Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I

Similar documents
CFWI STORMWATER SUBTEAM PROJECTS REPORT. Steering Committee Meeting

Regional Water Supply Planning

The City of Cocoa (City) is located in east

Central Florida Water Initiative Northern Everglades and Estuaries Springs Water Quality, Supply and Planning

Basin Management Action Plan Suwannee River

SRWMD Strategic Plan

City of Fort Myers Central and South Advanced Wastewater Treatment Facilities Draft Permits. April 21, 2016 Public Meeting

The Springs and. Aquifer System of Florida. Debra Segal, M.S. Volunteer for the Howard T. Odum Florida Springs Institute. Rock Springs, Orange County

2016 Reuse Inventory ii

Water Reuse in Arizona

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers

G.B. Sonny Hall, PhD. Veronika Thiebach

Treatment Wetlands: Facilitating the Beneficial Use of Reuse

FDACS BMP PROGRAM OVERVIEW. UF/IFAS and FDACS/Office of Agricultural Water Policy

The Permitting Dilemma: Groundwater Recharge Wetlands for Treated Wastewater Disposal

POTABLE WATER ELEMENT

DELINEATION OF SPRING PROTECTION AREAS AT FIVE, FIRST-MAGNITUDE SPRINGS IN NORTH- CENTRAL FLORIDA

Water Supply Water Quality Water Reuse and Conservation Watershed Management Interagency Coordination

Central Florida has historically utilized

Michael Weatherby, P.G., MWH, Tampa, FL

Subject: WUP Integrated Water Use Permit (IWUP) Annual Water Conservation Progress Report (AWCPR)

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

Lake County Success. support through synergistic local partnerships that not only mitigate, but also produce

Guidelines for Preparation of Reuse Feasibility Studies for Applicants Having Responsibility for Wastewater Management. Use it Again, Florida!

Draft March 31, Estimate of Nitrogen Loading from Septic Systems in Martin County. Gary Goforth, P.E., Ph.D. 1

SUWANNEE RIVER WATER MANAGEMENT DISTRICT

Corporate Environmental Water Stewardship Go Green. Todd Reeve October 17, 2017

Pennsylvania s Chesapeake Bay Tributary Strategy Implementation Plan for Sewage Facilities Planning

Charlotte County Utilities

Stormwater as an Alternative Source of Water Supply: Feasibility and Implications for Watershed Management 1

PIMA COUNTY COMPREHENSIVE PLAN CO PIMA COUNTY REGIONAL COMPREHENSIVE PLAN POLICY MAJOR PLAN AMENDMENT

Indirect Reuse with Multiple Benefits The El Monte Valley Mining, Reclamation, and Groundwater Recharge Project

Stormwater Treatment Wetlands

STREAM AND BUFFER AREA PROTECTION/RESTORATION

Fiscal Year 2015 Cooperative Funding Initiative Applications. Southern Region

WATERSHED. Maitland Valley. Report Card 201

Nutrient Management in. A presentation to the West Metro Water Alliance

Environmental Geography

New Castle County, DE. Floodplain Regulations

POLK COUNTY SOUTHEAST WELLFIELD DESCRIPTION OF PROJECT PLANNING LEVEL PROJECT DETAILS. (Water Supply Options project number 28)

State Agency Use of Reclaimed Water in 2016

Contents: Purpose and objective Water and energy conservation 1 1

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY

The Regulatory Framework

Environmental Information Worksheet

Option 11. Divert Water from Miocene and Hendricks Canal to Supply the Ridge

Water Resources on PEI: an overview and brief discussion of challenges

Council of Governments

DEVELOPMENT OF A WATER SUPPLY PLAN FOR POLK COUNTY & ITS MUNICIPALITIES

VILLAGE OF BELLAIRE WATER QUALITY ACTION PLAN

Mississippi River Basin Healthy Watershed Initiative

Wisconsin Wastewater Operators Association. Protecting Our Water Resources: The Future Bill Hafs - NEW Water 10/2014

Raw water sources, facilities, and infrastructure

BEING GOOD STEWARDS: IMPROVING EFFLUENT QUALITY ON A BARRIER ISLAND. 1.0 Executive Summary

PINELLAS COUNTY RESTORE ACT DIRECT COMPONENT PROJECTS IDEAS SUBMITTED TO PINELLAS COUNTY

FACTSHEET INTRODUCTION. help rebalance the water cycle, mitigate the effects of climate change and improve human health and livelihoods.

INTRODUCTION TO HOBBY FARMING AND WATER QUALITY

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

Contents. ECFT Model Documentation in Support of the 2014 Draft CFWI RWSP

SECTION 3 NATURAL RESOURCES

Securing and Protecting Water Rights and Uses in Arizona

Water in New Orleans. Jennifer Roberts. Sewerage & Water Board of New Orleans

Bradley M. Hill, R.G. Utilities Director City of Flagstaff

Subsequent to these early efforts, the complexities associated with potable water provision have increased significantly.

SLIDES: Status of Southern Nevada Water Authority (SNWA): Third Intake into Lake Mead and Groundwater Project

Texas Water Resources Institute

WATER RESOURCE PROGRAM

Use of Reclaimed Water at Nurseries

GI BMP Training Program Review Worksheets

Storm Water and Sanitary Sewer

PA Municipal Separate Storm Sewer System (MS4) TMDL Plan

Town of Sewall s Point Septic Tank to Sanitary Sewer. History

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

CHESAPEAKE BAY TMDL ACTION PLAN ( MS4 General Permit)

Developing a Sustainable Water Supply Strategy for the City of Plantation, Florida

Florida Department of Environmental Protection. Bureau of Mining and Minerals Regulation. Regulation of Mines. Howard J. Hayes, Program Administrator

Read: Case Study: America s First River : A Success Story Summarize the story of the Hudson River and PCB s:

EFFLUENT DOMINATED WATER BODIES, THEIR RECLAMATION AND REUSE TO ACHIEVE SUSTAINABILITY

GOALS, OBJECTIVES, & POLICIES

What Are Environmental (Instream) Flows?

City of Moscow University of Idaho Water Reclamation and Reuse Program

Walnut Creek Watershed Management Authority. Project Kick Off March 18, 2015

Streamlines V2, n2 (May 1997) A Newsletter for North Carolina Water Supply Watershed Administrators

Overview of Truckee Meadows Water Resources

C O M P R E H E N S I V E P R O T E C T I O N & R E S T O R AT I O N P L A N. f or th e

PAKISTAN BALOCHISTAN SMALL SCALE IRRIGATION PROJECT (SSIP) PROJECT INFORMATION DOCUMENT (PID) CONCEPT STAGE Report No.: AB1661 Project Name

Potable Water Supply, Wastewater & Reuse Element

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

MEMORANDUM. The general findings of the assessment are as follows:

Wastewater Treatment & Water Supply Alternatives Analysis

1. GENERAL DESCRIPTION OF LAND USE / COVER TYPES (SEE GENERAL DESCRIPTIONS ON PAGE 7) A 2. ADJACENT LANDS & EASEMENTS 3. FAMILY AGRICULTURAL LEGACY

East Maui Watershed Partnership Adapted from Utah State University and University of Wisconsin Ground Water Project Ages 7 th -Adult

HILTON HEAD WATER SUPPLY & SALTWATER INTRUSION. Beaufort County Council September 2012

What is a stormwater utility fee?

TORCH LAKE TOWNSHIP WATER QUALITY ACTION PLAN

POLK COUNTY COMPREHENSIVE WATER SUPPLY PLAN FINAL PCU-SWRUSA. Prepared For: Polk County, FL

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Water Recycling and Reuse

Leila Talebi and Robert Pitt. Department of Civil, Construction, and Environmental Engineering, The University of Alabama, P.O. Box , Tuscaloosa

Transcription:

St. Johns River Water Management District Wekiva Spring Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase I Project includes construction of a 5.8 mile 20-inch diameter reclaimed transmission line from the Altamonte Springs reclaimed water facility, known as APRICOT, to the city of Apopka. The project includes pipeline, booster pumps, and necessary infrastructure to deliver 3.0 mgd of reclaimed water to Apopka.The project will also reduce nutrient loading to the Little Wekiva River up to approximately 27,400 lb/yr of TP and 59,400 lb/yr of TN. Total anticipated cost: $1,300,000 Altamonte Springs FDOT I-4 Storm water Capture and Reclaimed Water Project Phase II Project to capture stormwater run-off from I-4 expansion through Altamonte Springs, treat to reclaimed water standards, and supplement flows to the City of Apopka from Altamonte Springs reclaimed water system. Project will reduce NP by 643 lbs/yr and TN by 3,259 lbs/yr to the Little Wekiva River. Total anticipated cost: $972,000 Altamonte Springs WWTP Pond Project Project to construct an 8.0 million gallon reservoir at the Altamonte Springs WWTF to provide additional wet weather storage for supplementing the City's reclaimed water system. Reduces wet weather discharges to the Little Wekiva River (WQ benefits). Total anticipated cost: $725,000 Silver Springs Marion County Silver Springs Shores Reuse to Spruce Creek Golf and Country Club

Marion County is proposing to provide up to 1.5 mgd of reuse water to the Spruce Creek Golf Course to off-set current groundwater use. Spruce Creek currently has a CUP for 0.767 mgd for irrigation which could be retired due to receipt of reuse water. Project requires construction of a transmission main from the Silver Springs Shores WWTP to the golf course. Could also provide an opportunity to connect with the City of Belleview for reclaimed water. Total anticipated cost: $3,190,000 Marion County Silver Springs Elimination of Off-line Plants Marion County is proposing to acquire non-compliant, off-line wasterwater treatment plants and route sewage to advanced waste water treatment (AWT) facility, which is part of Marion County Utilities. Total anticipated cost: $835,000 Marion County Silver Springs Storm water Retrofit Marion County proposes to augment stormwater ponds with liners, conversion to wetlands, soil amendments to provide additional nitrate treatment within a 2 square mile radius in the Silver Spring springshed. The project will be cooperatively funded by the FDEP, SWFWMD, SJRWMD, and Marion County. Total anticipated cost: $900,000 Blue Spring (Volusia) Deltona Lakes Lake Monroe Pump Station and Treatment Facility The project includes construction of a 4-mgd treatment system at the Deltona Lakes Water Reclamation Facility (WRF) supply to treat water from the St. Johns River. The treated water will be used to augment reclaimed water supplies only, therefore the treatment process will not produce a concentrate that requires discharge. Offset to groundwater use by river water provides benefits to flows in Blue Spring. An intake structure with pump station is proposed at the withdrawal point on the St. Johns River, and transmission main to the WRF for treatment. Ground storage and high service pumping facilities are proposed at the WRF after treatment, to convey the reclaimed water to aquifer recharge facilities and to the reuse system to meet irrigation demands.

Total anticipated cost: $2,900,000 West Volusia Interconnection of Reclaimed Water from East to West Volusia County This project will provide storage, pump stations and interconnect transmission lines to allow transfer of up to 8 mgd of surface water and excess reclaimed water from sources in East Volusia County to a storage tank and recharge reservoir in West Volusia County. Will reduce groundwater usage in Volusia County benefiting flows in Blue Spring. Total anticipated cost: $5,640,000 West Volusia Reclaimed Water Transmission Mains This project consists of construction of new transmission mains to convey reclaimed water to new customers and land application areas for recharge. Two new reclaimed water transmission mains will be constructed in order to convey reclaimed water from the Deltona East WWTP and Deltona Lakes WWTP. Project will reduce groundwater usage in Volusia County and benefit flows in Blue Spring. Total anticipated cost: $1,600,000 West Volusia Water Suppliers Reclaimed Water Interconnect Project The project is to construct interconnect transmission lines to the reuse distribution systems of the cities of Deland, Deltona and Volusia County. Three construction phases are anticipated. The first phase involves the construction of Section A, connecting the Volusia County s Deltona North WWTP with the City of DeLand s reclaimed water distribution system. Phase 2 includes Section B, connecting the Deltona and DeLand areas with the Volusia County s Southwest Regional Water Reclamation Facility, and Phase 3 includes Section C, connecting the Deltona North Wastewater Treatment Plant with the City of Deltona s Reclaimed Water Distribution System. Total anticipated cost: $1,980,000 West Volusia Water Suppliers Aquifer Recharge Enhancement Project The project consists of reclaimed water storage and aquifer recharge components providing up to 4 MGD from surface water, stormwater, and reclaimed water sources. The 4 MGD assumes a direct 1:1 benefit to the Floridan aquifer. The project includes

construction of a recharge/storage reservoir, and infiltration systems within the Blue Spring springshed and adjacent to lakes with established minimum levels. Total anticipated cost: $1,640,000 City of Deland - Reclaimed Water System Expansion Project will provide approximately 150,000 gpd of reclaimed water to 290 homes in Bent Oaks (Phases I) and Phase II Victoria Square, Willow Ridge, Eastbrook, & blue Lake Woods (190 connections) Total anticipated cost: $766,000 City of Sanford and Volusia County Reclaimed Interconnect Project to interconnect the City of Sanford's reclaimed water system with Volusia county under the St. Johns River. Project will provide approximately 1.5 mgd of reclaimed water to Volusia southwest region. Project will provide benefits to the MFR of Blue Spring and reduce surface water discharges by the City of Sanford. Total anticipated cost: $1,920,000 West Volusia Water Suppliers Aquifer Recharge Enhancement Project The project consists of reclaimed water storage and aquifer recharge components providing up to 4 MGD from surface water, stormwater, and reclaimed water sources. The 4 MGD assumes a direct 1:1 benefit to the Floridan aquifer. The project includes construction of a recharge/storage reservoir, and infiltration systems within the Blue Spring springshed and adjacent to lakes with established minimum levels. Total anticipated cost: $1,640,000 City of Deland - Reclaimed Water System Expansion Project will provide approximately 150,000 gpd of reclaimed water to 290 homes in Bent Oaks (Phases I) and Phase II Victoria Square, Willow Ridge, Eastbrook, & blue Lake Woods (190 connections) Total anticipated cost: $766,000

District-wide Springs Water Quality and Natural Systems Investigation Many springs in the District have experienced declines in discharge, deterioration of water quality, and loss of biological habitat. This project represents a multi-disciplinary approach that includes a combination of monitoring, modeling, and scientific investigation necessary to address these spring issues. Several Bureaus will coordinate these efforts to provide a comprehensive investigation in the causal effects on spring declines, changes in water quality, and loss of habitat. Management agencies are required to determine what actions can most cost-effectively ameliorate these changes. This project seeks to understand the hydrologic/biological/ecological mechanisms at work and identify cost-effective management actions. The project approach will incorporate the following components: environment sciences biological assessment and monitoring, hydrologic data collection and monitoring, groundwater flow and transport modeling, and surface water hydraulic and hydrodynamic modeling. Total anticipated cost: $3,525,000 Suwannee River Water Management District Otter Spring and Hart Spring Restorations (Gilchrist County): Restoration of spring vent and run areas at these high public use springs (removal of sediments, enhancing flow and recreational opportunities): $450,000 Construction of wastewater transmission lines from both locations to remove RV sites and recreational facilities from septic systems adjacent to the both springs (water quality loading reduction/water quality improvement, located within the impaired Suwannee River basin) $2,500,000 Pot Spring Restoration (Hamilton County; District lands): Pot Spring is a second magnitude spring along the Withlacoochee River on District land. A combination of human use and river erosion has begun to erode the bank of the spring boil causing harm to both the spring and the existing wooden access platform. Request $450,000 to fix existing erosion problems and repair access platform at this popular spring.

Santa Fe River Basin, including Ichetucknee Springs and the springs along the Santa Fe River (multiple counties): Isotope and chemical signatures in the majority of springs and wells in the Santa Fe basin indicate that the nitrate in the water is from inorganic fertilizers. This suggests that inorganic fertilizer is the main source of nitrate pollution in the Santa Fe River to be addressed (FDEP BMAP 2012). FDEP has provided a $900,000 grant to SRWMD to fund the implementation and retrofitting of agricultural irrigation systems to improve both irrigation efficiency and nutrient pollution within the Santa Fe and Middle Suwannee basins. This program is currently enrolling participants and it is anticipated that available funding will be allocated in early 2013. Request $2,000,000 in additional funding for continuation of this program in the Santa Fe basin alone. Rose Spring Run Restoration (City of Perry, Taylor County): As part of City revitalization, restoration of a channelized spring run (Rose Spring Run/Creek) to provide water quality, flood attenuation and natural system benefits as part of a downtown revitalization project. $600,000 Lake City Wastewater Management (Columbia County; Santa Fe River/Springs BMAP): Wastewater reuse facility upgrades, which may include distribution systems, water treatment system including constructed wetlands and aquifer replenishment at City sprayfield. $4,500,000 Northwest Florida Water Management District Jackson Blue Spring, Jackson County (1 st Mag. Spring) 1. Northwest Florida Mobile Irrigation Lab Project. This program supports water conservation goals of Northwest Florida Water Management (NWFWMD) for Jackson Blue Spring by reducing consumptive use of agriculture irrigation. Irrigation equipment and application rates for farms are evaluated leading to improvements using best management practices and equipment enhancements. This results in reduced pumping of ground water and reduced impacts on spring flow. The project evaluates piped agriculture irrigation systems to estimate potential and actual water savings and, as needed, provides system repair/retrofit recommendations for improved efficiency to

the farmers. This program is also supported by FDACS and NRCS. District budget for FY13 and FY 14 - $125,000 2. Sod-Based Crop Rotation Research Program. This program supports water conservation and water quality improvement goals of Northwest Florida Water Management (NWFWMD) for Jackson Blue Spring by reducing consumptive use of agriculture irrigation and reducing the application rates for fertilizer on farm land. The Sod-Based Crop Rotation System is designed to decrease irrigation demands, increase nitrogen use efficiency, reduce the incidence of plant pests, improve soil and water quality, diversify farm income, and provide economic risk management. In the system under development, the sod based rotation consists of two years of bahiagrass followed by peanut and then cotton with winter grazing planted after crop harvest and over killed or frosted bahiagrass. District budget for FY13 and FY 14 - $80,000 Williford Springs, Washington County (2nd Mag. Spring) 1. The District will conduct spring restoration and protection measures at Williford Springs in Washington County. The restoration project will restore and protect the spring and improve public access. Spring restoration and protection measures include, but are not limited to, the following activities: sediment removal, spring bank restoration and protection, stormwater facilities, canoe dock/boardwalk (to enhance protection of the spring-run), spring entrance steps and patio deck, other boardwalks, view decks (2), compositing toilet, picnic pavilions (3), parking area, interpretative and connector trails and landscaping. District budget for FY13 and FY 14 - $1,957,239