APPENDIXG FUGITIVE DUST CONTROL PLAN

Similar documents
H. Dust Suppressant - water, hygroscopic materials, or non-toxic chemical stabilizers used

CITY OF PALM DESERT FRED WARING DRIVE PALM DESERT, CALIFORNIA TEL: (760) FAX: (760)

Department of Public Health Proposed Rules and Regulations for the Handling and Storage of Bulk Material Piles (Proposed December 19, 2013)

FUGITIVE DUST CONTROL PLAN HUNTLEY GENERATION STATION 3500 RIVER ROAD TONAWANDA, NEW YORK. PREPARED FOR: Huntley Power, LLC Tonawanda, New York

AIR EMISSION PERMIT NO IS ISSUED TO ISPAT INLAND STEEL MINING CO

Re: Chicago Port Railroad Company and Midwest Marine Terminals Inc. Combined Variance Request

SUBPART OOO Check-OFF FORM July 11, 2005

Chapter MINERAL EXTRACTION AND MINING OPERATIONS

RULE 8021 CONSTRUCTION, DEMOLITION, EXCAVATION, EXTRACTION, AND OTHER EARTHMOVING ACTIVITIES (Adopted November 15, 2001; Amended August 19, 2004)

A. Texas Department of Transportation 2004 Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges (TxDOT).

Comments on Draft Permit #12-POY-079. FTS International Proppants, LLC. Acadia, Trempealeau, Wisconsin. March 15, 2013

DUST CONTROL PLAN. Condit Hydroelectric Project Decommissioning FERC Project No Prepared by. Prepared for. and

ROCK CRUSHING PLANT APPLICATIONS ADVICE

COAL STOCKPILES IN INDIAN POWER PLANTS. H Ramakrishna TCE Consulting Engineers Limited 73/1, St Marks Road, Bangalore , Karnataka, India

Environmental Leadership Program Inspection Form Portable Asphalt Facility

FUGITIVE DUST CONTROL GUIDELINES BEST MANAGEMENT PRACTICES CONFINED BEEF CATTLE FEEDING OPERATIONS

Environmental Guideline on Stone crushing plant set up temporarily for the purpose of a project by a public department

Alma Offsite Landfill Phase IV S2180 State Hwy 35 Alma, Wisconsin

DRAFT AIR EMISSION PERMIT NO Major Amendment IS ISSUED TO. Miller Milling Co LLC

Project Summary Characterization of Mud/Dirt Carryout onto Paved Roads from Construction and Demolition Activities


NORTH AMERICAN Precast Concrete Sustainable Plant Program

RECYCLED ASPHALT PAVEMENT AND ASPHALT MILLINGS (RAP) REUSE GUIDANCE MARCH 2013 (VERSION 1.0)

CAP.GB.DUS.7/03. Use this booklet to help assure that your business is meeting air quality laws, and to train your employees.

EROSION AND SEDIMENT CONTROL PLAN (ESCP) FOR PROJECT TITLE

ITEM 6 CONCRETE CURBS, GUTTERS, AND SIDEWALKS

Traction sand. Spillage- Septic waste, plastics. Metal Salts, pure metals carbonates

I. Site Name and Location

July 31, Julie Morita, M.D Commissioner, Department of Public Health & Environment 333 South State St., 2nd Floor Chicago, IL 60604

I. Site Name and Location

TOWN OF ROTTERDAM RESIDENTIAL BUILDING PERMIT APPLICATION Ext. 395 Needed to Obtain Permit:

Appendix D. Valley Fever Considerations (Memorandum)

City of Chicago Department of Public Health

MITIGATED NEGATIVE DECLARATION & MITIGATION MONITORING PROGRAM CITY OF CHICO PLANNING DIVISION

State of Utah. Department of Environmental Quality DAQE-AN October 26, 2009

CITY OF ASTORIA PUBLIC WORKS ENGINEERING DIVISION ENGINEERING DESIGN STANDARDS FOR IN-FILL DEVELOPMENT

UNHSC Bioretention Soil Specification February, SOIL PREPARATION (PERFORMANCE SPECIFICATION) for Bioretention Systems

Particulate Matter Rules Update BAAQMD BACWA Meeting

SACHSE EROSION CONTROL GUIDELINES

TECHNICAL SUPPORT DOCUMENT (TSD) August, Mailing Address P.O. Box 35130, Tucson, AZ

APPENDIX 13A WASTE RECYCLING CENTER OPERATIONS SUMMARY AREA A SITE

Concrete Waste Management

SPECIFICATIONS FOR DOUBLE CHIP SEAL

SECTION BITUMINOUS CONCRETE PAVEMENT

Measuring Bulk Solids on a Conveyor

Outline of Presentation. Inspecting Construction Site BMPs. Inspector. Back to Basics. Erosion Control. Erosion Control

PERVIOUS PAVEMENT. Alternative Names: Permeable Pavement, Porous Concrete, Porous Pavers

LADOTD Construction Specifications: Parts II, III & IV MARK MORVANT, P.E. ASSOCIATE DIRECTOR, RESEARCH

SECTION 14 - GENERAL INDUSTRIAL ZONE (M2) REGULATIONS

Division 02 - Site Work Section

DEPARTMENT OF ENVIRONMENTAL PROTECTION BUREAU OF AIR QUALITY

LS 2519 CONCRETE PAVER PAVEMENT RECONSTRUCTION

An Overview of Low Cost Pavement Alternatives in Canada

City of Bullhead City Development Services/Public Works. Permit Submittal Requirements FENCES

Activity Aspects Impacts/ Nuisances Construction phase - Site preparation. - Generation of excavated soil, debris and construction wastes

(1) Adequately wet asbestos-containing waste material as follows by doing all of the following:

SACRAMENTO COUNTY ASPHALT RUBBER HOT MIX-GAP GRADED (ARHM-GG):

SECTION 820 PUMP STATION DEMOLITION AND SITE RESTORATION

CITY OF CAMDENTON OFFICE OF THE BUILDING OFFICIAL Commercial Building & Architectural Review Permit Application

STATE OF MINNESOTA MINNESOTA POLLUTION CONTROL AGENCY FINDINGS OF FACT

BASE CONSTRUCTION MATERIALS A Aggregate

Ordinance No July 1, 2016

SPECIFICATIONS FOR SAND SEAL

Design of Illinois Tollway Composite Pavements

Product Directory. Material Handling Solutions.

CHAPTER 7 PAVEMENT DESIGN. 1. Gradation (sieve and hydrometer analysis) 3. Moisture density relationships and curves

SECTION TRENCHING & BACKFILLING

ACC New Home Approval Process, Builder Guidelines, & Design Review Checklist

Submersible Pump Fulfills Quarry Stone Washing Requirements. By Mike Bjorkman, Vice President and Director of Marketing, BJM Corp.

Fumigation Operations

PART 1 GENERAL REQUIREMENTS

2015 ANNUAL ENGINEERING INSPECTION REPORT ENTERGY INDEPENDENCE PLANT CLASS 3N LANDFILL PERMIT NO S3N-R2 AFIN:

A. Texas Department Transportation 2004 Standard Specifications for Construction of Highways, Streets and Bridges (TxDOT):

5. Partially filled fuel tanks within the building shall be pumped empty. The oil and tanks shall be removed and deposed of in a legal manner.

August 18, Mr. Randy Woolard General Manager IE Furniture, Inc Ball Park Road Thomasville, NC 27360

Air Quality in the Eastern Sierra

Ingham County Drain Commissioner Patrick E. Lindemann 707 BUHL AVENUE P. O. BOX 220 MASON MI PH. (517) FAX (517)

The GREENBOOK 2015 Standard Specifications for Public Works Construction

SITE PLAN CRITERIA FOR MUNICIPAL SOLID WASTE & RECYCLABLES STORAGE & ENCLOSURE REQUIREMENTS

TOWN OF OCEAN RIDGE CONSTRUCTION SITE MANAGEMENT HANDBOOK

DATE: December 10, 2012 REPORT NO. PW CHAIR AND MEMBERS COMMITTEE OF THE WHOLE OPERATIONS AND ADMINISTRATION

Asphalt Rubber Chip Sealing DRAFT MAINTENANCE SPECIFICATION. March 22, 2007

Asphalt-Rubber Chip Seal and Polymer Modified Asphalt-Rubber Two Layer System, Case Studies

PART 1 - GENERAL 1.01 General Provisions A. The Conditions of the Contract and all Sections of Division 1 are hereby made a part of this Section.

Municipality of Waterville Public Sidewalk Repair Policy

PolyPavement TM. The Natural Soil Pavement NON-TRAFFIC AREA WIND & WATER EROSION PREVENTION

ORDINANCE NO. An ordinance amending Chapter 51, Dallas Development Code: Ordinance No , as

Dust Recovery Collector Systems. University of Iowa Iowa City, IA. Considerations for NAAQS & NFPA Compliance

ENGINEERING DESIGN & IMPROVEMENT STANDARDS

Niagara Falls Storage Site Safety Measures During Remediation

Soil Stabilizing Technology. for. Road Construction

2 No. Continuous Ambient Air Quality Monitoring System (CAAQMS) installed in downwind & upwind direction and are connected to APPCB server.

7.1 INTRODUCTION 7.2 MATERIALS 7.1 ROAD PAVEMENT REPAIRS - GENERAL

Welcome to Douglas County PUD

CONSTRUCTION PERMIT. DATE ISSUED: January 7, 2015 ISSUED TO: Martin Marietta Materials, Inc.

ROCK SALT TODAY IQUIQUE CHILE MINE PURE DRY CHILEAN ROCK SALT

HAVER Mining HAVER & BOECKER HAVER & BOECKER

BRADLEY UNIVERSITY. The Performance and Sustainability of Permeable Pavement Progress Report on the Work Performed Under IAPA Scholarship

APPLICATION FOR PUBLIC INFRASTRUCTURE PERMIT

HINGULA OPEN CAST PROJECT HINGULA AREA MAHANADI COALFIELDS LIMITED

Transcription:

APPENDIXG FUGITIVE DUST CONTROL PLAN

As required by 324.5524 a fugitive dust control plan has been prepared. Pertinent sections are as follows: (1) The provisions of this section, including subsection (2), shall apply to any fugitive dust source at all mining operations. (2) Except as provided in subsection (8), a person responsible for any fugitive dust source regulated under this section shall not cause or allow the emission of fugitive dust from any road, lot, or storage pile, including any material handling activity at a storage pile, that has an opacity greater than 5% as determined by reference test method 9d. Except as otherwise provided in subsection (8) or this section, a person shall not cause or allow the emission of fugitive dust from any other fugitive dust source that has an opacity greater than 20% as determined by test method 9d. The provisions of this subsection shall not apply to storage pile material handling activities when wind speeds are in excess of25 miles per hour (40.2 kilometers per hour). (3) In addition to the requirements of subsection (2), and except as provided in subdivisions (e), (f), and (g), a person shall control fugitive dust emissions in a manner that results in compliance with all of the following provisions: (iv) All unloading and transporting operations of materials collected by pollution control equipment shall be enclosed or shall utilize spraying, pelletizing, screw conveying, or other equivalent methods. (v) Crushers, grinding mills, screening operations, bucket elevators, conveyor transfer points, conveyor bagging operations, storage bins, and fine product truck and railcar loading operations shall be sprayed with water or a surfactant solution, utilize choke-feeding, or be treated by an equivalent method in accordance with an operating program required under subsection (4). This subparagraph shall not apply to high-lines at steel mills. (b) If particulate collection equipment is operated pursuant to this section, emissions from such equipment shall not exceed 0.03 grains per dry standard cubic foot (0.07 grams per cubic meter). (c) A person shall not cause or allow the operation of a vehicle for the transporting of bulk materials with a silt content of more than 1% without employing 1 or more of the following control methods: : (i) The use of completely enclosed trucks, tarps, or other covers for bulk materials with a silt content of 20% or more by weight.

(ii) The use of tarps, chemical dust suppressants, or water in sufficient quantity to maintain the surface in a wet condition for bulk materials with a silt content of more than 5% but less than 20%. (iii) Loading trucks so that no part of the load making contact with any sideboard, side panel, or rear part of the load comes within 6 inches ofthe top part ofthe enclosure for bulk materials with a silt content of more than 1% but not more than 5%. (d) All vehicles for transporting bulk materials off-site shall be maintained in such a way as to prevent leakage or spillage and shall comply with the requirements of section 720 of the Michigan vehicle code, Act No. 300 of the Public Acts of 1949, being section 257.720 of the Michigan Compiled Laws, and with R 28.1457 of the Michigan administrative code. ( 4) All fugitive dust sources subject to the provisions of this section shall be operated in compliance with both the provisions of an operating program that shall be prepared by the owner or operator of the source and submitted to the department and with applicable provisions of this section. Such operating program shall be designed to significantly reduce the fugitive dust emissions to the lowest level that a particular source is capable of achieving by the application of control technology that is reasonably available, considering technological and economic feasibility. The operating program shall be implemented with the approval of the department. (5) The operating program required by subsection (4) is subject to review and approval or disapproval by the department and shall be considered approved if not acted on by the department within 90 days of submittal. All programs approved by the department shall become a part of a legally enforceable order or as part of an approved permit to install or operate. At a minimum, the operating program shall include all of the following: (a) The name and address of the facility. (b) The name and address of the owner or operator responsible for implementation of the operating pro gram. (c) A map or diagram ofthe facility showing all of the following: (i) Approximate locations of storage piles. (ii) Conveyor loading operations. (iii) All traffic patterns within the facility. (d) The location of unloading and transporting operations with pollution control equipment.

(e) A detailed description of the best management practices utilized to achieve compliance with this section, including an engineering specification of particulate collection equipment, application systems for water, oil, chemicals, and dust suppressants utilized, and equivalent methods utilized. (g) The frequency of application, application rates, and dilution rates if applicable, of dust suppressants by location of materials. (h) The frequency of cleaning paved traffic pattern roads and parking facilities. (i) Other information as may be necessary to facilitate the department's review of the operating program. (6) Except for fugitive dust sources operating programs approved by the department pursuant to R 336.1373 ofthe Michigan administrative code between April23, 1985 and May 12, 1987, the owner or operator of a source shall submit the operating program required by subsection ( 4) to the department by August 12, 1987. (7) The operating program required by subsection (4) shall be amended by the owner or operator so that the operating program is current and reflects any significant change in the fugitive dust source or fugitive dust emissions. An amendment to an operating program shall be consistent with the requirements of this section and shall be submitted to the department for its review and approval or disapproval. The following have been identified as sources of fugitives: Temporary Development Rock Storage Area Roadways Temporary Development Rock Storage Area The TDRSA will be used to store rock produced during development of mine drifts, ramps, and decline. Once stope areas are mined out, rock will be reclaimed from the TDRSA and used to backfill secondary stopes. Rock may also be reclaimed from the TDRSA and crushed for use in the backfill plant. Except for active portions of the storage area, development rock will be covered to the extent practical in order to reduce windblown fugitive dust.

Roadways Unpaved (gravel-surfaced) roadways include: Main Entrance Road, Point C to F, and all parking areas. Roadway past the Water Treatment Plant and continuing to the MVAR stack. To the west of the truck wash building, (pointe on the drawing) traffic areas will be covered in asphalt or concrete. The surfaced areas are designed for run off to flow into the contact water basins. Originally, water trucks were proposed to keep unpaved roadways damp and dust free. During the winter, it was assumed that the roadways will be covered with snowpack. It is not uncommon for freeze-dry conditions to occur during late fall, winter, and again in the spring. Freeze-drying occurs when there is no snow cover combined with extended below freezing temperatures. Roadway surfaces can freeze and a very thin layer becomes desiccated. It is not practical to use water to prevent freeze-drying. Rather than relying on snow cover, approved dust suppressants will be applied to unpaved roadways on an as-needed basis. Water trucks will also be available during warmer months. Paved areas may be cleaned using a street sweeper. Paved areas may also be washed (flushed) using water trucks. On site staff will continually monitor roadways. Application of dust suppressants or water will be performed when any visible emissions from unpaved routes are observed. Paved areas will be swept on a regular basis. The goal is to prevent visible dust emissions from roadways when wind speeds do not exceed 25 mph. Attached is the Roadway Dust Suppression Form, which will be completed on a daily basis.

Eagle Project - Roadway Dust Suppression Form Date: I I Shift: Employee: Temperature: Weather Conditions*: Dust from roadways observed? Yes: Road segment(s): No: If yes to above, actions taken: Sweeping: Road segment(s): Dust suppressant: Road segment(s): ------------- - ------ Water applied: Road segment(s): --- ----------------- Comments: *During windy conditions, use on site weather station data to verify winds speeds in excess of 25 mph and note above.