WESTERN ENGINEERING CONSULTANTS, Inc LLC

Similar documents
PLANNED UNIT DEVELOPMENT, PLANNING APPROVAL & SUBDIVISION STAFF REPORT Date: June 4, 2015

HIGH SCHOOL #2 Severance, CO MANAGEMENT PLAN November,

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

Walker County Manufactured Home Rental Community Regulations Infrastructure Development Plan

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

Zoning Permits 11-1 ZONING PERMITS

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

RECOMMENDATION: Staff recommends approval and provides the following motion for the commission s consideration:

RESIDENTIAL BUILDING PERMIT

LAND USE APPLICATION - DIRECTOR Measure 49 Forest Zone Dwelling

Construction Application for Permit (CAP) Instructions

Received by:* Date Received:* Zoning Approval:* Date:* PERMIT#:* *ZONING: *SETBACKS: FRONT ft/ SIDE ft/ REAR ft *FLOOD ZONE:

City of North Miami Beach, Florida COMMUNITY DEVELOPMENT DEPARTMENT

HEADQUARTERS WEST LTD. FARM, RANCH, AGRIBUSINESS REAL ESTATE SALES & SERVICES

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

LOT GRADING. LOT GRADING REQUIREMENTS The following lot grading requirements came into effect on May 1, 2007:

Wastewater Master Facility Report. (Project Name) (Project Basin Location)

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

APPLICATION FOR CONSTRUCTION LETTER OF APPROVAL

FENCES. This hand out is for REFERENCE ONLY. For more details see specific code sections.

TES Industrial Development SW ¼ SEC Lacombe County Outline Plan

Task Order Authorization

City of Elgin SUBDIVISION FINAL ENGINEERING Engineering Submittal Checklist

HAROLD L. MOSELEY SUBDIVISION, RESUBDIVISION OF LOT 2

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

BIG SKY OWNERS ASSOCIATION

RESIDENTIAL BUILDING PERMIT PROCEDURES

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

This is only a general checklist; please refer to the CVWD Development Design Manual (DDM) for all requirements and regulations.

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

Building Permit Submittal Requirements

TOWAMENCIN TOWNSHIP BUILDING PERMIT PROCEDURES

Reems Creek Homeowners Association, Inc. P.O. Box 1546, Weaverville, NC

GUIDELINE FOR PROVIDING WATER AND SEWER SERVICE TO DEVELOPER PROJECTS AND PUBLIC OR PRIVATE PROPERTIES

I. RELEASE FROM PLANNING PRIOR TO SUBMITTAL TO ENGINEERING DEPARTMENT

SECTION 3.0 SPECIFICATIONS FOR DRINKING WATER DISTRIBUTION SYSTEMS DESIGN

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

ADMINISTRATIVE DESIGN REVIEW (ADR) An applicant s guide to the process

a. Structures subject to section Architectural & Site Design Standards must comply with the following additional fencing standards:

City of Redwood City Stormwater Pollution Prevention Program. Drainage Guidelines for Residential Development

AREA STRUCTURE PLAN PROCESS

COUNTY OF SUFFOLK STEVEN BELLONE SUFFOLK COUNTY EXECUTIVE DEPARTMENT OF PUBLIC WORKS

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

SBSA. DATE: 31 May 2016 HILL AIR FORCE BASE CEN/CEIE PLAN REVIEW CHECKLIST FOR NEW DEVELOPMENT AND REDEVELOPMENT CONSTRUCTION

Keys Edge Community Development District. Engineer s Report Infrastructure Improvements

CITY OF GLASGOW BUILDING PERMIT APPLICATION 126 E. Public Square Glasgow, KY Phone: (270) Fax: (270)

A City Project Review of Eagles Edge subdivision water system and drainage improvements.

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

City of Jacksonville Development Guide Building Permits

Lot 2. 1 Mile Population: 5,200 Median HH Income: $46, Mile: Population: 35,500 Median HH Income: $49,300

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

REYHER FARM. Diverse Agricultural Business Located In Southeast Colorado For Sale. 7,000+/- ACRES OFFERED AT $19,500,000

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

CHAPTER 5: UTILITIES

Water Availability Analysis

Cass County Soil Erosion & Sedimentation Control Program

NAME: Roadway Public Private *Site Plan (2 Sets) ZONING REVIEW DIVISIONS OF PROPERTY / / TO INSPECTOR / / FEES PAID: BUILDING PERMIT / / $ $ Rcpt.

BULLARD STREET HEYWOOD AVENUE 40' PUBLIC R/W 40' PUBLIC R/W MARKED CROSSWALK FUTURE B.O.C. LANDSCAPE SCREENING (USDG U-03 RESIDENTIAL WIDE)

Preconstruction Meeting Packet

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

STAFF REPORT. Project Description. Proposal. Snyderville Basin Planning Commission From:

THE CITY OF THE VILLAGE PLANNED UNIT DEVELOPMENT DESIGN STATEMENT FOR MULFORD ESTATES

3.0 DESIGN CRITERIA FOR SANITARY SEWER FACILITIES

#21 ) FDP Covenant Group FINAL DEVELOPMENT PLAN

OFFICE OF THE COMMUNITY & NEIGHBORHOOD SERVICES City Hall Holland, Michigan

PLANNING COMMISSION STAFF REPORT

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

SEWER SYSTEM DESIGN GUIDELINES

CITY OF ASHLAND REDEVELOPMENT PLAN FOR THE ASHLAND INVESTMENT CO., LLC HOUSING DEVELOPMENT

TABLE OF CONTENTS (draft rev. 7/19/11)

Request for Proposal Topographic/Property Line Survey

Chapter 6. Hydrology. 6.0 Introduction. 6.1 Design Rainfall

The following is required for a complete permit submittal for each unit.

ENGINEERING DESIGN STANDARDS

NOBLESVILLE PLAN COMMISSION STAFF REPORT DECEMBER 16, 2013

Statement of Existing (This is not a Permit)

SECTION CONSTRUCTION SERVICES

MONROE COUNTY ZONING OFFICE

Request for Proposals and Bids for Civil Engineering Services for Off-site Improvements for a Residential Neighborhood

City of Grenora, ND Municipal Infrastructure Needs Assessment August 2012

DIVISION 5 STORM DRAINAGE CRITERIA

THE CROSSROADS IN WINCHESTER 4. DRAINAGE PLAN. 4. Drainage Plan. a. Drainage Plan Description

The following materials and documents are required in order for you to obtain a Building Permit:

Ordinance amending the San Francisco Public Works Code by adding Article 4.2,

COMMUNITY DEVELOPMENT

SECTION 5 EXCEPTIONS AND MODIFICATIONS

Red Fox Run Property Owner s Association, Inc. P.O. Box 194 Tryon, NC 28782

CITY OF TAMPA WASTEWATER DEPARTMENT TECHNICAL STANDARDS GUIDELINE. FOR CONSTRUCTION OF WASTEWATER FACILITIES July 2014 Version 6

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

BLOCK, LOT ; Section Requirement Status of Permit Review Status of C.O. Review The first 6 items are relevant to the principal building (house):

City and County of Broomfield, Colorado CITY COUNCIL AGENDA MEMORANDUM. 11f - Page 1

UNINCORPORATED JACKSON COUNTY BUILDING PERMITS

All driveways shall have a separate site plan when the application is submitted.

ARTICLE 4 ZONING DISTRICTS

Department of Planning Services Division of Planning Phone: 302/ FAX: 302/

52 North Broadway DEIS Scoping Outline

Transcription:

WESTERN ENGINEERING CONSULTANTS, Inc LLC 127 S. Denver Avenue, Ft. Lupton CO 80621 2501 Mill St. Brush, CO 80723 Ph. 303-913-7341, Fax 720-294-1330 Email: firstname.lastname@westerneci.com August 24, 2017 City of Ft. Lupton 130 S. McKinley Avenue Ft. Lupton, CO 80621 RE: NPC SUBDIVISION / MINOR SUBDIVISION SUBMITTAL Dear City Staff, Please find the attached Minor Subdivision Application and supporting documents for NPC, Llc NPC Subdivision submittal. This letter is intended to serve as the Project narrative (Minor Subdivision Item #5). General Information and Brief Project Description: Applicant: NPC, Llc PO Box 4430 Parker, CO 80134 Site Plan Address: Current Lot B address is 10741 Hwy 52, Ft. Lupton, CO 80621 Phone Contact: Chris Goodwin at 303-579-9143 or Dave Nelson at 970-222-7380 Current Land Use: Acreage: Change in Use: Partially Developed Zoned PUD 64.874 acres (Proposed Lot 1 = 20.113 ac, Proposed Lot 2 = 44.761 ac) No Description of new use: NPC, Llc proposes to subdivide the existing Lot B into two lots one to be retained for the existing current approved Office/Shop/Equipment yard for Nelson Pipeline and the other to be sold. It is important to note that the existing uses and conditions are as approved by USR-1375 in 2002. Thus no further design or improvements are proposed with this application. Detailed Description: The overall property is 64.874 acres. Proposed Lot 1 of 20.113 ac shall be retained for Nelson Pipeline and their current uses whereas proposed Lot 2 of 44.761 ac is proposed to be sold. Said sale is currently under contract pending approval of this Minor Subdivision. State Highway 52 is the current Lot B (RE 1469-02-1-RE-2765) frontage totaling 54.99 feet. A shared access (asphalt paved) extends just over 500 feet (55 foot wide) to the remainder of the current flagpole Lot B. To the west of said entrance is Lot A AMRE-2765 and further west is Lot A RE-1437. Said access was dedicated as a 55 foot Non Exclusive Access Easement for both Lot A s noted (Lot A AMRE-2765 & Lot A RE-1437).

Western Engineering Consultants inc LLC Page 2 of 7 Lot B includes a one story wood framed office building, an adjacent one story metal shop building, an accessory one story metal building, a one story cinder block building, fuel pumps, parking lots, domestic and irrigation well, irrigation ditch along the west property line, irrigation pond, septic field, and various concrete pads currently make up the proposed Lot 1. A gas well is also shown on Lot 1 with a 150 foot radius well head setback per surveyor notes said well is plugged. The remainder of the property is an irrigated (center pivot) No changes to hours of operation, # of employees, access, or use are proposed to differ from the current approved USR-1375 (City approved PUD) for Lot B. The only changes proposed to that portion of Lot 1 that will serve as the access to Lot 2 shall be minor internal fence removal and the extension of a gravel access road just inside the eastern property line. Said access road will be located just east and outside of the existing storm detention pond so as not to disturb the existing improvements. Owner NPC Llc (c/o Chris Goodwin or Dave Nelson) PO Box 4430 Parker, CO 80134 Chris at 303--579-9143 or Dave at 970-222-7380 Civil Engineer: Western Engineering Consultants 127 South Denver Avenue Ft Lupton, Colorado 80643 303-913-7341 Chadwin Cox PE Land Surveyor: Traffic Engineer: Geotechnical Engineer: Electrical Engineer: Drainage Engineer: King Surveyors 650 East Garden Drive Windsor, Colorado 80550 970-686-5011 Steven Parks, PLS No additional traffic currently proposed No improvements (buildings or pavement) proposed To Be Determined Western Engineering 127 S. Denver Avenue Ft. Lupton, Colorado 80643 303-913-7341 Chadwin Cox PE

Western Engineering Consultants inc LLC Page 3 of 7 Location of Site: Total Property Area: 10741 Highway 52, Ft. Lupton, Colorado Weld County Parcel # 130146902000079 64.874 Acres (2,825,911.44 sf) Other Existing Site Features (all to remain): Ex Buildings Parking lots Apron concrete paving Monument Sign Landscaping Asphalt and Gravel accesses and yard COMPREHENSIVE PLAN: The current Land Use Plan for this area shows the property as Mixed Use. The current and proposed use will be consistent with the Land Use Plan and current zoning. ZONING DISTRICT: The existing Zone District is PUD. DENSITY: No change to the proposed Lot 1 is under consideration (beyond minor internal fence removal). Lot 2 will be required to meet the current PUD unless otherwise submitted and amended by others (no change proposed here-in). DIVERSITY: The current use is consistent with the PUD Zone and Comprehensive Plan which provides a diversity of uses in the area. LAND USES: To the west, north, and east lie agricultural uses. Immediately to the south lie two existing agricultural residences. Further south (across Hwy 52) lies another farm/agricultural use. CONNECTIVITY: The property is directly connected to the City of Fort Lupton via State Highway 52 on the south.

Western Engineering Consultants inc LLC Page 4 of 7 OPEN SPACE: Not applicable. ROADWAY NETWORK: No public roadways are proposed by this subdivision. TREATMENTS TO ROADWAYS None expected. Any change in use by Lot 1 or proposed use for Lot 2 will require a traffic analysis supporting the use. PROPERTY INTERFACE WITH ROADWAYS: State Highway 52 is the existing adjacent roadway. SETBACKS: Only a 20 foot setback requirement and building envelope was noted on the Lot B USR-1375. No modifications to said setbacks are proposed herein. It should be noted that the north line of NPC Subdivision Lot 1 between Lot 1 and Lot 2 was set at the northernmost point of the existing USR-1375 building envelope so as not to interfere with the prior approved and documented encumbrances. FENCING: The existing site perimeter fencing is proposed to remain as is. Only minimal internal fence along the eastern boundary of Lot 1 will be removed for Lot 2 access. IRRIGATION SYSTEM No modification to the existing irrigation systems are proposed or expected. The New Brantner Ditch private lateral exists along the west property line and no modification is proposed. POTABLE WATER: Well permit # 58471F serves Lot B. The applicant (or Lot 2 buyer) will modify the existing well permit (current use of approximately 40 gpm) in order for an additional well to be drilled to serve Lot 2 (for the balance of the decree from the existing well drilled in 2002). SANITARY SEWER: City sewer is not readily available. An OSWTS currently exists on proposed Lot 1. No addition or modification to the existing system is proposed for Lot 1. Any need for Lot 2 will be handled via separate application through the City. GAS AND ELECTRIC: An existing Xcel gas main lies along State Highway 52. Electricity is already extended into the property from Hwy 52 by United Power.

Western Engineering Consultants inc LLC Page 5 of 7 No modifications to the existing utilities are proposed. STORM WATER MANAGEMENT: The existing improvements located on proposed Lot 1 are captured, routed, conveyed and stored in an onsite detention pond. No modification or changes to the tributary areas of said storm water system are proposed. Any improvements on Lot 2 will be handled via separate application through the City. LANDSCAPE: No modification to existing landscape is proposed. OFF STREET PARKING: All parking shall be on site as is currently handled. EXTERIOR LIGHTING: No modification to any existing lighting is proposed. POTENTIAL IMPACT ON ADJACENT NEIGHBORHOODS: This minor subdivision will not modify the adjacent properties. Any future development applications will be handled via separate application through the City. SMELLS: No new smells are expected to occur. EXISTING OR PROPOSED MINERAL DEVELOPMENT STATE OF OWNERSHIP CONFLICTS: See attached summary of mineral rights. Based on the site of the property it is not expected that any limitations will occur. No conflicts are anticipated. PUBLIC IMPROVEMENTS: None are proposed. ACCESS: One approved CDOT Access will remain as is. Any use proposed on Lot 2 will be handled via separate application through the City. GRADING: No grading is currently proposed beyond placement of road base east of the Lot 1 detention pond.

Western Engineering Consultants inc LLC Page 6 of 7 WILL SERVICE LETTERS: WEC will contact the Fort Lupton Fire Rescue as a courtesy. Since no improvements are proposed to be added or modified by this subdivision no modification to the Fire Districts protection is expected. Lot 1 is serviced by a State permitted well # 58471F. Lot 2 water will be provided by amending the existing permit to drill a separate well (yet to be drilled) on Lot 2. Sewage will be handled by an OSWTS (on site wastewater treatment system) to be approved by separate application. Electricity is provided by United Power. Gas is provided by Xcel Energy. WEC has requested Will Serve Letters from both. SURVEYS: The Site topography and boundary survey was provided by King Surveyors in Windsor. SUBMITTAL & HOPEFUL PROJECT SCHEDULE: Date: Time/ Event: location: August 24, 2017 1:00 p.m. Submit Minor Subdivision documents Notes: November 15, 2017 Achieve full approvals MINOR SUBDIVISION APPLICATION CHECKLIST: The following is a summary of the checklist items: 1. Completed land use application, Cost Agreement, & Fees included 2. Two full size paper copies and fifteen 11*17 copies included 3. One set of No. 10 envelopes for adjacent properties (within 500 ft) included 4. Proof of Ownership (deed) & title work included 5. Development reports Approved USR-1375 discussed above a) Final drainage report Previously approved by USR-1375 b) Final street plans None existing or proposed c) Final utility drawings Previously approved by USR-1375 d) Park facilities master plan Not applicable e) Final landscape Previously approved by USR-1375 f) Signed warranty deed & title insurance Title work included g) Warranty deeds and title for proposed ROW Not applicable h) Water rights Included 6. Additional documents as required by the City

Western Engineering Consultants inc LLC Page 7 of 7 Pursuant to the properties within 500 feet of this Lot said information was derived from the Weld County website. Please contact me with any questions or comments you may have on our proposal for this project! Sincerely, Western Engineering Consultants inc., LLC Chadwin F. Cox, P.E. Senior Project Manager Encl. Minor Subdivision Application package