SPACE TYPE: OUTSIDE PARKING (STRUCTURE)

Similar documents
SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

A/E Design Deliverable Checklist

DIVISION PARKING STRUCTURES

LEVEL TWO NUMBERS AND TITLES. Introductory Information. Bidding Requirements. Contracting Requirements. Facilities and Spaces. Systems and Assemblies

Project Information Session / Meet and Greet # 3

Building Inspection Report

2003 International Residential Building Code

Building Codes and Ordinances ARC 227

A/E Design Deliverable Checklist

SPECIFICATION FOR THE DEVELOPMENT OF LPA CLEAN ROOM INFRASTRUCTURE Description of work

BOWIE LEARNING CENTER

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

CODE COMPLIANCE PLAN REVIEW PROCEDURES

Seasons Business Center New Construction!

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

One and Two Family Additions

UNIFIED FACILITIES GUIDE SPECIFICATIONS ************************************************************************** SECTION TABLE OF CONTENTS

2009 IBC Section 1024 Approved Luminous Egress Path Markings

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

G-001 & 2750 LAKE VILLA DRIVE METAIRIE, LOUISIANA PHONE(504) FAX(504) INDEX OF DRAWINGS W. ESPLANADE AVE.

e a s t 2303 Dulles Station Blvd., Herndon, VA BASE BUILDING SPECS

Construction Cost Estimate - DRAFT

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

RESIDENTIAL NEW CONSTRUCTION PLAN REVIEW CHECKLIST

LASALLE - BACKUS EDUCATION CAMPUS

HERMIT S REST GRAND CANYON NATIONAL PARK BUILDING CODE REVIEW

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

MODULAR BUILDING SPECIFICATIONS

The Ashland Project. Total Area: 1,778 Sq.Ft. 3 Bedroom, 2 Bath, 2 Car Garage

Property Condition Assessment

A. Submit the following in addition to the standard requirements.

Chapel House- Design Process- Envelope and Energy savings

Administrative Changes

EMERGENCY MANAGEMENT PREPAREDNESS AND ASSISTANCE TRUST FUND ARC 4496 Evaluation Questionnaire

Cheldelin Middle School

Meriter Heights Renovations Madison, Wisconsin

10/23/2011. Plan Examination. Plan ExaminationPurpose. Catch problems in advance of construction.

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

GUIDELINES FOR SANITARY DESIGN AND CONSTRUCTION OF MILK PRODUCTS PLANTS (rev )

Property Condition Assessment (PCA) Checklist c:\users\joseph\documents\hhc\blog\pca cklist template.doc Friday, August 11, 2006

City of Richmond Zoning Ordinance Page 12-1

GENERAL PLAN REVIEW REQUIREMENTS

BUILDING SCOPE OF WORK

1. Unified Facilities Criteria - Design: General Building Requirements (UFC ).

Velma F Thomas Early Childhood Center

SIDEWALK & RAILING REPLACEMENT BOARD OF ED BUILDING

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

A Design-Build Project: Repairing the Courthouse Square Complex

CHECKLIST Inspecting a Garage

TOWNSHIP OF LOGAN 125 MAIN STREET, PO BOX 314 BRIDGEPORT, NJ FAX

Code Requirements for Existing Buildings. R. W. Sullivan, Inc. 529 Main St., Suite 203 Charlestown, MA (617)

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

THE CONSTRUCTION SUPERVISOR

Electric Service Standards

Budget Estimate Basic Tenant Improvement

SWING DOOR SPECIFICATION

MINIMUM SPECIFICATIONS

SECTION ALTERNATES

Training Certification Categories

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

RESIDENTIAL BUILDING REQUIREMENTS

Table of Contents.2. Introduction...3 Gravity Loading and Deflections..4. Existing Structural System..8

SECTION ENTRANCE FLOOR GRILLES STAINLESS STEEL GRATING

Table of Contents. Page Title

The better way to build TM. Installation Manual FOUNDATION SIPs & FROST WALLS SIPs

CARL E. SCHLUTER ELEMENTARY SCHOOL

Jane Addams Elementary School S Avenue H Chicago, IL 60617

SITE ANALYSIS, DESIGN BRIEF AND CASE STUDY

PLANS REVIEW CRITERIA - COMMERCIAL BUILDINGS

Completed. Project. Melbourne High School. Comprehensive Additions and Renovations

The Inspection Process. Waxhaw N.C.

SECTION SECTIONAL OVERHEAD DOORS 522 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS. Display hidden notes to specifier. (Don't know how?

Additions and Renovations to Saint Robert Bellarmine Parish Center and Narthex 9/16/14 Outline Design Development Specification

SECTION PATHWAYS FOR COMMUNICATIONS SYSTEMS

Arbor Heights Elementary School. Concrete for South Building Foundation Stem Walls

DUKE UNIVERSITY CONSTRUCTION STANDARDS

Salt lake city Public Safety Building. Case Study CS 2. Grounded in strength.

Attachment D-1: Civil/Structural Scope of Work

FACILITY DESIGN PLAN FOR HARDING HALL RENOVATION AND ADDITION SOUTH DAKOTA STATE UNIVERSITY DATE: March 29, 2017

Suspended Metal lath and Cement Plaster. Coverings Rigid Insulation, 1/2 - in 0.75 psf. Floor Fill Lightweight Concrete, per inch 8 psf

NEW CONSTRUCTION ADDENDUM TO COA APPLICATION

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

WIRING METHODS CHAPTER 38

Series - 1

Floor Plan. *The floor plan represents a section view of a residence which has had an imaginary cut made approximately 4 feet above the floor line.

FLOORPLAN /ELEVATION SQ.FT. BDRM BATHS GARAGE BASE PRICE

4 EXTREME FOUNDATION PANELS

Structural Inspection

TILE TILE

TERMINAL BUILDING EVALUATION

Seal Harbor Development 1 Nagog Park Acton, MA 01720

Date Rater Verified. Rater Verified. Slab / Pre-Drywall / Thermal Inspection

Transcription:

SPACE TYPE: OUTSIDE PARKING (STRUCTURE) Construction Criteria The unit costs for Outside Parking (Structure) space types are based on the construction quality and design features in the following table. This information has been generally organized under Uniformat structure. Substructure Foundation Standard Foundation Substructure Envelope Slab on Grade Shell Superstructure Structural Frame Structural Floor Construction Elevators Fire Egress Reinforced concrete spread footing Water resistant membrane with rigid insulation, with sealant sloped at footing Gravel drainage course with filter mat over 4 drainage tile 4000 PSI 6 reinforced concrete slab with welded wire fabric Moisture barrier Gravel base on compacted fill Sealant at joints and wall junctures Precast reinforced concrete structural columns and beams and double T deck with concrete topping Camelback layout Tier-to-tier height of 12-6 with a clear height under the T of 8-6 Live load of 50 LB/SF 2 topping on double T deck Precast panels U-type poured-in-place reinforced concrete stairs Shell Exterior Closure Exterior Wall Precast concrete spandrel panels with panel design to match nearby structure as appropriate Painted finish on inside surface Mechanical fasteners on steel channel frame Vehicle barrier steel rail capable of withstanding 6000 LB concentrated force Outside Parking (Structure) 5-1

GSA Unit Cost Study Corner Stone 60% veneer/40% open Cast concrete Exterior Doors Glazed Exterior Doors at Non-Glazed Exterior Doors at Equipment or Storage Rooms Vents and Areaways Shell Enclosure Roof Roof Covering Roof Edge Aluminum frame glass panel with intermediate rail Tempered safety glass Keyed lever lockset with panic release bar on inside Automatic closers 16 gauge door with glazed upper panel integral with premanufactured booth construction Hollow core 1¾ metal door 6-0 (w) by 7-0 (h) 16 gauge steel frame Keyed lever lockset Architectural painted drainable steel louvers with 6 deep adjustable blades with rain gutter Parking deck with sealer; rebars to be epoxy coated Aluminum scupper connected to storm drainage downspout Interior Construction Partitions Elevator 6 CMU Structural slab-to-slab Open Painted finish on precast panels Specialties Handrail Connecting and Balcony Railings Wheel Stops Pipe handrail welded construction with painted finish Pipe handrail welded construction with painted finish Precast concrete Pavement Markings Masonry reflective paint 5-2 Outside Parking (Structure)

Traffic Control Floor Identification Reflective metal signs with 5 high letters Direction for level designation, parking, exit, elevator location, and emergency egress Traffic control for stop, yield, one way, no parking, handicap parking Painted signs on columns with ADAAG compliant tactile Braille vinyl signage modules Painted signs with ADAAG compliant tactile Braille vinyl signage modules Interior Finishes Walls Columns Equipment Rooms Floors Equipment Rooms Ceiling Equipments Rooms Painted with vinyl cove base Painted concrete surface Open painted concrete surface Enamel paint with vinyl cove base and steel corner guards Broom concrete finish Sealed concrete Painted exposed structure Painted plaster ceiling Exposed structure above Conveying Systems Elevators Service Elevators Holed hydraulic elevator Front opening Allowance to be $5,000 per cab (Oct. 00 dollars) Outside Parking (Structure) 5-3

GSA Unit Cost Study Plumbing HVAC Ventilation System Fire Protection Fire Suppression Fire Alarms Hose bibs at every level Floor area drains at every low point Trench drains with cast iron covers at every vehicle entrance/exit point Sand and oil trap at all storm drain discharge points Sprinkler misters at integral planters on building spandrel panels Forced ventilation at enclosed spaces Packaged terminal air conditioner (PTAC) to serve parking booth only; unit to provide outside air supply with positive pressure relative to surrounding parking areas Fully sprinklered with automatic down-turned sprinkler heads on dry pipe system; provide one sprinkler head for every 100 SF Standpipes in stairwells and per code Fire extinguisher cabinets on each tier Audible and visible (strobe) alarm in each tier Electrical Electrical Outlets Wall mounted duplex outlets at every tier and in each elevator lobby Lighting Surface mounted metal halide light fixtures every 20-0 OC Parabolic fluorescent 24 (w) by 48 (l) recessed ceiling fixtures with two T-8 lamps and electronic ballasts located every 80 SF (or T-5 equivalent) Telephone and Communication Outlets Emergency telephones at each tier Security Devices Conduit and boxes for one telephone and LAN connection provided as part of the Tenant Improvement unit costs; wiring and equipment by others Provide exterior security system, including CCTV cameras, related to protection of elevator lobby space, stairs and other support spaces accessible from the parking area 5-4 Outside Parking (Structure)

Building Site Work Roadways Pavement Markings Traffic Control Protective Bollards Booth Walkways Vegetation Site Lighting Concrete 12-0 (w) lanes with curbs Masonry reflective paint Reflective metal signs with 5 high letters Traffic control for stop, yield, one way, and no parking Concrete filled protective bollards at vehicle entry keypads to protect equipment 16 gauge painted insulated metal panels with metal tube frame and insulated metal roof with integral door Transaction window with deal tray Curb mounted Package mechanical unit with fresh air curtain at vehicle window Concrete walkways Grass ground cover Shrubs along entrance paths and structure perimeter Metal halide high mast general lighting Metal halide building security flood lighting Outside Parking (Structure) 5-5