CONDITIONAL USE PERMITS (CUP):

Similar documents
ARTICLE XIII. COMMUNICATION TOWERS

1.0 Purpose. 2.0 Scope

8.8 WIRELESS COMMUNICATION FACILITIES IN DOUGLAS COUNTY THE COUNTY BOARD OF SUPERVISORS OF THE COUNTY OF DOUGLAS DOES ORDAIN AS FOLLOWS:

LEGIS TIVE IMPLEMENTATION GUIDELINES

ARTICLE X TRANSMISSION TOWER REGULATIONS

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

9.2 Definitions. The following terms are defined, for purposes of Section 9, as follows:

SEWRPC Model Zoning Ordinance ZONING REGULATIONS FOR WIND ENERGY SYSTEMS

TELECOMMUNICATION STRUCTURES

New York State Unified Solar Permit Expedited Solar Permit Process for Small-Scale Roof-Mounted Residential and Commercial Solar Electric

Narrative for Conditional Use Permit Application Proposed AT&T Wireless Communications Facility Koochiching County CUP#1103 Introduction

CHAPTER 43 WIRELESS TELECOMMUNICATIONS TOWERS

Addition to Section 4 - Special Use Regulations

ZONING ADMINISTRATOR AGENDA

ARTICLE XXIII SMALL WIND ENERGY SYSTEMS 85

City of Kitchener. Telecommunication Tower and Antenna Protocol. October 1, Table of Contents. Site Selection Design & Landscaping

WIND ENERGY CONVERSION SYSTEMS

ARTICLE 16 - WIND ENERGY CONVERSION FACILITIES

B U I L D I N G P E R M I T A P P L I C A T I O N

Environmental Information Form

CHAPTER 28 WIND ENERGY CONVERSION SYSTEMS (WECS)

WIND ENERGY CONVERSION SYSTEMS APPLICATION

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT

APPLICATION FOR SOLAR PERMIT

COMMUNITY DEVELOPMENT

Administrative Hearing Staff Report. CLEARWIRE XEROX BUILDING CONDITIONAL USE PLNPCM East 500 South Hearing date: November 12, 2009

Verizon Wireless Collocation Guidelines Washington/Baltimore/Virginia

Radiocommunication and Broadcasting Antenna Systems

# 5 ) UN THREE CUPS YARD NORTH AMERICA CULTIVATION FACILITY SPECIAL USE PERMIT PUBLIC HEARING

RESIDENTIAL BUILDING PERMIT PROCEDURES

PLANNING & COMMUNITY DEVELOPMENT DEPARTMENT STAFF REPORT. Fair Oaks / Orange Grove Specific Plan - Limited Commercial District 3, Sub-district "d.

BUILDING ACTIVITY APPLICATION PACKAGE

SOLAR PANEL INSTALLATION NYC Department of Buildings

The requirements set forth in this Section shall govern the construction and/or installation of all Renewable Energy Systems:

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

CITY OF HOMESTEAD Utility Rights-of-Way Use Permit Application

Nance County Zoning Regulations for Wind Energy Conversion Systems

UNIVERSITY OF MASSACHUSETTS AMHERST POLICE DEPARTMENT

Residential Sewer Backup Prevention Program

ADMINISTRATIVE DESIGN REVIEW (ADR) An applicant s guide to the process

Council Agenda Report

CMPA Campus Wide Solar Array Installation 2 of 4

Tom Taormina, K5RC Amateur Radio Emergency Coordinator Storey County NV

CHAPTER 19. TELECOMMUNICATIONS FACILITIES AND ANTENNAS

Commercial Tax Abatement

DR-15-11/LLA Staff Presentation for ConAM Properties LLC applications for Design Review and Lot Line Adjustment

EARLY START PERMITS. Site cleaning, including removal of any existing asphalt, and/or concrete slab, Excavation work under the building footprint,

11 April 8, 2015 Public Hearing

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

REPORT TO PLANNING AND DESIGN COMMISSION City of Sacramento

Application Requirements for obtaining a Building Permit

ARBORIST REPORT. Report History: Report 1 New design

SOLAR ENERGY SYSTEMS APPLICATION

1 Customer and contact information

7. EXCAVATION IN PUBLIC STREETS The E-Permit & U-Permit

City of Centerville Building, Zoning & Code Enforcement Department

NY State Unified Solar Permit

Permit Requirements: Building Codes: The City of Clanton has adopted the following codes which are enforced by the Building Department:

ONTARIO BUILDING CODE STANDARD PRACTICE

Airport Master Plan Update (AMPU) Phase 2. Scope of Work

COUNTY OF SAN JOAQUIN

DEVELOPMENT SERVICES PO Box 1110 Tampa, FL Date: May 12, Interested Parties. John L. Barrios, CBO, Building Official

TOWN OF DEWITT PLANNING AND ZONING PERMIT REQUIREMENTS FOR DECKS

WE MUST HAVE 72 HOURS NOTICE. Phone

City of Kingston Engineering Department. Application for New Outdoor Patio. Note: Agreement:

# 7 ) UN MY PLACE HOTEL SPECIAL USE PERMIT PUBLIC HEARING

MUNICIPAL OFFICES 1481 EAST COLLEGE AVENUE, STATE COLLEGE, PA TELEPHONE: FAX:

Franklin County Communique to the Planning Board

BUILDING CODES & DESIGN CRITERIA

ADOPTION OF CHAPTER 120 (TREE CONSERVATION ORDINANCE) OF THE 1976 CODE OF THE COUNTY OF FAIRFAX, VIRGINIA

THE CORPORATION OF THE TOWNSHIPSHIP OF ADELAIDE METCALFE

Canadian Solar Developers Ltd.

C O M M E R C I A L W I N D E N E R G Y R E G U L A T I O N S - R E V I S E D : 3 / 3 0 / 1 6

OWNER S AFFIDAVIT. I, certify that I am the owner of the property described as: ADDRESS: LOT: BLOCK: SUBDIVISION:

SIGN AREA (SQ. FT.): SIGN DIMENSIONS: STREET FRONTAGE OF PROPERTY (ft):

Request for Qualifications (Design-Build Contract) State of Ohio Standard Forms and Documents

APPLICATION FOR PORCH / DECK PERMIT

City of Jacksonville Development Guide Building Permits

# 17 ) UN DESERT GREEN FARMS SPECIAL USE PERMIT EXTENSION OF TIME PUBLIC HEARING

SECTION 5 EXCEPTIONS AND MODIFICATIONS

MT. PLEASANT, MICHIGAN

Reems Creek Homeowners Association, Inc. P.O. Box 1546, Weaverville, NC

Marbella Isles Homeowners Association, Inc.

Document B101 TM. Standard Form of Agreement Between Owner and Architect

Specifications for Asphaltic Paving of Clark Road in Salem Township and Ludlow Road in Union Township both in Champaign County, Ohio.

FEBRUARY 27, 2017 RESIDENTIAL BUILDING PERMITS FORUM

Building Permit Application Instructions INFORMATION REQUIRED FOR ISSUANCE OF A BUILDING PERMIT

INVITATION TO BID ON TOWN PAVING PROJECTS

REQUEST FOR PROPOSALS OREGON CITY ANNEX FIBER OPTIC ENGINEERING & INSTALLATION. Date Due: Friday, September 8, Time Due: 4:00 p.m.

ECONOMICS COURSE. Preconstruction Operations

BUILDING PERMIT APPLICATION

THE CORPORATION OF THE TOWNSHIP OF MINDEN HILLS COMMITTEE OF THE WHOLE/GENERAL COMMITTEE MEETING Thursday, April 10 th, 2008

PROCEDURE FOR REQUESTING A BUILDING PERMIT

Architectural Commission Report

Applications for Power Plants, Substations, Transmission Lines, Industrial System Designations and Hydro Developments

CHAPTER 13 R-5 MANUFACTURED MOBILE HOME PARK RESIDENTIAL DISTRICT

Amelia Park Neighborhood Association, Inc.

REQUEST FOR PROPOSAL. Construction Management Services Not at Risk

City of La Palma Agenda Item No. 2

Transcription:

April 2, 2001 Memo To: From: Re: Telecommunication Service Providers David Less, City Planner CITY REQUIREMENTS FOR TELECOM TOWERS AND ANTENNAS Effective March 2001, the City s new telecommunication ordinance governing the location of telecom towers and antennas went into effect (Section 15.71 of the Manitowoc Municipal Code). We have prepared this outline to help you better understand the requirements under Section 15.71: 1. When a conditional use permit is required or not required for the installation of telecom services in the City; 2. Information that each City department will review prior to the issuance of a conditional use permit or building permit (this is information provided by the telecom service provider); 3. Required information for a new tower application; and 4. On-going responsibilities of a telecom service provider. Note that this document is intended only as a summary of key provisions under Section 15.71. You are advised to not construe or interpret this document as a comprehensive listing of all telecommunication requirements. You are advised to review Section 15.71 in its entirety. CONDITIONAL USE PERMITS (CUP): CUP and Tower Application Required for: 1. Construction of new towers. 2. Increased height of existing towers. 3. Antennas increasing the height of alternative tower structure by 1

more than 15'. 4. Increasing the area of a tower site. 5. Amateur radio service facilities that exceed guidelines under 15.71(3)(f). CUP is Not Required for: 1. Antenna onto an existing tower that does not increase height of tower. 2. Antenna onto an alternative tower structure with less than 15' height increase. 3. Exempt structures under 15.71(3)(a). SUMMARY OF RESPONSIBILE PARTIES: City Attorney: City Clerk: A. Negotiation of lease terms for location on City-owned or MPU-owned facilities. 15.71(5)(ad)(1)c. A. Negotiation of lease terms for location on City-owned or MPU-owned facilities. 15.71(5)(ad)(1)c. A. Collect tower application and CUP fee. 15.71(5)(a) B. Upon receipt, mail copy of tower application to Manitowoc County Clerk, MPU and Manitowoc County Airport Advisory Committee. 30-day period to provide written recommendation. 15.71(5)(a) A. None. City Planning: 2

A. Secure recommendation of Airport Advisory Committee. 15.71(4)(b)1 B. Verify compliance with Airport Height and Use Limitation Zoning Ordinance (15.47). 15.71(4)(b)2. C. Architectural review of building-mounted facilities. 15.71(5)c) D. Review as built site plans. 15.71(5)(e) E. Verify if alternative tower structure is contributing structure in Manitowoc Intensive Resources Survey Final Report, 1988. 15.71(5)(f) F. Site plan review and approval. 15.71(5)(ag)3. G. Landscape plan review and approval. 15.71(5)(ag)4. A. Architectural review of building-mounted facilities. 15.71(5)c) B. Verify if alternative tower structure is contributing structure in Manitowoc Intensive Resources Survey Final Report, 1988. 15.71(5)(f) City Engineer: A. Approval for telecom facilities to cross public R-O-W. 15.71(5)(h) B. Approval of access into tower site. 15.71(5)(x) A. None. Director of Building Inspection: A. Copy of executed lease or license agreement. 15.71(3)(c) B. Collect building permit fees. 15.71(3)(c) C. Calculate and collect tower and antenna fees. 15.71(3)(c) 15.71(5)(ac) D. Review structural report. 15.71(3)(c)(2)b. F. Documentation regarding impact of proposed antenna on height of 3

Fire Chief: tower or alternative tower structure. 15.71(3)(c)(2)c. G. Analysis of collocation/useable space on other towers and structure in service area. 15.71(3)(d) 15.71(5)(b) H. Confirm construction of tower for future collocation: 1. Original tower owner + 6 or more future tower owners for towers 200+ in height. 2. Original tower owner + 4 or more future tower owners for towers less than 200' in height. 15.71(5)(b) I. Approval of roof-mounted facilities. 15.71(5)(d) J. Verify all setbacks and separation requirements. 15.71(5)(k) 15.71(5)(l) K. Approval of security fencing design and material. 15.71(5)(p) L. Review FAA lighting mandates. 15.71(5)(u)2. M. Collect certificates of insurance. 15.71(5)(ae) A. Copy of executed lease or license agreement. 15.71(3)(c) B. Collect building permit fees. 15.71(3)(c) C. Calculate and collect tower and antenna fees. 15.71(3)(c) 15.71(5)(ac) D. Review structural report. 15.71(3)(c)(2)b. E. Documentation of CUP approved, if required. 15.71(3)(c)(2)d. F. Approval of roof-mounted facilities. 15.71(5)(d) G. Collect certificates of insurance. 15.71(5)(ae) A. Installation of fire protection equipment at discretion of Fire Chief. 15.71(5)(aa) A. Installation of fire protection equipment at discretion of Fire Chief. 15.71(5)(aa) Manitowoc Public Utilities: 4

A. Contamination of water supply. 15.71(5)(ad)(1)(d) A. Contamination of water supply. 15.71(5)(ad)(1)(d) Recreation and Parks Director (R&PD): A. For locations in City-owned parks, approval of R&PD required. 15.71(5)(ad)2. A. For locations in City-owned parks, approval of R&PD required. 15.71(5)(ad)2. NEW TOWER APPLICATIONS - INFORMATION REQUIREMENTS: 1. Name, address, etc. of tower owner and property owner. 15.71(5)(ag)1. 2. Map or aerial photo of all towers and antenna support structures within 1 mile search radius. 15.71(5)(ag)2. 3. Site plan under 15.71(5)(ag)3. 15.37(2) 4. Required lighting systems. 15.71(5)(ag)3.a. 5. Drawing depicting tower and antenna type, height and design characteristics. 15.71(5)(ag)3.a. 15.71(5)(ag)13. 6. Equipment, cabinetry, shelters, electrical and grading details.15.71(5)(ag)3.a. & 3.b. 15.71(5)(ag)13. 7. Site landscape plan under 15.71(5)(ag)4. 15.69 8. Potential visual impacts of proposed facility. 15.71(5)(ag)5. 9. Map detailing tower owners plans for facilities in City. 15.71(5)(ag)6. 10. Description of telecom services to be offered. 15.71(5)(ag)7. 11. Intermodulation study or RF letter or non-interference letter. 15.71(5)(ag)8. 12. Availability of suitable existing towers or alternative tower structures. 15.71(5)(ag)9. 15.71(5)(b) 15.71(3)(d) 13. Affidavit and copy of letters sent to tower owners in 1 mile search radius declaring collocation and siting needs, plus any responses. 5

15.71(5)(ag)9. 15.71(5)(b) 14. Tower design can meet or exceed collocation requirement. 15.71(5)(ag)9. 15.71(5)(b) 15. Aeronautical study and obstruction evaluation, including compliance with Airport Height and Use Limitation Zoning Ordinance under 15.47. 15.71(5)(ag)10. 16. Statement of anticipated tower site maintenance needs. 15.71(5)(ag)11. 17. Letter of intent from tower owner declaring collocation availability at new tower under reasonable terms and conditions. 15.71(5)(ag)12. 18. Break apart or fall radius calculations. 15.71(5)(ag)13. 19. Certification that new tower meets EIA or TIA standards for structural and wind load, as well as all federal, stated and local regulations. 15.71(5)(ag)14. 15.71(5)(h) Tower Owner Requirements: 1. File tower application with City Clerk s office. 15.71(5)(a) 2. Delivery of 4 as built site plans to City Planning within 60 days of commencing operation at the tower site. 15.71(5)(e) 3. Notify Director of Building Inspection of change in existing telecom services, at least 30 days in advance. 15.71(5)(g) 4. Noise, traffic, testing and maintenance outside limits require approval of Director of Building Inspection. 15.71(5)(m) & (5)(n) 5. 3-year inspection report submitted to Director of Building Inspection. 15.71(5)(o) 6. Cooperate with Director of Building Inspection in annual inspection of site (optional). 15.71(5)(ab) 7. Insurance certificate delivery to Director of Building Inspection for changes in coverage, change in carrier, etc. 15.71(5)(ae) 8. Notice to Director of Building Inspection of intent to discontinue, abandon or terminate tower or antenna operation. 15.71(5)(af) 9. Copy of any notices sent to Director of Building Inspection which are provided to FCC or FAA detailing intent to discontinue, abandon or terminate tower or antenna operation. 15.71(5)(af) FEES - EFFECTIVE APRIL 1, 2001: 6

Telecommunication Tower Permit Fee (new tower construction, including installation of tower owner antenna at time of original tower construction) Telecommunication Tower Permit Fee (expansion of existing tower, including installation of new antenna, when no new tower construction permit fee has been previously paid) $25.00/foot of tower height $25.00/foot of tower height (existing plus expansion height) Telecommunication Tower Permit Fee $25.00/foot of tower (expansion of existing tower, including height (expansion height installation of new antenna, when new tower only) construction permit fee has been previously paid) Telecommunication Antenna Permit Fee $500/antenna or (antenna installed on existing tower or alternative $500/antenna/array tower structure after original construction of (ie. 9 panel antenna tower or alternative tower structure) array is 9 x $500 = $4,500) RunDate: 4/2/01 Filename: E:\wpfiles\telecomsum2.wpd 7

8