SUMITOMO METAL MINING 1

Similar documents
Special Feature Concentration on Core Businesses

2 nd Quarter of FY2015 Progress of Business Strategy

INSG Environmental & Economics Session. Bruce Wedderburn. 27 th April 2010

The Nickel Industry Long term drivers of nickel supply & demand

Environmental Sustainability Metrics for Nickel Sulphide Versus Nickel

NICKEL PROCESSING TECHNOLOGY 10 YEARS ON FROM CAWSE, BULONG AND MURRIN MURRIN

John Jones. Vice-President, Business Development - Asia

Boliden to acquire Kevitsa Finnish nickel-copper-gold-pgm mine from First Quantum. 10 March 2016

The future of nickel production - the outlook for nickel sulphide and laterite resource development

Direct Nickel Process Breakthrough Technology. May 2015

Overview of the Australian Nickel-Cobalt Industry

Nickel & Molybdenum Overview: Nickel: A Battery-Charged Future. Molybdenum: Still Groundhog Day

Treatment of Nickel-Cobalt Laterites

HELLENIC COPPER MINES LTD. History of the Company

Copper Cliff Nickel Refinery Complex

PROUDLY POSITIONED AS AN AUSTRALIAN MINER ASX:MLX. November 2017 AGM Presentation

Boliden does not accept any liability whatsoever arising from or in connection with the use of this information.

THE PERFORMANCE OF Z100 (UNS S32760) SUPERDUPLEX STAINLESS STEEL IN SULPHURIC ACID.

19 th Zinc and its Markets Seminar May 4 th 6 th, 2015 Radisson Blu Royal Hotel, Helsinki, Finland. Welcome address. Robin Lindahl

NICKEL INTRODUCTION: USES OF NICKEL

HYDROMETALLURGY PROCESS OVERVIEW

Low-cost, rich, DRC copper

China s Nickel Industry

Commodity Market Forecasting

M E T A L S & ENERGY INSIGHT

Mineral Processing by Bioheapleaching at The Talvivaara Nickel Mine in Sotkamo, Finland. Jukka Pitkäjärvi General Manager Talvivaara Exploration Ltd

TECK S CESL COPPER PROCESS: A COMMERCIAL READY CONCENTRATE LEACH ALTERNATIVE

Nickel & Molybdenum Overview: More Likely to See Leafs Win the Stanley Cup? See a Market Turn?

Nickel Market Developments

Recent Developments in Copper Hydrometallurgy

Structural Nickel Surplus to Structural Market Deficit Future Supply Challenges

Cobalt as a by-product of nickel and copper production. Jack Bedder Senior Analyst Roskill Information Services. October 2 nd 2013

NEW. The Chinese Nickel, Ni Pig Iron and Stainless Market Prospects for

Precious Metal Refining VFB Site Visit 14 November 2017

Southern Copper Corporation November, 2011

CSR Report 2013 SUMITOMO METAL MINING CO., LTD.

Mining. Voisey s Bay Mine Site. Courtesy: Vale. Government of Newfoundland and Labrador

Mining Solutions. Innovative Solutions for Hydrometallurgy

Hydro takes over Vale s aluminium business in transforming transaction

MARKETING UPDATE 31 OCTOBER 2016

Copper Industry. Overview: 5 th July 2017 I Industry Research

THYSSENKRUPP INDUSTRIAL SOLUTIONS Resource Technologies: Innovative Customer Solutions

ASIAN NICKEL CONFERENCE

CO-TREATMENT OF LIMONITIC LATERITES AND SULPHUR BEARING MATERIALS AS AN ALTERNATIVE TO THE HPAL PROCESS C.J. FERRON AND C.A.

Nickel: State of the market

Copper. Solvent Extraction

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

Syerston Nickel & Cobalt Pre-Feasibility Study Completed. Scandium by-product credits provide potential for significant economic upside

NICKEL AND COBALT RECOVERY FROM A BULK COPPER-NICKEL CONCENTRATE USING THE CESL PROCESS

COB AGM Investor Presentation

MINDORO DRILLS 16.9 METERS OF 1.81% NICKEL AT AGATA

DEVELOPMENTS IN COPPER SMELTING AND REFINING

OMITIOMIRE OXIDE COPPER FEASIBILITY STUDY

SPECIALISTS IN THE DESIGN, MANUFACTURE AND SUPPLY OF DC ELECTRICAL SYSTEMS.

PALLAMET 500 Palladium-Nickel

ENERGY CONSUMPTION AND GREENHOUSE GAS EMISSIONS IN THE CHILEAN COPPER MINING INDUSTRY Events of 2008 DE/07/09

TSX: LUN OMX: LUMI Handelsbanken Handelsbank Conf Con er f ence Stockholm

Copper: Five things to look for in 2017

Recovery of Cu, Zn, Ni and Cr from Plating Sludge by Combined Sulfidation and Oxidation Treatment

Voisey s Bay Project Update

Analysts Day May 7, 2013 Mooresboro, NC

LIB raw material supply chain bottlenecks: looking beyond supply/demand/price. Robert Baylis Managing Director

Tomakomai CCS Demonstration Project in Japan

Mineral & Metal Resources Business Unit

The declining discovery rate what is the real story?

Richard LAUCOURNET Group head in the development of advanced materials for new energies CEA TOWARD A MORE EFFICIENT PROCESS TO RECOVER MATERIALS

The operating profit, excluding revaluation of process inventory, increased to SEK 1,744 m (1,318) due to improvements in metal prices.

Reduction in Steam Losses from 100,000 Steam Traps

ERAMET TOKYO PRESS CONFERENCE. July 6 th, 2017

COMPANY RESEARCH AND ANALYSIS REPORT. Mipox Corporation. Tokyo Stock Exchange JASDAQ. 3-Jul FISCO Ltd. Analyst.

Dentsu 2017 and Beyond -Innovation Reinvention-

Confidence in Carrapateena project grows

Diversified Australian Producer

NICKEL MARKET PERSPECTIVES September 23 rd, 2014 Metal Bulletin Conference, Jakarta

PAUL B. QUENEAU P.B. Queneau & Associates, Inc. The Bear Group Phone: (303) ; Fax:

COMBINED GENERAL SHAREHOLDERS' MEETING. 27 May 2016

From copper ore to pure copper with the power of TAKRAF and ABB equipment

Welcome to. Future events - May, PRESSURE LEACH PLANT DESIGN & OPERATION FORUM or HEAP LEACH TESTWORK SCALE-UP & DESIGN SYMPOSIUM

Mitsui s Participation in Coal, Railway & Port Business in Mozambique

Iván Arriagada, CEO Antofagasta Minerals. Producer Challenges

2011 RESULTS. SFAF meeting, Paris February 16 th, 2012 ALLOYS, ORES & PEOPLE.

Raw Material & Supplementary Material Report

RESOURCE GOLD PTY. LTD.

NORTH KALGOORLIE NICKEL PROJECT A WORLD CLASS NICKEL ASSET

Export Breached RM80 billion, Highest on Record

Separation of nickel and cobalt from calcium, magnesium and manganese by solvent extraction with synergistic mixtures of carboxylic acids

Southern Copper Corporation Highlights

Direct Nickel Process Breakthrough Technology

Twin Metals Minnesota LLC Overview Minnesota SME. April 23, 2014

Decision making to support sustainability in the copper industry: technology selection

MARKETING UPDATE. Rob Ward T M E

The Aurubis Copper Mail informs you monthly about current trends on the copper market.

mineral producers, mineral consumers and international cooperation Dr. Sven Renner Program Manager Extractives & Development

Jade Precision Engineering. Material Safety Data Sheet. Section I Product Identification. Section II: Composition / Information on Ingredient

Drilling, metallurgical test work and a new resource model add 21% to oxide gold reserves

At Home in North America

ERAMET. Investors and Analysts Presentation - December 2015

2012 Minerals Yearbook

Nickel & Cobalt 2009

Geir Gulliksen, Supervisor.

Transcription:

SUMITOMO METAL MINING 1

SUMITOMO METAL MINING 2

Pogo All Weather Road Pogo Mine SUMITOMO METAL MINING 3

(JPY 100M) SUMITOMO METAL MINING 4

JPY 100M JPY 100M SUMITOMO METAL MINING 5

Business operations focused on earnings maximization and cost minimization SUMITOMO METAL MINING 6

(08-1Q = 1.0) SUMITOMO METAL MINING 7

08/1-2Q=100 SUMITOMO METAL MINING 8

JPY 100M Holding above 50% SUMITOMO METAL MINING 9

JCRRanking: Short-term:-1(highest level) Long-term:A+(top 30 SUMITOMO METAL MINING 10

Pogo Mine Pogo Mine SUMITOMO METAL MINING 11

Maintain and make full use of sound financial position SUMITOMO METAL MINING 12

Practical use as SMM s mining school to develop engineers SUMITOMO METAL MINING 13

Category Additional SMM staff Roles Additional SMM staff to serve as operators at Pogo (previously 4 SMM staff Pogo Pogo Mine SUMITOMO METAL MINING 14

Acquisition, in July 2009 of Teck s interest (40%) for $245M, bringing Japanese interest to 100% (SMM85%) First overseas mine with SMM serving as operator Pogo Cash operating cost (per toz 2009 : further reduction 2008 US$487 2007 US$499 Logo mark designed by a high school student in Pogo SUMITOMO METAL MINING 15

FY09 Significant reduction of production cost, Pursuit of rights to profitable copper mines SUMITOMO METAL MINING 16

(1) FY09CBNCNi refinery : smooth startup after expansion CBNC : production launch; Increase capacity from 10kt to 22kt (product: 17kt) Ni refinery: Increase capacity from 36kt to 41kt (product: 33.2kt) (2) Goro production launch by the end of 2009 (SMM forecast (3) Taganito:SMM announced on 14 Sep 2009 that SMM has reached a decision to proceed with Taganito project. Total investment US$1.3billion Launch of commercial production in 2013 Products Ni/Co mixed sulfide (Ni:30kt/y Co2.6kt/y) sell to SMM Production period Approx. 30yrs (4) 2013 Ni refinery: Increase capacity from 41kt to 65Kt SUMITOMO METAL MINING 17

HPAL+MCLE in nickel refining * Coral Bay Nickel Corp. (CBNC: Philippines): Production of nickel/cobalt mixed sulfide by HPAL * Domestic nickel refinery: Japan s only production of electrolytic nickel/cobalt from mixed sulfide, applying MCLE (matte chlorine leach electro winning) * Developments at CBNC Phase I: 2004: launch of production at 10,000 t/yr Phase II: 2009: operations stable (investments into production expansion: US$307mn) Capacity to be expanded to 22,000 t/yr HPAL: High Pressure Acid Leach: technology for recovering nickel and cobalt from low-grade laterite nickel ore First company to achieve large-scale commercial production CBNC Philippines * 2007: Received Grand Prize in Nikkei Manufacturing Awards * 2008: Received Watanabe Prize from Mining and Materials Processing Institute of Japan * 2009: Received Okochi Memorial Production Award SUMITOMO METAL MINING 18

Ore Slurry Sulfuric Acid, Vapors (Recovery) Vapors Heater Autoclave Flash Vessel Autoclave operating conditions temperature: 230250 Pressure: 35Mpa SUMITOMO METAL MINING 19

Only CBNC achieved planned production volume in short time HPAL plants at other companies either shut down or significantly undershot planned production volume. Cawse (Norilisk), Bulong (Preston): Plants closed. Ravensthorpe (BHP): Despite investment of US$2bn, plant closed almost immediately after production startup; buyer now being sought. Murrin Murrin (Anaconda): Operating at near 30,000 t/yr, against planned 45,000 t/yr Raventhrope SUMITOMO METAL MINING 20

SMM is Japan s only producer of electrolytic nickel. April 2009:production capacity increased from 36Kt to 41Kt Total investment 5.7bn (Production capacity to reach 65Kt in 2012; capital investment also including facility expansion) MCLE: matte chlorine leach electrowinning (Hydrometallurgy smelting method) Outstanding productivity, high quality achieved Reduction in environmental burden Improvement of work environment Nickel refinery won Okochi Memorial Production Award 1980: Cobalt separation by solvent extraction method 1996: Achievement of MCLE process Niihama Nickel Refinery Japan SUMITOMO METAL MINING 21

SMM announced on 14 Sep 2009 that SMM has reached a decision to proceed with Taganito project. Philippines Location: Taganito, northeast Mindanao Island,the Philippines Total investment US$1.3billion Launch of commercial production in 2013 Products Ni/Co mixed sulfide (Ni:30kt/y Co2.6kt/y) sell to SMM Production period Approx. 30yrs Coral Bay Taganito Planned Site SUMITOMO METAL MINING 22

SUMITOMO METAL MINING 23

Pogo Mine SUMITOMO METAL MINING 24

$/T 10,000 9,000 8,000 7,000 6,000 Curre nt LME Cas h & Stoc k His tric al Chart LME COMEX SHFE LME Cas h KT 2,000 1,800 1,600 1,400 1,200 5,000 4,000 3,000 2,000 1,000 0 00/1 00/7 01/1 01/7 02/1 02/7 03/1 03/7 04/1 04/7 05/1 05/7 06/1 06/7 07/1 07/7 08/1 08/7 09/1 09/7 1,000 SUMITOMO METAL MINING 25 800 600 400 200 0 (Source: SMM

E-Cu SUMITOMO METAL MINING 26

09 forecast: 6.78$/lb (Source: SMM SUMITOMO METAL MINING 27

Nickel Special/stainless steel, electronic materials, etc. SUMITOMO METAL MINING 28

Au $/Toz Oil $/barrel Fear of inflation Financial crisis Fear of inflation SUMITOMO METAL MINING 29

(SourceSMM Price trends of SMM s main metals: Cu Ni Au SUMITOMO METAL MINING 30

\ SUMITOMO METAL MINING 31

Note The materials provided herein are not intended as disclosure under the Securities Law, and no warranty is made as to their completeness or accuracy. Any projections included in these materials are based solely on information available at the time of this briefing, and are subject to change based on market conditions, competitive conditions, and a number of other factors. Therefore, we ask that you refrain from making any investment decisions based on these materials alone. The Company cannot be held responsible in any way for any losses that may occur as a result of the use of these materials. All copyrights, trademarks, and intellectual property rights attaching to the materials herein are the sole property of Sumitomo Metal Mining Co., Ltd. SUMITOMO METAL MINING 32