Locked Cycle Leaching Test and Yellowcake Precipitation

Similar documents
Core Analysis with the Tracer

2013 PROJECT REPORT FOR METALLURGICAL TESTING ON THE SAN ALBINO PROJECT

SILLIKER, Inc. Southern California Laboratory 6360 Gateway Drive, Cypress, CA Tel. 209/ Fax. 714/

CERTIFICATE OF ANALYSIS REVISED REPORT

COPPER PRECIPITATION AND CYANIDE RECOVERY PILOT TESTING FOR THE NEWMONT YANACOCHA PROJECT

SUB-Programs - Calibration range Fe Base for "PMI-MASTER Pro" Spark - mode Fe 000

SCOPE OF ACCREDITATION TO ISO GUIDE 34:2009

CERTIFICATE OF ANALYSIS

Limestone Neutralisation of Arsenic-rich Effluent from a Gold Mine

Strong Acid Leachable Metals (SALM) in Soil - Prescriptive

High Purity Acids Trace Elemental Analysis. Detect as low as 1 to 100 ppt

High-Purity Acids & Reagents

Report No. A13575 Part 5

Discipline Chemical Testing Issue Date Certificate Number T-3553 Valid Until Last Amended on - Page 1 of 9

KKB Micro Testing Labs Pvt. Ltd., , 2 nd Floor, Tarun Plaza, NFC Main Road, Krishna Nagar Colony, Moula Ali, Hyderabad, Telangana

Innovative Mine Waste Management Planning at a Site with Multiple Waste Streams

LABORATORY TURNAROUND TIMES AND CHARGES

BLACK STURGEON LAKES WATER QUALITY MONITORING

AAS - Atomic Absorption Mono Element ppm Standard Solutions (Spectro ECON)

9 Toxins / 11 Essential Minerals

New GCSE 4462/02 SCIENCE A HIGHER TIER CHEMISTRY 1

Extracting uranium from its ores

Corrosion Studies on GeoBrom HG520

REPORT NUMBER REPORT DATE SEND TO ISSUE DATE Apr 18, Apr 18, 2017 RECEIVED DATE Apr 05, 2017

HEAP LEACHING OF LOW GRADE URANIUM ORES AT SOMAIR

Corrosion Studies on GeoBrom HG520

Corrosion Studies on GeoBrom HG520

Table of Contents. Quality Management LIMS System... Customer Services...

DETERMINATION OF ELEMENTS IN DRINKING WATER AS PER BUREAU OF INDIAN STANDARDS 10500, & USING THE AGILENT 5100 ICP-OES

Chapter 1.6. Polished Single-Crystal Silicon, Prime Wafers (all numbers nominal) Wafer Specification Table. Diameter 100 mm 4-inch 150 mm 6-inch

Surface Water Samples: Containers, Preservation and Hold Times Table

BUCHANS MINERALS SUCCESSFULLY PRODUCES HIGH PURITY MANGANESE ELECTROLYTE FOR THE PRODUCTION OF ELECTROLYTIC MANGANESE METAL

Extraction of rare earth elements from mine tailings

CANADA BRITISH COLUMBIA WATER QUALITY MONITORING AGREEMENT

TWEED RIVER HIGH SCHOOL 2006 PRELIMINARY CHEMISTRY. Unit 2 Metals

Awak Mas DFS Optimisation - Metallurgical Breakthrough

Warm Mineral Springs Sampling by Sarasota County

Copyright in this document is wholly reserved to Ausenco Services Pty Ltd.

McClean Lake Site Guide. AREVA Resources Canada Inc.

EU Water Analysis Using the Thermo Scientific icap 7400 ICP-OES Duo

CARBOWAX SENTRY Polyethylene Glycol (PEG) and Methoxypolyethylene Glycol (MPEG) Products

JACOBS NEW PROCESS FOR REMOVING IRON FROM PHOSPHORIC ACID FINAL REPORT

4. Where do the names of the elements come from? Some were named as substances before they were known to be elements. sulfur 16

The image part with relationship ID rid4 was not found in the file. Welcome

Use of Lime Activated Class F Fly Ash for Full Depth Reclamation (FDR) of Asphalt Pavements

Precipitation of Nickel Hydroxide from Simulated and Atmospheric-Leach Solution of Nickel Laterite Ore

MEMBRANES FOR WTPS JUSTIN RAK-BANVILLE, M.SC., P.CHEM., EP WATER AND WASTEWATER INFRASTRUCTURE WSP CANADA INC

NICKEL AND COBALT RECOVERY FROM A BULK COPPER-NICKEL CONCENTRATE USING THE CESL PROCESS

EXCELLENT NICKEL LEACHING TESTWORK RESULTS

PRELIMINARY OXIDE HEAP LEACH TESTWORK DELIVERS EXCELLENT RESULTS AT THE SOUTH HOUNDÉ PROJECT

Minco Plc Woodstock Manganese Property

AP Chemistry A. Allan Chapter 18 - The Representative Elements: Groups 1A through 4A

STANDARD DI VETRI E MATERIALI CERAMICI

GENARAL INTRODUCTION TO METALLURGY :Std: XI-CHEMISTRY

Hycroft Oxidation Pilot Plant Overview

TECHNICAL MEMORANDUM

Effect of Water Composition on Flotation of Lead and Zinc Sulphide Ore

Drinking Water Analyses

CHLOR-ALKALI INDUSTRY

EFFECT OF LEAD NITRATE ON CYANIDATION OF ANTIMONIAL REFRACTORY GOLD AND SILVER ORES

Ste De Maisonneuve Blvd W Montréal, QC H3A 3L4 Tel: Fax:

Contaminated Extraction Pit treated to allow dewatering for continuation of mining works

Pulp and paper companies in Maine

Newmont Mining Corporation Water Management Standard

Test Report No. F690101/LF-CTSAYHA Issued Date : August 20, 2013 Page 1 of 5

In Situ and Dump Leaching of Phosphate Rock

Basic Survival Chemistry

19 th Zinc and its Markets Seminar May 4 th 6 th, 2015 Radisson Blu Royal Hotel, Helsinki, Finland. Welcome address. Robin Lindahl

For personal use only

Part 1. Preparation and Color of Solutions. Experiment 1 (2 session lab) Electrons and Solution Color. Pre-lab Report, page 29

At Home in North America

Mining Solutions. Innovative Solutions for Hydrometallurgy

STARVED ACID LEACH TECHNOLOGY (SALT) CONCEPTUAL STUDY. InCoR Holdings Plc MINING AND METALLURGY. April 2014 REPORT Rev. 00 > Internal ref.

Coal Ash Material Safety

Magnetic Conditioning of Flotation Feed to Increase Recovery of Fine Value Minerals at Boliden s Garpenberg Concentrator

ATI FLAT ROLLED PRODUCTS Brackenridge, PA for technical competence in the field of

Chapter: The d and f Block Elements

Agricultural Lime Recommendations Based on Lime Quality

HEAP LEACHING TECHNOLOGY Moving the frontier for treatment

Acid leaching technology for obtaining a high-purity of silica for Photovoltaic area

THE ALKALINE SULFIDE HYDROMETALLURGICAL SEPARATION, RECOVERY AND FIXATION OF TIN, ARSENIC, ANTIMONY, MERCURY AND GOLD

Dynamic Waste Water Modeling for Coal Burning Power Plants

Agilent Resources for Workflow Compliance MEASURING ELEMENTAL IMPURITIES IN PHARMACEUTICAL MATERIALS

METALLIC MATERIALS SPECIFICATION HANDBOOK

Trading Symbol: TSXV: BMC News Release No Shares Outstanding: 166,283,160 May 8 th, 2013

White Dam Gold Project Dump Leach

Optimization of circuits for pressure leaching of sulphide ores and concentrates

THE FERRIC ION - GOD S GIFT TO HYDROMETALLURGISTS TO KEEP EM HUMBLE. By Chris Fleming SGS Lakefield Research Ltd.

Web Mapping Service of Natural Background Values of Groundwater in Germany

Direct Nickel Process Breakthrough Technology. May 2015

Lower Cost Higher Performance Graphite for LIBs. Prepared by: Dr. Edward R. Buiel President and CEO Coulometrics, LLC. Date: March 23, 2017

Coal Fly Ash as Contaminant Barrier for Reactive Mine Tailings

INDEX DETAILED. STP292-EB/Jan. 1962

Published in German in METALL (Berlin) 28 (11), (1974) THE RECOVERY OF COPPER, IRON, AND SULFUR FROM CHALCOPYRITE CONCENTRATE BY REDUCTION

RE: REVIEW OF THE PRAIRIE CREEK MINE SCOPING STUDY

SCOPE OF ACCREDITATION

Oxidation and Reduction

OCN 201 Chemical Oceanography Class Notes, Fall 2014 The origin of sea salt Chris Measures, Department of Oceanography

Hydrometallurgy Applications

Al. Mickiewicza 30, Krakow, A-0 pavilion tel. (12) , Secretariat KHGI (12) , fax (012) ELABORAT # 8 page 1/pages 4

Transcription:

Locked Cycle Leaching Test and Yellowcake Precipitation In 2013, the Saskatchewan Research Council ( SRC ) in Saskatoon, SK, Canada commenced locked cycle alkaline leach testing on drill core samples from Kivalliq s Lac 50 Trend uranium deposits. These tests were designed to simulate continuous leaching operations, optimize processing conditions to remove impurities and determine dosage of reagents required. A final yellowcake product was also produced to confirm low impurity levels demonstrated by preliminary testing disclosed in Kivalliq s news release of February 28, 2013. The locked cycle alkaline leaching tests show that after an initial charge of sodium carbonate and sodium bicarbonate these reagents can be recycled. Any additional leach reagent needed can be produced onsite by capturing the carbon dioxide extracted from exhaust gases of diesel generators typical in mining operations. After initial start up, sodium hydroxide and lime are the only alkaline reagents that the alkaline leaching process will consume. An 8.7 kilogram composite sample derived from 49 drill core pulp rejects from 12 Lac 50 and J4 Zone drill holes was submitted to SRC for locked cycle leach tests. A total of 21 cycles were conducted at 70 o C, 50% pulp density, 300 kpa of oxygen gas for up to 48 hours. Fresh alkaline solution, containing 50 g/l sodium carbonate and 20 g/l sodium bicarbonate, was only used in the first cycle to start the process. The other 20 cycles were performed in the recycled alkaline solutions after sodium diuranate precipitation and carbonation. Lime, as a calcium hydroxide solution, was used to precipitate and remove sulfate and other impurities. To reduce consumption of sodium hydroxide, lime was also used to remove excess sodium bicarbonate from the leach solution. The sodium hydroxide consumption rate was determined to be 16.9 kg/tonne while the consumption rate for lime was 7.6 kg/tonne. After sodium diuranate precipitation, excessive sodium hydroxide in the recycled barren solution was carbonated to produce sodium carbonate and sodium bicarbonate by introducing carbon dioxide gas. The process conditions of leaching, impurity removal, sodium diuranate precipitation, and carbonation achieved high uranium leaching recovery (>95% in 48 hours), effective lime precipitation impurity removal with low uranium loss (<0.1%), high uranium recovery in the sodium diuranate precipitate (99.6%), and consistent solution regeneration for recycling. Low Impurity Yellowcake Production Sodium diuranate produced from each leach cycle was combined, dissolved in sulphuric acid, and precipitated as a single representative ammonium diuranate yellowcake final product. The final uranium peroxide yellowcake product was analyzed at SRC for uranium and impurities. The results compared with Impurity Maximum Concentration Limits from ASTM C976-13 Standard Specification for Uranium Concentrate are shown in Table 1. The yellowcake produced contains 70.0% uranium and low impurity levels. Boron and magnesium are marginally higher than penalty levels but significantly below reject levels. All impurities assayed meet ASTM C976-13 standards. The conditions for uranium peroxide yellowcake production are not yet optimized and will be the focus of future testing. TABLE 1. Impurity Analysis of Kivalliq Yellowcake Product ASTM C976-13a

Specifications ASTM C967-13 (Mass%, Uranium Basis) Kivalliqre(Mass%, Uranium Basis) Component Limit without Penalty Limit without Rejection Yellowcake Product Uranium (U) N/A 65% min. 70% Arsenic (As) 0.05% 0.1% 0.0016% Boron (B) 0.005% 0.1% 0.008% Calcium (Ca) 0.05% 1% <0.01% Carbonate (CO 3 ) 0.2% 0.5% 0.04% Chromium (Cr) N/A N/A <0.0001% Fluoride (F) 0.01% 0.1% <0.01% Halides (Br, Cl, I) 0.05% 0.1% <0.002% Iron (Fe) 0.15% 1% <0.01% Lead (Pb) N/A N/A <0.0001% Magnesium (Mg) 0.02% 0.5% 0.05% Moisture (H 2 O) 2% 5% 0.2% Molybdenum (Mo) 0.1% 0.3% 0.003% Phosphorus (PO 4 ) 0.1% 0.7% <0.01% Potassium (K) 0.2% 3% <0.01% Selenium (Se) N/A N/A <0.001% Silica (SiO 2 ) 0.5% 2.5% 0.07% Silver (Ag) N/A N/A <0.001% Sodium (Na) 1% 7.5% <0.01% Sulfur (S) 1% 4% 0.16% Thorium 0.1% 2.5% <0.0001% Titanium 0.01% 0.05% 0.009% 234 U 56 µg/gu 62 µg/gu 55.2 µg/gu Vanadium (V) 0.06% 0.3% 0.003% Zirconium (Zr) 0.01% 0.1% <0.001% Metallurgical Results Demonstrate High Uranium Recoveries and Rapid Leach Kinetics (September 11, 2013) In 2012, the Saskatchewan Research Council ( SRC ) commenced a metallurgical testing program on core from Kivalliq s Lac 50 Trend. The program objectives were to maximize uranium extraction through

the removal of sulphides using flotation and optimizing the alkaline leaching processes. Results from the 2012 metallurgical program were very encouraging with high U 3 O 8 recovery rates and the production of a low impurity final yellowcake product. (see Kivalliq news release of February 28, 2013) In 2013, metallurgical testing was expanded to include a composite sample from the newly discovered J4 deposit. The goal was to compare alkaline leach parameters of the J4 Zone to previous test work, while continuing to develop optimal grinding, sulphide flotation and leach conditions. A 26.0 kilogram composite derived from 44 split drill core pulp rejects was submitted to the SRC Mineral Processing Group for metallurgical analysis. Pulp samples used in the composite were selected from 17 holes drilled along 650 metres of strike length at J4 Zone. A head grade sample taken from the composite and analyzed by total digestion ICP at SRC is shown in Table 1. TABLE 1. J4 Zone Composite Sample ICP Total Digestion Assay (ppm) U Ag Pb Cu Zn Mo Zr Total S Sulphide 7040 43.5 3885 6075 3030 3090 608 21200 13700 Sulphide flotation on J4 Zone composite material tested variable grind sizes in water and alkaline solution respectively. An optimum sulphide recovery of 99.2% was achieved in alkaline solution at a grind size of 100% passing 140 mesh (106 µm). Alkaline leaching of J4 Zone flotation tails achieved rapid uranium extraction of 86.7% in 6 hours, 92.3% in 12 hours, 95.2% in 24 hours, 96.7% in 48 hours, 97.2% in 72 hours, and 97.5% in 96 hours under the following conditions: 100% passing 140 mesh grind, 70 o C, 50% solids slurry, 50 g/l Na 2 CO 3 and 20 g/l NaHCO 3 solution chemistry and oxygen at 300 kilopascals as oxidant. Using the same optimized conditions, an additional test was conducted on a sample from the 2012 Lac 50 composite (but at 100% passing 200 mesh grind as per 2012 composite preparation). When compared to the 2012 result leach kinetics improved with uranium extractions of 83.6% in 6 hours, 91.7% in 12 hours, 95.1% in 24 hours, 96.4% in 48 hours, 97.0% in 72 hours, and 97.3% in 96 hours. Figure 1 compares alkaline leach kinetics from 2013 to that of 2012.

FIGURE 1. Optimized Leach Kinetics for J4 Zone composite and 2012 Lac 50 composite samples Positive Metallurgical Results from Lac 50 Trend; Low Impurity Yellowcake Produced (February 28, 2013) Commencing in June 2012, the Saskatchewan Research Council ( SRC ) metallurgical testing program on core from Kivalliq s Lac 50 Trend was designed to investigate uranium alkaline leaching optimization and perform a preliminary evaluation of the purity levels of the final yellowcake product. Objectives of the tests were to: Maximize uranium extraction through optimizing the alkaline leaching process Maximize the recovery of sulphides through flotation Compare preliminary yellowcake product impurity levels to ASTM C967-13 uranium ore concentrate specifications A 60 kilogram ( kg ) composite was derived from split drill core pulp rejects submitted to SRC for analysis. Samples were selected from 51 holes drilled along 3.2 kilometres of strike length at the Lac 50 Trend Main Zone, Western Extension and Eastern Extension. Previous work indicated carbonate content above 13% and therefore alkaline leaching was considered the most effective extraction process for the Lac 50 Trend uranium deposits. Results from alkaline leaching tests to date are highly encouraging. Optimized results(shown in Figure 1) indicate that a 74 µm (-200mesh) feed at 70 o C, atmospheric pressure, 50% pulp density, sufficient oxidation, and a reagent addition rate of 70 kg/tonne (50 kg Na 2 CO 3 and 20 kg NaHCO 3 ), extracts 94.1% of uranium in 48 hours and extracts 95.9% of uranium in 72 hours.

FIGURE 1. Optimized Leach Kinetics of Uranium Alkaline leaching is a selective process that can result in a pregnant leaching solution with relatively low impurity levels. The use of an alkaline leach circuit at the Lac 50 Trend could have additional benefits: Simple purification processes to produce yellowcake Environmentally sensitive recirculated processing solution circuit resulting in reduced reagent use and uncomplicated effluent treatment Simplified tailings handling with the possibility to utilize tailings for backfill during mining A preliminary yellowcake precipitation was performed with the leach solution from the composite. Uranium in the pregnant solution was readily precipitated as sodium diuranate. The optimized uranium value attained was 71.9% for a final yellowcake product. In addition to U, the final yellowcake sample was analysed for several major impurities, the results for which are shown compared with Impurity Maximum Concentration Limits from ASTM C967-13 Standard Specifications for Uranium Ore Concentrate in Table 1. TABLE 1. Impurity of the Preliminary Kivalliq Yellowcake Product Specifications ASTM C967-13 (Mass%, Uranium Basis) Kivalliq (Mass%, Uranium Basis) Component Limit without Penalty Limit without Rejection YC Product

Uranium (U) N/A 65% min. 71.9% Arsenic (As) 0.05% 0.1% 0.0009% Barium (Ba) N/A N/A 0.0001% Boron (B) 0.005% 0.1% N/A Cadmium (Cd) N/A N/A 0.00006% Calcium (Ca) 0.05% 1% 0.02% Carbonate (CO 3 ) 0.2% 0.5% 0.069% Chromium (Cr) N/A N/A 0.018% Fluoride (F) 0.01% 0.1% N/A Halides (Br, Cl, I) 0.05% 0.1% N/A Iron (Fe) 0.15% 1% <0.01% Lead (Pb) N/A N/A 0.007% Magnesium (Mg) 0.02% 0.5% N/A Mercury (Hg) N/A N/A N/A Moisture (H 2 O) 2% 5% N/A Molybdenum (Mo) 0.1% 0.3% 0.0004% Phosphorus (PO 4 ) 0.1% 0.7% 0.03% Potassium (K) 0.2% 3% <0.002% Selenium (Se) N/A N/A <0.0001 Silica (SiO 2 ) 0.5% 2.5% N/A Silver (Ag) N/A N/A 0.0003% Sodium (Na) 1% 7.5% <0.01% Sulfur (S) 1% 4% 0.125% Thorium 0.1% 2.5% 0.00006% Titanium 0.01% 0.05% <0.002% 234 U 56 µg/gu 62 µg/gu N/A Vanadium (V) 0.06 0.3% <0.0001% Zirconium (Zr) 0.01% 0.1% N/A Assayed impurities are below the Maximum Concentration Limit Without Penalty standard specifications for uranium ore concentrate. Low impurity levels achieved in preliminary yellowcake tests are very encouraging at this early stage of testing. The SRC metallurgical program was designed to build on first phase metallurgical testing initiated in 2010 by SGS Mineral Services ( SGS ). SRC aggregated a master composite sample weighing approximately 60 kg, by blending and homogenizing 166 quarter split and half split pulp reject samples from drill core submitted to SRC Geoanalytical Lab for analysis as part of Kivalliq's 2010 and 2011

diamond drilling programs. A head grade sample from the 2012 composite analyzed by SRC s ICP 1 total digestion method assayed 0.737%U, 0.217%Mo, 0.667%Cu, 0.221%Zn, 0.231%Pb, and 26.7 g/tonne Ag. The SRC facility operates in accordance with ISO/IEC 17025:2005 (CAN-P-4E), General Requirements for the Competence of Mineral Testing and Calibration laboratories and is accredited by the Standards Council of Canada. The samples are analyzed by SRC's ICP-OES multi-element ICP1 method. ICP1 results for are reported in parts per million (ppm). 1 ppm = 1g/tonne, 10,000 ppm = 1%. ICP results U>1,000 parts per million (ppm) are analyzed using SRC's ISO/IEC 17025:2005-accredited U 3 O 8 Assay method. Jeff Ward, P.Geo, President of Kivalliq and a Qualified Person for the Company, has reviewed and approved the information contained in this release. Metallurgical Tests from NI-43-101 Tech Report (March 1, 2012) During 2010, Kivalliq engaged SGS to carry out preliminary metallurgical testing to examine uranium recovery from a composite of pulp rejects from 2009 half split drill core submitted to SRC for uranium and trace element analytical work during the 2009 drilling program (Brown and Todd, 2011). The test work included sample preparation, head analyses and agitated leach tests. Detailed metallurgical test procedures, analyses and a list of the sample rejects from the 2009 drill core that was used in the composite metallurgical sample and metallurgical test procedures are provided in the March 1 2011 Technical Report on the Angilak Property (Dufresne and Sim, 2011). The uranium extraction results were considered excellent, with 98% dissolution for acid leach tests and up to 94.7% dissolution for alkaline leach tests. Both acid and alkaline leaching were evaluated due to the high carbonate content in the preliminary composite samples. Uranium leach extraction kinetics were all considered good with the acid leach tests reaching maximum extraction of uranium at 6 to 10 hours and the alkaline atmospheric tests requiring up to 24 hours. Metallurgical Testing from NI-43-101 Tech Report (March 1, 2011) During 2010, Kivalliq engaged SGS to carry out preliminary metallurgical testing to examine uranium recovery from a 73 kg composite of pulp rejects from 2009 half split drill core submitted to SRC for uranium and trace element analytical work during the 2009 drilling program (Brown and Todd, 2011). The test work included sample preparation, head analyses and agitated leach tests. The reject samples received by SGS were combined, blended and then crushed to -10 mesh (-2 mm) and split into metallurgical test charges. A head sample was representatively split and subjected to a detailed chemical analysis. The head grade was determined to be 0.77% U 3 O 8, with minimal thorium, 3% sulphur (S) and more than 10% carbonate reported as CO 2 The levels of rare earth elements (REE s) and other potentially deleterious elements such as arsenic (As) and selenium (Se) were found to be low. A total of six leach extractions using a variety of leach conditions and sample grinding were completed and are listed in Table 1. In general, the uranium extraction results were considered high, with 98% dissolution for both acid leach tests (Test 1 and Test 3) and up to 94.7% dissolution for alkaline leach tests (Test 4, Test 6, Test 7 & POX 1). Acid consumption during the first two tests at 359 and 489 kg/t respectively, was relatively high. This was attributed to the high carbonate gangue content of the composite and therefore both acid and alkaline leaching were evaluated. Uranium leach extraction

kinetics were all good with the acid leach tests reaching maximum extraction at 6 to 10 hours and the alkaline atmospheric tests requiring up to 24 hours. Test ID TABLE 1: Uranium leach test conditions and extractions (from Brown and Todd, 2011). Grind Size, P80 μm Leach Medium Temp., ºC Retention Time, hrs % U Extraction Leach Type Test 1 90 5 g/l H2SO4 50 24 98.0 acid Test 3 90 40-50 g/l H2SO4 50 24 98.0 acid Test 4 90 50g/LNa2CO3,20g/LNaHC O3 80 48 94.7 alkaline POX 1 90 50g/LNa2CO3,20g/LNaHC O3 120 8 91.7 alkaline Test 6 43 50g/LNa2CO3,20g/LNaHC O3 80 48 70.3 alkaline Test 7 90 50g/LNa2CO3,20g/LNaHC O3 80 24 93.0 alkaline