OF GEOTECHNICAL INSPECTOR (Issued pursuant to Section 15 of the Mines Act) Name of Property: Permit No.: M-29 Mine Manager: Don Strickland Company: (BC) Ltd. Address: Box 1400 Princeton, BC V0X 1W0 Persons Contacted: Copies To: Gordon Frost, Darren Tinney, Patrik Gillerstedt, Trevor Phelps George Warnock, Manager Geotechnical Engineering, MEM Al Hoffman, Chief Inspector of Mines, MEM Diane Howe, Deputy Chief Inspector of Mines, MEM Stephen Rothman, Inspector of Mines, Health & Safety, MEM Heather Narynski, Senior Geotechnical Inspector, MEM Date of Inspection: May 26, 2014 In this document, Code means the Health, Safety and Reclamation Code for Mines in British Columbia INTRODUCTION An inspection of the active pits and waste rock dumps was conducted by Chris Carr in the company of Gord Frost (Chief Mine Engineer, Copper Mountain Operations) and the tailings management facility in the company of Gord Frost and Mike Westendorf (Chief Metallurgist, Copper Mountain). Observations made during the inspection, and actions required to follow-up on this inspection report are summarized below. The purpose of this inspection was as follows: To determine if the mine is meeting the requirements of the Code. To determine if geotechnical practices at the mine are consistent with generally accepted engineering practices at mines in British Columbia. To identify potential ground stability hazards or concerns at the mine. The following areas were inspected during the mine tour: Active Open Pits Active Waste Rock Dumps Tailings Management Facility The is currently mining Pit 2 South and Pit 3 with waste rock hauled to the East Dump, North Dump and South Dump and low grade ore consigned to the Low Grade NAG Dump. Tailings are being discharged directly to the centre area of the Tailings Management Facility (TMF). Cyclone sand construction at the East and West Dams of the TMF will recommence after the crest drains are installed.

Report of Geotechnical Inspector June 2, 2014 Page 2 of 9 External geotechnical services associated with the design and performance monitoring of the open pits, waste rock dumps and low grade ore stockpile continue to be provided by Golder Associates. External geotechnical services associated with the TMF and the 701 Dump are provided by AMEC Earth and Environmental. It is understood that CMM has a full-time geologist to complete daily mapping and pit wall monitoring. Future mining is being considered at the Virginia Pit (old pit crossed by mine access road) and at the proposed Oriole Pit (adjacent to Pit 3). The following reports were reviewed prior to the mine inspection: 701 Rock Storage Area Slide 2013 Annual Review Report, Landslide Mitigation Measures and Monitoring prepared by AMEC dated 31 March, 2014. Tailings Management Facility 2013 Annual Review and As-Built Report prepared by AMEC dated 28 March 2014. OBSERVATIONS AND INSPECTION ORDERS Location: Open Pits Pit development is active in Pit 2 South with Shovel #2 on the 1190 bench (Photo 1). Pit development is active in Pit 3 with Shovel #1 in the bottom of the pit and Shovel 3 near the top. A berm has been constructed to prevent access at the toe of a previously reported multi-bench failure (adjacent to the drills shown in Photo 2). Permit Condition 2(c)(i) of the April 1, 2010 permit amendment requires a pit slope monitoring and safe work procedure for areas subject to pit slope raveling and multi-bench failure. A Standard Operating Procedure for working below pit walls, including pit slope monitoring procedures, shall be prepared and a copy submitted to the Ministry by June 30, 2014. Continuing pit slope movement along the south wall has required construction of a step-out and construction of a berm to control rock fall below the old access ramp (Photo 3). This area continues to be reviewed by the design consultant. Permit Condition 2(c)(iv) of the April 1, 2010 permit amendment requires that the pit slope design, blasting practices and pit wall monitoring program be reviewed annually by a licensed Professional Engineer to ensure safe working conditions with a copy of the report submitted to the Chief Inspector within 3 months of the inspection. The annual pit slope design and performance report for 2013 is overdue and shall be submitted to the Ministry by June 30, 2014. Location: Low Grade Ore Stockpile Stockpile development is active on the Low Grade NAG stockpile (Photo 4). Location: 701 Rock Storage Areas Re-sloping of the 701 Rock Storage Area continued in 2013 and a report on landslide mitigation and monitoring was submitted to the Ministry. Additional waste rock removal is planned in 2014.

Report of Geotechnical Inspector June 2, 2014 Page 3 of 9 Wireline extensometers and survey prisms that were removed to allow excavation work during 2013 shall be re-established on the 701 Rock Storage Area as soon as possible and monitoring shall continue in accordance with the existing procedures. Location: Active Waste Rock Storage Areas Waste rock is currently being hauled to the North Dump, East Dump and South Dump. The waste dumps are constructed at an overall slope of 27 in 25 m high lifts with 17.5 m wide benches. Development of the North Dump to elevation 1325 is shown in Photo 5. A soil containment berm constructed along the toe of the east side of the East Dump appears to be effective in protecting the public road below from rock roll-out (Photo 6). The west side of the East Dump at approximate elevation 1350 is shown in Photo 7. Permit Condition 3(c) of the April 1, 2010 permit amendment requires that an annual report on the monitoring and stability performance of waste rock dumps identified as high failure consequence be prepared by a licensed Professional Engineer and submitted to the Chief Inspector. The 2013 annual report on performance of high consequence dumps shall be submitted to the Ministry by June 30, 2014. Construction has started on the South Dump. Permit Condition 3(a) of the April 1, 2010 permit amendment requires that site investigation results and stability analyses for the South Dump be submitted to the Chief Inspector for review and approval prior to construction. South Dump construction shall not proceed until approved by the Ministry. Location: Pit 3 to East Dump Landbridge Dump construction across the southeast corner of Pit 3 is planned to provide a shorter haul to the East Dump (Photo 8). Initial dump construction has started and the dump material appears to comprise weak till-like material. Cracks were visible along the crest of the re-handled dump material. Dump construction shall not proceed until the dump construction plan has been reviewed by the Ministry. The construction plan shall include deployment of at least one wireline extensometer on the dump crest with displacement and response criteria to monitor displacement. Location: Tailings Management Facility Management of the tailings facility is now carried out by mill operations with instrumentation monitoring by mine operations. Cyclone sand optimization studies are in progress to achieve the specified grain size distribution for downstream dam construction at the East and West Dams. The above water beach adjacent to the East Dam is more than 100 m wide (Photo 9). The above water beach at the West Dam is very wide and in excess of the required 200 m (Photo 10). The tailings delivery lines have been temporarily relocated to the downstream dam crests to allow installation of the crest drains. An erosion gully was observed on the downstream crest of the West Dam. It is understood that a valve clamp on the tailings line failed recently resulting in the washout and an uncontrolled spill of tailings over the downstream slope of the dam.

Report of Geotechnical Inspector June 2, 2014 Page 4 of 9 Frequent visual monitoring of the tailings lines located along the downstream dam crest (suggested frequency every hour) shall be undertaken when the tailings lines are in operation. The tailings delivery lines shall be moved to the upstream crest of the tailings dams as soon as possible after the crest drains are installed. Slope inclinometers have been installed in the East and West Dams. Slope inclinometer BH12-01E installed at the East Dam is indicating foundation movement within a glaciolacustrine zone at elevation 778 to 779 m. Slope inclinometer time displacement plots shall be prepared to display the movement at the defined movement zones. Two piezometers were installed in the area of the tunnel plug and it is understood that one of the piezometers is no longer functioning. A piezometer shall be installed to replace the piezometer that is not functioning unless justification is provided for continuing to monitor at a single location. TMF Emergency Preparedness and Response Plan Emergency Preparedness and Emergency Response Plans (EPRP) are included in the Operations, Maintenance and Surveillance Manual. The Mining Association of Canada recommends that the plans be tested periodically to ensure that they are effective in responding to an emergency. A schedule for testing the EPRP shall be prepared and submitted to the Ministry by June 30, 2014. The EPRP shall be reviewed at least annually and updated as required. CLOSURE Under Section 15 (6) of the Mines Act, a written response is required from the Mine Manager within 15 days of the receipt of this Inspection Report. In addition, Section 30 (1) of the Mines Act requires this Inspection Report to be posted in a conspicuous location at the mine site for 30 days. Please feel free to contact the undersigned with any questions or comments. Chris Carr, P. Eng. Geotechnical Mines Inspector On behalf of Ministry of Energy and Mines Signature Dated: June 2, 2014

Report of Geotechnical Inspector June 2, 2014 Page 5 of 9 Photo 1: Pit 2 South Photo 2: Pit 3 view of north and east wall

Report of Geotechnical Inspector June 2, 2014 Page 6 of 9 Photo 3: Pit 3 view of south and west wall Photo 4: Low Grade NAG Stockpile view from East Dump

Report of Geotechnical Inspector June 2, 2014 Page 7 of 9 Photo 5: North Dump view to north Photo 6: Soil berm at toe of East Dump view to south

Report of Geotechnical Inspector June 2, 2014 Page 8 of 9 Photo 7: West side of East Dump view to south Photo 8: Area of Pit 3 Landbridge access to East Dump

Report of Geotechnical Inspector June 2, 2014 Page 9 of 9 Photo 9: TMF East Dam Photo 10: TMF West Dam