COLUMN SPACING TRUCK ACCESS/DOORS EAVE HEIGHT UTILITIES PARKING & DRIVES

Similar documents
Seasons Business Center New Construction!

Property Offering. Cold Storage Warehouse 4501 Hitch Peters Road Evansville, IN 47711

BOWIE LEARNING CENTER

New Beautifully Designed Office Condominium Complex. Heading

Property Condition Assessment

3600 Army Post Road Des Moines, IA 50321

Manufacturing Facilities Proposal

GREAT PLAINS BUSINESS PARK

The facility is approximately 439,350 square feet, located on a acre parcel on Wood Dale Road in Wood Dale, Illinois. 439,350 Square Feet

NEW DEVELOPMENT COMPLETION 1ST QTR 2018

Building Inspection Report

LASALLE - BACKUS EDUCATION CAMPUS

m 2 Distribution Center Bergen op Zoom

Edouard AVANT GROVE U I C U I C. Modern Living Made Easy uichomes.com

SPACE TYPE: PHYSICAL FITNESS (EXERCISE ROOM)

BEAVER MINES STORE 602-1ST AVENUE SOUTH BEAVER MINES

General Conditions 39,522 5, ,292 26,050 75,921 1, Labor hours

REQUIREMENTS FOR SUBSTANTIALLY DAMAGED AND SUBSTANTIALLY IMPROVED STRUCTURES

HURON PUBLIC WORKS BUILDING HURON, SOUTH DAKOTA BID NO R

For Sale/For Lease Refrigerated Warehouse 4602 Domain Drive Menomonie, WI 54751

ARCHITECTURAL EXPANSION JOINT PRE-INSTALLATION INSPECTION

PLUMMER ELEMENTARY SCHOOL

LOGAN SCHOOL SCHOOL WITHOUT WALLS AT LOGAN

CENTRAL GREAT PLAINS SERIES

FOR SALE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE STATE-OF-THE-ART MANUFACTURING/WAREHOUSE. 950 South Service Rd. Stoney Creek, ON

Construction Summary

TERMINAL BUILDING EVALUATION

The Ultimate Home Value with Quality,

Exhibit A Declaration of Restrictions Development and Design Standards For Ridge Park Estates

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

CHARTRES COURT Washington Avenue Houston, Texas ChartresCourtHouston.com CHARTRES COURT LLC

Feasibility Report. Property Inspection Engineers, Inc. (248) Property Address. 405 Fairgrove Royal Oak, MI.

MODULAR BUILDING SPECIFICATIONS

THE RESTORE LOUISIANA REIMBURSEMENT ESTIMATE

standard features Power Exhaust Fans w/light - Both Baths GFCI Receptacles Upgrade Light Fixture - Bath 1 Vanity - Per Lav GFCI Receptacles

Power Zone Center. Your solution for power distribution and control systems

A/E Design Deliverable Checklist

CARL E. SCHLUTER ELEMENTARY SCHOOL

Cheldelin Middle School

Budget Estimate Basic Tenant Improvement

The parking lot is in varying condition depending upon location. The vehicular and pedestrian traffic flow is generally good.

SECTION (Master Template Final-05) ELECTRICAL BOXES. A. Provide boxes for electrical equipment and wiring devices as follows:

2 Main School Building BLDG-124A Building Purpose Building Area Administrative, Classrooms, Cafeteria and Gymnasium 61,905 SF Inspection Date June 28-

BUILDING PERMIT APPLICATION

Timber Trail Plan LOT BEDROOMS 4.5 BATHROOMS 2,974 FT 2 Land/Home Package OFFERED BY: SUNRIVER REALTY LINDA DORR, BROKER

3 CITY CENTER 180 SOUTH CLINTON AVENUE Rochester, NY 14607

Pembridge The Country Club Collection TOWNHOMES AT CRYSTAL SPRINGS

CONSTRUCTION AND RENOVATION FUNDED BY THE CFI EXAMPLE OF A DETAILED COST ALLOCATION METHOD

The following is required for a complete permit submittal for each unit.

Material Report - [Trade Contractors] for plan: [E:\SoftPlan14\Projects\Sample Drawings.spf\2-Storey sqft.spf] Page 1 of 5

One and Two Family Additions

A Design-Build Project: Repairing the Courthouse Square Complex

CHAPTER 26 PLASTIC SECTION BC 2601 SECTION BC 2603 GENERAL FOAM PLASTIC INSULATION

THE STRATA UNIT May 25, 2008

RESIDENTIAL COMPONENT TECHNOLOGY Mobile Manufactured Housing

Rebuilding your Home after the storm? Adding on, renovating, or remodeling your home? Here's information YOU need to know about the 50% Rule.

HISTORIC PLAN, FLOOR PLANS, AERIAL PHOTOS

DESIGN AND CONSTRUCTION STANDARDS. Section 2: Standards for Specific Categories of Work. Laboratory Standards

STRUCTURAL ABBREVIATIONS S-001 GENERAL NOTES CONCRETE MASONRY NOTES DESIGN NOTES SOF NSWG-10 UAS SUPPORT FACILITY FY 2016 MILCON P-225

e a s t 2303 Dulles Station Blvd., Herndon, VA BASE BUILDING SPECS

The following is required for a complete permit submittal for each unit.

Total Building Area: 1964 Construction 30,140 square feet 1976 Construction 36,787 square feet 66,927 square feet

CITY OF HAGERSTOWN PLANNING & CODE ADMINISTRATION DEPARTMENT. Submittal Requirements

Wellington Manor Series

Mount Vernon Elementary School Grades PK 5

Sri Ganesha Temple HTNT Construction Update (June, 2016) Copyright All Rights Reserved.

RESIDENTIAL CONSTRUCTION New Dwellings and Additions

CATAMARAN TOWER - 1 Seef Area Plot 19, 20

Typical Finished Basement Details

2014 Commercial Plan Submittal Checklist

A. Submit the following in addition to the standard requirements.

Applying for Permits to build a new house in Linn County

Project Information Session / Meet and Greet # 3

Paul Laurence Dunbar Career Academy High School 3000 S King Dr Chicago, IL 60616

Universal Design Standards

Features & Amenities. EXTERIOR FINISHES COMMUNITY FEATURES

Basement Renovation Guide For Residential Dwellings

SITE PLAN AND ARCHITECTURAL REVIEW APPLICATION

7663 N. San Fernando Rd. Burbank Airport Commerce Center Burbank, CA 91505

Hansen Pole Buildings Planning Guide. Toll Free / Toll Free FAX

HOUSE REPAIRS & RENOVATIONS BUILDING PERMIT REQUIREMENTS

ELKINS, WEST VIRGINIA

INFORMATIONAL PACKAGE ACCESSORY RESIDENTIAL BUILDINGS (INCLUDING DETACHED GARAGES, STORAGE BUILDINGS & WORKSHOPS)

CODE COMPLIANCE PLAN REVIEW PROCEDURES

2018 APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)

CITY OF CEDAR FALLS DEPARTMENT OF DEVELOPMENTAL SERVICES INSPECTION SERVICES DIVISION PHONE Residential Accessory Structures

The Oaks at Powers Ferry. A Townhome Community

DeKalb County School District/Stadiums Avondale Stadium Final School Assessment Report May 20, 2016

COLONIAL PLANS. 708 North Street US Highway Route 1 Houlton, Maine (207)532,2444

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Green Remodeling Illustrations GREEN REMODELING ILLUSTRATIONS GREEN BUILDING GUIDELINES FOR HOME REMODELING

BUILDING PERMIT APPLICATION PACKAGE

OWNER S REPONSIBILITIES AND PREPARATION INSTRUCTIONS. Schedule "C"

CANNING WAREHOUSE CANNERY DISTRICT BOZEMAN, MT

Building Services. Experienced Professionals. Reliable Service. Quick Response.

Facilities Condition Assessment Qualcomm Stadium

TOWN OF PORT ROYAL BUILDING CODES DEPARTMENT Building Permit Submittal Requirements

RESIDENTIAL BUILDING REQUIREMENTS

Applying the Building Code During Design

Transcription:

LOCATION & ACCESS Akron Business Centre I and II 4.2 acre site at Opportunity Parkway (Wooster Avenue) & Pier Drive Located in Downtown Akron Adjacent to Innerbelt Expressway (Route 59) and just north of 1-77 and I-76 Firestone Business Centre I and II 6.3 acre site located at the intersection of Firestone Parkway and Emerling Ave. One and a half miles south of I-76, one mile west of I-77 and one mile north of I-277 PROPERTY DATA Akron Business Centre I: Akron Business Centre II: Firestone Business Centre I: Firestone Business Centre II: EAVE HEIGHT 20 35,267 S.F. 37,900 S.F. 47,500 S.F. 47,500 S.F. COLUMN SPACING Akron Business Centre I: 25 x 47-6 & 25 x 52-6 Akron Business Centre II: 25 x 45 & 25 x 50 Firestone Business Centre I & II: 25 x 50 TRUCK ACCESS/DOORS Truck docks with insulated metal industrial doors Drive-ins with insulated metal industrial doors Personnel: 20-gauge flush hollow metal door ROOF 2 standing seam, 24 gauge aluminized steel, single-sloped with 4 vinyl faced insulation (U =.08; R = 13) SPRINKLER SYSTEM Wet / Ordinary hazard HVAC Warehouse: gas fired unit heaters (Heating: 60 F temperature difference at 0 F outside) Office: Gas fired furnace with electric air conditioner, (Heating: 68 F temperature difference at 0 F outside and Air Conditioning: 15 F temperature difference at 90 F outside) OFFICE AREAS Partitions: 5/8 drywall on 3-5/8 metal studs Ceiling: 2 x 4 acoustical tile on suspended T-grid Floor: covered with commercial grade carpeting or vinyl tile (VCT) Entrance Doors: glass with aluminum tubular frames and bronze finish Interior Doors: 1-3/8 flush birch doors Windows: insulated glass with aluminum tubular Plumbing: Water closet and surface mounted lavatory PARKING & DRIVES Automobile Parking: 6 concrete Automobile Parking: 4 concrete and asphalt (Firestone Only) Truck Drives / Ramps: 7 concrete UTILITIES Electric: Ohio Edison (Akron Business Centre - 208V/3-phase) Electric: Ohio Edison (Firestone Business Centre - 277/480V, 3 phase, 4 wire) Gas: Dominion East Ohio Telephone: AT&T Water: City of Akron Sanitary Sewer: City of Akron Storm Sewer: City of Akron EXTERIOR WALLS Akron Business Centre I and II Brick and split face block system Dryvit finish concrete block and metal studs Firestone Business Centre I and II Face brick and concrete block system 3 interlocking metal panels with a pebble-grained, fluoropolymer finish Insulated glass curtain wall framed in tubular bronze aluminum FLOOR 5 reinforced concrete WAREHOUSE LIGHTING Fluorescent fixtures (25 F.C.)

FOR LEASE 22,695 Sq. Ft. Warehouse - Office 1500 Firestone Parkway, Akron, Ohio Individual Space Specifications Office Area: 2,696 SF Warehouse Area: 19,999 SF Total Area: 22,695 SF Unit Number: Truck Docks: Drive-in Doors: E - H Two (2) 8 x 8 overhead doors & Three (3) 8 x 10 ovherhead doors One (1) 8 x 9 overhead door & Two (2) 12 x 14 overhead doors Eave Height: 20 Column Spacing: 25 x 50 Electricity: Lighting: Sprinklers: 277/480 Volt, 800 Amp, 400 Amp, 100 Amp, 3 phase, 4 wire service, 30 KVA & 25 KVA transformer; 120/208 Volt, 100 Amp service High lumen T8 lamps and instant start, electronic ballasts: Energy efficient (50% less consumption than traditional T12 lighting) Only 7% luminary depreciation over the life of the bulb Wet / Ordinary Hazard Estimated Operating Costs: $1.69/SF/YR based on actual costs for 2014. Operating cost estimates are based on Real Estate Taxes, Building Insurance, Common Area Maintenance and Property Management Fees for the year and the square footage listed above. Costs may vary in the future. Common Area Maintenance includes only the maintenance items performed by the owner for the benefit of the entire project, such as snowplowing, lawn care, backflow prevention test and general exterior maintenance, etc. Mark Ray, Vice President Tom Blaz, Leasing Associate 216-351-7976, ext. 244 216-351-7976, ext 273 markray@fogg.com tblaz@fogg.com fogg.com RAY FOGG CORPORATE PROPERTIES, LLC 981 Keynote Circle, Suite 15 Cleveland, Ohio 44131 The information contained herein is from sources deemed reliable, but no warranty or representation is made to the accuracy hereof.