Office of Planning, Design and Construction. Capital Program Update April 10, 2017

Similar documents
SUNY Hospitals & A Healthier New York. Capital Briefing March 1, 2013

RFP Feasibility Design Services: Clinical Education & Assessment Center Expansion Questions & Answers: February 13 th, 2018

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

LIFE OF A CAPITAL PROJECT

1.0 ABOUT THE NU GUIDELINES

Subject: Lucretia Mott School No. 3 Rehabilitation. Figure 1 Figure 2 Figure 3

LANSDOWNE HIGH SCHOOL RENOVATION PRELIMINARY DESIGN PRESENTATION. The Board of Education of Baltimore County Verletta White, Interim Superintendent

Healthcare Specific Metrics

BRUCE MONROE AT PARK VIEW ELEMENTARY SCHOOL MODERNIZATION PROPOSED MAIN ENTRY - EXTERIOR RENDERING

Minnesota Healthcare Engineers Association, Fall Conference. Bob Dehler, P.E. Engineering Program Manager September 14, 2017

UCSF Mission Bay & Dogpatch Construction Community Meeting 11/7/2017

UAA Science Renovation Phase 2 Narrative EXISTING BUILDING SITE

- DATA REQUIREMENTS BIM

Retrofit of an Existing Californian Hospital to Immediate Occupancy Standards One Year Later Again R. Jay Love, S.E.

January 18, 2010 Report No. 7 MONTHLY CONSTRUCTION PROGRESS REPORT

Crockett Elementary School Renovations

CITY OF NOVI. Police Department

A/E Design Deliverable Checklist

Mueller Laboratory Renovation

A PRESENTATION OF THE SCHEMATIC DESIGN FOR THE CHEMISTRY BUILDING RENOVATION PROJECT WILL TAKE PLACE AT THE MAY MEETING MEMORANDUM

RATIONALE AND REASONING

MR Project Implementation Guide

Landscape elements will be completed between now and Spring Break by UCO Contractor should have resolved parking lot lighting issues

Home Building Planner

The Consumer s Guide to. Basement Renovations. The Consumer s Guide to Basement Remodeling Total Renovations

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

Design Process 101. Michael Barnard, AIA, NCARB. animalsheltering.org/expo #AnimalCareExpo. Copyright

ARTICLE VII - OFF-STREET PARKING AND LOADING Section 7-10

Procedure for Department Managed Repair and Renewal Projects Under $15,000

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607

5.0 Daylighting Analysis (Breathe Study)

Addendum #02 New County Office Building Responses to RFP Questions

PRESCRIPTIVE COMPLIANCE METHOD

University of Wisconsin La Crosse Science Lab Building DFD# 13B3H / RA# 1290.A December 3, 2014

BASEMENT FINISH CONSTRUCTION PLANS REFERENCE: 2015 INTERNATIONAL RESIDENTIAL CODE. PERMITS

Architectural Services

CONSTRUCTION UPDATE NOVEMBER 2016 THIS IS PROGRESS. THIS IS AUBURN.

Building Information Modeling (BIM) Execution Plan

Construction Summary

Cottage of the Year SL-593 MOSER DESIGN GROUP PLAN SPECIFICATIONS ABOUT THIS PLAN PLAN PRICING. illustration MUIR STEWART

THE DESIGN PROCESS HEALTHCARE DESIGN RESOURCE INDUS HOSPITAL, KARACHI PAKISTAN AUGUST 2010 AUG. 02, 2010

Auburn University Facilities Management Policy :

Rice University Request for Proposal August 26, 2016

FUTURE BOND PROGRAM PROPOSED PROJECTS Summary Report. September 2013

r e s i d e n t i a l o u t s i d e v i l l a g e c e n t e r

UNASSISTED OFFICE MOVES FREQUENTLY ASKED QUESTIONS

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

HQ Building Renovation. Mark Focht, President Nancy Somerville, EVP Michael O Brien, CFO

Division 09 FINISHES TABLE OF CONTENTS

A/E Design Deliverable Checklist

What happened to Division 17? and what is CLA? A Strategic Plan for Communications, Life Safety and Building Automation Systems

Comparison of the life safety elements of the 1997 UBC and the IBC 2000.

Considering Modular Buildings for Your Space Needs?

L+M Cancer Center IPD: Embracing a True Collaborative Team Approach

LEED v4 Building Design and Construction Quiz #8 EQ

Communications Page 1 of 9

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

TEXAS A&M ENGINEERING

Ongoing and Future Project Work. Construction Management

Project Brief. Royal Columbian Hospital Redevelopment Project Phase One

SCHEMATIC DESIGN CANNING WAREHOUSE BOZEMAN, MT. The Cannery District CQ + MA SD Set Canning Warehouse / 100% SD

APPENDIX B FF&E RESPONSIBILITY MATRIX

Thule Prototype BIM Manual for Dormitories. February 5, 2010

INSPIRE each student to develop a strong

Manufacturing Facilities Proposal

Sustainable Renovation

B-2 COMMUNITY COMMERCIAL BUSINESS DISTRICT. Uses allowed in the B-2 Community Commercial Business District are subject to the following conditions:

Laker Hall Program Study Intercollegiate Athletics. Preferred Concept & Project Phasing SUCF Project No

UNIVERSITY OF CENTRAL FLORIDA

A Design-Build Project: Repairing the Courthouse Square Complex

Projects Currently in Planning, Design and Construction. April 12, 2017

HOLDER CONSTRUCTION COMPANY Superintendent s Weekly Activity Report #160 Douthit Hills Student Community, Clemson University Project Tony Greene

Basement Renovation Guide For Residential Dwellings

Case Study The Polyclinic Northgate Plaza, Seattle, WA

OMAHA BASEBALL STADIUM. May 21, 2009 Report No. 2

FY CAPITAL IMPROVEMENT PROGRAM MID-YEAR STATUS REPORT

City of La Palma Agenda Item No. 2

UNIVERSITY OF ARIZONA CONSTRUCTION AND RENOVATION PERMITTING PROCEDURE ADOPTED: JULY 2011

Volume II- Project Development Processes

Excellence in. Modular Building Design

Abington Memorial Hospital Abington, PA. Project Description

PHYSICAL FACILITIES Consultant s Handbook Division 27 COMMUNICATIONS 0000 COMMUNICATIONS

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

THE CONSTRUCTION SUPERVISOR

Easthampton High School Building Project. Public Information Forum #3

Jackson Miracle Building Plan Outreach Roundtable. November 1, 2016

Manage Deliverables - Construction Step 6 February 2015

CONSTRUCTION UPDATE. June 2017 THIS IS PROGRESS. THIS IS AUBURN.

DAT MEETING NOTES # 3

LEED LEED. Leadership in Energy and Environmental Design. A voluntary, consensus-based. high-performance, sustainable buildings and neighborhoods

Basic Design Considerations for a Laboratory. The Ministry of Health & Family Welfare, under the Drugs & Cosmetics Act, laid down

Baseline Hillside Ordinance Correction Sheet (Ordinance No. 184,802 Effective 3/17/17)

MADISON HIGH SCHOOL // Executive Summary

CODE COMPLIANCE PLAN REVIEW PROCEDURES

CASESTUDY: UNITEC s integrated information system

SOUTH DAKOTA BOARD OF REGENTS. Budget and Finance ******************************************************************************

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

Request For Proposal (RFP) For Architectural/Design Services. Ski Hi Park Multi-Purpose Building

Transcription:

Office of Planning, Design and Construction Capital Program Update April 10, 2017

Projects Under Construction

Translational Research Center

Translational Research Center Phase I Site work Completed - June 2015 Phase 2 Building Drywall and ceiling installation continues Floors, walls, ceiling installation in progress Window systems nearing completion Exterior building envelope 99% complete Selection of furniture and equipment complete Construction Completion July 2017

Translational Research Center

Translational Research Center

Translational Research Center

School of Medicine (SOM)

School of Medicine (SOM) Phase I Site Utilities Completed December 2015 Phase 2 Building Site work in progress Exterior glass complete Floors, ceiling, paint, equipment continues Contractor furnished millwork, furniture & interior glass, in progress Furniture selected and ordered A/V and technology design complete Landscape and simulation packages in design Construction Completion - July 2017

School of Medicine Infrastructure Contract II Phase 3 Alumni Drive Improvements Scope: Improving maneuverability of Alumni Drive, pedestrian circulation and parking Construction Start - March 2016 Remaining work: Repaving of Lot 11 Completion- June 2017

Children s Neurodiagnostic Suite Scope: Neurodiagnostic Suite includes; three exam rooms, staff work room, storage and a subwaiting room for family. Rooms are provided for EEG, EMG, care-givers and family members Punchlist complete First Patient Day - April 2017

N215 Pathology Lab Renovation Scope: Pathology lab renovation to improve exhaust and create additional tissue workspace Notice to proceed will be 04/11/2017 Construction Completion October 2017

Lexington Renovations Scope: Emergency Department Renovation. Construction to be completed in four phases. Project is substantially complete Air balance in progress Open for patient care 100% of renovated space

Farmers Market Up In Farms Scope: To convert a portion of the Farmers Market to a Food Hub Construction in progress Construction Completion May 2017

Farmers Market Up In Farms

Children s 3 rd Floor Finish Upgrades Scope: Phased updating of finishes in 3 rd floor Children s Hospital space Public space complete 18 patient rooms complete 7 rooms currently under phased construction Construction Completion June 2017

New CT at Jackson Medical Mall Scope: Turnkey project to renovate JMM Room MI111-A and install a new CT Project is substantially complete Project punch list is in progress First Patient April 2017

UP Belhaven / RAD Building (Relocate UMMC G.I. Clinics) Scope: Relocate UMMC G.I. Clinics. Upgrade interior finishes, flooring for the G.I. procedural space on the 3 rd floor, elevator lobby finishes upgrades, exterior waterproofing, painting in 4 th floor offices and occupied spaces. Construction started February 1 st and is in progress First Patient - August 2017

Third Floor Plan G.I. Procedure

UP Belhaven / Watkins Building Scope: Interior facelift for the public portions of the G.I. Clinical space 2nd floor. New paint, flooring, and countertops will be part of the package. Lease execution in December, 2016 Construction ongoing First Patient May 2017

MRI Upgrade at Jackson Medical Mall Scope: Turnkey project to renovate JMM Room MI105 and install a new MRI Construction in progress Scheduled completion is Spring of 2017

Planning & Design Projects

Master Plan Update Scope: Updating the facility master plan of the UMMC main campus and the Jackson Metro area Final report submitted April 2017 UMMC internal review and approval in progress Submit to IHL May 2017

Parking and Traffic Study Scope: Analysis of current parking and traffic conditions and determining future needs for both vehicular and pedestrian traffic Final Draft report completed Nov 2016 and is under review by UMMC Final report complete January 2017 Impact of Garage C Parking will be evaluated first quarter of 2017

Children s of Mississippi Expansion Project

Children s of Mississippi Expansion Project Scope: Ambulatory Clinics New Critical Care Tower Parking & Infrastructure Design Development in progress Development of project plan in progress Procurement of CMAR in progress

Clinical Research Unit Scope: Full design and construction project for a new Clinical Research Unit on the south wing of the 6 th floor shell space in the Adult Hospital Initial plans already developed through a separate planning project Bureau kick off has occurred, and the project is currently in Schematic Design SD meeting held on April 6, 2017 PLAN FOR CLINICAL RESEARCH UNIT

ASC at Select Specialty Hospital Scope: Renovation of existing O.R.s & associated spaces at Select Specialty Hospital to comply with 2014 FGI standards Project will have 5 O.R.s, 1 Procedure Room, 7 Pre-Op bays, 10 PACU bays, 2 (23) Hour/PACU bays, plus all support spaces ENLARGED FLOOR PLAN Pricing Set Complete Select Specialty build-out pricing and lease terms under review by UMMC KEY PLAN

Mayo Freezers at the Jackson Medical Mall Scope: Freezers of priceless samples arriving from the Mayo Clinic in late May/early June; UMMC needs a location to house these freezers. They will be located in an empty space on the 3 rd floor of JMM. Freezers can move right in, no work needed other than electrical modifications Outlets need to be put on emergency power; our generator from the USB building will be returned in August/September. JMM has provided electrical price & PDC meeting with user group to confirm forward movement.

Telehealth Lease C Spire Building Scope: Telehealth to lease roughly 11,500 square feet of the 6 th floor Will allow for roughly double existing square footage Full-Service Lease Expected Occupancy: September 2017

Telehealth Lease C Spire Building

Dermatology Clinic Louisville, Mississippi (Temporary Location) Scope: 2,475 square feet Term of Lease: 1 Year This facility will allow Dermatology to become operational and establish a presence in Louisville until a more permanent location can be renovated by Winston County Medical Center Opened on April 5, 2017

Dermatology Clinic Louisville, Mississippi (Long-Term Location) Scope: 3,085 square feet owned by Winston County Medical Foundation Currently houses WCMF s Rehabilitation Clinic, which will be relocated to the new hospital upon completion Clinic will be renovated for UMMC Dermatology Approx. ¼ mile from Winston County Medical Center Interior Demo New Construction Existing Requires IHL Board Approval Expected Availability: Spring, 2017 Expected Occupancy: Fall, 2017 Proposed Layout

Main Hospital Pharmacy Renovation Scope: Reconfigure and renovate the existing pharmacy to comply with USP 797 Regulations Create more efficient work flow, including a new modular clean room for compounding & an Ante-Room Create a central office suite for drug information services and pharmacy resident staff Phase 1 Phase 2 Pre-Bid Meeting April 18, 2017 Bid Opening April 25, 2017 Phase 3

Pediatric Pharmacy Relocation Scope: Build out a portion of the shell space above Children s Emergency Service Move the Pediatric Pharmacy out of the Wiser building to the renovated shell space. This will allow the non-clinical part of NICU s expansion and reconfiguration Phase 1 Bid Documents currently being finalized Drawing review April 10, 2017 Phase 2

Humphreys County Urgent Care Scope: Build out space in existing warehouse to provide new clinic, classroom, and office space Under construction First Patient Summer 2017

Pre-Anesthesia Testing Scope: Provide a newly renovated clinic for Pre-Anesthesia Testing, in the recently vacated Pavilion Lab. This will move Pre-Anesthesia Testing out of Suite A and allow Suite A to fully utilize their entire clinic. Architect submitted preliminary construction budget PDC working with DIS and requestor to compile FF&E budget for Administration review

Milk Bank Scope: Renovate existing W117 Conference Room to a Milk Bank to accommodate preparation and storage of milk. Construct a pass thru window for drop off. Two schematic plans have been developed and presented to users, awaiting feedback Initial Fire Safety review complete

7 th Floor Psychiatry Renovations Scope: Assessment of both East and West wings of Psychiatry for FGI code compliance and implementation through design and renovations. Preliminary budget submitted by architect with items address individually with an associated risk rating and cost Reviewing preliminary budget with users East Wing West Wing

Telemetry Room Expansion Scope: Expand existing telemetry room to accommodate minimum of one additional station, enhance existing ventilation and lighting Coordinating location for temporary telemetry room Finalizing quote documents to include revised Philips relocation cost

CAY/CDC 3 rd Floor Select Hospital Scope: Relocate CDC to 3 rd floor of Select Hospital. Replace damaged, dated flooring and wall covering, paint throughout. New countertops at highly visible locations Recent square footage change Working with users to develop revised space plan and associated construction, furniture and DIS budget

Bed Shop and Patient Equipment Relocation Scope: Relocate Bed Shop and Patient Equipment from the 6 th floor of the Critical Care Tower Currently performing test fit for space behind Pharmacy in basement Proposed space would require significant downsizing of current bed storage (approximately 60 beds downsized to 17 beds) making it less of a viable option without coupling with offcampus storage

Children s Stair Enclosure Scope: Enclose existing children s stairwells Currently working with manufacturers to obtain material cost for an aluminum mesh-like material Preliminary approval from UMMC Fire Safety based on proposed product and existing conditions

Office of Planning, Design & Construction Project Management Summary No. of Projects Total Project Cost UMMC FUNDS* 79 $ 304,004,214 OTHER 6 $ 94,402,488 TOTAL 85 $ 398,406,702 PROJECTS IN PLANNING 141 * Includes Children s of MS Expansion - $180 million

Office of Planning, Design & Construction Small Projects Status No. of Projects As of 02/27/2017 As of 04/10/2017 Design / Estimating 30 27 Estimate Submitted 40 31 Approved / PO in Process 65 44 TOTAL 135 102

Determination of Reviewability (DoR) Status Projects* Submitted to MSDH Answered Days CON Req d? UP Belhaven/Watkins 10/03/16 11/17/16 45 No GE MRI Replacement 03/23/17 *As of 04/10/17

Office of Planning, Design and Construction Questions?