icore HR outperforms other building boards in many important ways including the following:

Similar documents
SECTION D Masonry Wall Systems. Contents. Introduction. Design Considerations. Installation. Components. System Specifications.

FIRE PROTECTION. GTEC Shaftwall systems 244 GTEC Shaftwall Stairwell systems 248 GTEC Horizontal Shaftwall systems 249 GTEC Encasement systems 250

RSIC-1. RSIC-1, the Low Cost, High Performance, Noise control Solution. RSIC-1 specifications:

I-STUD Shaftwall System

EXCEL Medical Waste - Equipment Installation Section SECTION GYPSUM BOARD

SECTION GYPSUM BOARD ASSEMBLIES

The GlasRoc Shaftliner Type X advantage...

Staggered stud acoustic partition system

Acoustic Design Criteria

COOK COUNTY ILLINOIS CONTRACT FOR WORK DOCUMENT NO Countywide Warehouse and Records Storage Center Hawthorne Project TKB No.

STEP UP SHOWER BASE INSTALLATION GUIDE FOR TIMBER AND CONCRETE FLOORS

GTEK TM SOUND GTEK TM IMPACT

Fire Barrier Duct Wrap 615+

GypLyner UNIVERSAL Metal framed wall lining system

MODULAR ACOUSTIC FENCING INSTALLATION GUIDE

Shaftwall & Stairwell Systems Fire protection & sound isolation for shafts & stairwells

Installation Guide and Safety Manual

Technical Manual. Harpro Low-Rise Residential Party Wall System HBG-004, October 2015 Homebuild Global Pty Ltd

PITTSBURGH CORNING ASSEMBLY INSTRUCTIONS. KWiK N EZ Rigid Track Silicone System for Thinline Series Glass Block

Magnum Board Section Digicon Information Inc. Page 1

Chevy Chase Club June 30, 2008 Bowie Gridley Architects SECTION GYPSUM BOARD SHAFT WALL ASSEMBLIES

ROOF MOUNT KIT OWNERS MANUAL

Part E robustdetails. robustdetails. January 2017 Update Pack. Dear Colleague,

SECTION GYPSUM BOARD

Pro-panel Cement Board Technical Guide

Shaftwall and Area Separation Wall Systems.

Pittsburgh Corning ProVantage Glass Block Installation System Assembly Instructions

ShaftWall. Shaft and duct encasement system. ShaftWall.

HOW TO: BOARD BATHROOMS, WET ROOMS & SHOWERS

SOUND INSULATION TESTING IN DWELLINGS

Se incluyen las instrucciones en español

BioPrism Solid Surface

SECTION GYPSUM WALLBOARD SYSTEMS. A. Gypsum board at new wall partitions or where indicated on drawings. B. ASTM C442 - Gypsum Backing Board

NATIONAL GYPSUM COMPANY Wood Frame Walls And Ceilings Single- And Double-Layer Construction

ONE SCHOOL STREET SEPTEMBER 18, 2008 GOWANDA, NEW YORK ARCH PROJECT NO

A. ASTM C190 - Test Method for Tensile Strength of Hydraulic Cement Mortars

Container Installation Guide

USG Tile & Flooring Solutions. Lightweight cement board. Easy to cut and fasten. Faster installation USG DUROCK BRAND CEMENT BOARD INSTALLATION GUIDE

SECTION COPPER WALL PANELS. ***This section has been updated to IBC. Verify for specific project conditions.***

Fire Door Installation

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

3M Fire Barrier Duct Wrap 615+ Product Data Sheet and Installation Guide (Condensed Version)

How do you install yours?

Assembly Instruction. wedi Fundo Primo Shower System

CONTRACT NUMBER: W912DQ-08-C % CORRECTED DESIGN 28 JULY 2008

GIB Quiet Clip GIB CBI March Features and Benefits

3M Fire Barrier Moldable Putty Pads MPP+ Product Data Sheet

Rev. 07 8/15 Please Read Disclaimers:

DURAGROOVE TM FACADE SYSTEM

Brick Veneer Walls. Insulation

HOW TO: INSULATE YOUR HOME AND UNDERSTAND U-VALUES GTEC THERMAL BOARD WITH PLASTERBOARD

PLATON FOUNDATION WRAP

Xtratherm Thin-R Thermal Liner (XT/TL Grade)

USGBORAL.COM SYSTEMS+ INTRODUCTION OUTRWALL BRICK VENEER WALLS EXTERNAL WALLS INNOVATIVE SYSTEMS SOLUTIONS

Container Installation Guide

INDUSTRIALIZED CONSTRUCTION BRASILIT FIBER CEMENT BOARD, PANELS AND ACCESSORIES FOR THE EXECUTION OF YOUR CONSTRUCTION

NOVABRIK MORTARLESS CONCRETE BRICK VENEER SPECIFICATION. MASTERFORMAT SECTION (Mortarless Concrete Brick Veneer)

Building Design Data

MaxiWall Low-Rise Multi Residential External Wall System

VHB Tapes. Design Guide for Sign Assembly. Proven worldwide. Now even more versatile for more sign applications, more surfaces.

Tiling Tiling Finishes C08

C05. S02. P02 P30 ShaftWall

QuietRock 530 RF Application Notes

138 H-STUD AREA SEPARATION WALL SYSTEM

PLATON RUGGED, DIMPLED HIGH-DENSITY POLYETHYLENE (HDPE) MEMBRANE THAT KEEPS FOUNDATIONS AND FLOORING DRY ADVANCED TECHNOLOGY EASY INSTALLATION

FIRE PROTECTION AND PERFORMANCE DRY LINING BOARD THE ULTIMATE IN FIRE PROTECTION! 91 mins fire integrity and 86 mins fire insulation on 9mm board

Issue date: 1st May Key changes since original publication (July 2005):

Reflective Insulation Specification & Application Guide for Post Frame and Metal Building Construction

PASSIVE FIRE PROTECTION PRODUCTS

WALL CEILING FACADE ACCESSORIES ACCESS PANELS CONTACT CLICK TO START

SECTION ACOUSTICAL PANEL CEILINGS

Union County Vocational - Technical Schools Scotch Plains, New Jersey

INSTALLATION MANUAL. METAL INSULATED PANELS -ROXUL -Expanded Polystyrene

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

Rondo steel stud. Framing Systems Installation Manual. revised: october 2008

SECTION WOOD GYMNASIUM FLOORING

Section HIGH-TENSION Stretched-Fabric Wall Systems SoftWalls, Inc.

Absco Premier Garden Shed Assembly Instructions Model: 30232G

Central Dartmouth Section Exterior Envelope Renovations METAL-CLAD WOOD DOORS Page 1 of 5 Dartmouth, NS

ROCKMAX MAG CEMENT BOARD

Assembly Instruction. wedi Fundo Primo Steam Shower System

84 Lapping & Jointing 86 Service Pipe Penetrations 87 Sealing to Cavity Wall Constructions 88 Protecting Membranes System Components.

Corium Brick Rainscreen System Specifications

HYBRID. Pre-Laying Checks

Tiling. Capital Gate Hotel, Abu Dhabi - UAE

Technical Services Information Bureau

SECTION GYPSUM WALLBOARD. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

PATENTS ARE PENDING. Building Dimensions. Exterior Dimensions Roof Edge to Roof Edge

Acoustic Cradle Levelling System

DECKING INSTALLATION GUIDE

Section 10. Rendering, Plasterboard & Fibre Cement Sheeting

Perimeter Relief and Control Joints in Fire-Rated Gypsum Board

nu-wall direct fixed Product BRANZ APPRAISAL No. 557 (2007) Scope Aluminium Product Brands NZ Limited 15 Gabador Place Mt Wellington Auckland

SECTION RADIATION SHIELDING ENCLOSURE Low Intensity Radiation Protection

AND ACCESSORIES FOR DRYWALL CONSTRUCTION

This Installation Guide uses the following symbols to indicate important information. Always observe the instructions indicated by these symbols.

Page 1 of 5

HILTI CP 674 Cavity Closure For Rainscreen / Cladding Systems

Sandwich panel SPA Product description

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

Transcription:

icore HR is a new and innovative system designed to provide high performance separating walls between units and apartments in high-rise commercial projects. icore HR system provides exceptional fire and acoustic ratings. It excels in its security rating by its ability to achieve a high impact resistance while maintaining high acoustic separation. The icore HR system utilizes 24mm icore Panel as the primary fire resistant barrier within the wall cavity, and 13mm as the linings. The s are installed as a central barrier. This application ensures easy inclusions of service penetrations such as switches, power points, light fittings and plumbing pipes within the wall system. By incorporating 13mm as the face walling to the system, and in conjunction with the central 24mm icore HR, a high impact, high acoustic, high fire rated walling system is produced. The icore HR system has been designed as separating walls between apartments, units, hallways, lifts and other applications for Class 2 and 3 buildings. icore HR outperforms other building boards in many important ways including the following: Moisture & Mould: icore HR wall panels are moisture resistant and mould resistant. Tested to ASTM E 514-03 Standard test method for Water Penetration & Leakage through Masonry. Laboratory tested by Termimesh Australia. Normal woodworking equipment required to cut and shape Multiboard. Fire Protection: Achieves FRL levels of -/90/90 and -/120/120 for non load bearing walls. icore HR and should be kept dry, and be stored in a dry and covered area. If stored externally, icore HR must be stacked flat, be stacked above the ground, supported on level ground and must be protected from the weather. Care should be taken to avoid damage to the products edges, ends and surfaces. If the product becomes wet, the product must be allowed to dry before fixing. icore HR should be stacked and handled carefully to avoid damage. Boards should be lifted from the pallet by sliding sideways and carried on its long edges. Individual boards should be stacked and handled carefully to avoid damage. The wall systems are available in non-load bearing applications, in both timber and steel frame walls, to achieve FRL levels of up to -/120/120, and exceptional acoustic levels that exceed the minimum requirements of the BCA of Rw + Ctr = 50db. One of the great benefits of the icore HR system is the ability to run standard electrical, hydraulic and mechanical services within the walling system. icore HR 24mm panels are the primary fire barrier of the system & the wall system provide the secondary fire and acoustic barrier via a 20mm cavity. This allows for easy inclusion of services such as switches, power points, light fittings and plumbing pipes, within the cavity of the system, without the need to penetrate the s. Three different icore HR configurations exist: 1. DIRECT - has the smallest foot print, but will only allow services to one side of the wall - /90/90 2. TOP HAT - still has a small foot print, but will allow full cavity services to one side and limited services to the other - /90/90 3. DOUBLE STUD - will allow full services to both sides of the shaftwall -/120/120 Cost effective: Easier and quicker to install than comparative systems. Impact Resistance: The system's linings, utilising 13mm, provides exceptional impact resistance and additional security benefits. Tested to the strict requirements of AS2908.2 Over 30% lighter than traditional cement sheeting. No harmful crystalline silica or asbestos. No special requirements required when cutting with power tools. Tested as safe. Acoustic Performance: Satisfies and exceeds the BCA's acoustic requirements for separating walls in Class 2 & 3 - Buildings of Rw => 45dB, Rw => 50db and Rw + Ctr => 50db Good Impact Noise Resistance: Complies with the BCA for discontinuous construction and can be selected to reduce the transfer of impact noise. For smooth cuts, use a circular saw. The edge can be planed or smoothed with an electric planer, rasp or file. Can also be cut easily using a normal hand saw. Use a standard drill tip. For making holes in the board. 50% recycled wood - Listed on ecospecifier.

The face linings of the icore HR system consists of 13mm which is a versatile, glass fibrereinforced recycled wood fibre and magnesium cement based lining board, that forms part of the range. is suitable for internal applications which require high fire resistance, high acoustic resistance, impact resistance and moisture resistance. Within the icore HR system, 13mm allows for easy installation, to the system and adds additional fire and impact resistance to the system. 13mm panels are approximately 12.7 kg/m2. The primary fire barrier of the icore HR system consist on s held in place by a proprietary, light gauge steel framing system. icore HR is suitable for enclosing lift shafts, stairwells and service shafts in multi storey construction, and within inter-tenancy walls that are non load-bearing. 2 icore HR Panels 38.1Kgm. An equivalent approved sealant is recommended for acoustic sealing of the icore HR system. Acoustic insulation for wall cavity as specified. As minimum batts must be R1.5 90mm thick and have 10kg/m3 density. 540 570 2900 24 18.7 29.28kg 30.91kg Accessory J Foldable track - non load bearing - 3000mm. Accessory Aluminium clip. Fire and Acoustic sealant 600ml. Sausage only. Wafer Head Screw 10g x 16mm. Needle point screw 6g x 25mm. The maximum height permissible for the 24mm icore HR is 3m. There should not be any other connections on to the icore HR Panels. Any penetrations in the icore HR Panels will lower both fire and acoustic performance of the system. To minimise this refer to the penetration details at the end of this publication. All service pipes must run through the studs/framing. The cavity between the icore HR Panels and the framing must be free of services or insulation. The cavity must be not less the 20mm as shown in the detailed drawing. The icore HR system is suitable for wind classifications N1 and N2 as determined by AS4055. Do not use system in cyclonic areas. To comply with the performance requirements under the Building Code of Australia, a number of tests on the icore HR System were conducted, including but not limited to fire resistance testing, acoustic testing and structural testing. These tests were conducted by NATA approved laboratories. It is therefore essential that the icore HR system be installed using the components and accessories as specified and in accordance with the instructions detailed in this brochure to ensure compliance with the BCA. 10g x 16mm drill point wafer head screws for fixing horizontal tracks to vertical perimeter tracks. Proprietary Power actuated fasteners for fixing bottom support track to concrete floor, installed to manufactures recommendations. The icore HR Wall System incorporates 24mm H-Studs to support the 24mm Panels at all vertical joints. Direct - 2 x 13mm - - R1.5 polyester batts - 76mm stud - 126mm foot print - 90 minute fire rating - Some limited services install ations available to one side - /90/90 65 54 126mm It is made from 0.55mm BMT G275 galvanised steel - Length: 3000mm. The icore HR foldable Steel J-Track is used in the following applications: Top Hat - 2 x 13mm - - R1.5 polyester batts - 20mm cavity - 76mm stud - 35mm top hat section - 181mm foot print - Some limited services - 90 minute fire rating available to one side and full service cavity available to other side - /90/90 63 52 181mm Support of the icore HR Panels at the top and the bottom of the wall. Support of the icore HR Panels at the ends of the wall. Double Stud - 2 x 13mm - - R1.5 polyester batts - 2 x 20mm cavity - 2 x 76mm stud - 242mm foot print - Full services can be installed on both sides - 120 minute fire rating either side - /120/120 68 57 242mm It is made from 0.55mm BMT G275 galvanised steel - Length: 3000mm.

1/ Install folding track to floor, soffit and end wall Step 1 String a chalk line on the ceiling, walls and floor in the same vertical plane to set your wall location. Install top, bottom and both side foldable J-Tracks with the foldable edge facing you. Ensure length and heights are cut tight to the wall height and lengths. Install a 5-10mm bead of fire and acoustic sealant on the inside of the left hand wall J-Track. Double Stud Shaftwall Elevation 2/ 3/ Install icore HR Panel Install H-Studs to restraint tabs in head and foot tracks Step 2 Working from left to right. Fit the first icore HR Panel into the top and bottom J-track, to the right hand side. Slide the panel firmly into the wall J-Track ensuring complete seating into the track. Screw a fastener through the top and the bottom of the J-Track. This will hold the panel in place. Step 3 Fit the second icore HR Panel into the top and bottom J-track and slide firmly into the first installed panel. Fit the next panel into the top and bottom track and slide it hard over the edges of installed icore HR Panels. Screw a fastener through the top and bottom J-Track. Flexible Sealant IBS Rod Folding J-Track Steel Studs 24mm icore HR panel Sealant Seal all gaps under steel angle where slab is uneven 4/ 5/ Install IBS Rod Fold Track Step 4 Repeat steps 2 and 3 of the sequence to install the rest of icore HR Panels up to the right hand wall J-track. Trim the width of the last panel to suit. Install the IBS rod between the top wall panels and the top J track. Intersecting Walls Step 5 Fold all the J-Track edges hard up against the icore HR Panels. Prior to folding the edge where optimum acoustic qualities are required run a bead of fire and acoustic sealant between the junction of icore HR Panels and the J-Track. Using a timber off cut against the folded J-Track, gently tap the fold tight - working left to right then top to bottom. Using a fasteners, fix the foldable edge through each J-Stud junction. Seal junctions between J-Tracks and abutting surfaces with fire and acoustic sealant. H-Stud Tape and set wall joints 6/ 7/ Install Stud Frame or furring channel as per system specifications Install Insulation Step 6 Install secondary stud wall or furring channels to the shaft wall system to the correct spacing's. Install free standing steel C stud frame on the other side leaving 20mm minimum gap to icore HR Panels. Step 7 Fit acoustic insulation between steel C studs as required. Adding A Fire Door Lining Fire or Acoustic Door Frame to manufacturers specifications 8/ Install Wall linings as per system specifications to outer sides of the wall system Step 8 Screw-fix 13mm to steel C studs or furring channels and complete the face wall installations (as instructed in the installation manual). Seal junctions between and abutting surfaces with fire and acoustic sealant. Fire or Acoustic Door to manufacturers specifications Direct System Shown

Penetrations to the icore HR system should be avoided at every opportunity. Any penetration through the system will lower the acoustic and fire rating of the system. The diagrams following are shown only as a guide to minimise the degradation to acoustic and fire ratings if penetrations cannot be avoided. Sealant 15mm min into icore HR panel panel lining Sealant 30mm min 13mm plywood fixed to icore HR panels for tap fixings Cable, up to 3 x twin flex Copper or Steel Pipe Backing Rod 152 max Sealant Taps, Mixer, Shower Rose or GPOs Ceiling lining panel 3-4mm Fire & Acoustic Sealant lining FCW Commercial Fire Collar H Stud Stud Wall Standard GPO or switch 100mm max PVC Pipe 100mm max PVC Pipe Flexible Sealant Sealant 15mm min into icore HR panel Ceiling Cable, up to 3 x twin flex lining Taps, Mixer, Shower Rose or GPOs Note: Offset Penetration minimum of 600mm on opposite sides of the wall Additional layer of lining Bath lining Backing Rod where required 10mm perimeter gaps sealed with Sealant Two 35 x 35mm angles mechanical fixed to studs 450 max icore HR and are manufactured from woven glass fibre, recycled wood fibres (50%), magnesium cement, and additives which catalyse the cementing action. As manufactured, the product will not release airborne dust, however during drilling, and sanding operations glass fibres and fine dust may be released. When using power saws in a confined space, dust extraction equipment is recommended to control dust levels. If power tools are used externally, wear an approved P1 or P2 dust mask, respirator and safety glasses. No special safety precautions are necessary when handling or working with icore HR. For further information refer to the icore HR Materials Safety Data Sheet, please refer to our website. icore HR (Multiboard) warrants for a period of seven (7) years ("the warranty period") from the date of purchase that all icore HR products ("the product") will be free from defects due to faulty manufacture or materials, and will be resistant to cracking, rotting, fire and damage to the extent set out in Multiboard's published literature current at the time of installation,

and strictly subject to the conditions set out below. Nothing in this document shall exclude or modify any legal rights of any person under the Trade Practices Act or otherwise which cannot be excluded or modified at law. The Warranty is strictly subject to the following conditions:- 1. The product, and any other products including fasteners and joining systems, applied to or used in conjunction with the product must be used and installed strictly in accordance with the recommended installation methods at the time of installation. 2. Under no circumstances will Multiboard be liable for defects arising from:- (a) A failure to use and/or install the product, or any products, strictly in accordance with the product manual. (b) Defective materials not supplied by Multiboard; or (c) Impact. 3. Multiboard will not be liable for breach of Warranty, and no breach of Warranty claim will be accepted, unless the Claimant makes a written claim and provides proof of purchase within 30 days of the alleged defect becoming apparent. 4. This Warranty is not transferable under any circumstances without the prior written consent of Multiboard. 5. A Claimant's sole remedy for breach of Warranty is (at Multiboard's option) that Multiboard will either replace or repair the defect, supply replacement product, or pay for the cost of replacement or rectification of the affected product. 6. Under no circumstances shall Multiboard be liable for any consequential loss, property damage or personal injury, economic loss or loss of profits, arising in Contract or negligence or howsoever arising. Without limiting the foregoing, Multiboard will not be liable for any claims, damages or defects arising from or in any way attributable to poor or defective workmanship, defective materials or poor design or detailing, settlement or structural movement and/or movement of materials to which the product is attached, incorrect design of the structure, in the event of but not limited to earthquakes, cyclones, floods or other severe weather conditions or unusual climatic conditions, normal wear and tear, or growth of any organism on any product surface. 7. The express warranties set out above are in lieu of all other representations, warranties or conditions, express or implied including but not limited to implied warranties or conditions of merchantable quality and fitness for a particular purpose, and those arising by statute or otherwise in law or from a course of dealing or use of trade and which are excluded to the fullest extent permitted by law. MBICOREHR102017