Greater Newcastle Transport Plan

Similar documents
Government Policy Statement on Land Transport 2018/ /28. DRAFT (FOR ENGAGEMENT ) NOT GOVERNMENT POLICY February 2017

INDEPENDENT PUBLIC INQUIRY SYDNEY S LONG TERM PUBLIC TRANSPORT PLAN

SEARs project justification and conclusion

Transport Domain Plan. Draft list of Enduring Questions

Intelligent Transport Systems Master Plan

The Policies section will also provide guidance and short range policies in order to accomplish the goals and objectives.

2040 Transportation Policy Plan Conversion to Performance Based Planning Basis. 25 th Annual CTS Transportation Research Conference May 21, 2014

Integrated Planning Strategy. Better transport systems and options creating better places

State Transit Authority. Corporate Plan June 2013 (Issue 2) State Transit Authority. Corporate Plan June 2013 (Issue 2) 1

IPSWICH NORTHERN ROUTES STUDY. Stage 1 Progress

PIA NSW SUBMISSION SYDNEY METRO NETWORK STAGE 1 (CBD METRO) ENVIRONMENTAL ASSESSMENT

Strategic Transport Plan Position Statement. June 2017

Auckland Transport Alignment Project. Arterial Roads Report

Chapter 1 Introduction

INTEGRATED TRANSPORT PLANNING: A QUEENSLAND EXPERIENCE

HUNTER STRATEGIC 2013 INFRASTRUCTURE PLAN PRODUCTIVITY SUSTAINABILITY LIVEABILITY

AMPO Annual Conference Session: Performance (Part 1) October 18, 2017 Savannah, GA

Response of the Road Haulage Association to Transport for London. Consultation on Mayor s Transport Strategy.

Transit Service Guidelines

Multi-modality assessments in promoting sustainable urban traffic

CITY OF JACKSONVILLE 2030 MOBILITY PLAN STUDY UPDATE GOALS, OBJECTIVES, AND PERFORMANCE MEASURES PREPARED FOR: CITY OF JACKSONVILLE

DRAFT Nelson, Tasman and Marlborough (Top of the South) regional summary STATE HIGHWAY INVESTMENT PROPOSAL SEPTEMBER 2017

VALUE OF RAIL The Contribution of Rail in Australia

F0.2 Integrated Transport and Land Use Planning

The Three C s of Urban Transportation Planning

Qube Holdings Limited. Presented to. Challenges & Efficiencies Presentation to AmCham May 2015 Maurice James Managing Director

THE N1 CORRIDOR CAPE TOWN: AN INTEGRATED MULTIMODAL TRANSPORT STRATEGY FOR THE CORRIDOR

Planning For Employment and Industry in Melbourne s Growth Areas

The People s Choice 2016 Policy Document

Liverpool City Region Candidate Major Schemes April 2013

GLOBE LINK CONNECTING SOUTH AUSTRALIA TO THE WORLD

THE REGION S PLAN POLICY FRAMEWORK. August 2015

MONITORING IMPLEMENTATION AND PERFORMANCE

Greater Manchester Local Transport Plan / /11

Making the Journey A Manifesto for Transport

FUTURE BUS RAPID TRANSIT PLANS

AN EXECUTIVE SUMMARY OF THE COMMITTEE FOR SYDNEY S JOINT SUBMISSION TO THE GREATER SYDNEY COMMISSION & TRANSPORT FOR NSW

GO RAIL NIAGARA SERVICE EXTENSION

Transport in the Liverpool City Region: Update for TravelWatch

Fairfax County Countywide Transit Network Study

Traffic Operations Centres Contents. Traffic Operations Centres New Zealand Transport Agency

1 Introduction 4. 2 Our vision 5. 3 Critical transport challenges 6. 4 Keeping it customer-focussed 10

Sustainability. Sustainability Principles. 1. Framework. Spokane Transit s definition of Sustainability is:

Attachment A: TransformTO Short-term Strategies

2015 CEF Transport Calls

Moving Goods in the Greater Vancouver Region. Presentation Overview. Greater Vancouver Region

TRANSPORTATION FACTS. OUR CUSTOMERS: Travel Patterns

Transport2025. Transport vision for a growing world city

SAN FRANCISCO MUNICIPAL TRANSPORTATION AGENCY

Draft Regional Transportation Plan Comments

Helsinki-Tallinn Transport Link Feasibility Study of a Railway Tunnel February 2018

Spatial Planning and National Roads

AUTHOR: ELAINE SEAGRIFF, INTERIM HEAD OF TRANSPORT, WEST OF ENGLAND COMBINED AUTHORITY

Eu Public- Private Smart Move High Level Group

Foreword. Mayor Stuart Crosby

Auckland Transport Code of Practice 2013

A Network Approach To Park & Ride

INTERSTATE CORRIDOR PLANNING

Passenger Transport Modelling [T1]

Accelerate 25: Draft Manawatu-Whanganui Economic Growth Action Plan Enabler Transport

With the challenges facing Washington s transportation

Rail Freight Service Review. Submission of the New Brunswick Department of Transportation

AIR QUALITY AND CLIMATE CHANGE EVALUATION GUIDANCE

Long Bridge Project. Environmental Impact Statement (EIS) Revised Purpose and Need

Are We Prepared for the Energy Movements? JEANNIE BECKETT THE BECKETT GROUP ENERGY EXPORT PERMITTING IN THE NW JUNE SEA-TAC CONFERENCE CENTER

Urban transport Issues for India

Appendix B5 PT Model Validation

LEVIN TO WELLINGTON ROAD OF NATIONAL SIGNIFICANCE - QUESTIONS AND ANSWERS

MASTER PLAN. Urban Rail Development. Plan. Bus Transformation Plan. Taxi Transformation. Plan. Interchange and Integration Plan.

Energy Savings by replacing old facility o Energy savings o Emissions

UNDERSTANDING KEY DRIVERS OF PUBLIC TRANSPORT PATRONAGE GROWTH - RECENT SOUTH EAST QUEENSLAND EXPERIENCE

1.1 Purpose of the Project

Information Guide for Suppliers

International Seminar on PRIORITISATION OF MULTIMODAL TRANSPORT INFRASTRUCTURE Noordwijk aan Zee, The Netherlands -- May 12-15, 1996

Community and Stakeholder Consultation Report. Powering Sydney s Future

EUTRAIN Europe Neighbourhood Cooperation Countries (incl. Russia, CIS, Black Sea, Balkan States) 3rd Regional Workshop Moscow, Russia

Programme Business Case

Chapter 2 Performance Measures

LAND USE POLICIES BY COMMUNITY DESIGNATION

SYDNEY: MOVING FORWARD

Overview 1 Our Vision for Critical Transport Challenges for Greater Manchester 4

TONBRIDGE & MALLING BOROUGH COUNCIL. PLANNING and TRANSPORTATION ADVISORY BOARD. 15 November 2016

Roadmaps to 2050 FFE (Madrid, Spain) 21 September 2017

To provide an update on the progress of the Peel Goods Movement Task Force and Peel Goods Movement Strategic Plan.

The SOL. Additional Comments in Support of Retaining Engineering Occupations

Oxford, Milton Keynes, Cambridge Northampton Growth Corridor

Functional Classification Comprehensive Guide. Prepared by

Niagara Region Transportation Master Plan Niagara-Hamilton Trade Corridor Technical Paper

Industrial Estates and Business Parks

DRIVING CHANGE: AUSTRALIA S CITIES NEED A MEASURED RESPONSE

Welcome to the Everett Transit Long Range Plan Visioning Workshop

European Truck Platooning Challenge (pilot) 2016

Project No 2 CONSTRUCTION OF MULTI MODAL TRANSPORT HUB (MMTH) COLOMBO FORT/PETTAH

One Public Transport System for Cornwall. Project Details

Exploring Mobility as a Service. Summary Report 26th January 2016

This page intentionally left blank.

Transform 66 Multimodal Project: Prioritization Process and Evaluation Criteria Approved March 3, 2016

WHITE PAPER Roadmap to a Single European Transport Area Towards a competitive and resource efficient transport system

Implementing the Sydney Strategic Transport Model (STM) in Emme 4. Dr Peter Hidas Bureau of Transport Statistics, Transport for NSW

Response to Sydney over the next 20 years: A discussion paper

Transcription:

Greater Newcastle Transport Plan Engineers Australia submission 16 February 2018

11 National Circuit, Barton ACT 2600 Tel: 02 6270 6555 Email: publicaffairs@engineersaustralia.org.au www.engineersaustralia.org.au

About Engineers Australia Engineers Australia is the peak body of the engineering profession, with over 100,000 members from all engineering disciplines across the country. Established in 1919, Engineers Australia is a not for profit organisation, constituted by Royal Charter to advance the science and practice of engineering for the benefit of the community. Introduction Engineers Australia welcomes the opportunity to provide a submission on the Draft Greater Newcastle Future Transport Plan. This Plan supports Transport for NSW s Future Transport 2056 Strategy and provides the strategic direction for future transport planning for the Greater Newcastle area. Greater Newcastle covers five local government areas, servicing a population of over 1 million people, and has been identified by the state government as a key Global Gateway, which will support the economy over the coming decades and beyond. This submission addresses a range of issues and provides related recommendations for consideration. Transport objectives The Draft Future Transport Plan ranges widely and presents some travel data and future travel projections for Greater Newcastle. However, it does not refer to or identify a need for the extensive work, using complex and highly developed travel projections, which is needed to analyse the possible future transport/land use configurations across the whole region. Only by using such scientifically derived forecasts can transport system options be tested for effectiveness, efficiency, cost and benefits the whole gamut of system and project appraisal and then the planned system optimised. Engineers Australia notes that the skills and the data resources for such transport system design and analysis are held very weakly in Australia, though they have in the past been strong. These skills and resources need to be retained by Governments and they need to be applied and updated continually; this is not a one off process. Other technical and commercial sectors do maintain their crucial demand and projection capabilities to deliver better outcomes, short and long term. The draft Plan does not articulate a clear transport vision for Greater Newcastle, nor does it describe the transport planning objectives that the Plan seeks to deliver. As a consequence, it is not clear what role Greater Newcastle will play in achieving the future transport strategy for NSW. This is particularly important given the region s role as Australia s largest regional economy. The Plan would benefit by identifying alignment with federal Government s transport priorities, particularly in relation to Smart Cities, defence infrastructure, and national road and rail networks. The draft Plan focuses on six of the 10 customer outcomes (3, 4, 6, 7, 8, 9). It is not clear why customer outcomes 1 (a safe transport system for every customer with zero deaths or serious injuries ), 2 (a transport system which is resilient to significant weather event ), and 5 (increased accessibility to employment services ) are not also relevant to Greater Newcastle. Greater Newcastle Transport Plan 3

Service and infrastructure initiatives Engineers Australia welcomes the long term planning horizon (20+ years) and supports the initiatives identified within the draft Plan. Given the disruptive future of our transport technology, the flexible investment approach identified in the draft Plan is supported. With technology central to the future transport plans of NSW, ensuring that transport modes interrelate effectively is crucial. Systems such as Mobility as a Service (MaaS), autonomous vehicles moving both freight and people, last mile freight transport systems, smart motorways and integrated mass transport will require not just the physical adaptations to roads, rail and ports, but the amalgamation of technology and physical assets in new ways that cannot, at this point of time, be clearly envisaged. However, the draft does not outline in any detail time lines for the initiatives identified in Section 2.3 nor does it clearly differentiate between those that are under investigation and those that are underway, and those that apply outside Greater Newcastle (e.g. Lakes Way and Golden Highway improvements). Similarly, the draft does not currently refer to the draft Freight and Ports Plan, and does not appear to be consistent with that Plan in relation to rail infrastructure. For example, the draft Greater Newcastle Transport Plan refers to higher speed connections on the east coast as a 20+ year initiative (although what mode of transport will be accelerated is unclear), while the draft Freight and Ports Plan refers to extension of the Pacific Highway to Raymond Terrace and the Lower Hunter Freight Bypass as 0 10 year initiatives. This ambiguity should be addressed to provide clarity to the overall transport plan. Additionally, adding references to the Infrastructure Australia audit would help provide greater clarity to the transport needs of Greater Newcastle. Engineers Australia considers that the draft Plan misses an opportunity to be more ambitious in relation to delivery of higher speed rail connectivity to Sydney and to more effectively plan for electric vehicle charging infrastructure. The need to improve transport between Newcastle and Sydney cannot be underestimated if the aspirations of the NSW Government for development of the state are to be achieved. Land use and transport vision for 2056 Engineers Australia supports the evidence based planning approach identified within the Plan and supports the Plan s intent to integrate transport and land use to deliver sustainable transport options within Greater Newcastle (which is the area within which 95% of trips take place). However, we do not support the notion that transport is sustainable with increasing private vehicle trips. The emergence of autonomous vehicle technology provides an opportunity for shared, on demand vehicles that could lead to a reduction in traffic congestion. Conversely, private ownership of autonomous vehicles has the potential to significantly increase congestion. We acknowledge the opportunity for an increasing proportion of trips to be made by active transport, as more than half of trips are less than five kilometres, and encourage Transport for NSW to make more funding available to local councils to deliver active transport infrastructure. Figures 10 and 11 of the draft Plan clearly identify strong connectivity between Newcastle and Lake Macquarie, particularly between Glendale, Charlestown, Kotara, Broadmeadow and Greater Newcastle Transport Plan 4

Newcastle CBD. Improved public transport between these destinations has the potential to reduce traffic congestion on the road network. The Plan does not currently identify the interaction between private and defence air travel and the wider transport network, and it is not clear whether Section 3.1 includes analysis of the contribution of air travel to travel behaviour. Section 3.2 of the Plan would benefit from inclusion of a discussion on how Williamtown Airport will contribute to the Global Gateway capability of Greater Newcastle, and the infrastructure required in the wider transport network to support air travel for commuting and visitation. Engineers Australia supports the development of integrated transport networks for Greater Newcastle s strategic centres, and welcomes the inclusion of proposed networks for Newcastle and Maitland CBDs. We would prefer that network plans for the other 12 emerging centres be prepared as part of the current planning process, rather than deferred for the precinct planning process. In relation to the Newcastle CBD plan, the ferry network should include potential for ferry services to the proposed cruise ship terminal at Carrington. The Cardiff Glendale network plan should include the Lake Macquarie Transport Interchange, with limited stops services transferred from Cardiff to a new train station at Glendale. The planning processes which the NSW Government has underway (Greater Newcastle Metropolitan Plan 2017 and the Draft Greater Newcastle Future Transport Plan 2018) are interlinked but the linkages are not referenced in either document. More significantly, there is no indication that these plans have been refined to optimise landuse and transport. For example, the process used to locate secondary and tertiary education facilities as generators of high travel volumes with respect to their future transport needs is not clear. Nor is it clear that issues such as ensuring that specific land use planning outcomes articulated in the Hunter Regional Plan have been considered, such as: planning for residential housing lands with road networks that allow efficient local bus routing and local/trunk transit interchanges; and recognising that vehicle technology is evolving and existing roads are becoming more congested. On this last point, it is worth reiterating that privately owned selfdrive vehicles are likely to increase congestion issues. A more focussed approach to the Future Transport and the Metropolitan Plans is essential. Sustainability of the future Greater Newcastle area will require major changes from the present high car use coupled with expanding fringe suburban districts. Greater intensification of land occupancy and utilisation of much higher efficiency vehicle/track systems are needed as the primary outcome of both the Future Transport Plan and the Metropolitan Plan. Customer outcomes for Greater Newcastle As mentioned previously, we recommend that Customer outcomes 1, 2, and 5 also be explored within the Plan. In relation to Customer Outcome 3, Engineers Australia supports the identified actions to improve connectivity, integrate services and make use of capacity. We note the use of ondemand services is likely to increase as autonomous vehicles become more prevalent. Autonomous taxis are likely to take a larger share of trips and could become an important public transport option. As discussed above, transport analysis indicates that transport between north Lake Macquarie and Newcastle CBD dominates transport trips. The priority corridors identify the need to develop multi modal routes between Charlestown and Newcastle CBD but not between Glendale and Newcastle CBD. Given the amount of traffic currently travelling between Glendale and Newcastle CBD, this corridor should be added. Greater Newcastle Transport Plan 5

Engineers Australia supports adoption of the Movement and Place framework described in response to Customer Outcome 4. However, we encourage Transport for NSW to apply the framework to support development of an integrated transport network, beyond just its road function. The plan also needs to address all aspects of transport journeys whether they are: By foot Bicycle Bus Taxi, Uber, or other on demand services Private cars, whether traditional or autonomous Motorcycle Heavy or light rail Ferry Plane Each mode should integrate seamlessly through suitably designed, resourced and located interchanges throughout the network. In this way people can move from one mode to another without a major disruption to travel. Park and ride options should also be considered as they have worked in other areas, but require suitable parking capacity and location. Discussion on Customer Outcome 6, while mentioning alternative fuels as a technology change, does not include mention of infrastructure required to support electric vehicles. Engineers Australia supports the proposals in relation to Customer Outcome 7. We particularly support development of a 30 minute public transport catchment around Newcastle CBD and recommend this approach be extended to other key employment nodes in Greater Newcastle including Maitland, Charlestown and Cardiff Glendale. We support investigation of flexible transport services (Customer Outcome 8) and the actions proposed to support development of Greater Newcastle as a Global Gateway (Customer Outcome 9). As discussed above, the Plan could reference actions proposed in the draft Freight and Ports Plan to develop the Port of Newcastle and include further actions to support passenger and freight movement through Williamtown Airport. Recommendations Engineers Australia recommends that: 1. A clear transport vision and planning objectives for Greater Newcastle are articulated in the Greater Newcastle Future Transport Plan. 2. The Plan clearly articulates integration to federal transport priorities and identifies opportunities for collaboration among three levels of government. 3. Customer outcomes 1, 2, and 5 also be explored within the Plan. 4. The initiatives under investigation and underway be more clearly identified, along with the time frames in which they are proposed and the contribution they make to meeting the transport planning objectives for Greater Newcastle. 5. Transport for NSW make much more ambitious commitments to public and active transport and emerging autonomous and electric vehicle initiatives required to meet planning objectives and identified customer outcomes. 6. The Plan clearly articulates how it interacts with the draft Freight and Ports Plan, and in particular, how implementation of the Freight and Ports Plan will facilitate improvements in non freight related transport. Greater Newcastle Transport Plan 6

7. The Plan provides more ambitious timeframes for higher speed rail connection between Sydney and Newcastle. 8. The Plan includes discussion of infrastructure required to support electric vehicles. 9. Transport for NSW works more closely with local councils to facilitate high quality active transport infrastructure, particularly within and between town centres, particularly in relation to funding. 10. The Plan specifically identifies opportunities to improve public transport between Glendale, Charlestown, Kotara, Broadmeadow, and Newcastle CBD. 11. The Plan includes discussion of the contribution of air travel and the implications for expanded air travel on the wider transport network. 12. Integrated transport network plans for all 14 strategic centres be included in the Plan. 13. The Newcastle CBD network plan includes ferry service to the proposed cruise ship terminal at Carrington. 14. The Cardiff Glendale network plan includes the Lake Macquarie Transport Interchange. 15. The Plan includes actions to integrate autonomous on demand services into the public transport system. 16. The corridor from Glendale to Newcastle CBD via Cardiff and New Lambton be added to the Plan for development of multi modal transport. Alternatively, the John Hunter to Newcastle CBD corridor could be extended to Glendale via Cardiff. 17. The Plan describes the application of the Movement and Place framework to an integrated transport network, rather than just the road component. 18. 30 minute public transport catchments be developed around all major employment nodes within Greater Newcastle. Conclusion Greater urbanisation brings with it the challenges of moving people and goods effectively and efficiently. As Greater Newcastle grows these challenges will come into greater focus. These challenges are not simply in relation to providing physical assets but the integration of technology. Cities that are adaptable to future disruptions that technology brings will have the advantage. To plan effectively for these changes means breaking down existing silos. For too long transport and metropolitan planning have worked independently, leading to decision making that is not aligned, piecemeal and ineffective. Planning has lagged behind land use and transport has too often been seen as a retrofit rather than the invigorator of progressive city planning. Engineers design, build, operate, maintain and use transport infrastructure. Their specialised skills and engagement in almost every part of the transport sector gives engineers a special insight to the capacity and innovative capacity of transport now and into the future. Contact details Thank you for the opportunity to make a submission on the draft plan. To discuss matters raised in this submission, please contact Helen Link, General Manager Engineers Australia Newcastle Division on (02) 4911 7310 or by email at hlink@engineersaustralia.org.au. Greater Newcastle Transport Plan 7