Compliance with the USEPAs Section 404(b)(1) Guidelines

Similar documents
APPENDIX F. SECTION 404(B)(1) EVALUATION SHORT VERSION. Herbert Hoover Dike Dam Safety Modification Study

Regulatory Guidance Letter 93-02

Department of the Army Permit Application

THE CORPS REGULATORY AUTHORITY

State of Florida Department of Community Affairs Areas of Critical State Concern Implementation Status Report Apalachicola Bay Area

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

Nationwide Permit General Conditions

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

Environmental Information Worksheet

Navigating the U.S. Army Corps of Engineers Regulatory Process

J O I N T P U B L I C N O T I C E

Distribution Restriction Statement

Environmental Assessment Appendix G: Coastal Zone Consistency. U.S. Army Corps of Engineers New York District

J O I N T P U B L I C N O T I C E

PUBLIC NOTICE. REPLY TO: Denver Regulatory Office 9307 South Wadsworth Blvd 30 DAY NOTICE Littleton, CO FAX (303)

SOLID WASTE DISPOSAL FACILITY CONSTRUCTION/DEMOLITION LANDFILL PERMIT APPLICATION PACKAGE. ADEM Form

Overview of the Clean Water Act and Water Quality Standards

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

Joint Public Notice. LOCATION: In Salmon Bay, Lake Washington Ship Canal, at Seattle, Washington.

PUBLIC NOTICE. Dredging with ten-years maintenance, return flow to the waterway and upland placement. Georgica Cove, tributary of Georgica Pond

Calculating Mitigation

Overview of Dredged Material Testing and Evaluation

314 CMR 4.00: MASSACHUSETTS SURFACE WATER QUALITY STANDARDS

Decision Notice and Finding of No Significant Impact

Chapter 10 Natural Environment

US Army Corps of Engineers and Stream Restoration Permitting

Purpose, Need, and the Alternatives Analysis

Notice No Closing Date: May 12, 2017

MARINE POLLUTION DEGRADATION MITIGATION MANAGEMENT IS ESSENTIAL FOR IMPROVING MARINE ENVIRONMENT

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

National Housing Trust Fund Environmental Review and Funding Requirements

CESAM-RD-C April 24, 2013 PUBLIC NOTICE NO. SAM AFM JOINT PUBLIC NOTICE SAM AFM U.S. ARMY CORPS OF ENGINEERS

Cross-Cutting Environmental Laws A Guide for Federal/State Project Officers

DECISION DOCUMENT NATIONWIDE PERMIT 40

Testing and Evaluation for Upland Placement of Dredged Material

Public Notice of Application for Permit

ECONOMIC IMPACT/ENVIRONMENTAL BENEFIT ANALYSIS

NATIONWIDE PERMIT 32

Guidelines for Preparing an Alternatives Analysis

5.5 NAVIGABLE WATERWAYS AND COASTAL ZONE

TAHOE TRUCKEE SANITATION AGENCY WASTEWATER TREATMENT INQUIRY

130A-294. Solid waste management program.

Wastewater ENVIRONMENTAL SETTING. Wastewater Collection

US Army Corp of Engineers

POLICY FOR NATURAL RESOURCE MANAGEMENT AREAS

Construct and Operate a Rail Line Between North Pole, Alaska and Delta Junction, Alaska

(1)(A)Inventory of the following existing natural resources on the USFSP Campus or within the context area adjacent to the University.

The Next Generation of Stormwater Management and Site Design. Melanie R. Grigsby, P.E. Stormwater Resource Manager, City of Fort Myers

STREAM AND BUFFER AREA PROTECTION/RESTORATION

3-13 Other Required Findings and Regulatory Compliance

Southwest Maui Watershed Plan. Presented by Robin S. Knox, Southwest Maui Watershed Coordinator Water Quality Consulting, Inc.

AP Environmental Science

LAW OFFICE OF BRETT VANDENHEUVEL 620 SW MAIN ST., STE 615, PORTLAND, OR OFFICE: , CELL:

15A NCAC 07H.0209 COASTAL SHORELINES (a) Description. The Coastal Shorelines category includes estuarine shorelines and public trust shorelines.

Standards for SWMF s. (Stormwater Management Facilities) Lacombe County s Guide to Developing Stormwater Management Facilities

Notice of Violations and Intent to File Suit under the Federal Water Pollution Control Act

Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012

Section 2: Site Restorations and PCSM s Office of Oil and Gas Management Oil and Gas Industry Training Summer 2012

MEMORANDUM OF AGREEMENT BETWEEN THE U.S. ARMY CORPS OF ENGINEERS AND THE NATIONAL PARK SERVICE P11PG00072

DECISION NOTICE FINDING OF NO SIGNIFICANT IMPACT (FONSI)

FOREST SERVICE HANDBOOK NATIONAL HEADQUARTERS (WO) WASHINGTON, DC

PUBLIC SCOPING MEETING AGENDA

DECISION DOCUMENT NATIONWIDE PERMIT 14

The project will be conducted in partnership with the Nez Perce Tribe.

Overview of the Habitat Conservation Plan

An Overview for Wetland Conservation & Management

Yes: Y No: N (a) (b) (c) (d) (a) (a) (b) (c) (d) (e)

The Next Generation of Mitigation: Linking Current and Future Mitigation Programs with State Wildlife Action Plans and Other State and Regional Plans

I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018

ENVIRONMENTAL GUIDELINES FOR PREPARATION OF AN ENVIRONMENT MANAGEMENT PLAN. Environment Protection Authority, ACT May 2009

North Dakota s Nutrient Reduction Strategy. Presented to the 2016 ND Water Quality Monitoring Conference March 4, 2016

JOI NT PUBLIC NOTICE

LAWS, REGULATIONS, AND RECORD KEEPING. FIFRA licensing private applicator Restricted Use Pesticide Special Local Needs INTRODUCTION

General Plan Update Workshop 6 Agriculture, Conservation, & Open Space February 23, 2005

3 Objectives 3 Ob jec tives

Long Island s. Environmental Issues. Environmental Issues. Environmental Setting. Environmental Setting. Suburbia and the Environment

EXISTING AND READILY AVAILABLE DATA

New Developments in Federal Wetlands Permitting

J O I N T P U B L I C N O T I C E

STORMWATER RUNOFF AND WATER QUALITY IMPACT REVIEW

APPENDIX H Guidance for Preparing/Reviewing CEQA Initial Studies and Environmental Impact Reports

Determining Whether a Proposal is Subject to the National Environmental Policy Act (NEPA) Section 102 Updated March

Title 26 DEPARTMENT OF THE ENVIRONMENT

WISCONSIN. Enforceable Provisions Applicable to Nonpoint Source Water Pollution DISCHARGE PROHIBITIONS

California High-Speed Train Program FEIR/EIS

Decision Rationale. Total Maximum Daily Load for Phosphorus for the Sassafras River, Cecil and Kent Counties, Maryland 4/1/2002

Georgia's Nonpoint Source Management Program. Linda MacGregor Watershed Protection Branch Georgia Environmental Protection Division

Department of the Army. Record of Decision

PUBLIC NOTICE PROJECT: Jack McNamara Field Airport (CEC) Runway Safety Area (RSA) Project

J O I N T P U B L I C N O T I C E

Permitting Handbook. A guide to the permit process for activities that affect Indiana s waters. Indiana Department of Environmental Management

The Next Generation of Mitigation: Linking Current and Future Mitigation Programs with State Wildlife Action Plans and Other State and Regional Plans

HEIDI J. CLARK, PH.D.

Oregon Department of State Lands. Protecting Natural and Fiscal Resources to Support Schools

Hudson Raritan Estuary Comprehensive Restoration Plan and Feasibility Study

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

February 14, Lieutenant General Todd T. Semonite

S.O.P. No. HMD

Transcription:

Compliance with the USEPAs Section 404(b)(1) Guidelines February 13, 2015 Regulatory Program Workshop Lisa Gibson Regulatory Permit Specialist US Army Corps of Engineers, Sacramento District US Army Corps of Engineers

Section 404(b)(1) Guidelines History of the Clean Water Act Organization of the 404(b)(1) Guidelines Purpose and Policy, Applicability, Definitions, Adaptability (Subpart A) Compliance with the Guidelines (Subpart B) Restrictions on Discharge (230.10) Restrictions Related to Alternatives (230.10(a)) Basic and Overall Project Purpose Alternatives Significant Degradation 2

Section 404(b)(1) Guidelines Restrictions on Discharge (230.10) (cont d) Restrictions Related to water quality, effluent, ESA, marine sanctuaries (230.10(b)) Restrictions Related to significant degradation (230.10(c)) Restrictions related to minimization (230.10(d)) Factual determinations Cumulative Secondary Findings of Compliance/Non Compliance Take Home 3

History 1948: Federal Water Pollution Control Act (FWPCA) passed 1972: FWPCA Amendments: Sweeping amendments. Authority for implementation to EPA (33 USC 1251(d)) 1977: Clean Water Act of 1977 signed corrections to 1972 FWPCA Section 404 of the Clean Water Act (33 USC 1344) 404(a) (33 USC 1344(a)): Authority to issue permits 404(b)(1) of the Clean Water Act (33 USC 1344(b)(1)): Guidelines developed by the Administrator (EPA), in conjunction with the Secretary (USACE) - 40 CFR 230 1980:Section 404(b)(1) Guidelines released by USEPA 4

Organization of 404(b)(1) Guidelines Preamble Subpart A: Policy, Definitions, Procedures Subpart B: Compliance with the Guidelines Subparts C-F: Potential Impacts Subpart G: Evaluation and Testing Subpart H: Actions to Minimize Adverse Effects Subpart I: Planning to Shorten Permit Processing Time Subpart J: Compensatory Mitigation 5

Subpart A 230.1: Purpose and Policy 230.2: Applicability 230.3: Definitions 230.4: Organization 230.5: Procedures 230.6: Adaptability 230.7: General Permits 6

230.1 Purpose and Policy Restore and maintain the chemical, physical, and biological integrity of waters of the U.S. through the control of discharges of dredged or fill material. 7

230.2 - Applicability USACE Regulatory Program under Section 404(a) and (e) of the Clean Water Act (CWA) USACE Civil Works Program State 404 Permit Programs approved by USEPA under Section 404(g) of the CWA Statewide dredged or fill material regulatory programs with BMPs approved under Section 208(b)(4)(B) and (C) of the CWA Federal construction projects meeting criteria specified in Section 404(r) of the CWA 8

230.3 - Definitions Act Adjacent Aquatic environment/aquatic ecosystem Carrier of contaminant Contaminant Discharge point Disposal site Extraction site 9 Mixing Zone Permitting authority Pollutant Pollution Practicable Special aquatic sites Territorial sea Waters of the United States Wetlands

230.6 - Adaptability Unlikely that Guidelines will apply in entirety to any one activity, no matter how complex Evaluation commensurate with impacts Regulatory Guidance Letter 95-01: Guidance on Individual Permit Flexibility for Small Landowners 10

RGL 95-01: Flexibility for Small Landowners March 6, 1995, Memorandum to the Field Applies to discharges affecting up to 2 acres of non-tidal wetlands for: Construction/expansion of a single family home/attendant features Construction/expansion of a barn/farm building Expansion of a small business facility Presumes that alternatives on property not currently owned by an applicant are not practicable under the Guidelines. Purpose tied closely to an applicant s property. In the case of expansion of a facility, the off-site analysis rarely identifies a practicable site. 11

230.7 General Permits General Permit complies with Guidelines if it meets applicable restrictions on discharge (40 CFR 230.10) and: Similar in nature and similar in impact Only minimal adverse effects when performed separately Minimal cumulative adverse effects Evaluation Process Set forth evaluation of individual & cumulative effects Consider prohibitions in 40 CFR 230.10(b) and factors in 230.10(c) and information supporting factual determination in 230.11 Precise description of activities and why similar in nature and environmental impact Cumulative effects include the number of individual discharge activities likely to be regulated until expiration, including repetitions of discharges at a single location 12

Subpart B 230.10: Restrictions on Discharge 230.11: Factual Determinations 230.12: Findings of Compliance or Non-Compliance with the Guidelines 13

230.10(a) Except as provided under Section 404(b)(2) no discharge shall be permitted if : there is a practicable alternative which would have less adverse impacts on the aquatic ecosystem so long as the alternative does not have other significant adverse environmental consequences 14

230.10(a)(1) Practicable alternatives include Activities which do not involve discharge of dredged/fill material into WOUS Discharges at other locations in WOUS 15

230.10(a)(2) An alternative practicable if: It is capable of being done after taking into consideration Cost (not economics) Existing technology Logistics in light of the overall project purpose 16

230.10(a)(3) Where the activity associated with a discharge is proposed for special aquatic site does not require access or proximity to or sighting within the special aquatic site to fulfill its basic purpose Practicable alternatives that do not involve special aquatic sites are presumed available, unless demonstrated otherwise Practicable alternatives which do not involve discharge in special aquatic site presumed to have less adverse impacts unless demonstrated otherwise 17

Water Dependency Project requires access or proximity to or sighting within a special aquatic site to fulfill its basic purpose. Special aquatic sites: Sanctuaries, refuges, wetlands, mud flats, vegetated shallows, coral reefs, riffle and pool complexes. If activity is not water dependent, alternatives presumed available unless demonstrated otherwise Even if water dependent, have to demonstrate that proposed activity is the least environmentally damaging practicable alternative Regulatory Guidance Letter 92-00: Water Dependency and Cranberry Production 21

Alternatives Information commensurate with impacts Should consider on-site and off-site alternatives Develop appropriate screening criteria used to determine practicability based on overall project purpose, costs, logistics, existing technology, and environmental effects Generally would not consider alternatives with greater impacts to the proposed action 22

Cost Consider those alternatives reasonable in terms of overall scope/cost of the proposed project. Not economics (preamble to 404(b)(1) Guidelines) Not applicants financial standing, investment, or market share If cost is unreasonably expensive to applicant, it is not practicable (preamble to 404(b)(1) Guidelines) Not currently any guidance or regulations related to consideration of cost in an alternatives analysis SPD working on a SOP for consideration of costs Provide overall costs for the construction of each alternative. 23

Logistics Not currently any guidance or regulations related to consideration of logistics in an alternatives analysis Identify any constraints to development Location Infrastructure Local/state/federal laws, regulations, ordinances, requirements Topography 24

Existing Technology Not currently any guidance or regulations related to consideration of existing technology in an alternatives analysis Are there ways to meet the overall project purpose that are not currently technologically practicable? 25

Off-site Alternatives Use overall project purpose to define geographic boundary of off-site alternatives and screening criteria (e.g. Development of a large-scale, mixed-use development, with associated infrastructure, in southwestern Yolo County) Determine availability Pending application/existing permit? For sale? Determine additional screening criteria related to cost, logistics, and existing technology Determine environmental effects of each alternative not just WOUS 26

On-site Alternatives Use overall project purpose to define screening criteria Determine additional screening criteria related to cost, logistics, and existing technology Determine environmental effects of each alternative not just WOUS 27

230.10(a)(4) (5) Analysis required by NEPA will in most cases provide information for evaluation of alternatives under Guidelines NEPA documents may contain broader range of alternatives than required NEPA documents may not consider alternative in sufficient detail to meet Guidelines NEPA documents may need to be supplemented To extent that practicable alternatives identified in Coastal Zone Management Program, Section 208 Program, or other planning process, such evaluation shall be considered, and supplemented 28

Tips for Alternatives Information Information provided by applicant/consultant is alternatives information, alternatives analysis completed by USACE Work with project manager to develop alternatives to the proposed action to be analyzed Do not assume that that project manager knows other local/state/federal laws, policies, requirements, ordinances, etc. Provide all information required to substantiate alternatives information Provide all of the information required to back up each statement made in the alternatives information submitted. 29

230.10(b) No discharge shall be permitted if it: Causes or contributes to violations of State water quality standard Violates toxic effluent standard or prohibition under CWA Section 307 Jeopardizes continued existence of ESA species Violates requirement imposed by Secretary of Commerce to protect marine sanctuary designated under Marine Protection Research & Sanctuaries Act 30

230.10(c) Except as provided under Section 404(b)(2), no discharge shall be permitted which will cause or contribute to significant degradation of WOUS. Based on factual determinations, evaluations, and tests required in Subparts B and C, after consideration of Subparts C F Effects include: Human health and welfare (municipal water supplies, plankton, fish, shellfish, wildlife, and special aquatic sites) Life stages of aquatic life and other wildlife (transfer, concentration, and spread of pollutants or byproducts) Aquatic ecosystem diversity, productivity, and stability (loss of fish and wildlife habitat or capacity of wetland to assimilate nutrients, purify water, or reduce wave energy) Recreational, aesthetic, and economic values 31

230.10(d) Except as provided under Section 404(b)(2), no discharge shall be permitted Unless appropriate and practicable steps have been taken which will minimize potential adverse impacts of the discharge on the aquatic ecosystem Use subpart H to identify possible steps 32

Subpart B 230.10: Restrictions on Discharge 230.11: Factual Determinations 230.12: Findings of Compliance or Non-Compliance with the Guidelines 33

230.11 Factual Determinations Determine potential short-term or long-term effects of discharge on physical, chemical, and biological components of aquatic environment in light of Subparts C-F Used in makings findings of compliance/non-compliance Evaluation and testing procedures in Subpart G used as necessary Determine nature and degree of effect that the discharge will have individually and cumulatively Consider possible loss of environmental values and actions to minimize impact (Subpart H) 34

230.11(g) Determinations of Cumulative Effects on the Aquatic Ecosystem Changes in aquatic ecosystem attributable to collective effect of a number of individual discharges Cumulative effects attributable to discharge should be predicted to extent reasonable and practical Collect information Solicit information from other sources Information documented and considered in decision making process Different than NEPA cumulative impact requirements! 35

230.11(h) Determinations of Secondary Effects on the Aquatic Ecosystem Effects on aquatic ecosystem that are associated with discharge, but do not result from actual placement of dredged/fill material Considered prior to final permit decision Examples: Fluctuating water levels in impoundment associated with operation of dam, septic tank leaching and surface runoff from developments on fill Leachate and surface runoff from sanitary landfill in WOUS Secondary impacts = Indirect impacts 36

Subpart B 230.10: Restrictions on Discharge 230.11: Factual Determinations 230.12: Findings of Compliance or Non- Compliance with the Guidelines 37

230.12 Findings Based on Subparts C-G, disposal sites must be: Specified as complying with Guidelines Specified as complying with Guidelines, with inclusion of appropriate & practicable conditions to minimize effects (Subpart H) Specified as failing to comply with Guidelines where: There is a practicable alternative w/ less adverse effects Will result in significant degradation (230.10(b) or (c)) Does not include all appropriate/practicable measure to minimize harm Insufficient information to make a reasonable judgment of compliance Findings set forth in writing and made available to applicant and shall Include factual determinations required by 230.11 and brief explanation of any adaptation of Guidelines to the activity 38

Take Home The Guidelines are a regulation, not Guidance Compliance with Guidelines required only for activities that would result in a discharge of dredged and/or fill material into waters of the United States Analysis commensurate with impacts The Corps is responsible for determining compliance with the guidelines Permit can be issued only for the LEDPA If a project does not meet all of the restrictions on discharge, the permit application must be denied. 39

QUESTIONS? 40 BUILDING STRONG