CCR RULE FUGITIVE DUST CONTROL PLAN

Similar documents
FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

I. Site Name and Location

I. Site Name and Location

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY WHITE BLUFF PLANT CLASS 3N LANDFILL PERMIT NO S3N-R3 AFIN:

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

Alma Offsite Landfill Phase IV S2180 State Hwy 35 Alma, Wisconsin

H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

AFOs, CAFOs and MAFOs

Erosion & Sedimentation Control Policy

Photographic Processing Facility Sector Control Policy

CHAPTER 8 EROSION AND SEDIMENT CONTROL PLAN REQUIREMENTS

LOUISIANA URBAN STORMWATER COALITION. EXECUTING A SWPPP DURING CONSTRUCTION Presented by: Diane T. Baum

Industrial Solid Waste Landfill Daily Log of Operations {as required by O.A.C (E)(10)} Yearly Cover Sheet (Form 1)

Closure Plan Brame Fly Ash Pond

LANDFILL CLOSURE PLAN ENTERGY ARKANSAS, INC. INDEPENDENCE PLANT CLASS 3N CCR LANDFILL PERMIT NO S3N-R2 AFIN

MAINE MEDICAL CENTER

August 18, Mr. Randy Woolard General Manager IE Furniture, Inc Ball Park Road Thomasville, NC 27360

SOLID WASTE FACILITY PERMIT Facility Permit Number: 19-AR-1250

Class III Composting Facility Requirements

c. Sites subject to regulation under Subtitle D of RCRA. The following discharges are not authorized by this permit:

Closure and Post-Closure Care Plan NRG Indian River Generating Station Indian River Landfill Phase II

Application for Employment

Environmental Leadership Program Inspection Form Portable Asphalt Facility

Module 4 Regulatory requirements for Land Disturbing Activities

Environmental Management System Integrated Pollution Control. Origination Date 1 st February Area: The Group

ODOR MANAGEMENT PLAN. Bridgeton Landfill St. Charles Rock Road Bridgeton, Missouri

DRIVER S EMPLOYMENT APPLICATION 9355 Highway 60 West Lewisport, KY 42351

Check the box below if you are operating mobile tire processing equipment [APC&EC Reg ]: Mobile Tire Processing Equipment

INITIAL INSPECTION REPORT ASH LANDFILL AREA SPRINGERVILLE GENERATING STATION SPRINGERVILLE, ARIZONA

NPDES/SDS Stormwater Permit Program for Construction Activity Inspection Report Corrective Actions. ( ) - ext. ( ) - ext. Owner Name Telephone Fax

Annual Inspection Report

Fumigation Management Plan Methyl Bromide

U N O F F I C I A L C O P Y

Understanding Stormwater Pollution Prevention Plans (SWPPPs) (SWPPPS)

Section XXV Preconstruction Assessments and Damage Mitigation Procedures

Applicant s Name: Visit to get a check done electronically.

DRIVER APPLICATION FOR

6.1 Introduction to Wastewater Issues

Groundwater Monitoring Requirements of the CCR Rule What s Next?

Application For Waste Regulation (Check all that apply)

MANAGEMENT OF SONOMA COUNTY WILDFIRE DEBRIS

Illinois Department of Agriculture Pesticide Regulatory Update

Module 3. Module 3a. As of July : A lot of local ESC ordinances are out of date! Virginia Erosion & Sediment Control Program

Written Post-Closure Plan. Pawnee Station - Active CCR Landfill Public Service Company of Colorado Denver Colorado

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

FAIRCHILD APPLICATION FOR EMPLOYMENT

Powered Industrial Truck/Forklift Operations Standards and Procedures. Disaster Cycle Services Standards & Procedures DCS SP DMWT

MARCH 2013 TO MARCH 2014 (YEAR 11) REPORTING PERIOD VILLAGE OF SKOKIE, ILLINOIS

MOBILE FOOD VENDOR LICENSE APPLICATION

PORT OF PORT HEDLAND - BULK PRODUCT MANAGEMENT PROCEDURE

STORMWATER MANAGEMENT PROGRAM. Table of Contents

Initial Closure Plan Slag Pond. Nelson Dewey Generating Station. Wisconsin Power and Light Company. Prepared for:

Closure Plan Ash Disposal Area PGE Boardman Power Plant

Content Copy Of Original

FUGITIVE DUST CONTROL GUIDELINES BEST MANAGEMENT PRACTICES CONFINED BEEF CATTLE FEEDING OPERATIONS

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

Article 10 - ADMINISTRATIVE SECTION

S.O.P. No. HMD

11 Ways to Avoid Storm Water Fines. No Exceptions!

SUBSURFACE INFILTRATION SYSTEM DESCRIPTION. Alternative Names: Sump, Drywell, Infiltration Trench, Infiltration Galleries, Leach Fields

SOLID WASTE FACILITY PERMIT

TITLE V/STATE OPERATING PERMIT

ACTIVE TRUCKING SERVICE, INC. BLOCK NO.(S): 6101, 6102, 6103 LOT NO.(S): 3.2, 1, TPD (Wood, Trees, Stumps RECYCLING CENTER NUMBER:

Air Individual Permit Part 70 Reissuance Pine St S Lester Prairie, MN McLeod County

CHAPTER 7 - INFRASTRUCTURE INSPECTION AND ACCEPTANCE... 2

Concrete Waste Management

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Quality Management System

Design Specifications & Requirements Manual

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

John Freeze President/CEO Commonwealth Hosiery Mills, Inc. P.O. Box 939 Randleman, NC 27317

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

Addition to Section 4 - Special Use Regulations

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0)

Texas Pollutant Discharge Elimination System Industrial Storm Water Permit TXR Storm Water Pollution Prevention Plan Worksheet Instructions

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

APPROVED ALTERNATIVE DAILY COVER MATERIALS FOR USE AT SANITARY LANDFILLS

COUNTY OF NEVADA COMMUNITY DEVELOPMENT AGENCY NEVADA COUNTY CDA GUIDELINES FOR ASH AND BURN DEBRIS CLEAN UP AND REMOVAL AFTER A FIRE

Department of Public Health Proposed Rules and Regulations for the Handling and Storage of Bulk Material Piles (Proposed December 19, 2013)

The Village of Wellington NPDES Guidance/Reference Document

Alto Tunnel Study. Weekly Progress Report February 10, 2017

SAWS Annual Irrigation Checkup -- FAQs

CLASS I AND II ABATEMENT PROJECT SUBMITTALS

STATE OF FLORIDA DEPARTMENT OF ENVIRONMENTAL PROTECTION GENERIC PERMIT FOR DISCHARGE OF STORMWATER FROM PHASE II

ASH AND BURN DEBRIS CLEAN UP AND REMOVAL PROCESS

SANITARY LANDFILL FACILITY PERMIT

Environmental Management Chapter ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT LAND DIVISION - SOLID WASTE PROGRAM ADMINISTRATIVE CODE

AIR EMISSION PERMIT NO IS ISSUED TO. Van Hoven Company, Inc.

Terms of Reference for Assessment of Water System Infrastructure and Water Supply Sources for Semi-Public Water Systems

TITLE V/STATE OPERATING PERMIT

EROSION & SEDIMENT CONTROL/STORMWATER CERTIFICATION: (Rev ) SP1 G180

UFGS (August 2004) UNIFIED FACILITIES GUIDE SPECIFICATION

You have applied in accordance with Section 9 of the Environmental Protection Act for approval of:

START WORK NOTIFICATION

Completing an NPDES or SDS Feedlot Permit Application

NEW JERSEY STATE DEPARTMENT OF ENVIRONMENTAL PROTECTION NEW JERSEY ADMINISTRATIVE CODE TITLE 7 CHAPTER 27 SUBCHAPTER 10. Sulfur in Solid Fuels

SECTION 17.1 STORMWATER MANAGEMENT AND EROSION CONTROL

Lead in Construction Guidance

Transcription:

Prepared for: FORT ARMISTEAD ROAD LOT 15 LANDFILL, LLC 1005 Brandon Shores Road Baltimore, Maryland CCR RULE FUGITIVE DUST CONTROL PLAN FORT ARMISTEAD ROAD LOT 15 LANDFILL BALTIMORE, MARYLAND Prepared by: 10220 Old Columbia Road, Suite A Columbia, Maryland 21046 Project Number ME1307 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland TABLE OF CONTENTS 1. PURPOSE...1 2. REGULATORY REQUIREMENTS...2 3. DEFINITIONS...2 4. RECORDS MANAGEMENT...2 5. CCR FUGITIVE DUST CONTROL MEASURES...3 6. CONDITIONED CCR...4 7. WEEKLY MONITORING PROCEDURE...4 8. CITIZEN COMPLAINTS...6 9. REPORTING AND NOTIFICATION REQUIREMENTS...7 10. PLAN REVIEW AND AMENDMENT...7 11. ATTACHMENTS...8 12. PROFESSIONAL ENGINEER CERTIFICATION...9 13. RECORD OF PLAN AMENDMENTS...9 ME1307/Lot 15 Dust Control Plan i October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland 1. PURPOSE The purpose of this plan is to outline the procedures that must be completed in order to comply with the Air Criteria requirements specified in 40 CFR Part 257.80(b), pertaining to the preparation and implementation of a Fugitive Dust Control Plan. As per the Rule, the Fugitive Dust Control Plan must address the items listed in 257.80(b)(1) through (b)(7), as follows: (1) The CCR fugitive dust control plan must identify and describe the CCR fugitive dust control measures the owner or operator will use to minimize CCR from becoming airborne at the facility. The owner or operator must select, and include in the CCR fugitive dust control plan, the CCR fugitive dust control measures that are most appropriate for site conditions, along with an explanation of how the measures selected are applicable and appropriate for site conditions. Examples of control measures that may be appropriate include: locating CCR inside an enclosure or partial enclosure; operating a water spray or fogging system; reducing fall distances at material drop points; using wind barriers, compaction, or vegetative covers; establishing and enforcing reduced vehicle speed limits; paving and sweeping roads; covering trucks transporting CCR; reducing or halting operations during high wind events; or applying a daily cover. (2) If the owner or operator operates a CCR landfill or any lateral expansion of a CCR landfill, the CCR fugitive dust control plan must include procedures to emplace CCR as conditioned CCR. Conditioned CCR means wetting CCR with water to a moisture content that will prevent wind dispersal, but will not result in free liquids. In lieu of water, CCR conditioning may be accomplished with an appropriate chemical dust suppression agent. (3) The CCR fugitive dust control plan must include procedures to log citizen complaints received by the owner or operator involving CCR fugitive dust events at the facility. (4) The CCR fugitive dust control plan must include a description of the procedures the owner or operator will follow to periodically assess the effectiveness of the control plan. (5) The owner or operator of a CCR unit must prepare an initial CCR fugitive dust control plan for the facility no later than October 19, 2015. The owner or operator has completed the initial CCR fugitive dust control plan when the plan has been placed in the facility s operating record as required by 257.105(g)(1). (6) Amendment of the plan. The owner or operator of a CCR unit subject to the requirements of this section may amend the written CCR fugitive dust control plan at any time provided the revised plan is placed in the facility s operating record as required by 257.105(g)(1). The owner or operator must amend the written plan whenever there is a ME1307/Lot 15 Dust Control Plan 1 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland change in conditions that would substantially affect the written plan in effect, such as the construction and operation of a new CCR unit. (7) Pursuant to 40 CFR 257.80(b)(7), the owner or operator must obtain a certification from a qualified professional engineer that the initial CCR fugitive dust control plan, or any subsequent amendment of it, meets the requirements of this section. 2. REGULATORY REQUIREMENTS Regulation (Federal/State) Citation CCR Rule 40 CFR Part 257.80 Air Quality (CAA) 40 CFR Part 50-61 Prohibition of Fugitive Emissions COMAR 26.04.10.03 3. DEFINITIONS Environmental Professional shall be an employee of Lot 15 or its owner/operator in charge of verifying that weekly inspections have been performed and in case of any fugitive dust emissions logged in the inspections or through citizen complaints, the environmental professional shall be in charge of following up and ensuring that the dust emissions are managed. Fugitive air contaminant An air contaminant of the outdoor atmosphere not emitted through a flue, including, but not limited to, industrial process losses, stock pile losses, reentrained dust and construction/demolition activities. Fugitive emissions Refers to those emissions which could not reasonably pass through a stack, chimney, vent or other functionally equivalent opening. 4. RECORDS MANAGEMENT Consistent with the requirements of 40 CFR Part 257.105(b) and (g), records associated with the implementation of this fugitive dust control plan must be retained for a period of 5-years. In addition, the plan must also become part of the facility s Operating Record. The facility s Operating Record posting requirements are also consistent with the public records web-site posting requirements of 257.107(g). These include the following dust control records/ documents: A. The posting of this plan and subsequent plan amendments; and ME1307/Lot 15 Dust Control Plan 2 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland B. The annual CCR fugitive dust control report required by 257.80(c), which includes: a description of the actions taken by the owner or operator to control CCR fugitive dust; a record of all citizen complaints; and a summary of any corrective measures taken. The public web-site can be found at the following web address: www.talenenergy.com 5. CCR FUGITIVE DUST CONTROL MEASURES The following procedures shall be implemented at all times at the Lot 15 Landfill to maintain dust control during the landfill operations. A. Dust will be avoided and controlled by watering the access road, and other landfill areas as needed, via water truck or firehoses if available. If necessary, tarps as an alternative cover may be used to aid in controlling dust production. B. Liquids to be used for dust control will be primarily potable water, stormwater, or groundwater. Leachate may also be used to avoid and control dust (if approved by MDE), within the active working areas only. C. The amount of liquids to be applied will be such that the potential for surface water runoff is minimized while the potential for dust generation is eliminated. D. At the active working area, liquids will be applied via water truck to maintain optimum moisture content for compaction and dust control. E. After the end of each working day, the active working area will be hydro-mulched. Hydro-mulch is a moist-applied mulch that contains tackifying agents, which enable it to adhere to the surface on which it is applied. The same liquids used for dust control will be used to moisten the mulch and combine it with the tackifying agents before application. F. If watering and hydro-mulching do not provide sufficient dust control in the active working area, an additional option would include placement of an approximately fourinch thick layer of soil cover (primarily retrieved from the landfill property). G. CCRs will be moistened prior to loading at the plant sources as needed, to prevent the potential for particles to become airborne during placement. Targeted moisture content will be 20% to avoid and control dust and prevent free water flow. Because of ME1307/Lot 15 Dust Control Plan 3 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland the short transportation distance from the power plants to the disposal site, the potential for loss of moisture during transportation is negligible. H. All hauling trucks will be covered with tarps to prevent fugitive dust emission. After a truck is loaded, the driver will extend a heavy-duty tarp over the entire dump body, covering the material to avoid and control the potential for blowing dust during transit. I. After disposal of CCRs at the active working area and prior to exiting the site, trucks transporting CCRs will travel through the truck and wheel wash system, when operable, to prevent fugitive dust when the trucks leave the site. If the truck/wheel wash system is not operable (e.g., when there is a risk of freezing or when undergoing maintenance), alternative measures will be used to prevent dusting from the trucks (e.g., inspections and use of brooms, as needed, to manually clean the trucks and wheels before they leave the working face). 6. CONDITIONED CCR CCR will be placed moist (targeted moisture content of 20%) to facilitate compaction and to avoid and control dust as explained in the previous section. 7. WEEKLY MONITORING PROCEDURE A. Assigned personnel will perform, at a minimum, weekly perimeter inspections and areas of interest associated with Lot 15 Landfill and will utilize the Weekly Fugitive Dust Inspection Log Sheet (see Attachment 1) as a tool to perform and document that the inspection was performed. The inspection will focus on the following fugitive emissions sources associated with the operation of Lot 15 Landfill. 1. Non-vegetated active areas in Cell 2 (see Attachment 2 Lot 15 Weekly Monitoring Program Survey Map). Controls of any observed dust from this area might include the following. (a) Mobilize water spray tanker to wet down area. (b) Mobilize hydromulcher to reduce the exposed working phase. (c) Apply a chemical dust suppressant to exposed surface. 2. Any vehicular traffic on or around the perimeter of Lot 15. Controls of any observed dust from this area might include the following. (a) Mobilize water spray tanker to wet down area. ME1307/Lot 15 Dust Control Plan 4 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland (b) Apply a chemical dust suppressant to exposed surface. B. Personnel will Complete the Inspection Log Sheet as follows: Month and Year The person completing inspection will fill-in the date the inspection was performed to include the month, day and year in the following format mm/dd/yyyy (Example 04/17/2015). Name Complete first and last name of the person performing the fugitive dust observation inspection (Example: John Doe). Start and End Time Complete the time that the inspection began and the time that the inspection concluded utilizing 24-hour time (Example: Start 07:00 End 08:30). Wind Speed and Direction The approximate wind speed in mph and direction the wind is moving towards (Example: Speed 5 mph, Direction South East). Fugitive Dust Emissions YES or NO. YES means that fugitive dust emissions were detected from a source and NO means that none were detected. If YES, the comments portion should be completed to identify the source of fugitive dust emissions and corrective action measures that were taken to mitigate the source of the fugitive dust emissions. Example: YES, Comments Fugitive dust emissions were observed from the Cell 2. The ash area coordinator was notified and the water tanker truck was mobilized to wet down the area. This area will continue to be wetted down until the storage pile size is reduced. No dust emissions were observed leaving the Lot 15 boundary. This observation was reported to the environmental professional. Comments / Corrective Actions Describe any YES entries made on the log and what actions were taken as a result of the observations towards mitigating the issue. Use additional pages if necessary. C. The person performing the inspection must inform the plant Environmental Professional if any YES entries are made on the inspection log sheet. This is necessary since some types of deviations may require reporting to the regulatory agency in a specified period of time after observing the deviation. D. The plant Environmental Professional should in-turn determine if notification is required and also inform environmental consultant so that the deviation is documented on the Annual CCR Fugitive Dust Control report. ME1307/Lot 15 Dust Control Plan 5 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland E. The plant Environmental Professional will verify that the monthly inspection forms have been completed no later than 15-days after the start on the month for the preceding month s observations. 8. CITIZEN COMPLAINTS A. As required under 40 CFR Part 257.80(b)(3), this fugitive dust control plan must include a procedure to log citizen complaints received by the owner or operator involving fugitive dust events associated with the CCR units located that the facility. The following procedure will be implemented in the event that a citizen complaint is received associated with fugitive dust emissions generated from Lot 15. 1. Attachment 3 of this document will be used to log the citizen complaint. The person completing the Fugitive Dust Complaint Log will record the following information on the log form: Date and Time the Complaint was received; Name of the Facility Representative taking the call and completing the log form; The Full name of the complainant (first and last). If the complainant does not want to provide their name, the word Anonymous should be used; Complainant Address and Phone Number write Refused to Provide if they do not provide this information at the time of the call; and Nature of the Complaint Record all details associated with the complaint, such as: source of dust emissions, wind-speed and direction, was there any property damage associated with the dust emissions, where emissions observed off the property, where was the complainant located at the time of the call, did a facility representative confirm the alleged dust emissions, and any other details associated with the call. 2. Within 1-hour after receiving a citizen dust complaint, a facility representative must start a fugitive dust observation / inspection of the source area in question. The Attachment 1 Fugitive Dust Inspection Log must be completed to document the follow-up observations. It should be noted in the Comments section that the inspection was being performed as a follow-up to a citizen s complaint. 3. The facility representative completing the Complaint Log Form must inform the plant Environmental Professional as soon as reasonably possible. The plant ME1307/Lot 15 Dust Control Plan 6 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland Environmental Professional must be provided with the details of the complaint. This is necessary since the complaint could potentially result in a reportable incident to the regulatory agency. 4. The plant Environmental Professional will in-turn contact the appropriate management personnel associated with Lot 15 and its parent company(ies). B. The citizen complaint log sheet must be included in the Citizen Complaint folder on the Operating Record Sharepoint site. C. The record of all citizen complaints received in the 12-month period following the submittal of the Annual CCR Fugitive Dust Control Report will be included in the report. 9. REPORTING AND NOTIFICATION REQUIREMENTS A. As required under 40 CFR Part 257.80(c), an Annual CCR Fugitive Dust report must be completed. The initial report is due no later than 14-months after placing the initial CCR fugitive dust control plan in the facility s operating record. The deadline for subsequent plan completion is 12-months after completion of the previous. The report is considered to be complete after it becomes part of the facility s operating record (ie. posted to the publicly available web-site). The annual report is required to contain the following items: 1. All actions taken by facility to control fugitive dust generation from Lot 15. A copy of the Attachment 1 Weekly Fugitive Dust Inspection Logs will be included to satisfy this item; 2. A record of all citizen complains. A copy of the Attachment 3 Fugitive Dust Citizen Complaint Logs will be included to satisfy this item; and 3. A summary of any corrective measures taken to mitigate fugitive dust generation. A copy of the Attachment 1 Weekly Fugitive Dust Inspection Logs will be included to satisfy this item. B. The Annual Report will be prepared and posted by the Environmental Professional or their designee. 10. PLAN REVIEW AND AMENDMENT A. 40 CFR Part 257.80(b)(6) requires the CCR Fugitive Dust Control plan be amended any time there is a change in conditions that would substantially affect the written plan ME1307/Lot 15 Dust Control Plan 7 October 2015

Compliance Demonstration Report Lot 15, Baltimore, Maryland in effect, such as the initiation of a new activity within the Lot 15 area that has the potential to generate fugitive dust emissions. B. While there is no specific plan review frequency, the plan should be reviewed by facility representatives at a minimum of annually on a calendar year basis. A record of the plan review will be documented (see Attachment 4 Record of Plan Review Log). C. 40 CFR Part 257.80(b)(6) requires that revised or amended plans be posted to the facility s operating record. Facility personnel will coordinate with the environmental professional for the posting of revised / amended plans to the facility s operating record / publicly available web-site. D. Any revised or amended plans require re-certification by a qualified professional engineer. A sample of professional engineer certification is contained in Attachment 5 of this plan. A certification of the preparation of the original plan is included in Section 12. 11. ATTACHMENTS Attachment 1 Weekly Fugitive Dust Inspection Log Attachment 2 Weekly Monitoring Program Survey Map Attachment 3 Fugitive Dust Citizen Complaint Log Attachment 4 Record of Plan Review Log Attachment 5 Sample Professional Engineering certification for Future Plan Amendments. ME1307/Lot 15 Dust Control Plan 8 October 2015

ATTACHMENT 1 Weekly Fugitive Dust Inspection Log

Attachment 1 - Lot 15 Fugitive Dust Inspection Log CCR Rule Fugitive Dust Control Plan Date Name of Person Performing Inspection Start Time End Time Wind Speed & Direction Fugitive Emissions Observed 1? (Y or N) Comments/Corrective Actions (if required) Note: Lot 15 fugitive dust emissions inspection should include those areas identified in Section 7A of the Lot 15 fugitive dust control plan and indicated on the Lot 15 Weekly monitoring program survey map. Any "YES" entry in the "Fugitive Emissions Observed" column must include some level of follow-up, corrective action measure taken to mitigate the source of dust emissions. A description of the corrective action measure should be noted in the "Comments/Corrective Actions" columns of the form. Any item with a "YES" entry in the "Fugitive Emissions Observed" column must also be reported to the plant environmental professional to determine if agency notification/reporting requirements apply.

ATTACHMENT 2 Weekly Monitoring Program Survey Map

Attachment 2 - Weekly Monitoring Program Survey Map Site Entrance Wetland Mitigation Area Cell 2 Cell 1 Wetland Mitigation Area Perimeter Road Proposed Expansion Temporary Basin Proposed Expansion Basin No.2 Legend: Approximate cell boundary Perimeter Survey Area

ATTACHMENT 3 Fugitive Dust Citizen Complaint Log

Attachment 3 - Lot 15 Fugitive Dust Complaint Log CCR Rule Fugitive Dust Control Plan Date & Time Complaint Received Name of Lot 15 Representative Taking Call Complainant Name Complainant Address Complainant Phone Number Nature of Complaint (Details Associated with Complaint 1 ) Note 1: Record all details associated with the complaint, such as: source of dust emissions, wind-speed and direction, was there any property damage associated with the dust emissions, were emissions observed off the property, where was the complainant located at the time of the call, did a Lot 15 employee confirm the alleged dust emissions? Any other details associated with the call. IMPORTANT: Within 1-hour after receiving a citizen complaint, a person must complete a Fugitive Dust Inspection of the alleged source area and complete the Attachment

ATTACHMENT 4 Record of Plan Review Log

Attachment 4 - Lot 15 Record of Plan Review CCR Rule Fugitive Dust Control Plan Date of Plan Review Name of Person Performing the Review Reason for Review (Annual or Other) Did Review Lead to a Plan Revision? (Yes/No) Comments 1 Note 1: Specify reason for plan review and detail any changes that may have been made in the plan revisions, such as Section numbers, etc. Note: any review that leads to a plan amendment/revision requires that the plan be recertified by a Professional Engineer. The revised plan must be posted to the facility operating record and posted to the public web-site. Only the most recent plan should be available on the public web-site. A plan review is required at a minimum, on an annual calendar year basis.

ATTACHMENT 5 Sample Certification Report for Future Plan Amendments

Professional Engineer Certification - As required by the U.S. EPA CCR Rule 40 CFR Parts 257 and 261 257.80 - Air Criteria CCR Fugitive Dust Control Plan CCR Unit: Lot 15 Landfill Certification: I,, a registered professional engineer in the state of certify that this Fugitive Dust Control Plan fulfils the minimum requirements of 40 CFR 257.80(b)(1) through 257.80(b)(7). This certification is based on my review of the document(s) listed: below / in the attached demonstration report and operational information and/or data provided (but not independently verified for accuracy) by FirstEnergy about the CCR Unit listed above. Documents: CCR RULE FUGITIVE DUST CONTROL PLAN FORT ARMISTEAD ROAD LOT 15 LANDFILL, prepared by Geosyntec Consultants (2015) Printed Name: PE License Number: State: Signature: Date: Seal/Stamp: