Version dated [01/11/2017] SPECIAL TERMS

CAPACITY BOOKING... 1 PART I - REQUIREMENTS FOR ACCESS TO THE TRANSPORTATION SERVICE ) REQUIREMENTS... 5

CODE OPERATIONNEL DE RESEAU ACHEMINEMENT

Vector Pipeline L.P. Original Sheet No. 30 FERC Gas Tariff First Revised Volume No. 1 v0.0.0 RATE SCHEDULE FT-1 FIRM TRANSPORTATION SERVICE

Evolution of the ATM5 offer Proposals from Elengy and Fosmax LNG

PETRONAS GAS BERHAD NETWORK CODE FOR PENINSULAR GAS UTILISATION TRANSMISSION SYSTEM

Coordinated implementation of the Network Code on Capacity Allocation Mechanisms. Information Memorandum

APPENDIX D TO GAS TRANSPORTATION TARIFF OF NOVA GAS TRANSMISSION LTD. TERMS AND CONDITIONS RESPECTING CUSTOMER S INVENTORIES AND RELATED MATTERS

SASOL GAS NETWORK CODE FOR THE TRANSMISSION SYSTEM

Framework Guidelines on Capacity Allocation Mechanisms for the European Gas Transmission Network FG-2011-G August 2011

Two Years of TPA in Italy: Snam Rete Gas experience. Deux années de accés tiers au réseau de transport en Italie: l expérience de Snam Rete Gas

Energie-Control Austria Executive Board Ordinance on Provisions for the Gas Market Model (Gas Market Model Ordinance 2012) Title 1 Principles

ACCESS CODE FOR TRANSMISSION. Attachment F: Plan for Incident Management

SARJAK CONTAINER LINES PVT. LTD.

Appendix 1: General Terms & Conditions for Entry/Exit Contracts (entry/exit sys- tem) Contents

Decision. on 1 st April Decision of 30 October 2014 forming a ruling on the changes to the ATRT5 tariff concerning the interim measures

PJM ARR and FTR Market

NTT DATA Service Description

Applicable TSO Terms for Use of the PRISMA Capacity Platform. 01 November 2015

FAR PROCEDURES Forecasting, Allocation, Reconciliation

CUSTOMER SUPPORT SERVICES POLICIES FOR ONLINE SERVICES

RATE SCHEDULE FT-R FIRM TRANSPORTATION - RECEIPT

AB AMBER GRID RULES FOR ACCESS TO THE NATURAL GAS TRANSMISSION SYSTEM

GENERAL SERVICE GAS SCHEDULE C

GENERAL CONDITIONS OF THE CONTRACT

Network codes workshop

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

SAP Hybris Commerce, cloud edition and SAP Hybris Commerce, Edge cloud edition Supplemental Terms and Conditions

FERC GAS TARIFF FIRST REVISED VOLUME NO. 1. (Superseding Original Volume No. 1) SOUTHERN STAR CENTRAL GAS PIPELINE, INC.

PUBLIC WIFI FROM EE SOLUTION TERMS

Agreement. The use of staff parking products. between. Flughafen Zürich AG. P.O. Box CH-8058 Zurich Airport. and

Capacity Allocation Concepts in the RO-HU-AT Open Season Procedure

DAIMLER GROUP NORTH AMERICAN COMPANIES

Shippers' guide to maintenance-related capacity reductions

Transportation. Tariff. Vector Pipeline Limited Partnership

Supplemental Agreement

SETTLEMENTS & BILLING BUSINESS PRACTICE

Update on the implementation of GR-BG Projects. Angeliki D. Mourtzikou, Head of Oil & Gas Dept. Regulatory Authority for Energy

REFERENCE INTERCONNECTION OFFER (RIO)

SCHEDULE 12 Transmission Enhancement Charges. Establishment of Transmission Enhancement Charges.

NATURAL GAS TRANSMISSION AND LNG RE-GASIFICATION TARIFF

Market Procedure: Network Control Services

Public consultation on the tariffs and conditions for using underground natural gas storage facilities in France. Technical consultation notice

COMMISSION STAFF WORKING PAPER INTERPRETATIVE NOTE ON DIRECTIVE 2009/73/EC CONCERNING COMMON RULES FOR THE INTERNAL MARKET IN NATURAL GAS

The present ACER Guidance to ENTSOG provides a framework for the development of a

California Independent System Operator Corporation Fifth Replacement Electronic Tariff

Thyssengas GmbH Price Sheet for Shippers and Downstream Network Operators applicable from 1 January 2016

3. RELATIONSHIP BETWEEN ISO AND PARTICIPATING TOs. Each Participating TO shall enter into a Transmission Control Agreement with the

EMVCo Type Approval. Terminal ESD Evaluation Administrative Process. Version 2.3. July 2014

CHAPTER THREE. Load Curves The curve showing the variation of load on the power station (power plant) with reference to time is known as load curve.

PROCEDURE. Part 5.6: Physical Markets Settlement Invoicing PUBLIC. Market Manual 5: Settlements. Issue 15.0 MDP_PRO_0035

Electricity Market Code

2. Market Operations Overview

Energie-Control Austria Interpretative Note on Transparency Requirements and Third-Party Access Services Concerning Storage Facilities

Consultation on the integration of gas markets of Czech Republic and Austria

Economic analysis of the sunset clause

COLLECTIVE AGREEMENT No

PURCHASING AND MERCHANDISING POLICY SOCIÉTÉ DES ALCOOLS DU QUÉBEC

LOAD SERVING ENTITIES PJM REGION

CRE consultation on the creation of a single gas market area

Gas Market Analysis Tool January 2017

SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness

Thomas-Krenn Service GTCs

1. For Service Bus relay, we guarantee that the properly configured. application would be connected with deployed relay in in at least 99.

#RCNTHUSIASM DAILY GIVEAWAY

April 28, Filing of CAISO Rate Schedule No. 90 Docket No. ER

Day-ahead ahead Scheduling Reserve (DASR) Market

Business Practice Manual for Reliability Requirements. Version 34

SCHEDULE SS STANDBY SERVICE

GENERAL TERMS AND CONDITIONS. for Storage Services ("GTCS") Uniper Energy Storage GmbH, Ruhrallee 80, Essen

the Real-Time Market will be based on the system marginal costs produced by the Real-Time

Ashbridges Bay Treatment Plant Biogas Cogeneration Proposal from Toronto Hydro Energy Services

Statement of Work Enhanced Technical Support (ETS) for AIX

(3) If you have cause for complaint, you may contact us using the information provided in the first paragraph.

The Commission's specific statutory authority to promulgate these rules is found in , C.R.S.

LEVEL 3 COMMUNICATIONS, LLC REGULATIONS AND SCHEDULE OF INTRASTATE CHARGES APPLYING TO COMMUNICATIONS SERVICES WITHIN THE STATE OF NEW YORK

FERC GAS TARIFF. Third Revised Volume No. 1. (Superseding Second Revised Volume No. 1) COLUMBIA GULF TRANSMISSION, LLC FILED WITH

Bengal Pipeline Company. Section Four Invoicing Information. May

UNMIK REGULATION NO. 2004/22 ON THE PROMULGATION OF A LAW ADOPTED BY THE ASSEMBLY OF KOSOVO ON ELECTRICITY

REGULATION OF GOVERNMENT OF THE REPUBLIC OF INDONESIA NO. 36/2004 ON OIL AND GAS DOWNSTREAM BUSINESS

Electricity Supply Agreement

DECISION ON A TEMPORARY REGIME FOR THE PROVISION OF ANCILLARY SERVICES AND BALANCING OF THE POWER SYSTEM OF BOSNIA AND HERZEGOVINA

TENP JOINT INFORMATION MEMORANDUM FOR THE DEVELOPMENT OF SOUTH-NORTH GAS TRANSMISSION CAPACITY FROM ITALY TO GERMANY AND BELGIUM THROUGH SWITZERLAND

Report on the Interim Measures Planned for the Implementation by GAZ-SYSTEM S.A. in connection with the entry into force of Commission Regulation

Kinder Morgan Illinois Pipeline LLC Original Sheet No. 15 FERC Gas Tariff First Revised Volume No. 1

Government of Saskatchewan. Procurement Standards Involving Conflict of Interest

CONSERVATION AND DEMAND MANAGEMENT CODE FOR ELECTRICITY DISTRIBUTORS

PART 17 - ISDN Services 1st Revised Sheet 1 SECTION 2 - ISDN Primary Rate Interface (PRI) Cancels Original Sheet 1

I-SEM Testing Tariff High Level Options Consultation

Tariffs January 1, 2017

OUR CUSTOMER TERMS CLOUD SERVICES TELSTRA APPS MARKETPLACE

Contract No. [ ] VNG Gasspeicher GmbH Maximilianallee Leipzig - hereinafter referred to as "VGS" -

FERC Job Title Description (Updated 2/2/2018) Account Representative II, Capacity Services

GPS watches for children marketing and contract terms and conditions

EU ADVANCE CARGO DECLARATION REGIME. A basic explanatory note

THE UNIVERSITY OF NEWCASTLE TERMS AND CONDITIONS FOR CONSTRUCTION TENDERING

FRENCH REGULATED LNG TERMINALS

Committed Offer: Offer on which a resource was scheduled by the Office of the Interconnection for a particular clock hour for the Operating Day.

PJM Manual 21: Rules and Procedures for Determination of Generating Capability Revision: 12 Effective Date: January 1, 2017

BMW ConnectedDrive Services Information

Transcription:

Disclaimer The present translation is not binding and is provided by GRTgaz exclusively for information purposes. GRTgaz disclaims any warranty of any kind as to the accuracy and completeness of the present translation, the document in French being the sole and unique reference for the execution of the Contract and that would in any case prevail over any translated version. GRTgaz reserves the right to update the translation at any time as deemed necessary by GRTgaz to improve and/or adjust the quality and/or content of the translation submitted and available on GRTgaz s website. The Shipper is free to use the translated document at its own risk and under its own responsibility and remains responsible for checking the latest version available on the website for this purpose. In addition to the translation proposed by GRTgaz, the Shipper may use at its own risk and costs other translated documentation if deemed necessary by the Shipper with the understanding that in any event a translation would not be considered in case of discrepancy with the French version. GRTGAZ NETWORK TRANSMISSION CONTRACT APPENDIX B3 SPECIFIC PROVISIONS FOR L-GAS AREA INFRASTRUCTURE USERS AND FOR THE SHIPPER IN CHARGE OF H-GAS TO L-GAS QUALITY CONVERSION SERVICES Version applicable as of October, 1 st 2017

The present appendix defines the specific rights and obligations that apply to the users of the infrastructures in L-gas Area and the Shipper in Charge of the H-Gas to L-gas Quality Conversion Services. The appendix complements the provisions of Section B. Clause 1 Definitions Daily Quality Conversion Capacity from L-gas to H-gas: maximum quantity of energy, expressed in MWh (GCV) per day, which GRTgaz undertakes to deliver each Day at the L-to-H Conversion Point, as defined in Appendix 2 to the Contract. Daily Quality Conversion Capacity from H-gas to L-gas Peak Service: maximum quantity of energy, expressed in MWh (GCV) per day, which GRTgaz undertakes to take off each day at the H-to-L Conversion Point - Peak Service, as defined in Appendix 2 to the Contract. Conversion Point: generic term to define one of the following points: L-to-H Conversion Point: virtual Delivery Point associated with L-gas Area of the Balancing Zone North. H-to-L Conversion Point as part of the H-gas to L-gas conversion service: a virtual Entry Point related to L-gas Area to which the Daily Quantities are allocated in the framework of the H-gas- to L-gas quality conversion service provided by the Shipper in Charge of the H-Gas to L-gas Quality Conversion Service. H-to-L Conversion Point Peak Service: a virtual Entry Point related to L-gas Area of the Balancing Zone North. Daily Quantity Converted from H-gas to L-gas as part of the H-Gas to L-gas Quality Conversion Service: quantity of energy, expressed in MWh (GCV), delivered to the H-to-L Conversion Point as part of the H-gas to L-gas quality conversion service. This quantity is determined according to the provisions of the clause entitled Daily Quantity of gas Converted from H-gas to L-gas as part of the H-gas to L-gas Quality Conversion Service of Section D3. Daily Quantity Converted from H-gas to L-gas Peak Service: quantity of energy, expressed in MWh (GCV), taken off at the H-to-L Conversion Point - Peak Service. This quantity is determined according to the provisions of Clause 3 of this Appendix. Daily Quantity Converted from L-gas to H-gas: quantity of energy, expressed in MWh (GCV), delivered to the L-to-H Conversion Point. This quantity is determined according to the provisions of Clause 3 of this Appendix. Conversion Service: generic term to define one of the following services: L-gas to H-gas Conversion Service: GRTgaz operates a service whereby GRTgaz takes off quantities of L-gas made available by the Shipper and simultaneously provides Version applicable as of October, 1 st 2017 Page 2 of 6

the Shipper with the equivalent Energy Content in the form of H-gas, up to the maximum Daily Conversion Capacity subscribed by the Shipper. H-gas to L-gas Conversion Service - Peak Service: GRTgaz operates a service whereby GRTgaz takes off quantities of H-gas made available by the Shipper and simultaneously provides the Shipper with the equivalent Energy Content in the form of L- gas, up to the maximum Daily Conversion Capacity subscribed by the Shipper. Such Conversion Service cannot be used to supply new major consumption sites. Clause 2 Marketing of Conversion Services 2.1 L-GAS TO H-GAS CONVERSION SERVICE Annual subscriptions for L-gas to H-gas quality conversion capacity are governed by the same provisions as the annual subscriptions for short-notice capacity at the Network Interconnection Points as described in Sub-clause 4.2.2 of Section B. The Monthly Capacity available for sale in a given month takes into account any potential transmission capacity restrictions due to maintenance and the allocated annual capacity. Monthly subscriptions for L-gas to H-gas quality conversion capacity are governed by the same provisions as the monthly subscriptions for capacity at the Network Interconnection Points as described in Sub-clause 4.2.6.1. of Section B. Daily subscriptions for L-gas to H-gas quality conversion capacity are governed by the same provisions as the daily subscriptions for capacity at the Network Interconnection Points as described in Sub-clause 4.2.7.2 of Section B. 2.2 H-GAS TO L-GAS CONVERSION SERVICE PEAK SERVICE - ANNUAL SUBSCRIPTIONS ONLY H-gas to L-gas Conversion Service quality conversion capacity may be subscribed annually on a first come first served basis as the annual subscriptions for short-notice capacity at the Network Interconnection Points as described in Sub-clause 4.2.2 of Section B. 2.3 PROVISIONS FOR CONVERSION SERVICE - RESERVATIONS Conversion services are sold through notifications sent by the Shipper to GRTgaz via TRANS@ctions or PRISMA. The Shipper has access to the Auxiliary Services for annual and monthly Reservations via the TRANS@ctions portal. Version applicable as of April, 1 st 2017 Page 3 of 6

Clause 3 Determination of Quantities 3.1 DETERMINATION OF DAILY QUANTITIES Every Day, the Daily Quantity Taken Off at the H-to-L Conversion Point - Peak Service and the Daily Quantity Delivered to the L-to-H Conversion Point are equal to the Daily Quantity Scheduled by GRTgaz at those points. Every Day, the Daily Quantity Converted from H-gas to L-gas Conversion Service - Peak Service is equal to the Daily Quantity Taken Off at the H-to-L Conversion Point Peak Service. Every Day, the Daily Quantity Converted from L-gas to H-gas is equal to the Daily Quantity Delivered at the L-to-H Conversion Point. Every day, the Daily Quantity Delivered to the H-to-L Conversion Point as part of the H-gas to L- gas Conversion Service is equal to the Daily Quantity Converted from H-gas to L-gas as part of the H-Gas to L-gas Quality Conversion Service. The calculation of the Daily Quantity Converted from H-gas to L-gas as part of the H-Gas to L-gas Quality Conversion Service is detailed in the Clause entitled Daily Quantities converted from H- gas to L-gas as part of the H-gas to L-gas Quality Conversion Service in Section D3. 3.2 SPECIFIC CASE OF DAILY QUANTITIES SUBJECT TO A SPECIAL TARIFF ACCORDING TO THE CONTRACTUAL L-TO-H GAS CONVERSION QUANTITY Every Day, the Daily Quantity equal to the positive difference between: The Daily Quantity Taken Off at the Network Interconnection Point in L-gas Area, at the Transport Storage Interface Point in L-gas Area, at the H-to-L Conversion Point Peak Service - in L-gas Area, and the Daily Quantity Delivered at the Transport Storage Interface Point in L-gas Area, at the L-to-H Conversion Point, the Daily Quantity Delivered at the Network Interconnection Point in L-gas Area and the Delivery Points in L-gas Area is subject to the contractual ex-post L-gas to H-gas conversion tariff beyond the tolerance level defined in Appendix B4 to Section B of this Contract. 3.3 SPECIFIC CASE OF L-GAS TO H-GAS CONVERSION USE CONTROL Every day from the 1 st of April of each relevant year and until the 31 st of March of the following year, the quantity equal to the difference (positive or negative) between: The Daily Quantity Taken Off at the Network Interconnection Point in L-gas Area, the Daily Quantity Taken Off at the Transport Production Interface Points in L-gas Area and at the H-to-L Conversion Point - Peak Service Version applicable as of April, 1 st 2017 Page 4 of 6

and The Daily Quantity Delivered to the L-to-H Conversion Point, the Daily Quantity Delivered to the Network Interconnection Point in L-gas Area is cumulative and constitutes the Cumulative Daily Quantity. Each year, the positive portion of the Cumulative Daily Quantity at the 31 st March is carried forward to the 1 st of April of the following year. Every Day, the Cumulative Daily Quantity is subject to a penalty fee in the amount of any daily imbalance noted further to the ex-post controls carried out on the quantities of L-gas physically converted to H-gas. Clause 4 Obligations and limitations to GRTgaz Obligations 4.1 OBLIGATIONS OF GRTGAZ GRTgaz undertakes to make the subscribed capacity available to the Shipper within the limits defined in this Chapter. 4.2 LIMITS RELATED TO OFFTAKE, TRANSMISSION AND DELIVERY OBLIGATIONS 4.2.1 LIMITATIONS RELATED TO DAILY CAPACITY The Daily Capacity referred to in this Sub-clause 4.2.1 is that defined in Appendix 2 to the Contract, reduced, where applicable, pursuant to the terms of the Chapter entitled Disruption in Service Continuity in Section A or in Clause 4.2.2 hereafter of this Appendix. GRTgaz is under no obligation to take off, or respectively to deliver at a Conversion Point, at any Hour, a quantity of Gas with an Energy Content in excess of one twenty-fourth (1/24 th ) of the Daily Entry (or respectively Exit) Capacity at that point. GRTgaz is under no obligation to take off at the H-to-L Conversion Point - Peak Service, on any Day, a quantity of Gas with an Energy Content in excess of the H-to-L gas Daily Quality Conversion Capacity - Peak Service. GRTgaz is under no obligation to deliver to the L-to-H Conversion Point, on any Day, a quantity of Gas with an Energy Content in excess of the L-to-H gas Daily Quality Conversion Capacity. Prior to the Validity Start Date and after the Validity End Date of a Daily Capacity set out in Appendix 2 to the Contract, the said Daily Capacity is deemed to be equal to zero (0). Version applicable as of April, 1 st 2017 Page 5 of 6

In the case of a Day with a duration of twenty-three (23) or twenty-five (25) hours, the limitations relating to the Daily Capacity as established in this Sub-clause 4.2.1 are subject to a coefficient of twenty-three/twenty-fourths (23/24 th ) or twenty-five/twenty-fourths, respectively. 4.2.2 LIMITATIONS RESULTING FROM SCHEDULING The limitations resulting from scheduling are specified in the Sub-clause entitled Limitations with regard to Scheduling in Section D2. Version applicable as of April, 1 st 2017 Page 6 of 6