ROLES AND RESPONSIBILITIES Small Pond Approval. SWM MD-378 Pond Checklist Training 10/17/07. Exemptions EMBANKMENT HEIGHT. Height of Dam Weir Wall

Similar documents
Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR SLOPE PROTECTION STRUCTURES. Definition

APPENDIX A EARTHEN EMBANKMENT. VERSION 1.0 March 1, 2011

Sediment Basin. Fe= (Depends on soil type)

Ponds. Pond A water impoundment made by excavating a pit, or constructing a dam or an embankment.

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

Prepared for Urban Drainage and Flood Control District

LAWRENCE, KANSAS STORMWATER MANAGEMENT CRITERIA

2C-12 Detention Basin Outlet Structures

Contact the Jurisdictional Engineer for materials allowed by each jurisdiction.

POND CONSTRUCTION. Woodland Steward Series

TVA Colbert Fossil Facility Ash Disposal Pond 4

United States Army Corps of Engineers. Addicks and Barker Dam Safety Update

ITEM D-701 PIPE FOR STORM DRAINS AND CULVERTS

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Treatment Volume: Curve Numbers. Composite CN or Not? Treatment Volume: Curve Numbers. Treatment Volume: Calculation. Treatment Volume: Calculation

Chapter 12 Storage. Contents. Overview... 1

Module 4 Regulatory requirements for Land Disturbing Activities

Design Data 6. Loads and Supporting Strengths Elliptical and Arch Pipe. Values of B d

SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 5/8/7)

Chatham Park Stormwater Manual

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR RIPRAP. Conditions Where Practice Applies

CHECKLIST FOR STREETS, INLETS, AND STORM SEWER DESIGN

Section 1000 Culverts and Bridges Table of Contents

Pre-Treatment Bioretention Cells Bioswales IOWA STORMWATER MANAGEMENT MANUAL DECEMBER 16, 2015

Standards for Soil Erosion and Sediment Control in New Jersey May 2012 STANDARD FOR GRASSED WATERWAYS. Definition. Purpose

Stormwater Local Design Manual For Houston County, Georgia

Table of Contents. 5-5 Release Rates Year Allowable Release Rate WQCV Release Rate EURV Release Rate...

SECTION 3 DRAINAGE. 3-1 General. 3-2 Drainage Ordinances and Legal Requirements

TYPE "A" CATCH BASIN

Section Storm Sewers STORM SEWERS PART 1 - GENERAL 1.01 SECTION INCLUDES. A. Storm Sewers. B. Abandonment of Storm Sewers

MODEL Stormwater Local Design Manual. City of Centerville

APPENDIX G HYDRAULIC GRADE LINE

Chapter 7. Street Drainage. 7.0 Introduction. 7.1 Function of Streets in the Drainage System. 7.2 Street Classification

Dam Safety Inspection Checklist

Filter Tube Barriers (Instream)

Location Drainage Study

ODOT Design & Construction Requirements for MSE Walls

SECTION FACILITY SANITARY SEWERS

Project Drainage Report

Hydraulic Design of Highway Culverts HDS 5 September 1985

CITY OF TROY DESIGN STANDARDS AND CONSTRUCTION SPECIFICATIONS

CHAPTER 12 BRIDGE DECK DRAINAGE SYSTEMS

Sanitary Sewer Extensions, Lift Stations, and Force Mains Engineering Report Form. I. General Information. 1. Name of Facility:

Welded Mesh Gabions and Mattresses River Protection Design Guide Anping County Zhuoda Hardware Mesh Co.,Ltd. Wire Mesh Industrial Zone, Anping

Created by Simpo PDF Creator Pro (unregistered version) Asst.Prof.Dr. Jaafar S. Maatooq

In preparation for constructing buildings on a property, the builder. Site Preparation CHAPTER

Geneva Dam. Design of a Steep, Temporary, Riprap Ramp

Table of Contents. July

Constructed Wetland Pond T-8

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

DIVISION 5 STORM DRAINAGE CRITERIA

Section Two: Steel Pipe Design

10.0 Storm Sewer Systems

Temporary Watercourse Crossing: Culverts

CATCH BASIN ST-1 ENGINEERING DEPARTMENT PLATE NUMBER 3.33' 3.0' 2.0' 4.33' 3.0' 4.0' 1.00' TO BACK OF CURB LINE

Ohio Department of Transportation Division of Production Management Office of Geotechnical Engineering. Geotechnical Bulletin

Gwinnett County Stormwater System Assessment Program

Sediment Basins and Skimmers. Jay Dorsey/John Mathews Ohio Dept. of Natural Resources, Division of Soil and Water Resources

Mr. Michael Malone CPS Energy 145 Navarro Street San Antonio, Texas Project No

Stormwater Management Studies PDS Engineering Services Division ES Policy # 3-01

Manure Storage for Environmental Management Systems

Erosion & Sedimentation Control Policy

DESIGNING AND CONSTRUCTION OF T-WALL RETAINING WALL SYSTEM

Appendix B. Storm Drain System Data

Storm Sewer Design. Bob Pitt University of Alabama and Shirley Clark Penn State Harrisburg

MICHIGAN DESIGN MANUAL ROAD DESIGN CHAPTER 4 INDEX DRAINAGE

(b) Discuss in brief shaft spillway with neat sketches. Marks 04. OR Q (2) Explain in brief USBR stilling basin. Marks 08

MANHOLES, VAULTS AND CATCH BASINS SECTION A. Section Soil and Aggregate Materials. C. Section Storm Drainage Systems

Overview of NRCS (SCS) TR-20 By Dr. R.M. Ragan

CHAPTER 3 STORMWATER HYDROLOGY. Table of Contents SECTION 3.1 METHODS FOR ESTIMATING STORMWATER RUNOFF

At least 2 feet above the seasonal high water table Overflow path or structure provided

The City of North Las Vegas (CNLV) does not allow valley gutters to be constructed across streets with right-of-way widths of 80 feet or greater.

Chapter 9 Hydraulic Structures

Redi Rock Specification and Installation Manual

ENGINEERED SOLUTIONS. Aluminum Structural Plate

Extended Detention Basin Maintenance Plan for [[== Insert Project Name ==]]

Index. Page numbers followed by f indicate figures.

Alberta Bridge Inventory STANDARD BRIDGE & CULVERT COMPONENTS. Standard Bridges. Typical Bridge Components. In Alberta there are about 13,300 bridges.

CHAPTER 9 STORMWATER MANAGEMENT PLAN REQUIREMENTS

Determination of Design Infiltration Rates for the Sizing of Infiltration based Green Infrastructure Facilities

Richland County Department of Public Works Engineering (Land Development) Division

Corrugated Metal Pipe Design Guide

THE ADVANTAGES HDPE MANHOLES

ENGINEERING DIRECTIVE

LOW WATER CROSSINGS, fords, or drifts, as they

Inflow Design Flood Control System Plan

DIVISION 3: SEWER. Improvement Design Standards City of Dundee Oregon. Division 3 : Sewer Page 1

Chapter 6 Hydrology TABLE OF CONTENTS CHAPTER 6 - HYDROLOGY

Factors affecting health of Ash Dyke and Preventive Measures. Kukreti RC Chowdhury Ujjwal Naresh D N

STANDARD SPECIFICATIONS SECTION BORING AND JACKING. A. Section includes requirements for boring and jacking casing pipe.

PERFORMANCE OF SOIL-CEMENT PLATING IN THE TEXAS PANHANDLE. Abstract

COON CREEK WATERSHED DISTRICT PERMIT REVIEW. Spring Lake Park Schools Westwood Middle School st Avenue NE, Spring Lake Park, MN 55432

STANDARD SPECIFICATIONS SECTION JACKED CASING

STREAMBANK RESTORATION DESIGN

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

16. Design of Pipeline Structures.

Brush layering construction

DAM AND CANAL SAFETY GUIDELINES

Transcription:

SWM MD-378 Pond Checklist Training 10/17/07 Ken Wolfe Warren Johnson USDA, NRCS Frederick, Maryland ROLES AND RESPONSIBILITIES Small Pond Approval MDE, WMA, Dam Safety Division Authority (COMAR 26.17.04.03) Soil Conservation Districts Delegated Authority (COMAR 26.17.04.05 G) NRCS Others such as County Governments and Cities Exemptions Exemption is only for District Small Pond Approval Intent NO Urban pond or Rural pond is exempted from MD-378. Excavated or embankment EMBANKMENT HEIGHT Measured from the Top Of Dam (TOD) to lowest point of excavation along the centerline of the dam, excluding the cut off trench. Height of Dam Riser and Barrel Height of Dam Weir Wall TOD TOD Core H H Original Ground Pond Bottom Original Ground Cradle Cut Off Cut Off 1

SMALL POND APPROVAL MAY BE EXEMPTED FOR CLASS A PONDS WHERE: The embankment height is less than 4 feet OR Storage at ES Crest or DHW (if no ES) is less than or equal to 40,000 ft 3 AND the embankment height is 6 or less OR EXEMPTION L = 10H + 20; where H = TOD - PB Horizontal projection L, DS from the pond bottom, is below ground, AND DS slope (within projection L) is less than or equal to 10 % at any point. CHECKLIST Minimum submittal requirements Included in the plans and design To recommend District small pond approval Hydrology Drainage Area Map Show TR-55 T c path (Post Dev) Indicate Flow Regimes Sheet, Shallow Concentrated, Open Channel Distance, Slope, Velocity as required Hydrology/Hydraulics Routing Program Show complete input and output data Where routing started from Tc used (Post Dev) RCN (Post) DA Stage/Storage/Discharge Table RF and duration 10 and 100 Yr WSEL (Summary Table) Computations MD 14 Pond Summary Sheet District submits to MDE Pick up from Cons District Office 2

Computations Riser Floatation Buoyant Force Outside dimensions of the riser plus the base Weight of the structure minus openings S.F. > or = 1.2 Computations Collar Design Increase saturated flow length by 15% (4:1 phreatic line) Measure projection from the outside of the pipe Concrete Pipe from cradle Min projection is 2 > 2 from a joint Min spacing 5X min projection Max spacing 14X min projection Computations Filter Diaphragms NRCS TR-60, Earthen Dams and Reservoirs 3ft thick 3X Pipe OD or Cradle 2 ft below C-33 Sand Computations Weir Details Notched weir with top of wall at 100 year WSEL or higher Show all dimensions Show steel requirements Overturning comps Cutoff To the bottom of the cutoff trench Footer on in-situ soils Computations Pre-Cast Risers Provide Shop Drawings on the plans sealed by a P.E. Include dimensions and steel requirements Include joint requirements if there will be differential backfill Computations Pre-Cast Risers Joint requirements Watertight joints Butyl rubber with non-shrink grout Differential backfill Joint fasteners with computations 3

DAM BREACH ANALYSIS HAZARD CLASS JUSTIFICATION Hazard Class Justification Class a - Structures located in rural, agricultural or urban areas dedicated to remain in flood tolerant usage where failure may damage non-inhabited buildings, agricultural land, floodplains or county roads. Hazard Class Justification Class b - Structures located in rural, agricultural, or urban areas where failure may damage isolated homes, main highways or minor railroads or cause interruption of use or service of relatively important public utilities. (If breach water can enter the this may be considered damage.) Supporting Documentation Dam Breach Analysis which includes Q max discharge (Sunny Day). Description of Dam. Description of all roads, structures and utilities down stream of pond. Map showing pond, downstream structures, cross section locations and proposed breach wave. All appropriate, routing, computations and supporting cross sections. Conclusion. Dam Failure Methods for Small Dams Use Breach Equation to determine Breach Flows Determine Downstream Flood Depths Simple approach, Manning s formula with downstream cross sections HECRAS Model Stop Danger Reach when hazard no longer exists Dam Breach The minimum peak discharge is as follows: Q max = 3.2 H w 2.5 where, Q max = the peak breach discharge, (cfs). H w = depth of water at the dam at the time of failure, (feet). This is measured to the crest of the emergency spillway or to design high water, if no emergency spillway exists. 4

Dam Breach Dam Breach Emergency Spillway or DHW Elevation Emergency Spillway or DHW Elevation Excavate for Barrel Hw Hw Dam Breach Emergency Spillway or DHW Elevation Emergency Spillway or DHW Elevation Dam Breach Hw Hw Dam Breach Where breach analysis has indicated that only overtopping of downstream roads will occur, the following guidelines will be used: Class Depth of Flow (d) ft. a d < 1.5 b & c d > 1.5 Dam Breach How far downstream should the analysis be taken To a point where there are no structures present downstream of the pond. The breach wave enters a flood prone area where no structures are present. The total volume of proposed breach is stored within the downstream valley, another storage structure or by a roadway fill. importance of the roadway shall be considered when making a classification. 5

Example Dam Breach Analysis Breach Wave Map Houses / Road Proposed Breach SWM Facility 6

Soils Exploration Report Required Address Geotechs recommendations in the design Show borings on plan view CL, ES, Borrow area Show soil logs in report Unified Classification Cutoff and Core Trench Cutoff extends 4 below pond bottom unless specifically addressed by a geotech in the report Core trench to 10 year WSEL 1:1 SS with minimum 4 top/bottom CL, CH, SC, GC Where does fill come from Pond Bottom Cutoff and Core Trench 4 feet Core Trench Cutoff Trench 10 yr WSEL Embankment Top Width (Table 2 based on H) SS (total of 5:1) Must show profile of dam Must show XS through PS Settlement (min 5%) Freeboard Requirements Embankment Freeboard Requirements Dependent on H and DA (Table 1) Typical Requirements for DA < 100 acres 1 above ES DHW (100 yr ) 2 feet between Crest of ES and TOD No ES, 2 above 100 yr WSEL Min pipe diameter = 2ft Requires Emergency Routing 7

Principle Spillway Must show profile Inlet is 1 below ES Crest Stable outlet to OUTLET CHANNEL Tables 3, 4, and 5 MD-378 Min gage and corrugations for metal pipe and requirements for plastic pipe Principle Spillway Tables 3, 4, & 5 CORRUGATED STEEL PIPE 2-2/3 inches x 1/2 inch Corrugations CORRUGATED STEEL PIPE 3 inches x 1 inch or 5 inch x 1 inch Corrugations CORRUGATED ALUMINUM PIPE 2-2/3 inches x 1/2 inch Corrugations CORRUGATED ALUMINUM PIPE 3 inches x 1 inch Corrugations Principle Spillway Circular Cross Section Water Tight Joints Deflection Requirements (5%) Modified Spangler Equation Modified Spangler Equation Assumptions Maximum deflection of the pipe = 5 percent Deflection Lag Factor = 1.5 Weight of soil cover = 120 pcf Bedding Constant = 0.10 Modified Spangler Equation h = [EI/(12) 2.5R3] + 0.0244E Where: h = Maximum permissible fill height measured from the top of the pipe E = Pipe material modulus of elasticity I = Moment of inertia for the pipe wall (in 4 / in) R = Radius of pipe (in) E = Modulus of soil reaction of embedment material (Maryland will use 200 psi with less than 85% compaction typical for fine-grained soils compacted around pipe conduits.) Trash Racks (WJ) NO flush trash racks Min openings > 6 but < ½ barrel diameter Not required on low flows < or = 6 Emergency Routing for low flows 6 or less. 8

EMERGENCY SPILLWAYS Emergency Spillways Earth spillways shall be trapezoidal and shall be located in undisturbed earth.. The only design that may be utilized without an emergency spillway is: a principal spillway with a cross-sectional area of 3 square feet with a non clog trash rack and large enough to pass the required storm discharge. The minimum capacity of emergency spillways shall be as shown in Table 1 Emergency Spillway Minimum Dimensions Cross Sectional 1 Min. 2 Min. DHW 8 Minimum 1 2 Design High Water With Natural Ground Emergency Spillway Minimum Dimensions Profile Natural Ground (In-situ soils) DHW Control Section Length 25 feet 9

Spillway Plan View Spillway Plan View 25 Square or Rectangular Control Section 25 Skewed Control Section Flow Flow Increased potential for erosion Spillway Plan View Flow 25 Exit Channel Angled Increased potential for erosion Turf Reinforcement Rock armoring Permissible Velocities Turf Reinforcement Must be a permanent type of mating May be used in areas where velocity exceeds permissible for grass alone. Maximum velocity must not exceed manufactures recommendations but in no case exceed 10 fps Covering mating with 1 to 2 inches of top soil is not considered fill. Rock Armoring May be used in areas where velocity exceeds permissible for grass alone. Where prolonged wetness may be a problem. 10

Armored Spillway Controlled Fill Flow Control Section 10 Max. Exit Channel Armored Spillway Top Soil Over excavate 1 to 2 inches. Cover with top soil Top soiling in this range is not considered fill. Specification Use updated specs January 2000 Changes Concrete - MSHA, Standard Specifications for Construction and Materials, Section 414, Mix # 3. Riprap - MSHA, Standard Specifications for Construction and Materials, Section 311. Geotextile - MSHA, Standard Specifications for Construction and Materials, Section 921.09 Class C. OBTAIN A COPY OF 378 Website www.md.nrcs.usda.gov THE END 11