BC BUILDING CODE ERRATA

Similar documents
Building Codes and Ordinances ARC 227

Phase Two Change Proposal for the Next Edition of the Building Code: 2-CC-B POTENTIAL CHANGE TO ONTARIO S BUILDING CODE:

Administrative Changes

2018 British Columbia Building Code Public Review of Proposed Changes

2003 International Residential Building Code

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

Training Certification Categories

Is Your Envelope Effective? BCBEC Luncheon January 29, 2009

Important Notice To Building Permit Applicants and Designers

WOOD USE IN NONCOMBUSTIBLE BUILDINGS

November 10, 2015 Baltimore, MD. presented by

PREP + INSULATION. DISCLAIMER: These tools are for illustrative purposes only and

Boulder City NV Prepared by (Print Name) Signature Date

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Thermal Bridging and Whole Building Energy Performance

Energy Efficiency: Designing Wood-Frame Buildings for Occupant Comfort

Chapter 2: Foundation

E d u c a t i o n a l S e m i n a r s f o r B u i l d i n g & R e s i d e n t i a l C o d e

Questar ThermWise Duct Technical Specifications

PRESCRIPTIVE COMPLIANCE METHOD

Carpenter Level 2 Rev. September 2017

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

CHECKLIST Inspecting a Garage

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

PART 1 BUILDING ENVELOPE THERMAL ANALYSIS (BETA) GUIDE

1) For the purpose of this Section, the term common space shall mean all spaces required to

Fenestration Components: Mechanical Summary. Water heater energy factor: Ef Fuel type: Gas Electric Other

REPORT HOLDER: THE DOW CHEMICAL COMPANY 1501 LARKIN CENTER DRIVE MIDLAND, MICHIGAN EVALUATION SUBJECT:

One and Two Family Additions

PENNSAFE BUILDING INSPECTION SERVICES LLC PERMIT APPLICATION

Building Regulations

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

EcoTouch Insulation with PureFiber Technology

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

Basement Renovation Guide For Residential Dwellings

Thermasheath -3. Insulation for the Building Envelope ROOF WALL SPECIALTY

Spray Polyurethane Foam. Insulation and Air Barrier Requirements of the 2012 I-Codes. Spray Foam Coalition

Modular Wood Framing Goes Vertical

Floor Plan. *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line.

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

APPROVED. Acceptable to the code official for compliance with the provisions of the applicable Code or referenced Standard.

RAPID STRUCTURAL ASSESSMENT REPORT

Suspended Metal lath and Cement Plaster. Coverings Rigid Insulation, 1/2 - in 0.75 psf. Floor Fill Lightweight Concrete, per inch 8 psf

Legalization of Dwelling Units Installed Without a Permit SCREENING FORM No fee to file

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Basic Information for Obtaining Permits, Submitting Plans, Scheduling Inspections, etc.

FIRE AND SMOKE PROTECTION FEATURES

Requirements for Additions/Enclosed Deck/Finished Bonus Room/Dormer

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

STATE OF NEW HAMPSHIRE DEPARTMENT OF NATURAL AND CULTURAL RESOURCES DIVISION OF PARKS AND RECREATION SKI PATROL HUT PROJECT #: CAP 1804

FCIA Webinar Gypsum Wall Patching

Acoustic Design Criteria

INTERIOR ENVIRONMENT

Airspace R-Values. Educational Overview. Revised 12/6/2016

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

C H A P T E R 3. Completing the Residential Analysis Worksheet STEP 1: WINDOWS AND OTHER GLASS AREAS

BUILDING CODES & DESIGN CRITERIA

District of Barriere A GUIDE TO BUILDING PERMITS

Plan Check & Field Inspection Guide

Protecting Penetrations in Fire Rated Construction

STEEL STUD, TRIMS AND ACCESSORIES FOR DRYWALL CONSTRUCTION MONTREAL TORONTO CALGARY EDMONTON VANCOUVER THE STRENGTH WITHIN

Facility Improvements

TECHNICAL INFORMATION SHEET NUMBER 1a

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: THERMAL INSULATION REPORT HOLDER: DEMILEC (USA) INC.

Building Design Data

I-STUD Shaftwall System

WHO IS THIS COURSE FOR?

Reference Guide: Mid-Rise Wood Construction in the Ontario Building Code Report by Morrison Hershfield (January 2015)

ISO Types 1-6: Construction Code Descriptions

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

A. Source Limitations: Obtain each type of building insulation through one source.

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague,

780 CMR: 9 th Edition Massachusetts State Building Code. Presented to: BSA Codes Committee. DATE: January 20, 2016

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Structural Technical Report #2 By Robert Whitaker

DIVISION: WOOD, PLASTICS AND COMPOSITES SECTION: STRUCTURAL PANELS REPORT HOLDER: ENERCEPT, INC.

Xtratherm Thin-R Partial Fill Cavity Wall Board (XT/CW Grade)

SECTION BASIC ELECTRICAL MATERIALS AND METHODS

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

INSULATION RETROFIT DESIGN ENERGY SOLUTIONS CENTRE YUKON GOVERNMENT

REPORT HOLDER: OMEGA PRODUCTS INTERNATIONAL, INC CALIFORNIA AVENUE CORONA, CALIFORNIA EVALUATION SUBJECT:

2013 COMMERCIAL PRODUCTS

Single family house in Herselt BE

IBC FIRE SAFETY. Code Change No: FS1-07/08. Original Proposal SECTION 702 DEFINITIONS

Residential Accessory Structures & Room Additions

CHAPTER 1: OVERVIEW OF ENERGY EFFICIENT CONSTRUCTION

DIVISION: THERMAL AND MOISTURE PROTECTION SECTION: WATER RESISTIVE BARRIERS/WEATHER BARRIERS SECTION: AIR BARRIERS

SECTION : FIRE WALL AND FIRE SUPPRESSION REGULATIONS FOR R1-Z, R-2, R-3 ZONING AND PDD CATEGORIES

Chapter 4-16 SPECIAL DESIGN STANDARDS FOR TYPE V CONSTRUCTION

Assemblies Evaluated For 1. Non Axial Load Bearing Wall 2. Transverse Load Capacity 3. Fire Resistance 4. Abuse Resistance

Insulation requirements

Transcription:

BC BUILDING CODE ERRATA The following changes should be made to print and offline copies of the 2012 BC Codes. The 2012 BC Codes subscription products include these changes. Highlighted text is used in some cases to indicate where specific portions of text have been changed. CHANGES TO DIVISION A 1.2.1.1.(1)(b) text should read section 2.3 of Division C CHANGES TO DIVISION B 3.1.2.6.(1)(b) Clause (b) should read: except as permitted by Sentence (2)... 3.1.5.5. Article title should read Combustible <Cladding Systems> for Exterior Walls 3.1.9.1.(1)(b) 3.1.9.1.(1)(c) there should be a comma before the word or. Add change indicators around the entirety of clause (c) to read <(c) tightly fitted> 3.1.9.5.(1) Add highlighted text, delete struck-out text as shown below: 1) A membrane ceiling forming part of an assembly assigned a fire-resistance rating on the basis of Appendix D <or Sentence 3.1.7.1.(4)> is permitted to be penetrated by openings leading into ducts within the ceiling space, provided a) the ducts are sheet steel, and b) the number of openings and their protection conform to the requirements of Appendix D <or Sentence 3.1.7.1.(4)>. 3.2.2.50. Change to read 3) <Except as required by Sentence (4), a building referred to in Subclause 3.2.2.50.(1) (d)(v) or (c)(vi) shall have an exterior wall assembly 3.2.3.4.(1) Add change indicator to read <(see Appendix A)> NEW! 3.4.3.4.(1) Add change indicator to 2050mm to read 1) Except as permitted by Sentences (4) and (5), every exit shall have a <clear height over the clear width of the exit> of not less than <2 050 mm>. 3.6.2.1.(6) Delete Sentence in Print version and replace with: 6) Electrical equipment that is required to be located in a service room according to the Electrical Safety Regulation shall be installed in a service room separated from the remainder of the building by a fire separation having a fire-resistance rating not less than 1h. 3.7.3.1.(1) Add change indicators around the name of the standard to read: <CSA Z7396.1, "Medical Gas Pipeline Systems Part 1: Pipelines for Medical Gases and Vacuum. > 3.8.3.5.(2) Delete word "any" to read: 2) Where <access is not provided to any main entrance>, a sign (see Sentence 3.8.3.12.(3)) shall be installed as far ahead of any wheelchair obstruction as is practical so as to indicate clearly the location of the accessible main entrance.

3.8.3.18. Add change indicators to Sentence 1 to read: 1) <Where counters serving the public and intended as a work surface for extended business transactions are provided, at least one accessible counter shall be provided that a) has its work surface not more than 865 mm above the floor, and b) is not less than 760 mm long centered over the knee space required by Sentence (2). (See Appendix A and Appendix Note A-3.8.2.1. in Appendix A.)> 2) Knee space beneath an accessible counter intended to be used as a work surface shall be not less than a) 760 mm wide, b) 685 mm high, and c) 485 mm deep. 4.1.8.4A (notes to table) In note number (3) insert the following after (3) Other soils include: a) liquefiable soils, quick and highly sensitive clays, collapsible weakly cemented soils, and other soils susceptible to failure or collapse under seismic loading, b) peat and/or highly organic clays greater than 3 m in thickness, c) highly plastic clays (PI > 75) more than 8 m thick, and d) soft to medium stiff clays more than 30 m thick. 6.2.4.1.(4) Add change indicators to read: Where a fuel-burning appliance is installed in a service room that is not in a suite of residential occupancy <nor in a suite of care occupancy>, a CO alarm shall be installed 9.9.8.1.(3) Should read: Where a public corridor is not less than 9 m wide and conforms to Subclauses 3.4.2.5.(1)(d)(i) to (d)(vi) 9.10.2.3. Add change indicators to entire article and highlighted text to read: <9.10.2.3. Group A, Division 2, Low Occupant Load 1) This Part may apply to a Group A, Division 2 assembly occupancy that is permitted by Article 3.1.2.6. to be classified as Group D, business and personal services occupancy, provided the building in which the assembly occupancy is located complies with Sentence 1.3.3.1.(1) of Division A.> 9.10.15.4.(2) Change to read Subclause 9.10.15.2.(1)(b)(iii). 9.20.2.1(1)(e) Change to read CAN/CSA-A8...

9.20.5.2. (Table) Add angle brackets to read: 9.32.4.2.(7) Delete entire sentence 7) Where CO alarms are installed in a house with a secondary suite including their common spaces, the CO alarms shall be wired so that the activation of any one CO alarm causes all CO alarms within the house with a secondary suite including their common spaces to sound.

10.2.1.1.B. Replace table with the following: Table 10.2.1.1.B. Minimum Thermal Resistance of Insulation RSI, m2 C/W for Buildings of other than Residential Occupancy as described in Sentence 1.3.3.3.(1) of Division A (Derived from ANSI/ASHRAE/IESNA Standard 90.1) Forming Part of Sentence 10.2.1.1.(4) Value Required Building Assembly Less than 4000 Degree Days 4000 to 5000 Degree Days Greater than 5000 Degree Days Heated Semiheated Heated Semi- Heated Semi- (1) heated (1) heated (1) Roof Insulation Above Deck 2.6 ci 0.9 ci 2.6 ci 0.9 ci 2.6 ci 0.9 ci Metal Building (2) 3.3 1.8 3.3 1.8 3.3 1.8 Attic or Other 5.3 3.3 6.7 3.3 6.7 3.3 Walls, Above Ground Mass 1.3 ci 1.7 ci 2.0 ci Metal Building (2) 2.3 1.9 2.3 2.3 2.3+2.3 (3) 2.3 Steel Framed (4) 2.3+0.7 ci 2.3 2.3+0.7 ci 2.3 2.3+1.3 ci 2.3 Wood Frame or Other 2.3 2.3 2.3 2.3 2.3 2.3 Suspended Floors Framed 5.3 2.3 5.3 2.3 5.3 3.3 Concrete Slab 1.5 1.5 1.5 0.7 ci Notes to Table 10.2.1.1.B.: ci continuous insulation: insulation that is continuous across all structural members without thermal bridges other than fasteners and service openings. It is installed on the interior or exterior or is integral to any opaque surface of the building envelope. (1) Semiheated space is an enclosed space within a building that is heated by a heating system greater or equal to 10W/m2 of floor area but does not exceed: (a) 45 W/m2 of floor area in locations of less than 4000 degree days, or (b) 60 W/m2 of floor area in locations of 4000 or greater degree days. (2) A building constructed primarily of a steel framed superstructure and metal skin. (3) The first rated R-value is the insulation compressed between metal wall panels and the steel structure. The second rated R-value is for insulation installed from the inside, covering the girts. (4) A wall with a cavity (insulated or otherwise) whose exterior surfaces are separated by steel framing members (i.e. typical steel stud walls and curtain wall systems).

10.2.1.1.B (notes to table) Remove extra period after systems to read: Notes to Table 10.2.1.1.B: (ci) Continuous insulation: insulation that is continuous across all structural members without thermal bridges other than fasteners and service openings. It is installed on the interior, exterior or is integral to any opaque surface of the building envelope. (1) Semiheated space is an enclosed space within a building that is heated by a heating system greater or equal to 10W/m 2 of floor area but does not exceed: a) 45 W/m 2 of floor area in locations of less than 4000 degree days, or b) 60 W/m 2 of floor area in locations of 4000 or greater degree days. (2) A building constructed primarily of a steel framed superstructure and metal skin. (3) The first rated R-value is the insulation compressed between metal wall panels and the steel structure the second rated R-value is for insulation installed from the inside, covering the girts. (4) A wall with a cavity (insulated or otherwise) whose exterior surfaces are separated by steel framing members (i.e. typical steel stud walls and curtain wall systems). CHANGES TO APPENDIX B A-9.25.3.4. and 9.25.3.6. Add change indicators to read: <A-9.25.3.4. and 9.25.3.6. Air Leakage and Soil Gas Control in Floors-on-ground The requirement in Sentence 9.25.3.3.(6) regarding the sealing of penetrations of the air barrier also applies to hollow metal and masonry columns penetrating the floor slab. Not only the perimeters but also the centres of such columns must be sealed or blocked.> CHANGES TO INDEX Index Add the following items: Drinking fountains 3.8.3.17 Elevating devices 3.8.3.10 Entrance accessible- 3.8.3.5 Hotels 3.8.2.31 Heat Recovery Ventilators Balancing 6.2.1.6 Multi tenant storage 3.3.5.9 Parking areas access 3.8.2.3 Parking stalls 3.8.3.4 Power operators for doors 3.8.3.5 Storage garage accessible parking 3.8.2.38.(3) Index Change the following: Plumbing 7 is listed as a heading, Change to read Plumbing (Book II)

2012 BC PLUMBING CODE CHANGES TO DIVISION A 1.2.3.1.(1) Change to read: 1) Personnel performing the installation, extension, alteration, renewal or repair of a plumbing system shall a) possess a tradesman s qualification certification as a plumber, b) be an indentured apprentice supervised by a journeyman who meets the criteria set out in Clause (a), or c) be the registered owner and occupant or intended occupant of the single family dwelling in which the plumbing work will occur.