BC Hydro Generation system operation Columbia Basin Regional Advisory Committee

Similar documents
For Bandon Utilities Commission

2017 WATER MANAGEMENT PLAN

John H. Kerr Dam and Reservoir Virginia and North Carolina (Section 216)

OVERVIEW OF RESERVOIR OPERATIONS AND FLOOD RISK MANAGEMENT

Bridge River Power Development Water Use Plan. Revised for Acceptance for the Comptroller of Water Rights

Does Water Resources Management in the Snake River Basin Matter for the Lower Columbia River? Or Is the Snake River Part of Another Watershed?

Missouri River Basin Water Management

Improved Water Supply Forecasts for the Kootenay Basin

BPA s HERMES Project: a Multi-objective, Multi-user Approach to Reservoir Optimization

Wind Workshop. Technical Characterization: Dependable Capacity & Firm Energy 10:00-10:30am

PERFORMANCE MEASURE INFORMATION SHEET #28

Cedar River Watershed Habitat Conservation Plan

Missouri River Basin Water Management

The Impacts of Climate Change on Portland s Water Supply

Electricity Supply. Monthly Energy Grid Output by Fuel Type (MWh)

Campbell River System. Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

UBCO Internal Research Grant program

The Non Market Value of Water in Oklahoma

Effects of projected climate change on energy supply and demand in the Pacific Northwest and Washington State

DES MOINES RIVER RESERVOIRS WATER CONTROL PLAN UPDATES IOWA ASCE WATER RESOURCES DESIGN CONFERENCE

Eugene Water & Electric Board. The Future of Utilities in the Pacific Northwest

CAP Excess Water Task Force

Hydropower as Flexibility Provider: Modeling Approaches and Numerical Analysis

CoquitlamBuntzen. Project Water Use Plan. Revised for Acceptance by the Comptroller of Water Rights

PORTFOLIO OPTIMIZATION MODEL FOR ELECTRICITY PURCHASE IN LIBERALIZED ENERGY MARKETS

Administration Division Public Works Department Anchorage: Performance. Value. Results.

RS Platou. Oslo 4 June Geir Isaksen CEO

BC Hydro Contact: Vancouver Island Community Relations Phone:

APRIL 23, Capacity Value of Wind Assumptions and Planning Reserve Margin

FOREWORD 02 ENERGY CONSULTANCY SERVICES 04 FUNDAMENTAL MARKET MODELLING 04 OPERATIONAL MARKET SIMULATION 05 ECONOMIC AND TECHNICAL ANALYSIS 06

Section 2. Mono Basin Operations

New York City s Operations Support Tool (OST) Delaware River Basin RFAC Meeting December 14, 2010

Alouette Project Water Use Plan Monitoring Program Terms of Reference

REGIONAL FORECASTING OF GENERATION FROM SMALL HYDROPOWER PLANTS

Pumped hydro Storage Plants

Regional Habitat Indicators Project. Workshop #1. Nov 9, 2016

Water Quality Study In the Streams of Flint Creek and Flint River Watersheds For TMDL Development

IAF Advisors Energy Market Outlook Kyle Cooper, (713) , October 31, 2014

Climate Change & Urbanization Have Changed River Flows in Ontario

Bridge River Water Use Plan

Hood River Water Conservation Strategy: achieving long-term water resource reliability for agriculture & local fish populations

Valuing ecosystem services linked to river flows in Lower Zambezi basin, Mozambique. Safa Fanaian, Susan Graas, Yong Jiang & Pieter van der Zaag

United Water Conservation District November 2016 Hydrologic Conditions Report 2017 Water Year. December 6, 2016

Briefing on 2018 Policy Initiatives Roadmap and Annual Plan

Hydroelectric System Scheduling by Simulation

Los Angeles 3 rd Regional

PJM Roadmap for edart

Final 2014 Flexible Capacity Needs Assessment

Water Operations 101. Jerry Johns and John Leahigh Department of Water Resources BDCP Steering Committee 5/8/09

Lower Yuba River Redd Dewatering and Fry Stranding Study 2008 Annual Report

TROA & Improved S2S Forecasting An Opportunity Jeanine Jones, CDWR

Outlook for Natural Gas Demand for Winter

SUPPLY CHAIN EXCELLENCE IN WIDEX. June 2016

August 22, 2014 FIRE ISLAND WIND

Hoover Dam Hydropower and River Operations Electric Market Forecasting Conference. Mark Cook, PE Manager, Hoover Dam

Water Balance and Regulation Alternative Analysis for Kajakai Reservoir using HEC-ResSim

ENERGY AND WATER STATISTICS 2016

Final Flexible Capacity Needs Assessment for 2018

Science Supporting Policy: The Case For Flow Quantity

BOARD BRIEFING DAM SAFETY QUARTERLY REPORT

2005 Integrated Electricity Plan Modelling Approach IEP Provincial IEP Committee Meeting #4 May 31/June 1, 2005

Mark Twain Lake Water Control Manual Update

San Antonio Water System Mitchell Lake Constructed Wetlands Below the Dam Preliminary Hydrologic Analysis

California ISO. Q Report on Market Issues and Performance. July 10, Prepared by: Department of Market Monitoring

CHAPTER 7 POWER PRODUCTION AND ENERGY CONSUMPTION

OSAGE RIVER BASIN OPERATIONS WATER MANAGEMENT

2017 IRP Advisory Group. July 21, 2017 IRPAG

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

Climate Change, Water and Security in the Mediterranean implications for science and policy (a perspective from the CLIMB project)

APPENDIX I CENTRAL EVERGLADES PLANNING PROCESS ISSUE RESOLUTION

5 Star London Hotels - Example Report

Colorado River Basin Water Supply and Demand Study. Navigating the Future of the Colorado River Natural Resources Law Center June 9, 2011

Considerations for Modeling a Water Bank at the Aspinall Unit with Current Environmental Flows

PROJECT BRIEF for the John Hart Generating Station Replacement Project

Customer Select Supply/Storage. Effective May 2009

Day Ahead Market Enhancements: Issue Paper/Straw Proposal

Renewable Energy in The Netherlands

Overview of the Instream Flow/Fish Habitat Element of the WRIA 1 Watershed Management Project. By Jeremy Freimund, P.H.

Request Number 9: Accidents & Malfunctions Dam Safety Cumulative Effects

Issues Options and Strategies for Flood Management : Shifts in approaches for flood Management in Bangladesh

Sustainable peaking power development planning of Sri Lanka with hydropower

Overview of the New Zealand Natural Capital Assessment May 2014

REGIONAL STORMWATER CAPTURE & USE FEASIBILITY STUDY TAC MEETING #1 - JULY 18, 2017

NBI strategic water resources analysis Phase I findings

Hedging Coal Price Risk in a Deregulated Power Market

Power to Gas: Hydrogen Enabled Storage & Grid Stabilization

Alouette Project Water Use Plan (April 15, 2009) Revised for Acceptance for the Comptroller of Water Rights

SURFACE WATER WITHDRAWALS & LOW FLOW PROTECTION POLICY MICHAEL COLLEGE, P.E. SUSQUEHANNA RIVER BASIN COMMISSION

The Optimisation of the supply-demand balance, the role of interconnections, and the impact of nuclear shutdown in Germany for EDF

CenterPoint Energy Services. Current Market Fundamentals June 27, 2013

TURBINE VENTING FOR DISSOLVED OXYGEN IMPROVEMENTS AT BULL SHOALS, NORFORK, AND TABLE ROCK DAMS

ENERGY SLIDESHOW. Federal Reserve Bank of Dallas

Mid-C Seminar July 16 th, 2014

The Hydrological and Ecological Impacts of Climate Change in a Large Lake Case Study of Lake Saimaa, Finnish Lake District

Energy Market Outlook

MEMORANDUM. January 6, Power Committee. Maury Galbraith. Draft Sixth Plan Electricity Price Forecasts

APPENDIX A NOTICE OF PREPARATION/ NOTICE OF INTENT. Proposed Lower Yuba River Accord June 2007 Draft EIR/EIS

Management of the Niemen River basin with account of adaptation to climate change

ANNUAL PLATTE RIVER SURFACE WATER FLOW SUMMARY

Transcription:

BC Hydro Generation system operation Columbia Basin Regional Advisory Committee Renata Kurschner Director, Generation Resource Management 11 September 2014

Generation System Operation Coordination of provincial generation (Heritage resources, IPPs, partner generation under Canal Plant Agreement) Operation mainly impacted by: Inflows Market Prices Loads Generation Availability Columbia River Treaty Water Use Plans BC Hydro large (multi-year) storage system is operated for long term, as opposed to annual, economic goals on a consolidated basis (domestic and trade activity) Generation System Operation 2

Generation Mix - Energy Non-Dispatchable Heritage Hydro ~78% Majority is Dispatchable Columbia, Kootenay and Pend d Oreille ~ 37% Peace ~28% Generation system operation 3

Benefits of System Storage System storage allows BC Hydro to reshape inflows in excess of the load into future periods when inflows are less than the load Generation system operation 4

System Storage (GWh) Annual Profile of System Storage 30000 Historic Maximum 29000 GWh Historic System Storage 25000 20000 15000 Historic Envelope 10 Year Historic Average 30 Year Historic Average 10000 Historic Minimum 6900 GWh 5000 Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Generation system operation Source: Historic System Storage.xls (jdb presentations) 5

Generation System Operation Timeframe: Beyond 3 years Timeframe: 3 years to real time Planning (IRP) Energy studies Operations Planning Real Time Dispatch Forecasts future load, determines supply needs (energy and capacity) and acquires resources Monthly system modeling maximizes long term net revenue from operations and determines: - storage operation - water values - domestic buy/sell - system surplus capability for trade Short term operations planning - detailed operating plans for individual plants - considers all risks and constraints, incl. water conveyance, flood control, WUP requirements Day ahead operating plan and hourly generation dispatch / water conveyance to meet load requirements and trade opportunities in a most economical manner; manages within the day unexpected events Informed by forecasts: weather and inflows, market prices, loads, unit outages, transmission availability Generation system operation 6

Columbia Basin in Canada Operation of Kinbasket, Arrow, Duncan, and Libby reservoirs are coordinated with the US (USAC and BPA) under the Columbia River Treaty: the Treaty Dams Revelstoke and Kootenay Lake are not directly regulated under the CRT. However, Kootenay Lake is subject to the IJC Order. 7

What Impacts Columbia Basin Operations? Water Licenses (diversion and storage for power generation) Inflows (across the system, incl. US Columbia basin) Market Prices Loads Generation Availability (across the system) Columbia River Treaty WUP constraints and other environmental/social objectives Other Agreements Non Treaty Storage Libby Coordination Agreement Non-Power Uses (or Flow Augmentation ) Agreement Generation System Operation 8

Kinbasket Inflow variability Inflows Benefit of Two River policy is inflows into system reservoirs are roughly independent but range of variation in system inflows is 16,000 GWh Generation system operation 9

Market Electricity Prices Storage operations enable BC Hydro to monetize annual, seasonal and daily price differences in the markets Generation system operation 10

Generation system operation 11

BC Hydro Domestic Load, Generation, & Market Activity - Daily Pattern Generation system operation 12

Columbia River Treaty Regulate flow for optimum power and flood control in both countries Creates requirement for: flood control space at Mica, Arrow and Duncan specific flows across the border (Arrow discharges) Power generation and flood control are generally well aligned drafting in winter when load high creates flood control space in reservoirs in expectation of spring flows Flood control requirements rarely limiting at Mica & Duncan, but often at Arrow (and Libby) Silent on other values (ie fisheries, recreation) Entities enter into supplemental agreements to adjust, by mutual agreement, flows at the border to accommodate other interests Generation System Operation 13

Non Treaty Storage Agreement Commercial agreement between BC Hydro and BPA to coordinate use of Mica storage not covered by Treaty for mutual benefit Decisions are made weekly by mutual agreement Provides for adjustments to Arrow discharges from those required by CRT (store into NTS when discharges reduced and vice versa) Optimizes both power and non-power benefits BC Hydro gains better flexibility to create economic value and balance Columbia WUP objectives BC Hydro receives a share of downstream benefits created by improved regulation under the NTSA More flexibility to generate at Mica across fall/winter for system load Reduced spill risk at Mica BC Hydro and BPA low water supply event releases firm energy and fisheries benefit BC Hydro system operations 14

Short Term Libby Coordination Agreement Original LCA (signed in 2000) addressed the impacts of power losses as a result of US unilaterally changing Libby operation in 1993 to support white sturgeon spawning but to the detriment of Kootenay River power generation Canadian Entity objected to further US changes to Libby operation implemented in 2003 and as a temporary and partial mitigation entered into a Short Term (supplemental) LCA that provides additional power loss mitigation and ensures cooperation prior to and during flood events. Canada desires to better address flood risk management in any future long term agreement BC Hydro system operations 15

Non Power Uses Agreement Canadian interests: Decreases Arrow discharges (storage) in Jan and keeps flows more steady until Mar for whitefish spawning Provides flexibility to keep flows steady or increasing from Apr through Jun for trout spawning US interests: Release of storage in Jul to supplement Treaty flows for salmon outmigration (hence agreement also called Flow Augmentation Agreement); note that flows may be further augmented in Jul and Aug by release of NTSA if there was NTSA storage during the period of Apr - Jun BC Hydro system operations 16

WUP Name Columbia River Project (Mica/Revelstoke/Arrow) Water Hardman Project BC Hydro system operations WUP operating constraints Date Signed Operational Constraints 11 Jan 2007 MIN and MAX reservoir levels. MIN Revelstoke downstream flow requirements. Soft constraints 21 Mar 2006 MIN and MAX headpond reservoir levels. MIN downstream flow requirements. Whatshan Project 15 Jun 2005 MIN reservoir levels. Elko Project 7 Apr 2005 MIN downstream flow requirements. Generation station discharge ramping rates. Spillimacheen Project 15 Jul 2005 MIN downstream flow requirements. Generation station discharge ramping rates. Aberfeldie Project 6 Nov 2006 MIN and MAX headpond reservoir levels. MIN downstream flow requirements. Generation station discharge ramping rates. Seven Mile Project 8 Dec 2006 MIN and MAX reservoir levels. Considerations for reservoir recreation/fisheries. Duncan Project 20 Dec 2007 MIN and MAX reservoir levels MIN and MAX downstream flow requirements. Dam spill discharge ramping rates. 17

WUP monitoring and physical works BC Hydro system operations 18

WUP operating constraints and works BC Hydro system operations 19

Mica operation typical drivers Typical Operational drivers: Jul to Oct*: discharge adjusted as needed to refill reservoir, minimize spill, & maximize electricity value BC Hydro system operations Nov to Mar: high discharge to meet electricity demand, discharge sometimes limited in Feb-Mar by Arrow Reservoir flood control curve. Apr to mid-jul: low electricity value, so discharge reduced to refill reservoir *Note Mica discharges during Jul-Oct can be quite variable, depending on spill probability at Mica and other reservoirs (e.g. Williston) as well as market electricity values 20

Arrow operation typical drivers Note Arrow discharge from Jan to July depends on overall basin runoff forecast, and will vary significantly with basin-wide snowpack Typical CRT & operational drivers: Jul-Aug: discharge increased to meet CRT needs & release Flow Aug water Sep-Dec: discharge lower to preserve storage in case of low snowpack. NTSA & STLA activity if economic. BC Hydro system operations Jan-Mar: higher discharges (if snowpack OK); sup. agrmts manage for steadier whitefish spawning flows Apr-June: lower, stable discharges to refill reservoir, manage trout spawning 21

Duncan operation typical drivers Typical CRT & operational drivers: Jul-Sep: discharge increased & then adjusted to manage reservoir refill & minimize downstream Can flooding BC Hydro system operations Oct-Dec: discharge limited to manage fish spawning in Duncan River. Res. level must remain below CRT flood curve. Jan-Mar: higher discharges to improve Kootenay Lake inflows & meet CRT flood control needs. Apr-Jun: discharge reduced to refill reservoir, subject to minimum WUP fish-flow needs in Canada 22

Kootenay Lake operation typical drivers Typical Operational drivers: Jul-Aug: lake drafted in compliance with IJC Order Sep-Dec: discharges adjusted to keep lake level below IJC Curve, with minimum fish flow downstream at Brilliant BC Hydro system operations Jan-Mar: lake drafted to meet IJC Curve. Discharge maximized (limited by Grohman Narrows) if lake level above IJC Curve. Apr-Jun: typically on maximum discharge to minimize peak lake level (and meet IJC Curve) 23

Libby operation typical drivers Typical operational drivers: Jul-Sep: discharge adjusted to manage reservoir refill & provide downstream fish flows BC Hydro system operations Oct-Dec: discharge reduced to minimum, then increased in late Nov to hit 31 Dec flood control level. Jan-Mar: discharges increased above minimum only if needed to stay at/below flood control curve. Apr-Jun: discharges increased for fish, then high sturgeon flows in late May or June. Discharges adjusted to maintain flood management space. 24

Questions? Generation system operation 25