Additional Information. Box 21: Types of Material Being Discharged and the Amount of Each Type in Cubic Yards.

Similar documents
State of Alaska Department of Natural Resources Division of Mining, Land and Water Northern Regional Office. Preliminary Finding and Decision

DRAFT GREATER MOOSES TOOTH TWO (GMT2) DEVELOPMENT PROJECT PERMITTEE RESPONSIBLE WETLANDS MITIGATION PLAN NATIONAL PETROLEUM RESERVE-ALASKA

State of Alaska Department of Natural Resources Division of Mining, Land and Water Northern Regional Office. Preliminary Finding and Decision

Department of the Army Permit Application

PROJECT DESCRIPTION KUPARUK RIVER UNIT KUPARUK CONSTRUCTION SERVICES PAD EXPANSION NORTH

Overview of Permitting Framework Alaska North Slope Oil and Gas Activities

NOTICE OF PREPARATION

GUIDE TO THE DEVELOPMENT OF A MINING AND RECLAMATION PLAN IN NEW BRUNSWICK

Revised by BP Exploration (Alaska) Inc. 16 April2014

Appendix D - Evaluation of Interim Solutions

Department of the Army. Record of Decision

Eska Creek Preliminary Feasibility Analysis

Public Notice of Application for Permit

The Business of Oil & Gas in Alaska Joshua Kindred, Alaska Oil and Gas Association. November 12, 2015

Instructions for the South Pacific Division Nationwide Permit Pre- Construction Notification (PCN):

TECHNICAL MEMORANDUM

ENVIRONMENT ACT TERMS OF REFERENCE NOVA SCOTIA DEPARTMENT OF TRANSPORTATION AND PUBLIC WORKS. Beaver Bank Bypass

SOUTH FLORIDA WATER MANAGEMENT DISTRICT. Question 13: Wetlands

TABLE OF CONTENTS 4.17 UTILITIES AND SERVICE SYSTEMS...

Cass County Soil Erosion & Sedimentation Control Program

Greenfield Pond B Rehabilitation

Closure Plan Ash Disposal Area PGE Boardman Power Plant

J O I N T P U B L I C N O T I C E

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

Application For Waste Regulation (Check all that apply)

Chapter 3 Affected Environment and Environmental Consequences

Application for Gas Exploration and Production

WETLANDS AND OPEN WATERS Compensatory Mitigation Definitions of Factors

Environmental Review Standards for OHTF Funded Projects

Information for File # PRH

Construct and Operate a Rail Line Between North Pole, Alaska and Delta Junction, Alaska

June 1, Dear Mr. Simpson:

SACHSE EROSION CONTROL GUIDELINES

Holly Swartz and Jason Shirey

Mill Creek (HHEI)

Construction of Dariali HEPP. Reinstatement Plan

Nationwide Permit General Conditions

Notice No Closing Date: May 12, 2017

Environmental Information Worksheet

Information for File #MVP MVM

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

Analysis of the City and Borough of Juneau Mining Ordinance. CBJ ; CBJ ; and October 12, 2017

GENERAL GUIDELINES FOR CONDUCTING THREATENED AND ENDANGERED SPECIES SURVEYS IN THE PINELANDS AREA. March 25, 2006 INTRODUCTION

Public Notice. Applicant: City of Dallas Project No.: SWF Date: April 18, Name: Chandler Peter Phone Number:

(Instructions and explanations of bid items and sources of unit costs are provided on the back of this page.)

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

Application Number: SP Project Name: Novo Nordisk Bright Sky Major Site Plan (acting as a Master Plan)

Annex I Lyons Ferry Hatchery Modification Plan

7 Mineral and Energy Resources

Keefer Pasture Drift Fence Project. Challis-Yankee Fork Ranger District Salmon-Challis National Forest

LAND USE APPLICATION - DIRECTOR Measure 49 Forest Zone Dwelling

Niagara Falls Storage Site Safety Measures During Remediation

SP Old Florida Investment Resources, LLC SMR Aggregates SR 64 Borrow Pit (DTS # )

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

is a possibility of the existence of permafrost as a result

Oil and Gas Fast Facts and Frequently Asked Questions February 19, 2013

MITIGATED NEGATIVE DECLARATION & MITIGATION MONITORING PROGRAM CITY OF CHICO PLANNING DIVISION

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Environmental Assessment and Finding of No Significant Impact. Bethel Harbor Improvements Bethel, Alaska

SPECIFICATION FOR PIPE CULVERT CONSTRUCTION

CHAPTER 10: PAVING. Refer to page 548 of the 2016 Spec book or page 573 of the 2018 Spec book for material specifications under G.

Nance County Zoning Regulations for Wind Energy Conversion Systems

Public Notice. Applicant: Lennar Homes Project No.: SWF Date: October 29, Name: Mr. Darvin Messer Phone Number:

BASE CONSTRUCTION MATERIALS A Aggregate

US Steel/Spirit Lake Sediment Cleanup Update for River Corridor Coalition

Design Considerations. Pursuing Dynamic Compaction. waste considered. Pursuing Dynamic Compaction. Page 1 of6

(this cover page left intentionally blank)

Chapter 13: Wildlife and Vegetation

COMPENSATORY MITIGATION AND THE MITIGATION RULE. USACE, Jacksonville District

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

Long-term Management Plan For The Mitigation Bank

Section SNOW DISPOSAL SITE DESIGN CRITERIA

DEPARTMENT OF ENVIRONMENTAL PROTECTION Bureau of Water Quality Protection. Design Criteria - Wetlands Replacement/Monitoring

NEW ENGLAND COUNCIL ON FOREST ENGINEERING CASE STUDY MARCH 6, 2012

WILMINGTON DISTRICT US ARMY CORPS OF ENGINEERS REGULATORY DIVISION. US Army Corps of Engineers BUILDING STRONG

Public Notice ISSUED: June 29, 2017 EXPIRES: July 31, 2017

I THOUGHT IT WAS JUST WET LAND: A GUIDE TO ENVIRONMENTAL PERMITTING FOR AIRPORTS ROAD SCHOOL 2018 SIMON DAVIES, SENIOR SCIENTIST MARCH 7, 2018

Constructed Wetland Pond T-8

Preliminary Decision Memo 2015 Recreation Residence Projects Odell Lake

1. All underground utilities under railroad tracks shall be encased in a larger pipe or conduit called the casing pipe.

NEW CASTLE CONSERVATION DISTRICT. through. (Name of Municipality) PLAN REVIEW APPLICATION DRAINAGE, STORMWATER MANAGEMENT, EROSION & SEDIMENT CONTROL

Project Alignment Appendix A

Master Development Plans (MDPs) / Geographic Area Plans (GAPS)

Operations Mine Site, Tote Road and Railway

TECHNICAL CONTENT PROPOSED STEEP SLOPE REGULATION

PERMEABLE INTERLOCKING PAVERS

VIRGINIA POLLUTION ABATEMENT PERMIT APPLICATION

JOINT PUBLIC NOTICE. April 14, 2014

ARTICLE XII RECREATIONAL VEHICLE PARK REGULATIONS

Road Cards Appendix 2

Blue Earth County Code

Municipal Stormwater Ordinances Summary Table

Public Notice Charlestown Road New Albany, Indiana 47150

Erosion & Sedimentation Control Policy

Lyon Creek Cedar Way Stormwater Detention Dam Operation and Maintenance Manual

TITLE 35 LEGISLATIVE RULES BUREAU OF ENVIRONMENT DIVISION OF ENVIRONMENTAL PROTECTION OFFICE OF OIL AND GAS

Table of Contents for Guide Specifications

CHAPTER 3 Environmental Guidelines for WATERCOURSE CROSSINGS GOVERNMENT OF NEWFOUNDLAND AND LABRADOR DEPARTMENT OF ENVIRONMENT AND LABOUR

Transcription:

Additional Information Box 21: Types of Material Being Discharged and the Amount of Each Type in Cubic Yards. New Pad: 140,000 cu yd gravel fill (140,000 cu yd Wetlands, 0 cu yd Uplands) Access Road: 125,000 cu yd gravel fill (95,000 cu yd Wetlands, 30,000 cu yd Uplands) Tie-in Pad: 1,500 cu yd gravel fill (1,500 cu yd Wetlands, 0 cu yd Uplands) Pipeline Vertical Support Members: 50 cu yd gravel fill (50 cu yd Wetlands, 0 cu yd Uplands) Total Anticipated Fill: 266,550 cu yd gravel fill (236,550 cu yd Wetlands, 30,000 cu yd Uplands) Box 22: Surface Area in Acres or Other Waters Filled (Acres or Linear Feet). New Pad: 17.22 acres Wetlands, 0 acres Uplands Access Road: 12.8 acres Wetlands, 4.4 acres Uplands Tie-in Pad: 0.36 acres Wetlands, 0 acres Uplands Pipeline Vertical Support Members: 0.05 acres Wetlands, 0 acres Uplands Total Anticipated Footprint: 30.43 acres Wetlands and 4.40 acres Uplands Box 23: Avoidance, Minimization, and Compensation The US Army Corps of Engineers manages natural resources to avoid, minimize, and compensate for impacts to wetlands. All Federal mitigation policies set a net benefit goal or, at a minimum, a no net loss goal for natural resources when allowed by existing statutory authority. Below we outline the steps we have taken to avoid, minimize, and compensate the impacts to wetlands. Avoidance: The following factors were incorporated into the project: Avoided crossing as many lakes, ponds, and streams as possible Limit anadromous stream crossing to a winter ice bridge so no permanent fill will be placed in to anadromous streams. Will use existing material sites and local existing roads to the extent possible Will work from an ice road to build access road and pipeline Utilize an ice road for transport of gravel to construct the project. Minimization: The following factors were incorporated into the project:

Minimized length of road and pads Routed road to follow along degraded Tractor Tracks to the maximum extent practicable. Field studies in 2016 identified that approximately 4.4 acres of this route are already uplands. Designed impacts to be the smallest possible while still accomplishing the project. Use approximate side slopes of 2:1 for gravel road and pad to limit footprint in wetlands Winter construction will minimize impacts to migratory birds Compensation: Hilcorp has investigated compensatory mitigation. Based on the discussion below, Hilcorp has not identified any means of practicable compensatory mitigation. Through Avoidance and Minimization, Hilcorp has worked to limit the impact to wetlands. Hilcorp s due diligence analysis of methods of compensation is described in detail below. Approved Wetlands Mitigation Bank No approved wetlands mitigation bank with a service area for the area of impacts is currently available. In Lieu Fee Agency The Conservation Fund was contacted on March 10, 2016 to inquire on the availability of credits. They have not confirmed that they are selling credits at this time. The Conservation Fund is the only In Lieu Fee agency in this watershed. Preservation The lands in the area are state and tribally owned. State lands cannot be used for preservation, as they are identified for resource development. This means there are state constitutional protection restrictions on the perpetual protection instrument which would be required for preservation. There are currently no parcels of land available in the watershed for purchase through the Alaska Department of Natural Resources. We investigated the use of tribal lands. According to communication with Arctic Slope Regional Corporation s Director of Land Management and Enforcement, at this time there are no tribal lands for sale in the area. Finally any preservation of lands in the watershed would appear not to have significant threat that would satisfy the regulatory requirements. Creation/Restoration Wetland creation/restoration on the North Slope is impracticable because wetlands are primarily developed though permafrost action (taking hundreds of years to develop) and the growing season is only 60 days. This prevents any reasonable success goals from being achieved that would show

replacement of the lost functions, as required by regulation. As shown through the preservation strategy, the perpetual protection instrument that would be required cannot be accomplished because of land ownership and constitutional protection restrictions. Out of kind mitigation (working with state/private/federal owners) is not considered practicable because: Those projects (e.g. culvert replacement, DOT road reinforcement) are a compliance issue and specifically excluded from gaining credits through compensatory mitigation. Ownership, long term maintenance, adaptive management strategies, financial assurance mechanisms, and perpetual conservation instruments would render any alternatives as being impracticable. Box 26: Other Certificates AGENCY PERMIT STATUS USACE Section 404 USEPA SPCC Plan To be revised USFWS ADNR Division of Oil and Gas ADNR Division of Mining, Land, and Water Endangered Species Act Section 7 Consultation Letter of Authorization Unit/Lease Operations Approval Plan of Development Material Sales Contract / Mining and Rehabilitation Plan Miscellaneous Land Use Permit Alaska Pollutant Discharge Elimination System (APDES) Permit Temporary Water Use Permit / Water Rights Existing / Existing To be revised Existing ADNR State Historical Preservation Office Tundra Travel / Ice Road Construction General Permit Archaeological Clearance Existing ADFG Title 16 Fish Habitat Permit ADEC NSB Oil Discharge Prevention and Contingency Plan Certificate of Reasonable Assurance Water Quality Certification- Concurrent with 404 Development Permit Ice Road Construction Permit Form 600 Form 500 To be revised Existing

PROJECT DESCRIPTION FOR THE MILNE POINT UNIT MOOSE PAD DEVELOPMENT AUGUST 2016

This page intentionally left blank.

Project Description Moose Pad Development TABLE OF CONTENTS 1.0 INTRODUCTION... 1 2.0 PROJECT DESCRIPTION... 1 2.1. Moose Pad... 1 2.2. Access Road... 1 2.3. Pipelines and Tie-In Pad... 2 2.4. Moose Pad Infrastructure... 2 3.0 PROJECT CONSTRUCTION AND OPERATIONS... 3 3.1. Ice Road... 3 3.2. Gravel Placement... 3 3.3. General Operations during Construction... 4 4.0 PROJECT SCHEDULE... 5 5.0 AUTHORIZATIONS ANTICIPATED... 5 Figure 1 Figure 2a-2e Figure 3a-3d LIST OF FIGURES Project Vicinity Map Project Plan View Maps Typical Road, Culvert, and VSM Design Diagrams Page i August 2016

Project Description Moose Pad Development This page intentionally left blank. Page ii August 2016

Project Description Moose Pad Development 1.0 INTRODUCTION The Schrader Bluff reservoir on the North Slope is estimated to contain 10 to 20 billion barrels of oil reserves. Hilcorp Alaska, LLC (Hilcorp) plans to expand oil resource development within the Milne Point Unit (MPU) Schrader Bluff reservoir by constructing a new pad and corresponding access road. In addition, Hilcorp plans to expand the existing pipeline, electrical, and communication in the western portion of MPU to accommodate additional future oil production. The proposed new pad (Moose Pad) will provide Hilcorp access to approximately 7 square miles of undeveloped oil reserves within the MPU. Initial development plans for Moose Pad will include approximately 44 new wells to be developed using directional drilling technology. To increase the amount of crude oil that can be extracted from the Schrader Bluff reservoir, the new wells will include both oil production wells and enhanced oil recovery (EOR) injection wells. 2.0 PROJECT DESCRIPTION The Moose Pad Development Project will occur within the MPU lease area at Alaska Division of Lands (ADLs) 025514, 025515, 025509. MPU is currently operated by Hilcorp and ownership is divided between Hilcorp (50%) and BP Alaska, Inc. (BPXA) (50%). The Moose Pad Development Project will involve the construction of Moose Pad and an access road located on the west side of Milne Point Road (Figure 1). To support new oil production wells on Moose Pad, an oil production pipeline, a small tie-in pad, and new pad infrastructure will also be installed. A total of 266,550 cubic yards of gravel fill into 34.83 acres of footprint (30.43 acres of wetlands and 4.40 acres of uplands) is anticipated to be placed for all components of the project. Additional details for each of the Moose Pad Development Project components are described in this section. 2.1. Moose Pad As shown in the attached Figure 1, the approximate location for the proposed Moose Pad will be within Sections 13 and 14, Township 13 North, Range 9 East, Umiat Meridian, Alaska with an approximate pad center at latitude 70 29 12 N and longitude -149 43 44 W (NAD83). The exact location of Moose Pad and the access road will be dependent on the results of environmental and topographical evaluations. The Moose Pad footprint will be approximately 1,500 ft. long by 500 ft wide at the base, and 1,480 ft. by 480 ft. at the top (17.22 acres) requiring approximately 140,000 cubic yards (Cu yd) of gravel fill. Initial plans for Moose Pad include drilling approximately 44 new wells with a well layout similar to the existing well layout on MPU H Pad. The orientation for Moose Pad is proposed to be in an east-west direction to correspond with the prevailing winds in the area. This orientation will greatly facilitate snow removal on the pad during winter months. 2.2. Access Road An access road will be constructed to connect Moose Pad to the existing Milne Point Road between MPU C Pad and L Pad. The proposed access road will be located within Sections 17 and 18, Township 13 North, Range 10 East, Umiat Meridian, and Section 13, Township 13 North, Range 9 East, Umiat Meridian, Alaska. Long-term field personnel interviews, historical photos, and field verification have determined an area of previously disturbed tundra in the vicinity of the Moose Pad Development Project. This area, known as Tractor Tracks consists of 4.4 acres of uplands complex, which will be used for the Page 1 August 2016

Project Description Moose Pad Development access road footprint to the maximum extent practicable to minimize impacts on intact wetlands. The final route for the access road will be determined following a complete review of available environmental and topographical data. The proposed access road footprint is estimated to be approximately 2.83 miles (14,980 feet) long and 35 ft. wide at the top and 55 ft. wide at the base (17.20 acre total footprint). Within the proposed 17.21 acre access road footprint, 4.40 acres of uplands tractor tracks have been identified, leaving 12.80 acres of wetlands to be filled during access road construction. Construction of the access road is estimated to require approximately 125,000 Cu yd of gravel fill. Specific road design characteristics will be determined once a final route is determined however; a typical road design cross section is provided in Figure 3a. The Moose Pad will be tied into existing power and communication sources in MPU by installing power and fiber optic cables within the bed of the access road. In addition, to avoid disrupting the natural drainage and to allow fish passage, culverts will be sized accordingly and installed within the roadbed. To provide for fish passage at stream crossings, culverts will be designed based on recommendations of a consulting hydrologist and Alaska Department of Fish and Game personnel. A typical design for culvert installation in a roadway is shown in Figure 3b. 2.3. Pipelines and Tie-In Pad Development of the Schrader Bluff reservoir at Moose Pad will require the addition of a new oil production pipeline to transport 3-phase flow back to the Central Facilities Pad (CFP). The new pipeline will be installed adjacent the access road to the maximum extent practicable to facilitate future pipeline maintenance and inspection activities. The new oil production pipeline will be installed on vertical support members (VSMs) designed similar to the existing VSMs along Milne Point Road. The typical design for the VSMs is shown in Figure 3c. Pipeline VSM installation is anticipated to cover approximately 0.05 acres of footprint and utilize an additional 50 Cu yds. of gravel fill. The new oil production pipeline will transition from VSMs to a buried pipeline to cross the Milne Point Road and will return to VSMs to tie into the common carrier pipeline on the east side of Milne Point Road. At this time, water or gas injection pipelines are not anticipated to be required at Moose Pad. The new oil production pipeline will require the addition of a small tie-in pad to allow access to the pigging equipment. This new tie-in pad will be approximately 50 ft. by 140 ft. at the top and 60 ft. by 160 ft. at the base (0.36 acres) 2:1 side slopes, and is estimated to require approximately 1500 Cu yd of gravel fill. The final location of the tie-in pad will be dependent on the final routes selected for the access road and oil production pipeline. Current plans indicate the tie-in pad will likely be constructed at the intersection of Milne Point Road and the proposed Moose Pad access road. A pig launcher building approximately 10 ft. by 30 ft. (300 sqft.) will be constructed at the tie-in pad to facilitate pigging operations at the pipeline intersection. Power and fiber optic cables installed within the access road bed will also tie into existing MPU power and communication systems at the tie-in pad. 2.4. Moose Pad Infrastructure The Moose Pad Development Project will require specific infrastructure to be installed on the pad including: a test separator building, a pig launcher building, and an electric submersible pump (ESP) drive building. In addition, future operations at Moose Pad are anticipated to require two water source wells to support the EOR injection wells. Water source wells will utilize canned pumps and will be permitted prior to drilling. At this time, a water disposal well is not anticipated for Moose Pad. Any liquid wastes generated at Moose Pad will be manifested and transported to an approved disposal facility in accordance with the Alaska Waste Disposal and Reuse Guide, also referred to as the Red Book. Page 2 August 2016

Project Description Moose Pad Development 3.0 PROJECT CONSTRUCTION AND OPERATIONS Construction of the Moose Pad Development will include the construction of an ice road, installation of the oil production pipeline and placement of gravel fill. Hilcorp proposes to utilize standard winter construction techniques for the North Slope. Additional details for each of these construction and operational components are described in this section. 3.1. Ice Road Access to the Moose Pad Development area will require the construction of an approximately 1.5 mile long ice road from the Ugnu/E-Pit Mine Site to the Moose Pad Project location, and then approximately 2.83 miles long alongside the proposed access road corridor. The ice road will be utilized to protect the tundra from truck and equipment traffic during access road construction. The timing for the construction of the ice road will correspond with state and local approval for tundra travel which is determined using accumulated snowfall and soil temperature. The ice road will be constructed approximately 12 thick (or deemed sufficient to protect the underlying tundra), 50 wide. The proposed design for the ice road design is shown in Figure 3a. The oil production pipeline will be installed on VSMs using the ice road for access to the tundra. VSMs will be designed similar to those existing along Milne Point Road and will be set in a sand slurry. Cuttings will be removed and hauled to an approved disposal site or utilized in the sand/water slurry for VSM setting. Water sources used for ice road construction and pipeline hydrotesting will be obtained from nearby permitted tundra lakes and ponds. Snow will be prepacked to establish travel corridors to and from water sources as well as alongside the proposed access road route. Additional snow required will be stockpiled from surrounding lakes and utilized as needed. 3.2. Gravel Placement The Moose Pad Development project will require approximately 266,550 Cu yd. of gravel which will be obtained from the Ugnu/E-Pit Mine Site under the existing Material Sale Contract with the Alaska Department of Natural Resources, Division of Mining Land and Water. If for any reason, material sources are not available, Hilcorp will utilize material from the Milne Point Mine Site as a secondary option. Hilcorp will begin mining operations at the Ugnu/E-Pit Mine Site during ice road construction operations in preparation for gravel placement following ice road completion. Mining operations at the Milne Point Mine Site may include blasting during winter months. Gravel will be placed with a minimum compacted depth of 5 feet (ft) and will utilize a 2:1 edge slope. Culverts will be installed ahead of the road construction crews and using the ice road for access. Construction of the first ¼ mile of the access road may begin prior to the completion of the ice road. Trucks hauling and placing gravel fill material will begin placing gravel fill from the Milne Point Road and continue moving outwards as new material is placed and compacted. Dozers and sheep s foot rollers will be used to grade the material in 1.5 ft 2 ft lifts and compact material prior to truck access. Trucks hauling gravel fill material and additional support equipment will require additional space to turnaround after the initial ¼ mile of the access road is constructed. Construction activities will be coordinated to allow trucks and equipment to begin using the ice road to turnaround once the ice road reaches its full thickness. Page 3 August 2016

Project Description Moose Pad Development Gravel fill material will be compacted at the time of placement. Because construction activities will be occurring during winter months, the road bed and pad surface will be excavated and re-compacted during the summer months to ensure adequate compaction. 3.3. Construction Quantities The following table summarizes estimated construction footprint and fill quantities to wetlands and uplands for the Moose Pad Development Project: Project Component Total Footprint (acres) Wetlands Footprint (acres) Uplands Footprint (acres) Total Fill (Cu yds.) Wetlands Fill (Cu yds.) Uplands Fill (Cu yds.) Moose Pad 17.22 17.22 0 140,000 140,000 0 Access Road 17.20 12.80 4.40 125,000 95,000 30,0000 Tie-In Pad 0.36 0.36 0 1,500 1,500 0 Pipeline 0.05 0.05 0 50 50 0 VSM s Totals 34.83 30.43 4.40 266,550 236,550 30,000 Note: All footprints and gravel quantities are estimated, and represent the most accurate information available for project planning purposes. Actual footprints and volume quantities may vary slightly based on local topography, gravel source quality, and compaction, as well as various other environmental and physical factors present during the extraction and installation of gravel resources. 3.4. General Operations during Construction During construction, existing facilities and infrastructure at MPU will be used for housing of construction crews and for mobilizing/transporting materials, supplies, and other equipment. Communications from the site during construction operations would be by radio and/or cellular phone. Portable toilets will be provided on site for construction workers. No food waste or other material that could attract wildlife will be stored at the site. Any C&D or MSW wastes generated on site will be bagged up and hauled to the North Slope Borough waste disposal facility on a regular basis. Any fuel tanks and/or generators utilized at the construction site would be located and contained within a bermed, lined, impermeable area sufficient to contain 110 percent of the largest tank capacity. The fuel storage capacity would be that required to meet daily operational and bulk re-supply needs during construction activities. During winter months, drifting snow will be cleared as needed on the pad location or as weather permits. Snow will be removed from the pad to the nearest available area permitted for snow storage. Page 4 August 2016

Project Description Moose Pad Development 4.0 PROJECT SCHEDULE Hilcorp plans to submit the permit application package to agencies in August 2016. Following agency approval, ice road construction and mining operations are anticipated to begin December 15, 2016. Pad and access road construction would follow ice road construction and would begin approximately January 15, 2017. Pad and access road construction is anticipated to take approximately three months to complete. Following spring thaw, the pad surface and road bed will be excavated and re-compacted during the month of July 2017. Pad infrastructure will be in installed following pad completion. 5.0 AUTHORIZATIONS ANTICIPATED Hilcorp will conduct the required environmental studies and obtain the appropriate approvals prior to beginning construction. The following authorizations are anticipated: AGENCY PERMIT STATUS USACE Section 404 USEPA SPCC Plan To be revised USFWS ADNR Division of Oil and Gas ADNR Division of Mining, Land, and Water Endangered Species Act Section 7 Consultation Letter of Authorization Unit/Lease Operations Approval Plan of Development Material Sales Contract / Mining and Rehabilitation Plan Miscellaneous Land Use Permit Alaska Pollutant Discharge Elimination System (APDES) Permit Temporary Water Use Permit / Water Rights Existing / Existing To be revised Existing ADNR State Historical Preservation Office Tundra Travel / Ice Road Construction General Permit Archaeological Clearance Existing ADFG Title 16 Fish Habitat Permit ADEC NSB Oil Discharge Prevention and Contingency Plan Certificate of Reasonable Assurance Water Quality Certification- Concurrent with 404 Development Permit Ice Road Construction Permit Form 600 Form 500 To be revised Existing Page 5 August 2016

Project Description Moose Pad Development This page intentionally left blank.

Project Description Moose Pad Development FIGURES

Leavitt Island r Spy Islands Pingok Island C h u k c h i S e a Wainwright! Barrow Jones Islands! B e a u f o r t S e a Nuiqsut!!! Deadhorse Kaktovik! Map Extent Bertoncini Island NW MILNE 1 S i m p s o n L a g o o n Milne Point Oliktok Point NIKAITCHUK OPP MPU-F Kavearak Point KRU-3R MPU-L N o Po MPU-C NIKAITCHUQ OC OLIKTOK CAMP i n t Creek MPU-D KRU-3Q KRU-3O U g n u r a v i k R i v MPU-A MPU-B e r MPU CFP KRU-O2-OB1 MINE SITE E MPU-E MPU MINE SITE Project Area Facility Primary Road Pipeline VICINITY MAP Moose Pad USACE Permit NAD83, Alaska State Plane Zone 4 SCALE: 0 0.5 1 2 Miles FIGURE: AES-RTS: 16-007-007.mxd, 08/10/16 1

Pad width = 500' at base (including shoulder) Access Road width = 55' at base Pad length = 1500' at base (including shoulder)

Access Road width = 55' at base

Access Road width = 55' at base

Access Road width = 55' at base

Tie In Pad width = 60' wide x 160' long at base Access Road width = 55' at base

~5' Drivable Access Road Width 30' Proposed Access Road Cross Section 4" Thick Pit Run of Max. 6" Rock Fill Geotextile Liner Ice Road Width 50' Proposed Ice Road Cross Section Grade Fig Typical Road, Culvert, and VSM Design Pipeline at Anchor/Saddle Cross Beam Vertical Support Member (VSM) Figure a: Typical Road Design Cross Sections Figure b: Typical Culvert Installation Design Figure c: Typical VSM Design

Fig Typical Pad Design Working Pad Width 480 Figure 3d: Typical Pad Cross Section